Corrective Action Plans

Browse how organizations respond to audit findings

Total CAPs
61,795
In database
Filtered Results
23,815
Matching current filters
Showing Page
327 of 953
25 per page

Filters

Clear
Active filters: Questioned Costs
HUD Section 202, Capital Advance – Assistance Listing No. 14.157 Recommendation: Management should implement a review process of the management fee rate upon any changes to that rate or system utilized to calculate that rate to ensure the HUD approved rate is utilized. Management should repay the am...
HUD Section 202, Capital Advance – Assistance Listing No. 14.157 Recommendation: Management should implement a review process of the management fee rate upon any changes to that rate or system utilized to calculate that rate to ensure the HUD approved rate is utilized. Management should repay the amount due the Organization. Explanation of disagreement with audit finding: There is no disagreement with the audit finding. Action taken in response to finding: The controller will annually review the calculation of the management fee that is being billed to the property by the accounting manager to validate the amount is in compliance with HUD form 9839-B. The overpayment from fiscal year 2024 was corrected in October 2024 Name of the contact person responsible for corrective action: Troy Marschel. Planned completion date for corrective action plan: 10/1/2024
View Audit 337517 Questioned Costs: $1
Management agrees with the finding and has made the transfer of cash back to the property.
Management agrees with the finding and has made the transfer of cash back to the property.
View Audit 337482 Questioned Costs: $1
Section 232 Insured Mortgage Note Payable– Assistance Listing No. 14.129 Recommendation: We recommend review of controls to include processes to ensure timely submission of quarterly financial reporting requirements. Explanation of disagreement with audit finding: There is no disagreement with the a...
Section 232 Insured Mortgage Note Payable– Assistance Listing No. 14.129 Recommendation: We recommend review of controls to include processes to ensure timely submission of quarterly financial reporting requirements. Explanation of disagreement with audit finding: There is no disagreement with the audit finding. Action taken in response to finding: Submissions have been made and controls will be reviewed to ensure timely submissions in the future. Name(s) of the contact person(s) responsible for corrective action: Joe Girardi, CFO Planned completion date for corrective action plan: November 2024
The management agent will repay the funds on behalf of the related party housing project until that property has funds available, pending HUD approval.
The management agent will repay the funds on behalf of the related party housing project until that property has funds available, pending HUD approval.
Finding 518994 (2024-001)
Significant Deficiency 2024
Management agrees with the finding and has made the transfer into the replacement reserve account.
Management agrees with the finding and has made the transfer into the replacement reserve account.
Management agrees with the finding and will request that the surplus cash payment be returned to the property.
Management agrees with the finding and will request that the surplus cash payment be returned to the property.
View Audit 337462 Questioned Costs: $1
Finding 518992 (2024-001)
Significant Deficiency 2024
Management deposited back the $14,068.
Management deposited back the $14,068.
Management agrees with the finding and the funds were promptly repaid within the same month.
Management agrees with the finding and the funds were promptly repaid within the same month.
Condition: Pertaining to the Nutrition Cluster, the District could not find 8 free/reduced applications selected and one application selected was not signed as required. Recommendation: We recommend ensuring that no matter in which format the District collects the applications, that they have acc...
Condition: Pertaining to the Nutrition Cluster, the District could not find 8 free/reduced applications selected and one application selected was not signed as required. Recommendation: We recommend ensuring that no matter in which format the District collects the applications, that they have access to the data for any possible future audits. Management Response: Management and the Food Service Department will ensure that all records are appropriately saved in digital and paper formats in anticipation of future audits. The Food Service Department will implement a triple check process to ensure that all electronic and paper applications are signed. Anticipated Date of Completion: June 30, 2025
Condition: Pertaining to the Nutrition Cluster, there were 8 cases where the household size was larger than the number of household members listed in Step 1 and Step 3 on the free/reduced application. In 3 cases there was no change in the free/reduced status if the smaller number of household memb...
Condition: Pertaining to the Nutrition Cluster, there were 8 cases where the household size was larger than the number of household members listed in Step 1 and Step 3 on the free/reduced application. In 3 cases there was no change in the free/reduced status if the smaller number of household members were used. In 5 cases there were changes in the status. There was an additional case where the listed income put the family in the reduced status but they were listed as free. Recommendation: We recommend reviewing applications to ensure that the household size and the listed household members in Step 1 and Step 3 match. Management Response: The Food Service Department will implement a triple check process to ensure that all household data matches and the appropriate criteria is being used to calculate household eligibility. Anticipated Date of Completion: June 30, 2025
Condition: The District did not receive the weekly certified pays for the construction project that was partially funded by Impact Aid construction funds. Recommendation: We recommend that school officials review the grant requirements for all of the federal grants that they receive. Managemen...
Condition: The District did not receive the weekly certified pays for the construction project that was partially funded by Impact Aid construction funds. Recommendation: We recommend that school officials review the grant requirements for all of the federal grants that they receive. Management Response: Management will request weekly certified payroll and a statement of compliance from all contractors working on construction projects to ensure that prevailing wages are being paid on the project. Anticipated Date of Completion: June 30, 2025
Corrective Action Plan December 19, 2024 Federal Audit Clearinghouse Northern Tier Career Center respectfully submits the following corrective action plan for the year ended June 30, 2024. Name and address of independent public accounting firm: EFPR Group, CPAs, PLLC Certified Public Accountants ...
Corrective Action Plan December 19, 2024 Federal Audit Clearinghouse Northern Tier Career Center respectfully submits the following corrective action plan for the year ended June 30, 2024. Name and address of independent public accounting firm: EFPR Group, CPAs, PLLC Certified Public Accountants 8 Denison Parkway East Corning, NY 14830 Audit period: July 1, 2023 – June 30, 2024 The findings from the June 30, 2024 schedule of findings and questioned costs are discussed below. The findings are numbered consistently with the numbers assigned in the schedule. FINDINGS AND QUESTIONED COSTS – MAJOR FEDERAL AWARD PROGRAM AUDIT FINDING 2024-001 – Student Financial Aid Cluster – Federal Direct Student Loans and Federal Pell Grant Program - Assistance Listing No. 84.286 and 84.063; Grant Period - For the year ended June 30, 2024 Condition: The School does not have a written information security program containing the required minimum elements including the designation of a qualified individual who is responsible for implementing and monitoring the School’s program. Criteria: The School is required to have a written information security program that includes the required minimum elements including designating a qualified individual who is responsible for implementing and monitoring the School’s program. Cause: The School did not have a written information security program containing the required elements. Effect of Condition: The School was not in compliance with the requirement to have a written information security program that includes the required minimum elements including designating a qualified individual who is responsible for implementing and monitoring the School's program Questioned Costs: None. Recommendation: The School should designate a qualified individual responsible for implementing an monitoring the School's information security program. This individual should put procedures in place to create a written information security program that addresses the required minimum elements required by the Student Financial Aid cluster included in the Gramm-Leach-Bliley Act - Student Information Security. Views of Responsible Officials and Planned Corrective Actions: NTCC is in the process of a First Reading Policy on or before February 20, 2025, and a Second Reading Policy for full approval on or before March 20, 2025. This policy will name the Practical Nursing Coordinator, as the individual responsible for implementing and monitoring the School’s security program. The seven required minimum elements for a financial institution of fewer than 5,000 customers will be in place with this policy. Contact Person Responsible for Corrective Action: Colleen Edsell, Business Administrator. Anticipated Completion Date: The corrective action plan will be completed by March 20, 2025. If the Federal Audit Clearinghouse has questions regarding this plan, please call Colleen Edsell at 570-265-8111. Sincerely yours, Gary Martell, Director
FINDING #2024-002: EDUCATION STABILIZATION FUNDS – EQUIPMENT AND OTHER CAPITAL EXPENDITURES (5000) Corrective Action Plan: Compton USD will act with diligence and care. Under the new Director of Fiscal Services, a pre-approval checklist for all grant expenditures, including mandatory CDE approval fo...
FINDING #2024-002: EDUCATION STABILIZATION FUNDS – EQUIPMENT AND OTHER CAPITAL EXPENDITURES (5000) Corrective Action Plan: Compton USD will act with diligence and care. Under the new Director of Fiscal Services, a pre-approval checklist for all grant expenditures, including mandatory CDE approval for equipment and capital expenditures, has been implemented.
View Audit 337387 Questioned Costs: $1
November 4, 2024 School District No. 55-0145, Waverly, Nebraska, respectfully submits the following corrective action plan for the year ended August 31, 2024. Name and address of independent public accounting firm: Romans, Wiemer & Associates, Certified Public Accountants, P.C., 1910 N Lincoln ...
November 4, 2024 School District No. 55-0145, Waverly, Nebraska, respectfully submits the following corrective action plan for the year ended August 31, 2024. Name and address of independent public accounting firm: Romans, Wiemer & Associates, Certified Public Accountants, P.C., 1910 N Lincoln Ave, York, NE 68467 Audit Period: September 1, 2023 through August 31, 2024 The findings from the November 4, 2024 schedule of findings and questioned cost are discussed below. The findings are numbered consistently with the numbers assigned in the schedule. FINDINGS – FINANCIAL STATEMENT AUDIT MATERIAL WEAKNESS 2024-001 Internal Control Structure Design Recommendation: While considering the cost of any benefits derived, activities should be segregated and handled by different employees. Action Taken: The cost of implementing a complete set of controls far outweighs the benefits derived by such. It is not financially feasible to have a complete set of controls. COMPLIANCE 2024-002 Deposit Risk Recommendation: Obtain adequate pledged securities from the financial institution. Action Taken: District personnel will contact the bank about getting additional coverage. 2024-003 Disbursements in Excess of Budget Recommendation: Either not approve disbursements over budgeted amounts or amend the budget if extra disbursements are needed. Action Taken: The District will monitor funds closer and either not approve disbursements over budgeted amounts or amend the budget if needed in the future. FINDINGS – FEDERAL AWARD PROGRAM AUDIT Nebraska Department of Education 2024-004 Internal Control Structure Design Recommendation: While considering the cost of any benefits derived, activities should be segregated and handled by different employees. Action Taken: The cost of implementing a complete set of controls far outweighs the benefits derived by such. It is not financially feasible to have a complete set of controls. If the Nebraska Department of Education has questions regarding this plan, please call Mikal Shalikow at (402) 786-2321. Sincerely yours, Name Title School District No. 55-0145, of Waverly, Nebraska
October 29, 2024 School District No. 12-0056, David City, Nebraska, respectfully submits the following corrective action plan for the year ended August 31, 2024. Name and address of independent public accounting firm: Romans, Wiemer & Associates, Certified Public Accountants, P.C., 1910 N Lincol...
October 29, 2024 School District No. 12-0056, David City, Nebraska, respectfully submits the following corrective action plan for the year ended August 31, 2024. Name and address of independent public accounting firm: Romans, Wiemer & Associates, Certified Public Accountants, P.C., 1910 N Lincoln Ave, York, NE 68467 Audit Period: September 1, 2023 through August 31, 2024 The findings from the October 95, 2024 schedule of findings and questioned cost are discussed below. The findings are numbered consistently with the numbers assigned in the schedule. FINDINGS – FINANCIAL STATEMENT AUDIT MATERIAL WEAKNESS 2024-001 Internal Control Structure Design Recommendation: While considering the cost of any benefits derived, activities should be segregated and handled by different employees. Action Taken: The cost of implementing a complete set of controls far outweighs the benefits derived by such. It is not financially feasible to have a complete set of controls. FINDINGS – FEDERAL AWARD PROGRAM AUDIT Nebraska Department of Education 2024-002 Internal Control Structure Design Recommendation: While considering the cost of any benefits derived, activities should be segregated and handled by different employees. Action Taken: The cost of implementing a complete set of controls far outweighs the benefits derived by such. It is not financially feasible to have a complete set of controls. If the Nebraska Department of Education has questions regarding this plan, please call Chad Denker at (402) 367-4590.
Management's  Response - The City recognizes that the requirement of providing the identifying assistance listing number was not provided on certain ARPA contracts awarded through the Department of Recreation and Human Services. It is the City's practice to include this ...
Management's  Response - The City recognizes that the requirement of providing the identifying assistance listing number was not provided on certain ARPA contracts awarded through the Department of Recreation and Human Services. It is the City's practice to include this information in all contracts where federal funds are awarded. In November of 2024 when it was identified that there were a number of subrecipients that had not been notified of this required information, the Department of Recreation and Humans Services emailed all subrecipients who had not previously been provided this information. In order to prevent this requirement from being overlooked in the future, the Law Department has also been informed of this requirement. The Law Department is in the approval process for all contracts and will not provide their approval until this requirement is met.
Authority Response: The Authority has recognized the deficiencies in the Housing Voucher Cluster and will implement internal control procedures that will ensure compliance with federal regulations. Sarah Parker, Executive Director, was designated to be responsible for implementing this corrective ac...
Authority Response: The Authority has recognized the deficiencies in the Housing Voucher Cluster and will implement internal control procedures that will ensure compliance with federal regulations. Sarah Parker, Executive Director, was designated to be responsible for implementing this corrective action by March 31, 2025.
View Audit 337316 Questioned Costs: $1
Authority Response: The Authority has recognized the significant deficiency in the Housing Voucher Cluster and will implement internal control procedures that will ensure compliance with federal regulations. Sarah Parker, Executive Director, was designated to be responsible for implementing this cor...
Authority Response: The Authority has recognized the significant deficiency in the Housing Voucher Cluster and will implement internal control procedures that will ensure compliance with federal regulations. Sarah Parker, Executive Director, was designated to be responsible for implementing this corrective action by March 31, 2025.
View Audit 337316 Questioned Costs: $1
Name of Contact Person: Kathy Mangels, Board President. Recommendation: We recommend the Authority separate the employee's ability to write checks, sign checks, and full access to the accounting software. Corrective Action: The Authority has updated the accounting software and reorganized the o...
Name of Contact Person: Kathy Mangels, Board President. Recommendation: We recommend the Authority separate the employee's ability to write checks, sign checks, and full access to the accounting software. Corrective Action: The Authority has updated the accounting software and reorganized the organization chart which will allow for enhanced controls. Proposed Completion Date: Immediately.
Pell Awards Planned Corrective Action: The system configuration has been reviewed and updated to ensure students Pell eligibility is are accurately awarded based on attendance. A review process will be implemented to manually verify Pell awards for students who withdraw from classes to ensure that a...
Pell Awards Planned Corrective Action: The system configuration has been reviewed and updated to ensure students Pell eligibility is are accurately awarded based on attendance. A review process will be implemented to manually verify Pell awards for students who withdraw from classes to ensure that adjustments are made appropriately Person Responsible for Corrective Action Plan: Deborah Rezene, Associate Vice President of Student Financial Services Anticipated Date of Completion: 1/3/2025
Verification Planned Corrective Action: We have contracted a third party servicer to complete and review verification for the current academic year to ensure accuracy and completion. We will establish an a process for periodic audits will be conducted to verify the accuracy of all completed verifica...
Verification Planned Corrective Action: We have contracted a third party servicer to complete and review verification for the current academic year to ensure accuracy and completion. We will establish an a process for periodic audits will be conducted to verify the accuracy of all completed verifications for students flagged. Person Responsible for Corrective Action Plan: Deborah Rezene, Associate Vice President of Student Financial Services Anticipated Date of Completion: 1/3/2025
U.S. Department of Education Clinton School District #124 respectfully submits the following Corrective Action Plan for the year ended June 30, 2024. Contact information for the individual responsible for the corrective action: Daniel Brungardt, Superintendent Clinton School District #124 Independen...
U.S. Department of Education Clinton School District #124 respectfully submits the following Corrective Action Plan for the year ended June 30, 2024. Contact information for the individual responsible for the corrective action: Daniel Brungardt, Superintendent Clinton School District #124 Independent Public Accounting Firm: Gerding, Korte & Chitwood, P.C., 723 Main Street, Boonville, MO 65233 Audit Period: Year ended June 30, 2024 The findings from the June 30, 2024, Schedule of Findings and Questioned Costs are discussed below. The findings are numbered consistently with the numbers assigned in the schedule. Significant Deficiency 2024-001 Child Nutrition Cluster Recommendation: We recommend that fund balances should be monitored to ensure that balances remain in line with child nutrition compliance requirements. Action Taken: Over the last five years, the school district's fund increased due to securing a contract at a low initial rate, while also benefiting from higher reimbursement rates and increased participation. This year, the district will once again go through the rebid process, and the estimated increase in costs is expected to range from 10% to 15%. This increase will likely surpass the amount the district receives in reimbursements, leading to a budget deficit. Additionally, student participation in the lunch program has declined over the years.
View Audit 337172 Questioned Costs: $1
Below are the participation percentage rates. Current Participation Rates for Oct 2024 (percentages) HS - 52.53 lunch with 56.38 being free/reduced 36.64 breakfast with 62.5 being free/reduced MS- 66.94 lunch with 62 being free/reduced 23.42 breakfast with 82.85 being free/reduced CIS - 65.48 lunch ...
Below are the participation percentage rates. Current Participation Rates for Oct 2024 (percentages) HS - 52.53 lunch with 56.38 being free/reduced 36.64 breakfast with 62.5 being free/reduced MS- 66.94 lunch with 62 being free/reduced 23.42 breakfast with 82.85 being free/reduced CIS - 65.48 lunch with 73.70 being free/reduced 44.38 breakfast with 78.07 being free/reduced HE - 70.41 lunch with 74.53 being free/reduced 47.93 breakfast with 76.72 being free/reduced Participation Rates from Oct 2019 (percentages) HS - 59.03 lunch with 52.65 being free/reduced 32.23 breakfast with 69.64 being free/reduced MS- 69.74 lunch with 68.01 being free/reduced 55.13 breakfast with 72.28 being free/reduced CIS - 77.87 lunch with 72.29 being free/reduced 44.54 breakfast with 83.43 being free/reduced HE - 76.88 lunch with 71.27 being free/reduced         45.09 breakfast with 84 being free/reduced Additionally, during the rebid process, the school district will seek companies that have successfully increased participation, as this could also impact the overall cost of the program. The district will reduce the fund based on the following: Increased Contract Costs: District administration believes that through the rebid process and the new contract, the district will achieve at least a 10% reduction in contract costs. Indirect Costs: The school district has not been claiming indirect costs as part of its food service allocation in the past. However, beginning next year, the district will start including indirect costs in its food service budget. This change will help ensure that the full scope of expenses associated with operating the food service program is accounted for, providing a more accurate reflection of the program’s financial needs New Equipment: The district operates four kitchens, with only one having received upgrades in the past 10 years. A list of necessary equipment upgrades has been compiled. Below is a forecast of additional costs for the next three years, along with the equipment that will be purchased that will reduce the food service budget by $940.874.48
View Audit 337172 Questioned Costs: $1
Completion Date: June 30, 2025 Sincerely, Daniel Brungardt, Superintendent Clinton School District #124
Completion Date: June 30, 2025 Sincerely, Daniel Brungardt, Superintendent Clinton School District #124
View Audit 337172 Questioned Costs: $1
U.S. Department of Housing and Urban Development 2024-001 - Eligibility Moving to Work Demonstration Program – Assistance Listing No. 14.881 Recommendation: We recommend that management implement controls over in-house and external housing specialists to ensure all documents are obtained by tenan...
U.S. Department of Housing and Urban Development 2024-001 - Eligibility Moving to Work Demonstration Program – Assistance Listing No. 14.881 Recommendation: We recommend that management implement controls over in-house and external housing specialists to ensure all documents are obtained by tenants and maintained in the files. Explanation of disagreement with audit finding: There is no disagreement with the audit finding. Action taken in response to finding: As it relates to the 2024-001 Eligibility finding, Atlanta Housing (AH) reached out to the Corbin family in one last attempt to gather the required information to address the participant’s file. The family has until Close of Business on Monday, November 4, 2024 to resolve the issues identified in the file. Failure to provide the required documents by the date noted will result in AH beginning the pro-termination process for failure to provide the required documentation to complete the recertification. Additionally, if the family does not comply, AH will correct the recertification, remove the educational exclusion, reinstate the income from the excluded income, and repay the Housing Assistance Payment via a Tenant Payment Agreement with the family. Name(s) of the contact person(s) responsible for corrective action: (1) Tracy D. Jones, Senior Vice President, Housing Choice Voucher Program Recommended correction: Ensure that management implement controls over in-house and external housing specialists to ensure all documents are obtained by participants. Corrective Actions: AH has a comprehensive six-week onboarding training program for all new hires that provides an overview of Housing Choice's end-to-end eligibility process for program participants. This training includes collecting, reviewing, and processing documentation necessary to complete the required certification for all programs. • Additionally, AH has a Quality Assurance program in place, which ensures that 100% of all new applicants' files are reviewed, along with 50% of all annual and interim recertifications. • AH employs a Quality Control Management System to track all corrections and manage the closure of those corrections effectively. • Furthermore, AH has utilized data from the Quality Control Management System to develop refresher training for current staff. Preventive Actions: • The Quality Assurance Manager will use the HCVP Operational procedures to conduct random reviews of previously audited and/or corrected files to ensure consistency and accuracy. • Key responsibilities include: ➢ Ensuring that the required checklist is utilized for each processed file. ➢ Reviewing the files of newly onboarded hires at a higher percentage than those of current staff. ➢ Providing a report on any abnormalities and documenting files of staff members who may require additional attention and one-on-one training. *Note: The issue for the file in question was addressed during the Audit and resolved November 4, 2024.