Person responsible for corrective action: County Attorney and Sheriff Corrective action planned: The County purchase policy should be followed with any expenditures exceeding $15,000. A reminder memo was sent to all offices for review. Corrective action planned: with only one SAM account for e...
Person responsible for corrective action: County Attorney and Sheriff Corrective action planned: The County purchase policy should be followed with any expenditures exceeding $15,000. A reminder memo was sent to all offices for review. Corrective action planned: with only one SAM account for each entity, it will be the responsibility of the county offices to contact the County Clerk for verification of a vendor standing within the SAM program for federal expenditures. Anticipated completion date: August 31, 2023
View Audit 17812 Questioned Costs: $1
CORRECTIVE ACTION PLAN Finding No. 2022-001 Procurement Federal Program: Crime Victim Assistance Assistance Listing Number: 16.575 In response to the Single Audit Finding referenced in the 2022 independent audit conducted by Donavon CPAs, Prevail will institute the following action steps to remedy...
CORRECTIVE ACTION PLAN Finding No. 2022-001 Procurement Federal Program: Crime Victim Assistance Assistance Listing Number: 16.575 In response to the Single Audit Finding referenced in the 2022 independent audit conducted by Donavon CPAs, Prevail will institute the following action steps to remedy the finding: ? The Interim Executive Director of Prevail, working in collaboration with Prevail?s Director of Operations, will generate a first draft of a Procurement Policy for board input and review. ? The draft will be reviewed by the Prevail Finance Committee on April 25, 2023, for input and suggestions. The Interim Executive Director will make edits in response to recommendations by the Finance Committee. ? The Procurement Plan will then be presented for board approval at the Prevail Board of Directors meeting scheduled for May 10, 2023. ? After approval, it will be the responsibility of the Director of Operations, under the oversight of the Interim Executive Director, to implement and maintain compliance with the plan. When a new Executive Director is hired, plan maintenance and compliance will become the responsibility of this role. ? On an annual basis, the Finance Committee will review the Procurement Plan to ensure Prevail maintains compliance.
The Center was unaware that, in accordance with the Department of Labor (DOL)(40 USC 3141-3144, 3146, and 3147), all laborers employed by contractors to work on construction contracts in excess of $2,000 financed by federal assistance funds must be paid wages not less than those established for prev...
The Center was unaware that, in accordance with the Department of Labor (DOL)(40 USC 3141-3144, 3146, and 3147), all laborers employed by contractors to work on construction contracts in excess of $2,000 financed by federal assistance funds must be paid wages not less than those established for prevailing wage rates. In the future, the Center will follow the guidance of the aforementioned section and adhere to this requirement.
FINDING 2022-003 (Auditor Assigned Reference Number) Contact Person Responsible for Corrective Action: Micah Williams/Amanda Myers Contact Phone Number: 765-832-2426 Views of Responsible Official: We concur with the finding. Description of Corrective Action Plan: The school corporation was under the...
FINDING 2022-003 (Auditor Assigned Reference Number) Contact Person Responsible for Corrective Action: Micah Williams/Amanda Myers Contact Phone Number: 765-832-2426 Views of Responsible Official: We concur with the finding. Description of Corrective Action Plan: The school corporation was under the assumption that the state procurement had secured the bidding/quote information for the vendor in question. Emails were given to document the ?go ahead? from our cooperative to order from the vendor. The corporation now understands that we are responsible for obtaining quotes outside of the cooperative. Anticipated Completion Date: Implemented immediately.
Compliance requirement ? Procurement, and suspension and debarment Institutional Comments on Findings and Recommendations: 1. The institution does not concur with the auditor findings on the deficiencies in a), b) and c), about requesting quotation because, In accordance with the procedures under 2 ...
Compliance requirement ? Procurement, and suspension and debarment Institutional Comments on Findings and Recommendations: 1. The institution does not concur with the auditor findings on the deficiencies in a), b) and c), about requesting quotation because, In accordance with the procedures under 2 CFR ? 200.320, and the definitions under 2 CFR 200.1 and 48 CFR Part 2, subpart 2.101 to support response to an emergency; the seven (7) referenced procurement transactions were under the Micro-purchase threshold for a national emergency response and the purchase could be awarded without soliciting competition or quotations. 2. The institution concurs with the auditor finding. The institution will incorporate the verification of suspension and debarment under the provisions of 2 CFR Section 200, 2 CFR Section 180.300 and other related regulations in the procurement policies of the institution. Actions Taken or Planned: The institution will incorporate the provisions of 2 CFR Section 200, 2 CFR Section 180.300 and other related regulations in the procurement policies of the institution.
View Audit 20027 Questioned Costs: $1
1. The institution does not agree, nor concurs, with the auditors on this finding because the institution used the reimbursement payment method. This method was the preferred one when the non-federal entity, as our institution, cannot meet the requirements in 2 CFR, section 200.305(b)(1) for advance...
1. The institution does not agree, nor concurs, with the auditors on this finding because the institution used the reimbursement payment method. This method was the preferred one when the non-federal entity, as our institution, cannot meet the requirements in 2 CFR, section 200.305(b)(1) for advance payment and the federal awarding agency sets a specific condition for use of the reimbursement. Title 2 of the CFR Part 200.305(b)(1), establish among others: "The non-Federal entity must be paid in advance, provided it maintains or demonstrates the willingness to maintain both written procedures that minimize the time elapsing between the transfer of funds and disbursement by the non-Federal entity, and financial management systems that meet the standards for fund control and accountability as established in this part". Furthermore, 2 CFR Part 200.305(b)(3) states: "Reimbursement is the preferred method when the requirements in this paragraph (b) cannot be met, when the Federal awarding agency sets a specific condition per ? 200.208, or when the non-Federal entity requests payment by reimbursement. " Since our institution was not able to meet 2 CFR, section 200.305(b)(1), and the HEERF guidelines has specific condition on how to use the funds; we choose the reimbursement method in the execution of the funds. Our institution adopted all HEERF instructions and guidelines as their policies to comply with the HEERF requirements, in addition to the CFR's regulations. Below some of the guidelines, instructions ad FAQs we adopted followed" a. Higher Education Emergency Relief Fund III, Frequently Asked Questions, American Rescue Plan Act of 2021, Published May 11, 2021, Questions 7 and 11 updated May 24, 2021, Question 36 updated September 30, 2021 b. US Department of Education, Notice of Proposed Institutional Eligibility Criteria, February 25, 2021 c. Federal Register Notice of Interpretation (NOI), regarding Period of Allowable Expenses for Funds Administered under HEERF Program, March 22, 2021 d. HEERF Notice of Interpretation for Period of Allowable HEERF Expenses (March 22, 2021) e. HEERF Lost Revenue FAQs (March 19, 2021) f. HEERF Period of Allowable Expenses Grant Records Notice (March 19, 2021) g. HEERF Grant Program Auditing Requirements (March 8, 2021) h. CRRSAA HEERF II Section 314(a)(1) Frequently Asked Questions (Published January 14, 2021 and Updated: March 19, 2021) i. CRRSAA HEERF II Section 314(a)(2) Frequently Asked Questions (January 14, 2021) j. CRRSAA HEERF II Section 314(a)(4) Frequently Asked Questions (Published January 14, 2021 and Updated: March 19, 2021) k. HEERF I and HEERF II Comparison Fact Sheet (Published January 14, 2021 and Updated: March 19, 2021) 1. HEERF Lost Revenue FAQ's, Published March 19, 2021 m. HEERF II, Public and Private Nonprofit Institution (a)(2) Programs (CFDAs 84.425K), FAQ's, Published January 14, 2021 n. HEERF II, Proprietary Institution Grant Funds for Students (CFDA 84.425Q) ((a)(4) Program), FAQ's Published January 14, 2021, Updated March 19, 2021. o. HEERF II, Public and Private Nonprofit Institution (a)(1) Programs (CFDA 84.425E and 84.425F), FAQ's Published January 14, 2021, Updated March 19, 2021. p. CAREST Act HEERF Rollup FAQs (issued October 14, 2020 and revised November 20, 2020) q. CARES Act HEERF Round 3 FAQs (Issued October 14, 2020 and revised November 20, 2020) r. CARES Act HEERF Supplemental FAQs (Issued June 30, 2020 and revised September 08, 2020) s. CARES Act HEERF Student FAQ's (Issued May 15, 2020) t. CARES Act HEERF Institutional Portion under Section 18004(a)(1) and 18004(c) FAQ's, (Issued April 9, 2020) u. CARES Act HEERF Emergency Financial Aid Grants to Students under Section 18004(a)(1) and 18004(c) FAQ's, (Issued April 9, 2020) v. CARES Act HEERF Institutional Portion under Section 18004(a)(1) and 18004(c) FAQ's, Issued April 9, 2020 w. COVID-19 FAQ's for Title III, IV, V and VII Grantees, June 16, 2020 x. COVID-19 Letter to HEP Grantees on Flexibilities Available Under CARES Act Section 3518, July 1, 2020 2. The institution does not agree, nor concurs, with the auditors on this finding because, as we mention in number 1 above, the institution adopted and followed the federal award and HEERF guidelines in the execution of the funds. The HEER funds were provided during the special national emergency caused by COVID-19. The DOE and HEERF officials issued many written guidelines, instructions, and FAQ's (Frequently Asked Questions) documents, due to the nature and novel of the national emergency situation. The institution adopted, followed, and relied on the many referenced guidelines and exercise extreme judgment to ensure compliance with the federal requirements and use of the funds. The institution belief this referenced guidelines and instruction were very specific and sufficient to execute the use of the funds. All direct charges to federal awards were for allowable costs under the guidelines and instructions from the Department of Education. Some of the allowable costs were verified and validated by an officer of the Department of Education and reviewed by an independent consultant. 3. The institution concurs with the auditor finding. Actions Taken or Planned: The institution begins in addition to the adopted HEERF guidelines, instructions, and CFRs; to develop additional procurement policies and are in the process of completing those policies. The institution expects to have those completed by May 31, 2023.
Finding Number: 2022-002 Planned Corrective Action: The District is currently working with OSBA to update the policies and policy DJC states ?If feasible, all purchases over $20,000 and not otherwise subject to required federal or state bidding requirements will be based on price quotations submitte...
Finding Number: 2022-002 Planned Corrective Action: The District is currently working with OSBA to update the policies and policy DJC states ?If feasible, all purchases over $20,000 and not otherwise subject to required federal or state bidding requirements will be based on price quotations submitted by at least three vendors.? The Treasurer and Business Manager will ensure that policy is followed when applicable. Anticipated Completion Date: October 31, 2023 Responsible Contact Person: Muata Niamke, Business Manager and Taylor Friedrich, Treasurer/CFO
FINDING 2022-001 Contact Person Responsible for Corrective Action: Dawn Mason and Dana Hedges Contact Phone Number: 260-868-2125 Views of Responsible Official: We agree with the finding. Description of Corrective Action Plan: The Food Service Director will obtain price or rate quotes for vendors exc...
FINDING 2022-001 Contact Person Responsible for Corrective Action: Dawn Mason and Dana Hedges Contact Phone Number: 260-868-2125 Views of Responsible Official: We agree with the finding. Description of Corrective Action Plan: The Food Service Director will obtain price or rate quotes for vendors exceeding $10,000 from three sources. These will be reviewed and initialed by the Business Manager. For vendors with total disbursements expected to be between $50,000 and $150,000, the Food Service Director will obtain contracts from the vendors and these contracts will be stored at our Central Office. DeKalb Eastern will confirm with the Education Service Center via email or letter that the Service Center is correctly certified with the state for procurement requirements. 1f the Education Service Center remains uncertified, the Food Service Director will obtain price or rate quotes for milk from three sources. These quotes will be reviewed and initialed by the Business Manager. The Food Service Director will request a certification from vendors with contracts over $25,000 to show they are not excluded from participation in federal award programs. In the event the vendor is unable to provide a certification, DeKalb Eastern will utilize the SAM website to view the exclusions list of vendors . Anticipated Completion Date: Ongoing - The Food Service Director will obtain the necessary price and rate quotes, as well as contracts and certifications and the Business Manager will review and initial the quotes.
FINDING 2022-001 (Auditor Assigned Reference Number) Contact Person Responsible for Corrective Action: Todd Pritchett Contact Phone Number: 317-889-4060 Views of Responsible Official: The finding is not disputed. The corporation experienced turnover during the audit period in the cafeteria manage...
FINDING 2022-001 (Auditor Assigned Reference Number) Contact Person Responsible for Corrective Action: Todd Pritchett Contact Phone Number: 317-889-4060 Views of Responsible Official: The finding is not disputed. The corporation experienced turnover during the audit period in the cafeteria manager's positon which may have contributed to inability to provide documentation of three quotes for the specified purchase. Description of Corrective Action Plan: On-going training and additional and more experience will continue to address proper documentation procedures. Anticipated Completion Date: Immediate
Lack of Purchase Order Compliance Requirement: Activities Allowed or Unallowed, Allowable Costs/Cost Principles We will make sure that we follow our SOP and that proper controls are in place to ensure the policies and procedures are being followed. We also have a new E.D. who checks and approves eve...
Lack of Purchase Order Compliance Requirement: Activities Allowed or Unallowed, Allowable Costs/Cost Principles We will make sure that we follow our SOP and that proper controls are in place to ensure the policies and procedures are being followed. We also have a new E.D. who checks and approves every purchase order. The proper controls are now in place.
Finding 2022-002: Procurement and Suspension and Debarment Audit Finding: During testing for the Fund?s controls on compliance over procurement and suspension and debarment, the Fund could not provide a procurement policy that is in compliance with prescribed standards in the Uniform Guidance. Ad...
Finding 2022-002: Procurement and Suspension and Debarment Audit Finding: During testing for the Fund?s controls on compliance over procurement and suspension and debarment, the Fund could not provide a procurement policy that is in compliance with prescribed standards in the Uniform Guidance. Additionally, suspension and debarment verifications were not performed prior to entering a covered transaction. Corrective Action Plan: While The Conservation Fund?s current practice includes procuring goods and services only from reputable vendors, the Fund agrees that its procurement procedures should be strengthened. By August 2023, an update of the procurement policy will be completed to reflect all aspects of the requirements of the Uniform Guidance, and the Fund will implement steps to screen vendors for suspension and debarment. Person(s) responsible for implementation of the corrective action plan: Monica A. Garrison, Senior Vice President Finance & Treasurer. Hillina Fetehawoke, Director of Accounting & Financial Reporting.
Finding 21480 (2022-001)
Significant Deficiency 2022
2022-001 Methods of Procurement Recommendation: We recommend that the County review their policies and procedures to ensure that they are operating in a manner that follows federal procurement requirements and the County?s procurement policy. The creation and use of a standard procurement checklis...
2022-001 Methods of Procurement Recommendation: We recommend that the County review their policies and procedures to ensure that they are operating in a manner that follows federal procurement requirements and the County?s procurement policy. The creation and use of a standard procurement checklist would assist the County in documenting all requirements for each procurement that is entered into. Management Concurs with the Finding and Recommendation Action Plan Taken in Response to Finding: The Finance Department will work with County Management and Board Departments to ensure familiarity and understanding of the County?s procurement policies and procedures. Additionally, the County is working towards the implementation of a financial system which will improve the controls in place to help ensure compliance with procurement requirements. The Finance Department is also working on a financial policies document and will would with County Manager on a review of the County?s procurement policy. Name(s) of contract person(s) responsible for corrective action: Tasha Morgan, Finance Director Planned completion date for corrective action plan: We anticipate the finding will be address by September 30, 2023
Finding 20743 (2022-001)
Significant Deficiency 2022
Bonner County Clerk Michael W. Rosedale Clerk of the District Court Ex-Officio Auditor & Recorder Clerk of the Board of County Commissioners Chief Elections Officer CORRECTIVE ACTION PLAN June 5,2023 Cognizant or Oversight Agency for Audit: Department of Treasury. Bonner County respectfully sub...
Bonner County Clerk Michael W. Rosedale Clerk of the District Court Ex-Officio Auditor & Recorder Clerk of the Board of County Commissioners Chief Elections Officer CORRECTIVE ACTION PLAN June 5,2023 Cognizant or Oversight Agency for Audit: Department of Treasury. Bonner County respectfully submits the following corrective action plan for the year ended September 30th,2022. Name and address of independent public accounting firm: Hayden Ross. PLLC 315 S Almon St. Moscow.ID 83843 Audit Period: Year ended September 30. 2022. The findings from the September 30, 2022, schedule of findings and questioned costs are discussed below. The findings are numbered consistently with the numbers assigned in the schedule. FINDINGS - FEDERAL AWARD PROGRAMS AUDIT DEPARTMENT OF TREASURY 2022-001 2 CFR 200.318 General Procurement Standards Recommendation: The County should expedite the provisions subject to vetting and begin following the Federal Procurement Policy and Procedures document which was adopted August 9,2022. Planned Corrective Action: The internal control oversight committee, comprised of all nine elected officials, along with the Comptroller has narrowly construed federal award purchases to fully comply with 2 CFR 200.318. This corrective action has already been addressed and is being remediated beginning May l, 2023. If the Department of Treasury has questions regarding this plan, please call Nancy Twineham or Michael Rosedale at208.265.1437. (Comptroller and Elected Clerk) Respectfully, Michael W. Rosedale Bonner County Clerk
2022-003 Public and Indian Housing ? CFDA 14.850 Recommendation: The Commission should implement policies and procedures to ensure all federal compliances are followed pertaining to Procurement, Suspension and Debarment. Action Taken: Management will implement policies and procedures to ensure the...
2022-003 Public and Indian Housing ? CFDA 14.850 Recommendation: The Commission should implement policies and procedures to ensure all federal compliances are followed pertaining to Procurement, Suspension and Debarment. Action Taken: Management will implement policies and procedures to ensure the Commission is in compliance with all grant requirements pertaining to the Public and Indian Housing Grant. Anticipated Completion Date of Action: September 30, 2023
#2022-002: Material Weakness in Controls over Compliance: Administrative Requirements of Uniform Guidance -Administrative Policies Recommendations: Grand Rapids Christian Schools should consider the following written policy additions or updates: ? Financial Management (2 CFR 200.302) The financial m...
#2022-002: Material Weakness in Controls over Compliance: Administrative Requirements of Uniform Guidance -Administrative Policies Recommendations: Grand Rapids Christian Schools should consider the following written policy additions or updates: ? Financial Management (2 CFR 200.302) The financial management policy should include records documenting compliance, and the tracking of funds to determine that expenditures are in accordance with the terms and conditions of the federal awards. The financial management and reporting system must provide the following : ? Identification - Title of the award, CFDA number ? Complete disclosure of accurate and current financial results of each federal award ? Source and application of funds for federal award activity ? Record retention and access - define the time period for which records must be kept (can vary by grant agreement), and who has the ability access the records (?200.333 - ?200.337) ? Written procedure to implement cash management requirements (see below) ? Written procedures for determining the allowability of costs (see below) ? Cash Management (2 CFR 200.305) A written policy is required by Uniform Guidance detailing the Organization's procedures to minimize the time that elapses between draw and expenditure of federal dollars. ? Allowable Costs (2 CFR 200.302(b)(7)) The Organization must have written procedures for determining the allowability of costs in accordance with Subpart E - Cost Principles of Uniform Guidance and the terms and conditions of the Federal award. This includes the determination of allowable costs and the review of this determination. The standard assumes policies and procedures are in place for disbursements, and the allowable cost policy will demonstrate how the Organization ensures compliance. The criteria for costs to be considered allowable are documented within 2 CFR 200.403. ? Procurement Standards (2 CFR 200.317 - 200.326) The Organization must have a written policy that promotes full and open vendor competition, conflict of interest policies should cover employees as well as the organization, and general purchase requirements with specific thresholds as set forth by the Uniform Guidance. There are five allowable procurement methods as described in ?200.320, depending upon the dollar value of the purchase or contract. Views of Responsible Officials and Planned Corrective Actions: ? Grand Rapids Christian Schools follows procurement and record retention standards provided by the USDA. ? GRCS does not have actual written policies and procedures for Financial Management, Cash Management, Allowable Costs, and Procurement Standards, but do have practices in place to follow USDA guidelines. In the case of cash management, the only location that takes cash is GRCHS. In that instance, along with Meal Magic, cash registers are zeroed out and balanced to Meal Magic and cash deposits are made daily. ? GRCS Business Office will work with the Food Service Director to begin formulating written policies and procedures specific to Grand Rapids Christian Schools. GRCS will utilize the resources from Uniform Guidance and Code of Federal Regulations (CFR) to develop policies that are compliant with those requirements prior to June 30, 2023.
The City of Dos Palos was on a state of emergency Resolution, and when these funds came available, understood that we could go forward with the rehabilitation of our 750,000 gallon tank, for storage for the City. In the future, if an emergency situation should arise, the City will review all regulat...
The City of Dos Palos was on a state of emergency Resolution, and when these funds came available, understood that we could go forward with the rehabilitation of our 750,000 gallon tank, for storage for the City. In the future, if an emergency situation should arise, the City will review all regulations and documents for procurement of the funds. The City's procurement policy is outdated and we will be implementing a new written procurement policy.
Finding 13021 (2022-001)
Material Weakness 2022
FINDING 2022-001 Contact Person Responsible for Corrective Action: Amy Copeland Contact Phone Number: (812) 689-6311 Views of Responsible Official: We concur with the finding. Description of Corrective Action Plan: The Ripley County Auditor, Amy Copeland, has already been in contact with the Auditor...
FINDING 2022-001 Contact Person Responsible for Corrective Action: Amy Copeland Contact Phone Number: (812) 689-6311 Views of Responsible Official: We concur with the finding. Description of Corrective Action Plan: The Ripley County Auditor, Amy Copeland, has already been in contact with the Auditors in the State of Indiana to help with a Procurement Policy they already have in place. This is so the Ripley County Attorney and I can work on getting Ripley County a Procurement Policy in place as soon as possible. Ripley County will also be writing a Suspension and Debarment Policy for any checks written over $25,000.00 to any subrecipient or contracts. The new polices will address procedures for procurement and suspension and debarment to ensure there is a review and approval process in place to ensure compliance. Anticipated Completion Date: 8/30/2023
Finding 2022-001 Federal Agency Name: U.S. Department of Housing and Urban Development Program Name: Mortgage Insurance Rental Housing Federal Financial Assistance Listing #14.134 Procurement, Suspension, and Debarment Finding Summary: The Project does not have a written procurement policy which co...
Finding 2022-001 Federal Agency Name: U.S. Department of Housing and Urban Development Program Name: Mortgage Insurance Rental Housing Federal Financial Assistance Listing #14.134 Procurement, Suspension, and Debarment Finding Summary: The Project does not have a written procurement policy which conforms to Uniform Guidance as outlined in 2CFR 200.317 through 200.327. During the year, management entered into transactions over the micropurchase threshold with eight vendors. Documentation was unable to be provided to support procurement compliance for seven vendors. In addition, there was one vendor with expenditures in excess of $25,000 and the Project did not verify the vendor against the central contractor registry prior to entering into the transaction or on a periodic basis to ensure that the vendor was not suspended or debarred. Responsible Individuals: Sue Lund, Administrator Corrective Action Plan: The Project is drafting a written procurement policy which conforms to Uniform Guidance as outlined above. In addition, for expenditures in excess of $25,000, the Project will verify the vendor against the central contractor registry prior to entering into the transaction or on a periodic basis to ensure that the vendor was not suspended or debarred. Anticipated Completion Date: July 2023
The Grants Finance Department, Purchasing Department along with the Federal Grants Department will review_vendors that are issued requisitions at each approval level to assist in catching $25K or more for Suspension and_Debarment. A printed document from SAM.GOV verifying eligibility to Requisitions...
The Grants Finance Department, Purchasing Department along with the Federal Grants Department will review_vendors that are issued requisitions at each approval level to assist in catching $25K or more for Suspension and_Debarment. A printed document from SAM.GOV verifying eligibility to Requisitions over $25K should be attached._At the initial setup of new vendors, the Purchasing Department will review vendors in SAM.GOV. A printed document_from SAM.GOV verifying eligibility of vendor will be attached to the vendor file.
Views of Responsible Officials: The funds were needed to be made immediately available to those who were in need because of the Coronavirus pandemic, which had made a serious impact on the homeless and those who were about to become homeless. Due to the urgency of the situation, it was determined to...
Views of Responsible Officials: The funds were needed to be made immediately available to those who were in need because of the Coronavirus pandemic, which had made a serious impact on the homeless and those who were about to become homeless. Due to the urgency of the situation, it was determined to be in the best interest of those in need to follow a faster process to disburse funds than to advertise requests for proposals, evaluate the proposals to make selections, and award contracts. Written procedures will be established for use of the alternative procedures.
Finding 8166 (2022-005)
Material Weakness 2022
FINDING 2022-005 Craig Wright (765)747-4828 Views of Responsible Official: We concur with the findings. Description of Corrective Action Plan: Correcting the audit findings is ongoing. The city has implemented monitoring procedures to review and prevent reoccurring errors. Anticipated Completion Dat...
FINDING 2022-005 Craig Wright (765)747-4828 Views of Responsible Official: We concur with the findings. Description of Corrective Action Plan: Correcting the audit findings is ongoing. The city has implemented monitoring procedures to review and prevent reoccurring errors. Anticipated Completion Date: The internal control monitoring and checks and balances will be implemented immediately and continue going forward.
Action Taken: The Home will update its purchasing policy to ensure the procurement standards in 2 CFR 200.317 – 200.326 are incorporated.
Action Taken: The Home will update its purchasing policy to ensure the procurement standards in 2 CFR 200.317 – 200.326 are incorporated.
Management Comments and Corrective Action: During the course of the single audit for the year ending August 31, 2022, it was noted that SWK "legacy" contracts did not follow the established procurement policy and procedures which requires SWK to obtain quotes from at least three sources and/or did ...
Management Comments and Corrective Action: During the course of the single audit for the year ending August 31, 2022, it was noted that SWK "legacy" contracts did not follow the established procurement policy and procedures which requires SWK to obtain quotes from at least three sources and/or did not document the quotations in the procurement file for one expenditure between $25,000 to $100,000. This instance of noncompliance noted was for a consumer goods (i.e., clothing, and personal healthcare). Due to the growing need to adequately care for the minors at SWK’s shelters coupled with the limitations of access to vendors caused by COVID-19, SWK utilized an existing vendor to minimize significant disruptions to operations. The Organization is aware they are operating under contracts that were procured in previous years that may not have all the records maintained. Reprocuring all of these contracts at once would potentially cause disruptions in operations due to the products/services related those vendors playing an important role in the Organization’s day-to-day operations. In April 2021, the Organization, hired new procurement leadership and invested Full Time Employees (FTEs) to develop a robust procurement department. As a result of this procurement revamp, Procurement adopted a hybrid model, and Desktop Protocols were established to provide universal procedures to fulfill policy. Protocols instruct staff on obtaining three quotes and provided tools for the selection of the vendor. In addition, quality protocols and tools are currently in development to verify a random sample of procurement transactions and files. The Organization still has several active contracts procured under the old policies that they are working on reprocuring as these contracts’ renewal dates arise, if not earlier. Proposed Implementation Date of Corrective Action: In process and to be completed by December 31, 2023. Person Responsible for Corrective Action: Fred Muniz, CFO 2023
FEDERAL AWARDS – CORRECTIVE ACTION PLAN REFERENCE # 2022-001 PROCUREMENT SUSPENSION AND DEBARMENT – MATERIAL WEAKNESS- NON-COMPLIANCE Program Name/ALN Emergency Solutions Grant Program (ALN # 14.231) Criteria: As per § 200.318 General procurement standards. (a) The Non-Federal entity must have and u...
FEDERAL AWARDS – CORRECTIVE ACTION PLAN REFERENCE # 2022-001 PROCUREMENT SUSPENSION AND DEBARMENT – MATERIAL WEAKNESS- NON-COMPLIANCE Program Name/ALN Emergency Solutions Grant Program (ALN # 14.231) Criteria: As per § 200.318 General procurement standards. (a) The Non-Federal entity must have and use documented procurement procedures, consistent with State, local, and tribal laws and regulations and the standards of this section, for the acquisition of property or services required under a Federal award or subaward. The non-Federal entity's documented procurement procedures must conform to the procurement standards identified in §§ 200.317 through 200.327. (d) The Non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include, but are not necessarily limited to, the following: Rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. Condition/Context: Condition: Based on our review of the Procurement compliance requirements, we noted that the Division has written procurement policies and competitive policies as required by CFR § 200.318 General procurement standards. We selected five (5) vendors for procurement Suspension and Debarment compliance testing of total population of 5 vendors subject to procurement and we were not provided with Procurement comparative bids therefore, we were unable: • To verify that the procurement method used was appropriate based on the dollar amount and conditions specified in 2 CFR section 200.320. • To Verify that procurements provide full and open competition (2 CFR section 200.319 and 48 CFR section 52.244-5). Questioned Costs: Cannot be determined Recommendation: We recommend that the Division must: (1) Use documented procurement procedures, consistent with State, and local, laws and regulations and the standards, for the acquisition of property or services required under a federal award or subaward. (2) The Division must maintain records sufficient to detail the history of procurement. These records should include, but are not necessarily limited to, the following: Rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. Corrective Action Plan: The Division will work with Territorial Headquarters to document procedures as outlined in the Recommendations above. Step 1 Action Date: Ongoing Final Implementation Date: 12/31/2023 Name and Phone # Of Person Responsible for Implementation: Jeanne Stromberg, Major, Divisional Finance Secretary (916) 563-3710
View Audit 4368 Questioned Costs: $1