Corrective Action Plans

Browse how organizations respond to audit findings

Total CAPs
48,663
In database
Filtered Results
7,124
Matching current filters
Showing Page
163 of 285
25 per page

Filters

Clear
Active filters: Questioned Costs
Corrective action plan: The program is no longer issuing new payments and is in the process of final reconciliation and closure. TRR management shared these findings with the external application review vendor on February 9, 2024, reiterating the processes for reviewing and approving rental assistan...
Corrective action plan: The program is no longer issuing new payments and is in the process of final reconciliation and closure. TRR management shared these findings with the external application review vendor on February 9, 2024, reiterating the processes for reviewing and approving rental assistance according to all program policies and procedures and ensuring that appropriate documentation related to review of applications is maintained in the files. Implementation date: February 9, 2024 Responsible person: Danny Shea, TRR Senior Program Manager
View Audit 296491 Questioned Costs: $1
Corrective action plan: The General Ledger Cost Allocation and Chartfield teams are currently fully staffed. An aggressive plan to complete FY 2023 reallocations and catch FY 2024 reallocations up to current (one federal quarter plus one month in arrears) is in place. Implementation date: August 31,...
Corrective action plan: The General Ledger Cost Allocation and Chartfield teams are currently fully staffed. An aggressive plan to complete FY 2023 reallocations and catch FY 2024 reallocations up to current (one federal quarter plus one month in arrears) is in place. Implementation date: August 31, 2024 Responsible person: Heather Nevill, Director, Fund Management
View Audit 296491 Questioned Costs: $1
Federal Direct Student Loans and Federal Pell Grant Program – Assistance Listing No. 84.268 and 84.063 Recommendation: We recommend that the University enhance its policies and procedures regarding stale-dated check escheatment to ensure that the funds are returned to the appropriate program within...
Federal Direct Student Loans and Federal Pell Grant Program – Assistance Listing No. 84.268 and 84.063 Recommendation: We recommend that the University enhance its policies and procedures regarding stale-dated check escheatment to ensure that the funds are returned to the appropriate program within 240 days from the date of issue. Explanation of disagreement with audit finding: There is no disagreement with the audit finding. Action taken in response to finding: The management team acknowledges this finding as it was identified and rectified during an internal audit earlier this year. Effective Fall 2023 a new process is in place that incorporates all Title IV funding into the current stale-dated refund check process. The Bursar and the Student Financial aid office will closely monitor aging checks and reissue or return funds to the Department of Education. Names of the contact persons responsible for corrective action: Stephanie Hanigan and Karinda Decker Planned completion date for corrective action plan: Completed
View Audit 296487 Questioned Costs: $1
The District has implemented training and a review process related to indirect cost requirements for federal programs.
The District has implemented training and a review process related to indirect cost requirements for federal programs.
View Audit 296464 Questioned Costs: $1
Finding 2023-001 – Eligibility for Subsidized Direct Loans ALN Number: 84.268 Federal Award Identification Number: P268K230616 Recommendation: It is recommended that the College ensure that all EFC information from the ISIR is entered in to the student aid packaging system before the student aid awa...
Finding 2023-001 – Eligibility for Subsidized Direct Loans ALN Number: 84.268 Federal Award Identification Number: P268K230616 Recommendation: It is recommended that the College ensure that all EFC information from the ISIR is entered in to the student aid packaging system before the student aid award is calculated. Action Taken: In review of the student records, the student aid packaging system at the time of aid determination indicated an EFC of $0 and months and weeks in academic year being zero. However, the FASFA was completed and the ISIR EFC amount was known at the time of the packaging and loan issued due to the cost of attendance not calculating correctly at time of packaging. The student aid packaging system parameters ensure that if need amount is $0 the system will stop a subsidized direct loan from being awarded. The weeks and months in academic year information was corrected in their next term and a subsidized loan was not awarded. Error appears related to only their first loan issued. The allowance of subsidized loans was due to user error because the months and weeks enrolled in academic year were showing as zero. The College has re-trained its staff on the sequence of processing and ensure that inputs for months and weeks in academic year are correct. The College also worked with their student information system to ensure the set up for academic year definitions for cost of attendance calculations are set to be automatic for proper calculations. The College made an internal report in order to review all student financial need for the 2022-2023 academic year in February 2024 and determined there were no additional students awarded need based aid in excess of their financial need. The College will continue to use this report every term to review need. For the 2 students that received subsidized loans in error, their loans were refunded in March 2024.
View Audit 296451 Questioned Costs: $1
FINDING 2023-003 Information on the federal program: Subject: Education Stabilization Fund – Advance Draws Federal Agency: Department of Education Federal Program: COVID-19 – Education Stabilization Fund Assistance Listing Number: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identif...
FINDING 2023-003 Information on the federal program: Subject: Education Stabilization Fund – Advance Draws Federal Agency: Department of Education Federal Program: COVID-19 – Education Stabilization Fund Assistance Listing Number: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Activities Allowed or Unallowed, Allowable Costs- Cost Principles Audit Finding: Material Weakness, Other Matters Condition: The School Corporation requested reimbursement prior to incurring expenditures under federal grant awards. An effective internal control system was not in place at the School Corporation in order to ensure compliance with requirements related to the grant agreement and the Activities Allowed or Unallowed, Allowable Costs- Cost Principles compliance requirements. Context: During testing disbursements charged to ESF grants, we noted the ESSER I grant award, tracked in Fund 7940, and the ESSER III grant award, tracked in Fund 7932, had a positive cash balance of $2,718 and $35,661, respectively, at June 30, 2023 as a result of advance payments received during fiscal year 2023. The School Corporation submitted a request for reimbursement on November 15, 2022 for $21,745 from the ESSER I grant award and $565,876 from the ESSER III grant award, respectively. These requests for reimbursements were partially supported by disbursements incurred as of the date of the request, however, partially include requests for advance payments that were still not fully expended as of June 30, 2023. Views of Responsible Officials and Corrective Action Plan: Management agrees with the finding. If there are any posting corrections after a reimbursement has been made and received, the Corporation Treasurer will contact IDOE (Indiana Department of Education) asking whether they would like the difference between the reimbursement and the new disbursement amount paid back to DOE or spent down within a specific time period. Responsible Party and Timeline for Completion: The Corporation Treasurer, Emma Conwell, will oversee the corrective action plan which will be implemented by June 30, 2024.
View Audit 296431 Questioned Costs: $1
Finding 382819 (2023-002)
Significant Deficiency 2023
Recommendation: TASC should continue to follow established controls to ensure the appropriate compensation of its employees at approved effective dates. Explanation of di...
Recommendation: TASC should continue to follow established controls to ensure the appropriate compensation of its employees at approved effective dates. Explanation of disagreement with audit finding: There is no disagreement with the audit finding. Action taken in response to finding: TASC will modify its Change of Employment Status (BUS 111) policy to include language requiring review of the content of the form with entry into the payroll system. Name(s) of the contact person(s) responsible for corrective action: Roy Fesmire, CFO Planned completion date for corrective action plan: June 30, 2024
View Audit 296417 Questioned Costs: $1
Finding #2023-002 – Material Weakness and Other Noncompliance. Recommendation: Provide additional staff training to ensure internal control procedures over client eligibility and required documentation are followed. Planned corrective action: Client eligibility and documentation requirements do ...
Finding #2023-002 – Material Weakness and Other Noncompliance. Recommendation: Provide additional staff training to ensure internal control procedures over client eligibility and required documentation are followed. Planned corrective action: Client eligibility and documentation requirements do not pertain to cost reimbursement grants; these regulations exclusively apply to fee-for-service grants. The fee-for-service grant programs concluded on September 30, 2023. Consequently, starting from October 1, 2023, the business model shifted to cost reimbursement only. As a result, no corrective actions are needed for fee-for-service grants. Responsible officer: Drew Dutton, President and CEO. Estimated completion date: Completed October 1, 2023
View Audit 296356 Questioned Costs: $1
The Authority has performed a review of all patients who have had indications of additional health insurance on an account with a HRSA payment, and made appropriate refunds.
The Authority has performed a review of all patients who have had indications of additional health insurance on an account with a HRSA payment, and made appropriate refunds.
View Audit 296311 Questioned Costs: $1
1. Finding 2023-001 a. Comments on the Finding and Each Recommendation We accept finding and recommendations made b. Action(s) Taken or Planned on the Finding A review of policies and documentation will be undertaken, and training with an emphasis of appropriate documentation handling will be appli...
1. Finding 2023-001 a. Comments on the Finding and Each Recommendation We accept finding and recommendations made b. Action(s) Taken or Planned on the Finding A review of policies and documentation will be undertaken, and training with an emphasis of appropriate documentation handling will be applied to those who handle the leasing information.
View Audit 296275 Questioned Costs: $1
Finding 2023-004 – Title I Grants to Local Educational Agencies - Activities Allowed or Unallowed, Allowable Costs/Cost Principles Contact Person Responsible for Corrective Action: Brad DeRome Contact Phone Number: X Views of Responsible Official: We concur with the finding. Description of Co...
Finding 2023-004 – Title I Grants to Local Educational Agencies - Activities Allowed or Unallowed, Allowable Costs/Cost Principles Contact Person Responsible for Corrective Action: Brad DeRome Contact Phone Number: X Views of Responsible Official: We concur with the finding. Description of Corrective Action Plan: We will ensure all payroll amounts recorded to Title I are reviewed to ensure they represent Title I payroll activity only. Anticipated Completion Date: March 2024
View Audit 296252 Questioned Costs: $1
Name of Contact Person - Mr. Michael Turek, Interim Superintendent ...
Name of Contact Person - Mr. Michael Turek, Interim Superintendent Corrective Action - We will follow our policy for federal purchases subject to quotation/bid/sole source requirements moving forward. The district will follow the policy for obtaining three quotation/bid requirements for federal purchases. In the event purchases are made through cooperative purchasing programs, three quotes will be documented when federal purchases are disbursed. We also implemented processes to improve documentation relating to the “reason” and “cost analysis” of sole source noncompetitive procurement. Anticipated Completion Date - The District will implement the above procedure immediately.
View Audit 296212 Questioned Costs: $1
FINDING 2023-002 Information on the federal program: Subject: Education Stabilization Fund (ESSER) - Internal Controls Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listing Number: 84.425D, 84.425U, 84.425W Federal Award Numbers and Year...
FINDING 2023-002 Information on the federal program: Subject: Education Stabilization Fund (ESSER) - Internal Controls Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listing Number: 84.425D, 84.425U, 84.425W Federal Award Numbers and Years (Or Other Identifying Numbers): S425D200013, S425U210013, S425W210015 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Finding: Material Weakness Condition: An effective internal control system was not in place at the School Corporation in order to ensure compliance with requirements related to the grant agreement and the Equipment and Real Property Management compliance requirements. Context: T There were three equipment purchases made during the audit period and charged to the ESF grants which totaled $28,289 in the aggregate. During testing of equipment purchases, the following items were noted: For one of three equipment purchases selected for testing, we noted an equipment purchase for computer hardware totaling $9,711 was not properly added to the School Corporation's capital asset ledger at June 30, 2023. The equipment purchase was charged to the ESSER Ill grant award (84.425U). For one of three equipment purchases selected for testing, we noted the equipment purchase was not pre-approved by the Indiana Department of Education (IDOE) within the approved grant application. The equipment purchase was for a middle school gym LED scoreboard in the amount of $5,163 and was recorded under the general supplies - instruction expenditure account for the ESSER II grant award (84.425D) . Purchases for equipment exceeding $5,000 require pre-approved by the Indiana Department of Education (IDOE). Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and will take the following corrective action: Northeastern Wayne School Corporation will work to segregate duties to help improve internal controls on all state and federal grants . All grants are written by the Superint endent and/or the Assistant Superintendent. All grants will be reviewed by the treasurer and the Superintendent prior to submission. All future ESSR Amendments will be reviewed by the individual responsible for the grant, reviewed and entered by the treasurer, and signed off on by the superintendent prior to submission . A printed version of the ESSR 111/ ARP Amendmen t with the treasurer's signature and the superintendent's signature will be kept on file. Responsible party and timeline for completion: Trisha Thomas, Treasurer, and Dr. Matthew Hicks, Superintendent. This will be completed by the December 2024 when the ESSR Ill/ARP Grant concludes.
View Audit 296199 Questioned Costs: $1
2023-001: Incorrect Pell Disbursement - Student Financial Aid Cluster Assistance Listing Number 84.007, 84.033, 84.063, 84.268, Grant Period - Year Ended August 31, 2023 Condition Found During our student file testing we noted one student out of forty was not disbursed the correct Pell Grant. The ...
2023-001: Incorrect Pell Disbursement - Student Financial Aid Cluster Assistance Listing Number 84.007, 84.033, 84.063, 84.268, Grant Period - Year Ended August 31, 2023 Condition Found During our student file testing we noted one student out of forty was not disbursed the correct Pell Grant. The student was enrolled as three-quarters time but was awarded as being a full-time student resulting in an over award of $574. We consider this error to be an instance of noncompliance relating to the Eligibility Compliance Requirement. This finding was repeated from last year, see Prior Year finding 2022-002. Corrective Action Plan Financial Aid Office will make sure to disburse the accurate Pell Grant amoutn according to the students' enrollment status. EWU will return the over awarded Pell to reflect the correct amount for the student. We have never had a finding for awarding full time Pell to a three-quarters attending student. This was an isolated incident. Responsible Person for Corrective Action Plan Director of Financial Aid Cesar Campos Implementation Date of Corrective Action Plan February 15, 2024
View Audit 296164 Questioned Costs: $1
Beginning January 31, 2024, DDAP started having internal discussions to determine the most effective and efficient methodology to evaluate the internal controls of the SCAs' data being reported to DDAP during the federal grant period and in the PPRs. Steps currently being taken by DDAP include updat...
Beginning January 31, 2024, DDAP started having internal discussions to determine the most effective and efficient methodology to evaluate the internal controls of the SCAs' data being reported to DDAP during the federal grant period and in the PPRs. Steps currently being taken by DDAP include updating the SCAs' monitoring process for the next annual monitoring cycle for FY 2023-24. The goal is to have a sound methodology with formalized policies and procedures in place by April 2024 to ensure the data collected is sampled for accuracy going forward. To ensure accuracy of the information reported by the SCAs, which is included on the PPRs, DDAP will add verification of this data to the current SCA monitoring process. Specifically, the Project Officers who conduct SCA monitoring will: - Add a question to the SCA Pre-Submission packet: ‘How does your SCA track SOR-funded clients in order to accurately report them on the SOR Report?’ The SCA must specifically state how they are accounting for these clients and how they arrive at the data reported to DDAP. If DDAP determines the process is not acceptable, the SCA will be required to revise and resubmit. - During the virtual monitoring call, Project Officers will review the SCA’s written answer to the question, and ensure they have a full understanding of where the SCA keeps data on SOR-funded clients, and how they access this data to complete the SOR reports. - During the onsite monitoring visit, the Project Officers will take the most recently submitted SOR report and ask the SCA staff to duplicate the steps they used to arrive at the reported numbers. * If the SCA is able to demonstrate how clients are tracked and the steps used to determine the reported numbers produce results consistent with what was submitted in the report, the SCA’s submitted data will be considered verified. * If the SCA is unable to demonstrate how clients are tracked, and the steps used to determine the reported numbers do not produce results consistent with what was submitted in the report, the SCA will be required to implement a process by which they can accurately track this data and report client numbers. Any SCA required to implement a new client-tracking system will be required to submit backup documentation with their SOR reports, until such time as they are able to demonstrate to DDAP that they are accurately tracking clients and can demonstrate the steps used to determine their reported numbers. - This review process and results will be added to the Monitoring Report sent to the SCA at the end of the monitoring cycle, to reflect the SCA’s compliance status. Anticipated Completion Date: 09/30/2024 Contact Names: Susan Duff, Chief, Program Monitoring Division; Autumn Croasmun, Project Director for State Opioid Response III Grant; Tia Roebuck, Director, Division of Budget and Procurement
View Audit 296143 Questioned Costs: $1
DOC will institute internal controls to review and monitor, on a quarterly basis, medical costs billed from the pharmaceutical vendor to ensure the billing is consistent with contract language. The review will be done by a Fiscal Management Specialist (FMS). The internal control will consist of the...
DOC will institute internal controls to review and monitor, on a quarterly basis, medical costs billed from the pharmaceutical vendor to ensure the billing is consistent with contract language. The review will be done by a Fiscal Management Specialist (FMS). The internal control will consist of the following: - Beginning with the December 2023 invoice, DOC will request fully executed procurement documents from the pharmaceutical contractor to verify acquisition costs. - The current contract language states that pharmaceuticals are billed at actual acquisition costs plus a dispensing fee. Therefore, the FMS will match the acquisition cost for the vendor for a sample of transactions to the invoices received from the vendor. - DOC will conduct this review on the pharmaceutical invoices for March, June, September, and December in each year continually. - DOC will document the review using an excel spreadsheet that has the universe of pharmacy orders by patient – matching the records and recording the date the review was done. All documents will be saved in an internal medical invoice folder. - Reviews will be completed by the last day of the month after the invoice is submitted. - Training on the new process will be done by March 31, 2024. Findings (or lack thereof) will be reported to DDAP by April 30th, July 31st, October 31st, and January 31st of each year via email. - If there are discrepancies, the vendor will be contacted immediately and a true-up will be requested in the next month’s invoices (either a credit or a debit depending on the discrepancy). DOC will continue to utilize PACE to complete full audits on reasonability of drug prices. DOC acknowledges, due to purchasing and distribution practices for the pharmaceutical vendor, Sublocade was not on prior reports. However, in the third and fourth quarter of 2023, Sublocade was added to the quarterly PACE audits for reasonability of drug prices. DOC has spoken with PACE and will now receive all quarterly audits and will be invited to all meetings between PACE and the contracted pharmaceutical vendor to discuss any findings. Anticipated Completion Date: 03/31/2024 Contact Names: Erica Benning, Director, Healthcare Services; Jodilynn Jacob-Byrd, Fiscal Management Specialist
View Audit 296143 Questioned Costs: $1
Office of Admin.–SSBG: The Bureau of Financial Operations (BFO) will continue conducting during-the-award subrecipient monitoring for the SSBG based on the results of the documented risk assessment. As it relates to the cash management portion of the finding, given the relatively small amount of f...
Office of Admin.–SSBG: The Bureau of Financial Operations (BFO) will continue conducting during-the-award subrecipient monitoring for the SSBG based on the results of the documented risk assessment. As it relates to the cash management portion of the finding, given the relatively small amount of funds involved and the number of counties affected, DHS has determined that it is not economically feasible to change the payment methodology at this time. Anticipated Completion Date: 06/30/2024 Contact Name: Kelly Graham, Director, Div. of Financial Policy and Operations OPD-SSBG: Due to the COVID-19 global pandemic as well as staff turnover and vacancies in OPD, regular monitoring of SSBG grant recipients was not performed on schedule. However, with the hiring of a full complement of staff for the DHS Policy Office, including a Grant Administrator, we are in the process of creating and implementing a robust monitoring plan for all 19 of our grantees for calendar year 2024, including in-person monitoring, desk monitoring, data collection, and analysis. Anticipated Completion Date: 12/31/2024 Contact Name: Jessica Schneider, Exec. Policy Specialist I, Grants
View Audit 296143 Questioned Costs: $1
New Directions, Cash Grants The Office of Income Maintenance (OIM) is determining how it can incorporate onsite financial monitoring into the monitoring that is currently being conducted. This includes consideration of the specific areas the financial monitoring should cover and the scope of the mo...
New Directions, Cash Grants The Office of Income Maintenance (OIM) is determining how it can incorporate onsite financial monitoring into the monitoring that is currently being conducted. This includes consideration of the specific areas the financial monitoring should cover and the scope of the monitoring. After OIM develops the monitoring procedures, OIM will start the onsite monitoring. Anticipated Completion Date: 12/31/2024 Contact Name: Joel O’Donnell, Dir., Bureau of Program Support, OIM Real Alternatives Despite repeated attempts and efforts by the Office of Policy Development (OPD) to engage Real Alternatives in ongoing monitoring activities, as well as monitoring after the end of the grant for previous years, the grantee was uncooperative and unresponsive to our requests and therefore regular monitoring was not completed. Effective December 31, 2023, the Department of Human Services’ grant agreement with Real Alternatives ended and was not renewed. Anticipated Completion Date: Completed Contact Name: Jessica Schneider, Executive Policy Specialist I, Grants, OPD
View Audit 296143 Questioned Costs: $1
PDE will continue to follow regulations requiring expenditure report certifications. Internal controls will be strengthened where necessary, to ensure that staff perform reviews of expenditure reports to verify all necessary certification signatures have been obtained. Anticipated Completion Date: ...
PDE will continue to follow regulations requiring expenditure report certifications. Internal controls will be strengthened where necessary, to ensure that staff perform reviews of expenditure reports to verify all necessary certification signatures have been obtained. Anticipated Completion Date: 06/30/2024 Contact Names: Carmen Medina, Chief, Student Svcs., Bur. of School Supp.; Clayton Carroll, Audit Coord., Bur. of Budget & Fiscal Mgmt.
View Audit 296143 Questioned Costs: $1
Compliance of the 52 Area Agencies on Aging (AAA) subrecipients is currently being monitored by three Fiscal Representatives using a Phase VIII monitoring tool. As the period of performance of evaluation comes to a close, a new tool will be drafted, taking into consideration the additional need for...
Compliance of the 52 Area Agencies on Aging (AAA) subrecipients is currently being monitored by three Fiscal Representatives using a Phase VIII monitoring tool. As the period of performance of evaluation comes to a close, a new tool will be drafted, taking into consideration the additional need for risk assessments. 1. With the use of a Monitoring log, PDOA plans to perform risk assessments systemically statewide for all Aging Cluster subrecipients. 2. A risk assessment is being developed to evaluate each subrecipient’s risk of noncompliance to proactively address any weaknesses in internal controls over federal programs. - Pointed questions regarding the Organization will be included to gauge management’s ability to follow all terms and conditions of the contract. - General Policies will be reviewed for adherence to all federal and state regulations and competence of personnel administering the programs. - Since multiple federal funding streams are involved, a fiscal component will also be administered to review internal controls for financial issues. 3. As a starting point, PDOA plans to prioritize the larger organizations which typically require more monitoring on an annual basis. 4. Subrecipient monitoring is projected to occur during the fiscal year ended June 30, 2024, for the Aging Cluster subrecipients to ensure timely compliance with all applicable federal regulations. 5. Performance check-ins are launching in April of 2024 as part of a statewide comprehensive monitoring as a new form of regulatory measure. 6. PDOA recognizes time and insufficient staffing as a barrier to achieving the goal of performing a risk assessment for every AAA, but has set an expectation of reaching half at a minimum. 7. Follow-Up procedures resulting from this finding will be reviewed and adjusted as needed to deliver optimal outcomes. Preliminary procedures will be directed to the agency’s audit review committee for resolution of completeness. 8. In the event the audit review committee determines additional steps beyond the monitoring efforts outlined above are insufficient, additional efforts will be communicated to the AAA network. Anticipated Completion Date: 06/30/2024 Contact Name: Jennifer Cave, Fiscal Management Specialist, PDOA Audit Liaison
View Audit 296143 Questioned Costs: $1
The final report for the grant H126A210056 has already been submitted to the RSA. No changes can be made to the RSA report at this point. A reconciliation process has been introduced which will eliminate period of performance (POP) violations for the current/future grants. Currently, OVR is using th...
The final report for the grant H126A210056 has already been submitted to the RSA. No changes can be made to the RSA report at this point. A reconciliation process has been introduced which will eliminate period of performance (POP) violations for the current/future grants. Currently, OVR is using this method to ensure correction of POP violations for the current VR grants (if any). Adjusting entries to correct the POP violation in SAP will be posted by 04/15/2024 subject to the approval of OB-OCO to open the closed internal orders of the grant. Anticipated Completion Date: 04/15/2024 Contact Name: Zulqarnain Nasir, Chief Financial Officer, OVR
View Audit 296143 Questioned Costs: $1
On March 2, 2021, AMLR program representatives attended a Department of Interior, Office of Surface Mining Reclamation and Enforcement online training covering 2 CFR 200 and contractor or subrecipient determinations. DEP ceased issuing AMLR grants under Management Directive 305.20, Grant Administr...
On March 2, 2021, AMLR program representatives attended a Department of Interior, Office of Surface Mining Reclamation and Enforcement online training covering 2 CFR 200 and contractor or subrecipient determinations. DEP ceased issuing AMLR grants under Management Directive 305.20, Grant Administration. DEP management has determined the recipients with existing agreements are subrecipients and DEP will follow this determination consistently with future agreements and accounting. DEP has developed written policies and procedures for subrecipient monitoring and has notified grantees to implement the policies and procedures immediately to ensure timely subrecipient compliance with federal regulations. On July 28, 2023, an audit resolution letter was issued by the Department of Interior, Office of Surface Mining Reclamation and Enforcement. To further address deficiencies, training for DEP Grant Managers was held on January 24, 2024, and January 31, 2024, to provide details and instruction on reporting requirements and proper documentation to ensure subrecipient compliance with federal regulations and DEP’s role in this compliance. Anticipated Completion Date: Completed Contact Names: Patrick Webb, Director, Bureau of Abandoned Mine Reclamation; Tim Golding, Exec. Assist., Office of Admin. and Management
View Audit 296143 Questioned Costs: $1
PDE agrees with the portion of the finding pertaining to the lack of required signature on an expenditure report. To address this error, PDE will retrain staff and update “Tool Tips” in PEARS so that it is clearer for field advisers. PDE disagrees with two of the conditions of the finding, as stat...
PDE agrees with the portion of the finding pertaining to the lack of required signature on an expenditure report. To address this error, PDE will retrain staff and update “Tool Tips” in PEARS so that it is clearer for field advisers. PDE disagrees with two of the conditions of the finding, as stated by the auditors. First, regulation 7 CFR 226.6 (o), cited and summarized by the auditors as requiring PDE to resolve and close reviews within a specific timeline, does not include this requirement in the text. The regulation requires that subrecipients resolve any issues with a timeframe specified in their corrective action. Second, the first bulleted condition, states that “these reviews did not include any complex findings that would have required more time to close.” PDE procedure for closing reviews states that “any exception must be communicated and approved by the Supervisor…” The procedure does not qualify or limit these exceptions to “complex findings.” Accordingly, PDE will continue to follow its procedures as written. Anticipated Completion Date: 06/30/2024 Contact Names: Vonda Ramp, Chief, Div. of Food & Nutr., Bur. of Bdgt. & Fiscal Management; Clayton Carroll, Audit Coord., Bur. of Bdgt. & Fiscal Management
View Audit 296143 Questioned Costs: $1
PDA: For federal programs within the Food Distribution Cluster (ALNs 10.565, 10.568, and 10.569), PDA will put the following steps in place for (1) identifying the federal award information and applicable requirements and (2) evaluating each subrecipient’s risk of noncompliance as Required by the Un...
PDA: For federal programs within the Food Distribution Cluster (ALNs 10.565, 10.568, and 10.569), PDA will put the following steps in place for (1) identifying the federal award information and applicable requirements and (2) evaluating each subrecipient’s risk of noncompliance as Required by the Uniform Grant Guidance. 1) PDA will ensure that FAIN numbers are now included in all new subaward agreements. (For currently existing agreements, PDA will send letters by June 30 to provide the FAIN and reiterate Single Audit requirements.) 2) For those subaward agreements that are permanent and/or cover multiple funding years, PDA will develop procedures to ensure that annual notices are sent to each subrecipient notifying them of the updated FAIN for their agreement and reminding them of the Single Audit requirements that are laid out in the terms of their initial signed agreement. 3) PDA will develop a process to evaluate each subrecipient’s risk of noncompliance with federal statutes, regulations, and the terms and conditions of the subaward for purposes of determining the appropriate subrecipient monitoring. The evaluation will be based on Key Performance Indicators, such as leadership tenure; prior incidents of food spoilage; or qualitative feedback from clients served. If the evaluation determines that additional monitoring tools beyond the routine performance of on-site reviews of the subrecipient's program operations are necessary, such conditions will be laid out in a separate letter communication to the sub-awardee. Anticipated Completion Date: 06/30/2024 Contact Name: Caryn Long Earl, Director, Bureau of Food Assistance PDOA: PDOA will implement the following steps to evaluate each subrecipient’s risk of noncompliance as required by the uniform grant guidance. 1. Evaluation is ongoing for the impacted Aging Cluster programs. 2. A risk assessment is being developed to evaluate each subrecipient’s risk of noncompliance to proactively address any weaknesses in internal controls over federal programs. - Pointed questions regarding the Organization included to gauge management’s ability to follow all terms and conditions of the contract. - General Policies will be reviewed for adherence to all federal and state regulations and competence of personnel administering the programs. - Since multiple federal funding streams are involved, a fiscal component will also be administered to review internal controls for financial issues. 3. Performance check-ins are launching in April of 2024 as part of a statewide comprehensive monitoring as a new form of regulatory measure. 4. Follow-Up procedures resulting from this finding will be reviewed and adjusted as needed to deliver optimal outcomes. Preliminary procedures will be directed to the agency’s audit review committee for resolution of completeness. 5. In the event the audit review committee determines additional steps beyond the monitoring efforts outlined above are insufficient, additional efforts will be communicated to the AAA network. Anticipated Completion Date: 06/30/2024 Contact Name: Jennifer Cave, Fiscal Management Specialist, PDOA Audit Liaison DOH: DOH plans to develop and implement a robust subrecipient monitoring program which includes establishing a new section within the Budget Office pending enacted budget funds and complement to support the creation of the section. Initiative goals/milestones include: 1. Educate Department: Budget Office is developing a bulletin that will outline the subrecipient monitoring requirements with links to state and federal sources. The bulletin will be shared with all program office staff. The Budget Office will develop the following templates and provide to all program offices: - Determination of vendor status: Subrecipient or Contractor - Risk Assessment Form - Internal Control Self-Assessment for Subrecipient Template - Subrecipient Monitoring Template 2. Implementation of full compliance initiative: Recommendations provided in the assessment will be used to develop and implement comprehensive policies and procedures lead by a new section in the Budget Office. Anticipated Completion Dates: 1 - 03/31/2024; 2 - 03/31/2025 Contact Name: Andrea Race, CFO DHS: Foster Care 1. For the portion of the audit finding that indicates State Agencies Did Not Identify the Federal Award Information and Applicable Requirements at the Time of the Subaward. Beginning state fiscal year 2024-2025, OCYF will begin sending out the required information to the Foster Care non-profit contractor. 2. Separately, OCYF will be developing a risk assessment process for the Foster Care non-profit contractor in state fiscal year 2024-2025. Anticipated Completion Dates: 1 - 06/30/2024; 2 - 06/30/2025 Contact Name: Melissa Erazo, Director, Bureau of Budget and Fiscal Support TANF and SSBG Effective December 31, 2023, DHS’ grant contract with Real Alternatives ended. We have no contract for services with them going forward. Despite repeated attempts and efforts to engage this grantee in ongoing monitoring activities, as well as monitoring after the end of the grant for previous years, they were uncooperative and unresponsive to our requests and therefore regular monitoring was not completed. Due to the Covid-19 global pandemic as well as staff turnover and vacancies in the Office of Policy Development, regular monitoring of SSBG grant recipients was not performed on schedule. However, with the hiring of a full complement of staff for the DHS Policy Office, including a Grant Administrator, we are in the process of creating and implementing a robust monitoring plan for all 19 of our grantees for calendar year 2024, including risk assessments, in person monitoring, desk monitoring, data collection and analysis. Anticipated Completion Date: 12/31/2024 Contact Name: Jessica Schneider, Executive Policy Specialist I, Grants
View Audit 296143 Questioned Costs: $1
PDA, Bureau of Food Assistance (BFA) has already or will put the following steps in place to address this deficiency and noncompliance finding. 1. BFA, in coordination with our contractor, Hunger-Free Pennsylvania, has developed a mechanism to track the reviews of all 16 lead subrecipient agencies f...
PDA, Bureau of Food Assistance (BFA) has already or will put the following steps in place to address this deficiency and noncompliance finding. 1. BFA, in coordination with our contractor, Hunger-Free Pennsylvania, has developed a mechanism to track the reviews of all 16 lead subrecipient agencies for the Commodity Supplemental Food Program (CSFP). This tracking mechanism will help to ensure that CSFP monitoring reviews are scheduled and completed in a timely manner, in accordance with federal regulations pertaining to CSFP. 2. BFA has scheduled a comprehensive monitoring review of Food Helpers (formerly known as Greater Washington County Food Bank). The review is scheduled to begin March 2024, and should be completed no later than April 30, 2024. Anticipated Completion Dates: 1 - Completed; 2 - 04/30/2024 Contact Name: Caryn Long Earl, Director, Bureau of Food Assistance
View Audit 296143 Questioned Costs: $1
« 1 161 162 164 165 285 »