Corrective Action Plans

Browse how organizations respond to audit findings

Total CAPs
55,616
In database
Filtered Results
422
Matching current filters
Showing Page
9 of 17
25 per page

Filters

Clear
Active filters: § 200.214
Conditions 1-3: The MOF acknowledges this finding and will address the deficiencies by reinforcing documentation and compliance requirements. Annual refresher training will be provided to current staff, and onboarding will be conducted for new staff to ensure adherence to established procedures. Con...
Conditions 1-3: The MOF acknowledges this finding and will address the deficiencies by reinforcing documentation and compliance requirements. Annual refresher training will be provided to current staff, and onboarding will be conducted for new staff to ensure adherence to established procedures. Condition 4: The MOF acknowledges this finding and notes that screening for debarred, suspended, or excluded entities was incorporated into the Grants and Sub-Grants Monitoring Procedures Manual in November 2024. The Ministry further confirms that this requirement will be enforced immediately.
Finding 1171701 (2023-011)
Material Weakness 2023
Chairman of the Board of County Commissioners: These procurement issues originated during the prior County Clerk’s administration, but the current leadership is focused on corrective measures. Together, we are: • developing a SOP to ensure vendor checks for suspension and debarment are conducted on ...
Chairman of the Board of County Commissioners: These procurement issues originated during the prior County Clerk’s administration, but the current leadership is focused on corrective measures. Together, we are: • developing a SOP to ensure vendor checks for suspension and debarment are conducted on all purchases over $25,000, • establishing written standards of conduct to address conflicts of interest and set clear procurement guidelines, • and enhancing oversight and review to ensure all procurement processes are fully compliant with federal regulations. Our goal is to build a consistent, transparent procurement framework that safeguards both compliance and public trust. County Clerk: I was not the County Clerk in office at this time. To correct this issue, the County plans to develop a SOP to timely and accurately track and report on the SEFA. The SOP will be reviewed, adopted, and monitored by the Board of County Commissioners.
Response to finding 2023-002 – Procurement, Suspension, and Debarment Views of Responsible Officials: CSforALL management agrees with the conditions identified by SAX Advisory Group, including the noted causes and resulting effects under 2023-002. Due to the organizational pause at the end of 2024 a...
Response to finding 2023-002 – Procurement, Suspension, and Debarment Views of Responsible Officials: CSforALL management agrees with the conditions identified by SAX Advisory Group, including the noted causes and resulting effects under 2023-002. Due to the organizational pause at the end of 2024 and the transition period throughout 2025, the Organization operated with significantly reduced staffing and limited capacity, which delayed the development of procurement policies addressing suspension and debarment requirements. Initial governance updates occurred during the 2025 Q4 Board meeting, where the Board approved a revised version of the By-Laws focused on correcting deficiencies in board structure and conflict-of-interest provisions. Procurement procedures recommended in this finding were not included in that initial revision but are scheduled for development and implementation as part of the 2026 rebuilding phase. Corrective Action taken in 2025: While no procurement-specific corrective action has yet been implemented, foundational updates to the By-Laws were approved at the 2025 Q4 Board meeting to address structural governance issues. These updates establish the basis for incorporating required procurement, suspension, and debarment procedures. The Operations Manager and Advisory Consultant have begun drafting updated procurement policies to ensure compliance with federal requirements. Corrective Action Planned for 2026: Draft procurement, suspension, and debarment policies will be completed and presented to the Board as a formal resolution in early 2026. Upon approval, these policies will be incorporated into the By-Laws and will take immediate effect. The Board has also approved the planned hiring of a consultant with Executive Director and strategy experience in 2026 to support policy implementation, training, staff alignment, and ongoing compliance review. These measures will ensure full compliance with procurement requirements throughout the 2026 operating year and beyond.
Thomas Swabb, Tribal Chairman Marjianne Yonge, Tribal Treasurer PO Box 747 Lone Pine, CA 93545 (760) 876-1034 Condition During testing we noted the following:For 1 of 1 vendors tested, the Tribe did not maintain documentation demonstrating that the vendor was verified as not federally suspended or d...
Thomas Swabb, Tribal Chairman Marjianne Yonge, Tribal Treasurer PO Box 747 Lone Pine, CA 93545 (760) 876-1034 Condition During testing we noted the following:For 1 of 1 vendors tested, the Tribe did not maintain documentation demonstrating that the vendor was verified as not federally suspended or debarred prior to entering into the contract. Corrective Action: Effective January 1, 2026, every proposal or contract that goes out will require all vendors to be active in SAMS.gov for all federal grants. This will be a requirement during the biddingprocess. Anticipated date of completion: January 30, 2026.
Finding 2023-001 – Coronavirus State and Local Fiscal Recovery Funds – Procurement and Suspension and Debarment (Material Weakness) Condition: An effective internal control system was not in place at the District in order to ensure compliance with requirements related to the grant agreement and the ...
Finding 2023-001 – Coronavirus State and Local Fiscal Recovery Funds – Procurement and Suspension and Debarment (Material Weakness) Condition: An effective internal control system was not in place at the District in order to ensure compliance with requirements related to the grant agreement and the simplified acquisitions procurement method of the Procurement and Suspension and Debarment compliance requirement. Context: There were two contracts subject to procurement and suspension and debarment during the year. For both procurements, the District could only provide final signed contracts and did not have evidence of the full bid process. For the first selection, the District provided the request for proposal but did not provide all bids that were received or a scoring rubric to support why the District selected the vendor. For the second selection, the request for proposal, bids received, and scoring rubric were not provided. Additionally, evidence of a suspension and debarment check for both selections was not available. The District did not have a formal procurement policy documented. Views of Responsible Officials: We concur with the finding. Description of Corrective Action Plan: Management will ensure that a procurement policy is adopted and followed and documents to support the process and vendor selections are maintained. Responsible Party and Timeline for Completion: The Treasurer is the responsible party. The completion will go into effect immediately.
FINDING 2023-004 Finding Subject: Drinking Water State Revolving Fund (DWSRF) Cluster - Procurement and Suspension and Debarment Contact Person Responsible for Corrective Action: Tyler Pearson, Clerk Treasurer Contact Phone Number and Email Address: 574-739-1416 clerktreasurer@cityoflogansport.org V...
FINDING 2023-004 Finding Subject: Drinking Water State Revolving Fund (DWSRF) Cluster - Procurement and Suspension and Debarment Contact Person Responsible for Corrective Action: Tyler Pearson, Clerk Treasurer Contact Phone Number and Email Address: 574-739-1416 clerktreasurer@cityoflogansport.org Views of Responsible Officials: We concur with the finding. Description of Corrective Action Plan: We will develop and implement a formal process for verifying that vendors are not suspended, debarred, or otherwise excluded from receiving federal funds before entering into contracts or transactions that meet or exceed the $25,000 threshold. The City will develop a purchasing policy that reflects the applicable state laws and regulations related to procurement. The City will also maintain proper documentation to support the appropriate procurement method. Anticipated Completion Date: December 31, 2025
(2023-004) Documentation of Purchasing Compliance - Significant deficiency Criteria Per CFR §180.300 and 2 CFR §200.214, the District must verify vendors are not suspended or debarred or otherwise excluded from participating in a covered transaction. This verification may be accomplished by checking...
(2023-004) Documentation of Purchasing Compliance - Significant deficiency Criteria Per CFR §180.300 and 2 CFR §200.214, the District must verify vendors are not suspended or debarred or otherwise excluded from participating in a covered transaction. This verification may be accomplished by checking the Excluded Parties List System (EPLS) maintained by the General Services Administration (GSA); collecting a certification from the entity, or adding a clause or condition to the covered transaction with that entity. Condition During our testing of suspension and debarment compliance, we noted that the District did not retain documentation demonstrating that vendors were verified as not suspended, debarred, or otherwise excluded from participation in federal programs prior to execution of two contracts, each with expenditures exceeding $25,000. Cause The District did not have formalized procedures to ensure suspension and debarment verifications were performed and documented prior to executing covered contracts. Effect Without adequate verification and documentation, there is a risk that the District could contract with vendors who are ineligible to receive federal funds, resulting in noncompliance with federal regulations. Questioned Costs No questioned costs were identified as a result of our procedures. Context/Sampling Two vendor contracts with expenditures greater than $25,000 were selected for testing. In both cases, the District did not provide documentation of suspension and debarment verification at the time of contract execution. Recommendation We recommend that the District implement procedures to verify vendor eligibility prior to entering into federally funded contracts. Acceptable methods include retaining a SAM.gov screenshot, obtaining vendor certification, or including a suspension and debarment clause in the contract. The District should also ensure documentation is retained in the procurement file and assign responsibility for this task to appropriate staff. Training and periodic reviews should be conducted to reinforce compliance and reduce the risk of using ineligible vendors. Management’s Corrective Action Planned Management concurs with the recommendation. IVGID will implement a procedure to document the procurement process and review of suspension and debarment for all vendors that undergo the bidding process.
Fiscal Year 2023 Single Audit Corrective Action Plan Finding Number: 2023-004 Procurement Condition: The CMHSP did not follow the formal procurement methods outlined in 2 CFR 200.320 prior to entering into contracts for services under the grant. Also, the CMHSP did not verify that the vendors were n...
Fiscal Year 2023 Single Audit Corrective Action Plan Finding Number: 2023-004 Procurement Condition: The CMHSP did not follow the formal procurement methods outlined in 2 CFR 200.320 prior to entering into contracts for services under the grant. Also, the CMHSP did not verify that the vendors were not suspended, debarred, or otherwise excluded or disqualified in accordance with 2 CFR requirements prior to entering into a contract for services under the grant. Planned Corrective Action: The finance team will make sure proper bids and documentation are kept as proof of sole source provider and why certain vendors were chosen over others. The finance team will ensure that any procurement for vendors are shared with the contract management team to verify that the vendors were not suspended, debarred, or otherwise excluded or disqualified in accordance with 2 CFR requirements prior to entering into a contract. Contact Person: Kevin Hartley, CFO 231.633.2171 Kevin.hartley@nlcmh.org Anticipated Completion Date: 10-1-24
View Audit 360525 Questioned Costs: $1
Views of Responsible Officials and Planned Corrective Actions: Agree with recommendation. Prior to executing a contract, employees with responsibility for engaging contractors and consultants funded by a Federal award will be required to check SAM.gov. This step will be included in the procurement...
Views of Responsible Officials and Planned Corrective Actions: Agree with recommendation. Prior to executing a contract, employees with responsibility for engaging contractors and consultants funded by a Federal award will be required to check SAM.gov. This step will be included in the procurement policy.
FINDING 2023-003 Finding Subject: COVID-19 – State and Local Fiscal Recovery Funds – Suspension and Debarment Contact Person Responsible for Corrective Action: Bob G. Courtney, Mayor Contact Phone Number and Email Address: 812-265-8300/mayor@madison-in.gov Views of Responsible Officials: We concur w...
FINDING 2023-003 Finding Subject: COVID-19 – State and Local Fiscal Recovery Funds – Suspension and Debarment Contact Person Responsible for Corrective Action: Bob G. Courtney, Mayor Contact Phone Number and Email Address: 812-265-8300/mayor@madison-in.gov Views of Responsible Officials: We concur with the finding regarding the lack of policies or procedures in place related to the SLRF suspension and debarment requirements. Description of Corrective Action Plan: Historically, the city has not had a centralized position who would be responsible for grant and compliance management which created an inferior process of internal controls. A new Project & Grant Manager position was created in the Mayor’s office in April 2025. When contracts for goods or services equal or exceed the required amount, verification will be done by checking the Excluded Parties List System (EPLS), collecting a certification from that person, or adding a clause or condition to the transaction with that person. Proper education on the process is already underway. Anticipated Completion Date: The new position referenced above has been filled and is in operation as of April 8th 2025.
Finding 560973 (2023-004)
Significant Deficiency 2023
View of Responsible Official and Corrective Action Plan Heading Home management agrees with this finding. Management has reviewed existing procurement policies and procedures found in Section III Policy #301 of Heading Home’s fiscal policies and procedures with appropriate staff and will enforce pol...
View of Responsible Official and Corrective Action Plan Heading Home management agrees with this finding. Management has reviewed existing procurement policies and procedures found in Section III Policy #301 of Heading Home’s fiscal policies and procedures with appropriate staff and will enforce policies and procedures to ensure competitive bids are obtained where required. Management has also reviewed the existing suspension and debarment policies and procedures found in Section III Policy #302 with appropriate staff, and which require vendors to be reviewed on the SAM website, to ensure they have not been suspended or debarred. Although this review was conducted after the fact, each of the five vendors noted in this finding has since been reviewed on the SAM website, and none of them returned a notice of suspension or debarment. Management is in the process of reviewing all vendors paid $10,000 or more against the SAM website and will ensure all vendors are checked against the website who currently meet this requirement, as well as for those anticipated to meet this threshold. Proof of the SAM website review and approval will be maintained in each vendor file. Management reviewed the above mentioned vendors and noted none of them were suspended or debarred. Circumstantial evidence consisting of emails leads the organization to believe bids/quotes were in fact solicited but the actual procurement packets could not be located due to the extensive turnover in management during 2023. Management anticipates the above corrective action plan will be fully implemented by September 30, 2025. The personnel responsible for overseeing implementation include Connie Chavez, Chief Executive Officer; Debbie Brickman, Chief Financial Officer; and Armando Sanchez, contract accountant team lead.
Finding 555111 (2023-002)
Significant Deficiency 2023
Management recruited a procurement officer in December 2024 to design and implement best practice procurement processes effective the first quarter 2025. Procurement policies will ensure full compliance with Federal and State requirements. Procurement policies will incorporate clearly defined proc...
Management recruited a procurement officer in December 2024 to design and implement best practice procurement processes effective the first quarter 2025. Procurement policies will ensure full compliance with Federal and State requirements. Procurement policies will incorporate clearly defined procedures around all contractors ensuring appropriate selection processes and contractual terms.
NONCOMPLIANCE WITH PROCUREMENT, SUSPENSION & DEBARMENT REQUIREMENTS, CORONAVIRUS STATE AND LOCAL FISCAL RECOVERY FUNDS, AL No. 21.027 Name of Contact Person: Michael Opie Corrective Action: Big Horn County will pass an updated Management of Federal grant Awards policy. Proposed Completion Date: Ma...
NONCOMPLIANCE WITH PROCUREMENT, SUSPENSION & DEBARMENT REQUIREMENTS, CORONAVIRUS STATE AND LOCAL FISCAL RECOVERY FUNDS, AL No. 21.027 Name of Contact Person: Michael Opie Corrective Action: Big Horn County will pass an updated Management of Federal grant Awards policy. Proposed Completion Date: March 31, 2024
A detailed Procurement process currently exists; however, due to staff turnover we were unable locate all the procurement documentation requested. We will continue to reinforce our Procurement policy (detailed below as it relates to documentation) and now require all documentation be stored in a Cen...
A detailed Procurement process currently exists; however, due to staff turnover we were unable locate all the procurement documentation requested. We will continue to reinforce our Procurement policy (detailed below as it relates to documentation) and now require all documentation be stored in a Central location for all applicable Finance staff. (1) Mary's Center will establish and maintain procurement records and files. The physical records will be kept in the office of the Chief Executive Officer and/or Finance office and virtual copies will be stored on the Finance shared folder. (2) Mary's Center will document in the procurement files some form of cost or price analysis made in connection with every procurement action. (3) For any contracted service (other than equipment-specific technical support), Mary's Center procurement file will include: Basis for selection of the contractor, Justification for lack of competition when competitive bids or prices are not obtained, and Basis for award cost or price. (4) These records and files will be kept in accordance with Mary's Center's Record Retention and Document Destruction Policy. Anticipated Completion Date: 3/31/2025 Responsible Contact Person: Tony Ricciardella, Interim Chief Financial Officer and Alison Roca, Controller
Finding 522283 (2023-009)
Material Weakness 2023
CORONAVIRUS STATE AND LOCAL FISCAL RECOVERY FUNDS, ASSISTANCE LISTING No. 21.027, PROCUREMENT AND SUSPENSION AND DEBARMENT Name of contact person: County Commissioners Corrective Action: Roosevelt County will follow the procedure of verifying contractors through SAM or GSA Websites when using SLFR...
CORONAVIRUS STATE AND LOCAL FISCAL RECOVERY FUNDS, ASSISTANCE LISTING No. 21.027, PROCUREMENT AND SUSPENSION AND DEBARMENT Name of contact person: County Commissioners Corrective Action: Roosevelt County will follow the procedure of verifying contractors through SAM or GSA Websites when using SLFRF funds. Proposed Completion Date: Immediately.
Finding 521096 (2023-009)
Significant Deficiency 2023
Condition: Suspension and debarment compliance was not verified for two covered transactions. Corrective Action Planned: All Purchase Order requests that are associated with a federal government grant will all have an attached list showing the company is not on the debarment list. We will also u...
Condition: Suspension and debarment compliance was not verified for two covered transactions. Corrective Action Planned: All Purchase Order requests that are associated with a federal government grant will all have an attached list showing the company is not on the debarment list. We will also update our School Contract language to include specific wording where the Vendor acknowledges the law and forfeits the contract if they are on the debarment list after the contract has been signed. A statement will be added to the contracts that states the following: ‘The Contractor (or use the term in the contract that identifies the vendor instead of Contractor) certifies under the pains and penalties of perjury, that the Contractor is not currently debarred or suspended by the Federal government, or any of its agencies, entities or subdivisions, nor is the Contractor currently debarred or suspended by the Commonwealth Massachusetts or any of its agencies, entities or subdivisions.’ If there is a section in the contract where the vendor certifies to other conditions (i.e. state taxes paid), then this language could be included under that section as another certification requirement. A Google Drive has been created to upload all supporting documents on a yearly basis. Anticipated Completion Date: 2/17/2025 Contact: Noel Velez, Director of Finance and Fiona Maxwell, Procurement Director
Finding 521085 (2023-007)
Significant Deficiency 2023
Condition: Suspension and debarment compliance was not verified for five covered transactions. Corrective Action Planned: All Purchase Order requests that are associated with a federal government grant will all have an attached list showing the company is not on the debarment list. We will also ...
Condition: Suspension and debarment compliance was not verified for five covered transactions. Corrective Action Planned: All Purchase Order requests that are associated with a federal government grant will all have an attached list showing the company is not on the debarment list. We will also update our School Contract language to include specific wording where the Vendor acknowledges the law and forfeits the contract if they are on the debarment list after the contract has been signed. A statement will be added to the contracts that states the following: ‘The Contractor (or use the term in the contract that identifies the vendor instead of Contractor) certifies under the pains and penalties of perjury, that the Contractor is not currently debarred or suspended by the Federal government, or any of its agencies, entities or subdivisions, nor is the Contractor currently debarred or suspended by the Commonwealth Massachusetts or any of its agencies, entities or subdivisions.’ If there is a section in the contract where the vendor certifies to other conditions (i.e. state taxes paid), then this language could be included under that section as another certification requirement. A Google Drive has been created to upload all supporting documents on a yearly basis. Anticipated Completion Date: 2/17/2025 Contact: Noel Velez, Director of Finance and Fiona Maxwell, Procurement Director
U.S. Department of Health and Human Services, passed through Kansas Department of Aging Aging Cluster – ALN 93.044 - Special Programs for the Aging_Title III, Part B_Grants for Supportive Services and Senior Centers - 2301KSOASS ALN 93.045 – Special Programs for the Aging_Title III, Part C_Nutrition...
U.S. Department of Health and Human Services, passed through Kansas Department of Aging Aging Cluster – ALN 93.044 - Special Programs for the Aging_Title III, Part B_Grants for Supportive Services and Senior Centers - 2301KSOASS ALN 93.045 – Special Programs for the Aging_Title III, Part C_Nutrition Services – 2301KSOAHD Management’s Response: Procurement began performing suspension and debarment checks on all vendors/contracts funded with grants in 2024. This process was implemented in the summer of 2024 as a result of the 2022 Single Audit Finding. Due to the audit not being completed prior to the completion of 2023, this finding was unknown to management. Upon being aware procurement was not doing the checks, immediate correction was undertaken. Checks are being done and documentation maintained in the purchasing file. The language has been included in bid documents as well. Views of Responsible Officials and Corrective Action: The reason for recurrence is the finding was communicated late in the prior year and due to transition and turnover within the department's staff. Procurement has begun the process of checking SAM.gov for debarment for potential suppliers. Also, departments have been informed of this required step for both suppliers and subrecipients. Downstream, need to evaluate if this language can be added to the contract templates. Management will ensure this is addressed by December 31, 2024. Responsible Official: Dr. Shelley Kneuvean Chief Financial Officer Unified Government of Wyandotte County & Kansas City KS
Management Response #2023-007: Due to staff shortages and turnover, the company lacked adequate personnel to effectively monitor or document grant activity. Additionally, formal documentation of policies and procedures was insufficient, and supporting documents were not stored in a centralized locat...
Management Response #2023-007: Due to staff shortages and turnover, the company lacked adequate personnel to effectively monitor or document grant activity. Additionally, formal documentation of policies and procedures was insufficient, and supporting documents were not stored in a centralized location, creating challenges in retrieving necessary information. Corrective Action Plan: In response to these issues, the company implemented the following corrective measures starting in mid-2023: • The Corporation established comprehensive, formal policies and procedures that document the current compliance practices. These procedures have been disseminated across the organization and incorporated into training programs to ensure all employees are aligned with the updated standards. • A procedure enhancement has been implemented in the procurement process, which requires the procurement manager to obtain three bids prior to the creation of certain purchase orders. This ensures competitive bidding and transparency in vendor selection. • Once a vendor is selected, the procurement manager will forward the vendor’s details to the compliance department. The compliance team will then verify the vendor's debarment status and federal eligibility to ensure compliance with all regulatory requirements. • A central repository platform has been created to store all vendor bids, price analyses, and related procurement documentation. This ensures that all relevant information is easily accessible and properly organized. • All accounts payable invoices designated for grant funding are now routed for prior approval to the respective grant program manager via the WorkPlace software before any payments are processed. This ensures proper oversight and alignment with grant requirements. These corrective actions aim to strengthen compliance, improve document management, and streamline oversight processes to prevent future issues related to grant monitoring and procurement. Responsible Party: Tamara Barnes, CFO
Finding 512678 (2023-003)
Significant Deficiency 2023
Suspension and Debarment State and Local Fiscal Recovery Funds – Assistance Listing No. 21.027 Recommendation: We recommend that the City review its policies over suspension and debarment review to ensure they are maintaining compliance and controls over verifying or contracting with vendors that ar...
Suspension and Debarment State and Local Fiscal Recovery Funds – Assistance Listing No. 21.027 Recommendation: We recommend that the City review its policies over suspension and debarment review to ensure they are maintaining compliance and controls over verifying or contracting with vendors that are allowable. Explanation of disagreement with audit finding: There is no disagreement with the audit finding. Action taken in response to finding: We will take actual computer image snips of the search results. Name(s) of the contact person(s) responsible for corrective action: Maryanne Groat Planned completion date for corrective action plan: 9/30/2024
Finding 508037 (2023-001)
Significant Deficiency 2023
2023-001: Significant Deficiency in Internal Controls and Compliance Finding -Child Nutrition Cluster ALN (10.553, 10.555,10.559): A competitive procurement process, which includes suspension and debarment certifications, was not properly performed by the Town for the purchase of school lunch food p...
2023-001: Significant Deficiency in Internal Controls and Compliance Finding -Child Nutrition Cluster ALN (10.553, 10.555,10.559): A competitive procurement process, which includes suspension and debarment certifications, was not properly performed by the Town for the purchase of school lunch food product. (Questioned Costs: $453,359) The Town of Clinton/School Department will maintain proper procurement procedures in compliance with Local, State and Federal laws and regulations. State procurement laws (MGL Chapter 30B for Goods and Services and MGL Chapter 149 Construction) are followed however the district is aware of the federal requirements. When there are exemptions from state procurement laws, or when federal regulations are stricter the district will use the strictest rules, under 2 CFR 200.318-327. These procedures have been updated in the Financial Procedures Manual (pages 231-240, under Section II Procurement System). The Town of Clinton/School Department has expanded membership with French River Education Center – Purchasing Cooperative to include several school lunch food products. The Town of Clinton/School Department will utilize two methods to determine if a potential vendor has been suspended or disbarred. Prior to approving a requisition for a contracted service in excess of $25,000 funded by a Federal grant, district will verify Sam.gov and will require the vendor to sign a Vendor Compliance Certification.
View Audit 328582 Questioned Costs: $1
Finding 503145 (2023-004)
Significant Deficiency 2023
Recommendation: The City should review and enhance controls and procedures to ensure that it follows the applicable procurement policy and Federal suspension and debarment regulations for all goods and services charged to the program. Explanation: There is no disagreement with the audit finding. Act...
Recommendation: The City should review and enhance controls and procedures to ensure that it follows the applicable procurement policy and Federal suspension and debarment regulations for all goods and services charged to the program. Explanation: There is no disagreement with the audit finding. Action taken in response to finding: The City of Harrington, Delaware will review the State’s procurement process to satisfy the compliance requirements for the program. The City of Harrington, Delaware will also put procedures in place to check and review each bidder as part of the Federal suspension and debarment policies. Name(s) of the contact person(s) responsible for corrective action: Norman Barlow, City Manager Amanda Marlow, Assistant City Manager Planned completion date for corrective action plan: Procurement training and monitoring, ongoing Suspension and debarment training and monitoring, ongoing
Finding 503144 (2023-003)
Significant Deficiency 2023
Recommendation: The City should review and enhance controls and procedures to ensure that it follows the applicable procurement policy and Federal suspension and debarment regulations for all goods and services charged to the program. Explanation: There is no disagreement with the audit finding. Act...
Recommendation: The City should review and enhance controls and procedures to ensure that it follows the applicable procurement policy and Federal suspension and debarment regulations for all goods and services charged to the program. Explanation: There is no disagreement with the audit finding. Action taken in response to finding: The City of Harrington, Delaware will review the State’s procurement process to satisfy the compliance requirements for the program. The City of Harrington, Delaware will also put procedures in place to check and review each bidder as part of the Federal suspension and debarment policies. Name(s) of the contact person(s) responsible for corrective action: Norman Barlow, City Manager Amanda Marlow, Assistant City Manager Planned completion date for corrective action plan: Procurement training and monitoring, ongoing Suspension and debarment training and monitoring, ongoing
Finding 503143 (2023-002)
Significant Deficiency 2023
Recommendation: The City should review and enhance controls and procedures to ensure that it follows the applicable procurement policy and Federal suspension and debarment regulations for all goods and services charged to the program. Explanation: There is no disagreement with the audit finding. Act...
Recommendation: The City should review and enhance controls and procedures to ensure that it follows the applicable procurement policy and Federal suspension and debarment regulations for all goods and services charged to the program. Explanation: There is no disagreement with the audit finding. Action taken in response to finding: The City of Harrington, Delaware will review the State’s procurement process to satisfy the compliance requirements for the program. The City of Harrington, Delaware will also put procedures in place to check and review each bidder as part of the Federal suspension and debarment policies. Name(s) of the contact person(s) responsible for corrective action: Norman Barlow, City Manager Amanda Marlow, Assistant City Manager Planned completion date for corrective action plan: Procurement training and monitoring, ongoing Suspension and debarment training and monitoring, ongoing
Action taken in response to finding: 1. Create procedure to verify vendors are not suspended or debarred: in progress a. Develop steps in the vendor diligence and procurement process to verify that the vendor is not suspended or debarred. b. Identify role or job that will handle responsibility for f...
Action taken in response to finding: 1. Create procedure to verify vendors are not suspended or debarred: in progress a. Develop steps in the vendor diligence and procurement process to verify that the vendor is not suspended or debarred. b. Identify role or job that will handle responsibility for following procedure. c. Formalize the process into a written procedure and add to the procurement or other relevant policy. d. Conduct periodic audits to assess adherence to the procedure and train as necessary to ensure compliance. Name of the contact person responsible for corrective action: Keith Flores, CFO Planned completion date for corrective action plan: End of 2024
View Audit 324609 Questioned Costs: $1
« 1 7 8 10 11 17 »