Finding No.: 2022-034 AL Program: 93.767 - Children’s Health Insurance Program Area: Activities Allowed or Unallowed and Allowable Costs/Costs Principles Questioned Costs: $1,182,511 Contact Person(s): Geroge J. Cruz, Medicaid Director Corrective Action Plan: Condition 1: The CNMI Medicaid Office re...
Finding No.: 2022-034 AL Program: 93.767 - Children’s Health Insurance Program Area: Activities Allowed or Unallowed and Allowable Costs/Costs Principles Questioned Costs: $1,182,511 Contact Person(s): Geroge J. Cruz, Medicaid Director Corrective Action Plan: Condition 1: The CNMI Medicaid Office respectfully disagrees with this finding. Due to internal scheduling constraints and the compressed timeline required to complete the FY22 audit, the requested documents were not submitted by the specified deadline, resulting in this finding. However, the office maintains all relevant supporting documentation and is prepared to provide it upon request from the Grantor. Proposed Completion Date: Ongoing Condition 2: CNMI Medicaid Office cannot confirm to agree or disagree with the findings stated, as the information references case numbers without sufficient supporting detail. The office does not operate a Medicaid Management Information System (MMIS) and therefore cannot automatically retrieve data to link case numbers with the total benefits paid or questioned costs. Additionally, two of the three case numbers provided are associated with multiple individuals. Even if the case numbers were accurate and beneficiary names included, the office would still need to identify the provider(s) associated with the payments in question. Claims data is maintained manually in Excel spreadsheets, consolidated across beneficiaries, and processed for payment through the MUNIS system using internally generated invoice numbers. These invoice numbers are not linked to specific beneficiaries. Therefore, to properly evaluate the findings, the office would require not only the case number, but also the beneficiary’s full name and the corresponding MUNIS invoice number. The office maintains all relevant supporting documentation and is prepared to provide it upon request from the Grantor. Proposed Completion Date: Ongoing Condition 3: The CNMI Medicaid Office respectfully disagrees with this finding. Due to internal scheduling constraints and the compressed timeline required to complete the FY22 audit, the requested documents were not submitted by the specified deadline, resulting in this finding. However, the office maintains all relevant supporting documentation and is prepared to provide it upon request from the Grantor. Proposed Completion Date: Ongoing
View Audit 371187 Questioned Costs: $1
Finding No.: 2022-033 AL Program: 93.489/93.575/93.596 - CCDF Cluster Area: Special Tests and Provisions – Health and Safety Requirements Questioned Costs: $1,757,352 Contact Person(s): Roselle Teregeyo, CCDF Co-Administrator/Accountant Corrective Action Plan: Condition 1: CCDF respectfully disagree...
Finding No.: 2022-033 AL Program: 93.489/93.575/93.596 - CCDF Cluster Area: Special Tests and Provisions – Health and Safety Requirements Questioned Costs: $1,757,352 Contact Person(s): Roselle Teregeyo, CCDF Co-Administrator/Accountant Corrective Action Plan: Condition 1: CCDF respectfully disagrees with this finding. In the middle of the Fiscal year, the CCDF Program transitioned to have the Quality Rating and Improvement System or QRIS perform the announced and unannounced visits. To allow the complete transition of the CCDF Certification and monitoring system, as independent from the Child Care Licensing Program, CCDF extended all expiration dates of CCDF Providers for an additional two months. This extension was given to all CCDF providers renewing from April 2022 to December 31, 2022. With the transition, CCDF allowed for providers to meet provider requirements in a year and were only subjected to an announced visit. Any non-compliance was noted, but supported to compliance through coaching. Effective October 1, 2022, all CCDF Providers are now subjected to announced and unannounced visits. Proposed Completion Date: Completed Condition 2: CCDF respectfully disagrees with this finding. Based on our records, all providers met the annual training hours. Proposed Completion Date: Ongoing
View Audit 371187 Questioned Costs: $1
Finding No.: 2022-031 AL Program: 21.027 - Coronavirus State and Local Fiscal Recovery Funds Area: Subrecipient Monitoring Questioned Costs: $61,003,095 Contact Person(s): Tracy B. Norita, Secretary of Finance Corrective Action Plan: Condition 1-3: The Department of Finance agrees with this finding....
Finding No.: 2022-031 AL Program: 21.027 - Coronavirus State and Local Fiscal Recovery Funds Area: Subrecipient Monitoring Questioned Costs: $61,003,095 Contact Person(s): Tracy B. Norita, Secretary of Finance Corrective Action Plan: Condition 1-3: The Department of Finance agrees with this finding. The Department has recently adopted and approved (August 2025) a Subrecipient Monitoring Policy and Procedures which specifically focused on the implementation of 2 CFR 200.331. The Department will expand on this policy and procedure to include the development and implementation of a comprehensive subrecipient monitoring policies that clearly outline the process for identifying subawards, assessing the risk of noncompliance, and conducting monitoring activities based on those risks. These policies will be aligned with federal requirements and best practices to ensure consistency and accountability. Furthermore, due to internal scheduling constraints and the compressed timeline required to complete the FY22 audit, the requested documents were not submitted by the specified deadline, resulting in this finding. However, the Department maintains all relevant supporting documentation and is prepared to provide it upon request from the Grantor. Proposed Completion Date: Ongoing
View Audit 371187 Questioned Costs: $1
Finding No.: 2022-030 AL Program: 21.027 - Coronavirus State and Local Fiscal Recovery Funds Area: Reporting Questioned Costs: $-0- Contact Person(s): Tracy B. Norita, Secretary of Finance Corrective Action Plan: Condition 1-3: The Department of Finance agrees with this finding. It is important to n...
Finding No.: 2022-030 AL Program: 21.027 - Coronavirus State and Local Fiscal Recovery Funds Area: Reporting Questioned Costs: $-0- Contact Person(s): Tracy B. Norita, Secretary of Finance Corrective Action Plan: Condition 1-3: The Department of Finance agrees with this finding. It is important to note that the issue occurred during FY22, a period marked by the transition from the legacy financial system (JDE) to the new Tyler Munis platform. During this time, processes for retaining and reconciling supporting documents had not been standardized, resulting in inconsistencies and a heightened risk of missing or improperly uploaded records. Furthermore, the Program Manager previously responsible for overseeing this grant is no longer with the Department. Due to internal scheduling constraints and the compressed timeline required to complete the FY22 audit, the requested documents were not submitted by the specified deadline, which contributed to this finding. Nevertheless, the Department is committed to provide relevant supporting documentation upon request from the Grantor. Proposed Completion Date: Ongoing.
Finding No.: 2022-027 AL Program: 21.026 - Homeowner Assistance Fund Program Area: Subrecipient Monitoring Questioned Costs: $4,157,924 Contact Person(s): Tracy B. Norita, Secretary of Finance Corrective Action Plan: Condition 1-4: The Department of Finance agrees with this finding. The Department h...
Finding No.: 2022-027 AL Program: 21.026 - Homeowner Assistance Fund Program Area: Subrecipient Monitoring Questioned Costs: $4,157,924 Contact Person(s): Tracy B. Norita, Secretary of Finance Corrective Action Plan: Condition 1-4: The Department of Finance agrees with this finding. The Department has recently adopted and approved (August 2025) a Subrecipient Monitoring Policy and Procedures which specifically focused on the implementation of 2 CFR 200.331. The Department will expand on this policy and procedure to include the development and implementation of a comprehensive subrecipient monitoring policies that clearly outline the process for identifying subawards, assessing the risk of noncompliance, and conducting monitoring activities based on those risks. These policies will be aligned with federal requirements and best practices to ensure consistency and accountability. Proposed Completion Date: December 31, 2025
View Audit 371187 Questioned Costs: $1
Finding No.: 2022-026 AL Program: 21.026 - Homeowner Assistance Fund Program Area: Reporting Questioned Costs: $-0- Contact Person(s): Zenie Mafnas, NMHC Director / Tracy B. Norita, Secretary of Finance Corrective Action Plan: The CNMI agrees with this finding. Department of Finance Program Manager ...
Finding No.: 2022-026 AL Program: 21.026 - Homeowner Assistance Fund Program Area: Reporting Questioned Costs: $-0- Contact Person(s): Zenie Mafnas, NMHC Director / Tracy B. Norita, Secretary of Finance Corrective Action Plan: The CNMI agrees with this finding. Department of Finance Program Manager previously responsible for overseeing this grant is no longer with the Department. DOF will work with NMHC to verify whether the required FFATA reports and any other required activities were prepared and submitted to the Subaward Reporting System. Proposed Completion Date: Ongoing
Finding No.: 2022-020 AL Program: 17.225 - Unemployment Insurance Area: Eligibility Questioned Costs: $80,773 Contact Person(s): Zachary Taitano, PUA Program Manager, DOL Corrective Action Plan: Condition 1: The CNMI agrees that the expenditure listing from the Financial System is significantly lowe...
Finding No.: 2022-020 AL Program: 17.225 - Unemployment Insurance Area: Eligibility Questioned Costs: $80,773 Contact Person(s): Zachary Taitano, PUA Program Manager, DOL Corrective Action Plan: Condition 1: The CNMI agrees that the expenditure listing from the Financial System is significantly lower than the listing generated from the HireMarianas Portal. This discrepancy is due to the fact that the expenditure listing reflects only disbursed payments, whereas the HireMarianas Portal listing includes transactions that were removed, cancelled, or rejected by the claimant’s financial institution. Additionally, the HireMarianas listing includes payments that were cancelled and subsequently reissued through the portal, which may result in what appear to be duplicate entries. Proposed Completion Date: Completed Condition 2: The CNMI partially agrees with this finding. While it is acknowledged that 8 of the 11 identified users’ SAVE verification results were uploaded onto the HireMarianas Portal late, all claimants were of Qualified Alien status in accordance with the definition provided through the Immigration and Nationality Act (INA). Moreover, all SAVE responses are now on the respective applicants’ supporting documents tab on the HireMarianas Portal. Proposed Completion Date: Ongoing
View Audit 371187 Questioned Costs: $1
Finding No.: 2022-019 AL Program: 15.875 - Economic, Social, and Political Development of the Territories Area: Subrecipient Monitoring Questioned Costs: $549,849 Contact Person(s): Nerissa B. Karakaya, CIP COTR / Angelina Phillips, Office of Management and Budget (OMB) Corrective Action Plan: Condi...
Finding No.: 2022-019 AL Program: 15.875 - Economic, Social, and Political Development of the Territories Area: Subrecipient Monitoring Questioned Costs: $549,849 Contact Person(s): Nerissa B. Karakaya, CIP COTR / Angelina Phillips, Office of Management and Budget (OMB) Corrective Action Plan: Condition 1 (N. Karakaya): CIP agrees with this finding. The address this finding, CIP will implement the following: 1. Establish Written Procedures: CNMI has developed and will initiate the implementation of formal written procedures requiring that all potential subrecipients be checked in SAM.gov prior to award and that verification is documented and retained in the official files. 2. Standardized Documentation: A standardized risk assessment checklist will be used for all subrecipients to confirm they are not suspended, debarred, or excluded under 2 CFR §180.300. 3. Staff Training: All staff responsible for subrecipient monitoring will receive training on federal requirements for exclusion checks and proper documentation procedures. 4. Monitoring and Review: CIP will conduct periodic reviews to ensure that SAM.gov checks are consistently performed and documented for all new and existing subrecipients. Condition 2 (N. Karakaya): CIP respectfully disagrees with this finding. The subrecipient was not required to submit the required project narrative report; instead, the report was prepared and submitted by the project manager responsible for managing the project as assigned by the Capital Improvement Program. In accordance with 2 CFR §200.328 – Monitoring and Reporting Program Performance, subrecipients are required to provide performance reports to the pass-through entity that document the status and progress of activities in accordance with the approved scope of work. To correct this issue, the subrecipient will implement a formal internal procedure designating the Program Coordinator as responsible for preparing, reviewing, and submitting all project narrative reports. Additionally, mandatory training will be conducted for all relevant subrecipient staff on federal reporting requirements and proper submission procedures, and all future narrative reports will include a certification by the authorized subrecipient representative confirming proper submission. The Capital Improvement Program will monitor submissions quarterly for the next 12 months to ensure full compliance. Corrective Actions: 1. Implement a formal internal reporting procedure requiring the subrecipient’s Program Coordinator to prepare, review, and submit all project narrative reports. 2. Conduct mandatory training for subrecipient staff on federal reporting requirements, documentation standards, and submission procedures. 3. Include a certification statement on all future narrative reports, signed by the subrecipient’s authorized representative, confirming proper submission. 4. Conduct quarterly monitoring of subrecipient submissions for the next 12 months to ensure compliance with reporting requirements. Proposed Completion Date: December 31, 2025 Condition 3 (N. Karakaya): We acknowledge the finding that documentation was not provided to verify whether eight subrecipients were subject to the audit requirements. The Capital Improvement Program will strengthen its subrecipient monitoring procedures to ensure compliance with 2 CFR 200.331(f) and related audit requirements. Corrective actions will include: 1. Policy Implementation: Adopt and disseminate the newly established Subrecipient Monitoring Policy and Procedures, which specify verification of subrecipients’ audit requirements. 2. Training: Provide training for program and grants management staff on the updated procedures and audit verification process. 3. Documentation: Maintain written evidence of audit requirement verifications for all subrecipients as part of the grant administration files. 4. Ongoing Monitoring: Incorporate periodic review of subrecipient audit status into the regular monitoring schedule to ensure continued compliance. These steps will be implemented immediately and will be applied to all current and future awards to prevent recurrence of this issue. Proposed Completion Date: December 31, 2025
View Audit 371187 Questioned Costs: $1
Finding No.: 2022-018 AL Program: 15.875 - Economic, Social, and Political Development of the Territories Area: Reporting Questioned Costs: $-0- Contact Person(s): Nerissa B. Karakaya, CIP COTR Corrective Action Plan: CIP agrees with this finding. A documentation checklist exists; however, it was no...
Finding No.: 2022-018 AL Program: 15.875 - Economic, Social, and Political Development of the Territories Area: Reporting Questioned Costs: $-0- Contact Person(s): Nerissa B. Karakaya, CIP COTR Corrective Action Plan: CIP agrees with this finding. A documentation checklist exists; however, it was not consistently fully extended to program administration records. Monitoring controls focused primarily on project completion, resulting in less attention to verifying that supporting documentation for administrative expenses was fully compiled and properly reconciled. In addition, segregation-of-duties constraints were evident, as the same staff oversaw both the preparation of reports and the maintenance of program administration records, which limited independent verification and delayed the retrieval of required documentation. The following steps will be implemented to address this finding. 1. Implement Formal Monitoring Procedures • Develop and document a standardized review checklist to verify that all data in financial and operational reports is supported by source documentation and reconciled to the accounting records. • Require periodic management sign-off (e.g., monthly or quarterly) to confirm that reconciliations are performed and retained. 2. Strengthen Segregation of Duties • Reassign key tasks so that data preparation, reconciliation, and approval are performed by separate individuals or units whenever possible. • Where staffing constraints prevent full segregation, implement compensating controls (e.g., independent supervisory review, dual sign-off). 3. Training and Capacity Building • Provide targeted training to finance and program staff on proper documentation, reconciliation procedures, and the importance of segregation of duties. 4. Periodic Internal Reviews • Establish periodic internal audits or spot checks by an independent unit (e.g., internal audit or compliance team) to verify adherence to the new monitoring controls and segregation requirements. 5. Timeline for Implementation • Within 30 days: Draft and approve written monitoring and reconciliation procedures. • Within 60 days: Reassign tasks to strengthen segregation of duties or document compensating controls. • Within 90 days: Conduct staff training and begin periodic internal reviews. 6. Monitoring & Reporting • Quarterly management reports to track completion of reconciliations and internal review results. • Annual evaluation of control design and effectiveness by internal audit or an independent reviewer. These actions will ensure reported data is consistently supported by accurate underlying accounting records and controls are suitably designed and effective, reducing the risk of misstatement or undetected errors due to inadequate segregation of duties. Proposed Completion Date: December 31, 2025
Finding No.: 2022-016 AL Program: 15.875 - Economic, Social, and Political Development of the Territories Area: Period of Performance Questioned Costs: $494,836 Contact Person(s): Epiphanio Cabrera, Jr., Grants Administrator, OGM-SC / Nerissa B. Karakaya, CIP COTR Corrective Action Plan: Condition 1...
Finding No.: 2022-016 AL Program: 15.875 - Economic, Social, and Political Development of the Territories Area: Period of Performance Questioned Costs: $494,836 Contact Person(s): Epiphanio Cabrera, Jr., Grants Administrator, OGM-SC / Nerissa B. Karakaya, CIP COTR Corrective Action Plan: Condition 1 (E. Cabrera): The Office of Grant Management (OGM) respectfully disagrees with this finding. Due to internal scheduling constraints and the compressed timeline required to complete the FY22 audit, the requested documents were not submitted by the specified deadline, resulting in this finding. However, OGM maintain all relevant supporting documentation and is prepared to provide it upon request from the Grantor. Based on our records, grant award D20AP00005 remains active with a period of performance extending through September 30, 2025, while grant award D20AP00037 was closed on September 30, 2024. Both grants remained operational well beyond the originally prescribed September 30, 2022 deadline. Given the extended period of performance authorized by the awarding agency, all associated questioned costs ($494,660.00) are supported by active grant activity and should be deemed allowable. Accordingly, OGM respectfully requests that these questioned costs be removed, as they reflect legitimate expenditures incurred within the approved grant periods. Proposed Completion Date: Ongoing Condition 2 (N. Karakaya): CIP agrees with the finding. To address the finding and prevent recurrence, CIP will: - Revise and strengthen written financial management policies to clearly define documentation requirements to substantiate expenditures and ensure costs are within the award’s period of performance. - Incorporate federal regulation references, including 2 CFR 200.303 (Internal Controls) and 2 CFR 200.344 (Closeout). - Implement a standardized checklist for technical analyst and program managers to confirm that all expenditure documentation includes dates verifying that costs were incurred within the period of performance. - Require a secondary review and sign-off by the CIP Administrator prior to submission of documentation to auditors. - Conduct mandatory annual training for program on federal period of performance requirements and required supporting documentation standards. - Provide refresher sessions before each audit cycle. - Establish a quarterly self-audit of grant files to verify that documentation is complete and properly supports expenditures. - Document results of each review and address deficiencies immediately. The responsible official will report progress on corrective actions to the CNMI leadership and maintain documentation of all implemented changes. Evidence of compliance (updated policies, training records, and self-audit reports) will be provided to the auditors upon request. Proposed Completion Date: December 31, 2025
View Audit 371187 Questioned Costs: $1
Finding No.: 2022-014 AL Program: 15.875 - Economic, Social, and Political Development of the Territories Area: Cash Management Questioned Costs: $482,041 Contact Person(s): Tracy B. Norita, Secretary of Finance / Nerissa B. Karakaya, CIP COTR Corrective Action Plan: Condition 1 (N. Karakaya): CIP a...
Finding No.: 2022-014 AL Program: 15.875 - Economic, Social, and Political Development of the Territories Area: Cash Management Questioned Costs: $482,041 Contact Person(s): Tracy B. Norita, Secretary of Finance / Nerissa B. Karakaya, CIP COTR Corrective Action Plan: Condition 1 (N. Karakaya): CIP agrees with the finding. However, this timing is inherent in our established process. For the Capital Improvement Program (CIP), once an expense is entered into Tyler Munis and posted, we request a drawdown for those expenses. The check clearing date will naturally occur after the drawdown request date because payment disbursement and check clearing are subsequent steps in the payment process. Our practice ensures that: • Drawdowns are based on recorded, approved, and posted expenditures, not on projected or unverified costs. • Requests for reimbursement are fully supported by documented and posted expenses, which comply with grant requirements. Corrective Action / Process Enhancement: Although we believe the current procedure meets federal and grantor requirements, we will: 1. Document the Existing Process: Prepare a written procedure that explains the sequence of posting expenses in Tyler Munis, requesting drawdowns, and issuing checks, to clarify why check clearing dates follow drawdown requests. 2. Communicate with Auditor/Grantor: Provide the written procedure to the auditors and grantor to ensure shared understanding of the process. 3. Consider Additional Controls (if recommended): If the grantor or auditor recommends further safeguards, CIP will evaluate and implement feasible enhancements. Proposed Completion Date: December 31, 2025
View Audit 371187 Questioned Costs: $1
Finding No.: 2022-012 AL Programs: 10.542 - Pandemic EBT Food Benefits (P-EBT) Area: Eligibility Questioned Costs: $58,494 Contact Person(s): Margaret Aldan, NAP Administrator Corrective Action Plan: Condition 1 & 2: CNMI NAP respectfully disagrees. Audit finding states that documentation supporting...
Finding No.: 2022-012 AL Programs: 10.542 - Pandemic EBT Food Benefits (P-EBT) Area: Eligibility Questioned Costs: $58,494 Contact Person(s): Margaret Aldan, NAP Administrator Corrective Action Plan: Condition 1 & 2: CNMI NAP respectfully disagrees. Audit finding states that documentation supporting eligibility determinations were not provided. Finding further states that CNMI NAP lacks monitoring control over the listing of validated eligibility roster data that were not uploaded into MAVEN eligibility system due to data entry capacity limitations (sic) were not being maintained; and Distributed coupons were not reconciled to the recorded expenditures for redeemed coupons. The resulting effect being that CNMI NAP is in noncompliance with the applicable eligibility requirements and questioned costs for condition 1. CNMI NAP was informed that this finding had been cleared so we are perplexed as to the re-emergence of this audit finding. CNMI NAP contends that: 1. Eligibility for P-EBT benefits is not determined by CNMI NAP. P-EBT eligibility was determined by identifying children who qualified for free or reduced-price school meals and then correlating that with a reduction of in-person schooling due to COVID-19. Children in households receiving SNAP and young children, under age six, were also eligible, provided their schools or childcare facilities closed or reduced hours for at least five consecutive days due to the pandemic. This data was provided by PSS, as well as the listing of eligible children that corresponded to this data set. 2. There are no “validated eligibility roster data case files” that were not uploaded into MAVEN due to data entry capacity limitations. All rosters provided by PSS were uploaded into MAVEN as this is the only way a case file can be generated in the system. 3. CNMI NAP has reconciled all benefits issued, including the P-EBT benefits for the audit year in question. This is a mandatory, non-negotiable process. Proposed Completion Date: Ongoing
View Audit 371187 Questioned Costs: $1
Finding No.: 2022-011 AL Program: 10.542 - Pandemic EBT Food Benefits (P-EBT) Area: Activities Allowed or Unallowed Questioned Costs: $-0- Contact Person(s): Margaret Aldan, NAP Administrator Corrective Action Plan: CNMI NAP respectfully disagrees with this finding. The April 2022 Compliance Supplem...
Finding No.: 2022-011 AL Program: 10.542 - Pandemic EBT Food Benefits (P-EBT) Area: Activities Allowed or Unallowed Questioned Costs: $-0- Contact Person(s): Margaret Aldan, NAP Administrator Corrective Action Plan: CNMI NAP respectfully disagrees with this finding. The April 2022 Compliance Supplement referenced by the auditor states: Special Tests and Provisions. 1. Verification of Free and Reduced-Price Applications (NSLP) Compliance Requirements: By November 15th of each school year, the LEA (or state in certain cases) must verify the current free and reduced-price eligibility of households selected from a sample of applications that it has approved for free and reduced-price meals, unless the LEA is otherwise exempt from the verification requirement. The verification sample size is based on the total number of approved applications on file on October 1st. A state agency may, with FNS approval, assume from LEAs under its jurisdiction the responsibility for performing the verifications. If the LEA performs the verification function it must be in accordance with instructions provided by the state agency. The LEA must follow up on children whose eligibility status has changed as the result of verification activities to put them in the correct category. CNMI NAP response: The 2022 Compliance Supplement states that the LEA, in this instance, PSS, is responsible for verifying the current free and reduced-price eligibility of households unless the LEA is exempt from the verification requirement. PSS is not exempt from the verification requirement and the CNMI NAP has never given instructions to PSS for data collection as it is the PSS’ responsibility to supply the data to NAP for P-EBT. NAP’s role is to distribute the benefits only. Similar to the SUN Bucks (S-EBT) program, PSS furnishes the student listing to NAP, after which NAP distributes the benefits according to the listing provided by PSS. Proposed Completion Date: Ongoing
Planned Corrective Action: The Organization will implement and reinforce a comprehensive system for retaining all invoices, payment records, and supporting documentation associated with federal awards. Additionally, the Organization will create and maintain a clear record retention policy. Invoice a...
Planned Corrective Action: The Organization will implement and reinforce a comprehensive system for retaining all invoices, payment records, and supporting documentation associated with federal awards. Additionally, the Organization will create and maintain a clear record retention policy. Invoice and Payment Documentation: • All invoices related to the federal program will be promptly reviewed and approved by the appropriate personnel to ensure they reflect allowable costs under the specific terms and conditions of the award. • Management will establish clear procedures for the proper recording and classification of payments, ensuring that they are linked directly to the corresponding federal program expenses. • All supporting documentation (e.g., purchase orders, contracts, receipts) will be retained in electronic formats within the accounting system, in accordance with the Organization’s record retention policy, ensuring availability for future audits or reviews. Retention and Accessibility: • The Organization will maintain a secure, organized filing system for all invoices and payments, ensuring that each record is easily accessible for audit purposes. This system will include electronic records that are stored in a centralized database, with restricted access to authorized personnel. • Retained invoices and payment documentation will be kept for the full duration required by federal regulations, typically for a period of at least seven years after the final expenditure report for the federal award has been submitted, or as otherwise required by the specific federal agency. Periodic Reviews and Monitoring: • To ensure ongoing compliance, Management will perform periodic reviews of federal program expenditures and documentation. This will include random sampling of invoices and payment records to confirm that they are complete, accurate, and in compliance with federal regulations. • In the event of any discrepancies or issues identified during these reviews, Management will take immediate corrective action to address the issue and prevent recurrence. By maintaining thorough records of all invoices and payments, the Organization aims to not only comply with federal audit requirements but also to ensure transparency, accountability, and sound financial management of federal funds.
View Audit 370890 Questioned Costs: $1
Reporting – Education Stabilization Funds INDIVIDUAL RESPONSIBLE: Business Manager and Federal Grants Director ANTICIPATED COMPLETION DATE: FY2026 CORRECTIVE ACTION PLAN: At this point in time the ESSR funds are no longer available, so there will not be any other documentation going forward. However...
Reporting – Education Stabilization Funds INDIVIDUAL RESPONSIBLE: Business Manager and Federal Grants Director ANTICIPATED COMPLETION DATE: FY2026 CORRECTIVE ACTION PLAN: At this point in time the ESSR funds are no longer available, so there will not be any other documentation going forward. However, with other grants the processes have changed. Since FY2022 an accounting firm was hired to catch the school district up on grant requests. This accountant requested funds on a quarterly basis. On July 1, 2025, the District hired a Federal Grants Director to work with the Business Manager to complete the grant catch up process and to create a system that documents each expenditure and the timing of the requests. Once the system is in place cash requests will be completed monthly.
Unsupported Expenditures – Education Stabilization Funds INDIVIDUAL RESPONSIBLE: Business Manager and Federal Grants Director ANTICIPATED COMPLETION DATE: FY2026 CORRECTIVE ACTION PLAN: At this point in time the ESSR funds are no longer available, so there will not be any other documentation going f...
Unsupported Expenditures – Education Stabilization Funds INDIVIDUAL RESPONSIBLE: Business Manager and Federal Grants Director ANTICIPATED COMPLETION DATE: FY2026 CORRECTIVE ACTION PLAN: At this point in time the ESSR funds are no longer available, so there will not be any other documentation going forward. However, with other grants the processes have changed. Since FY2022 an accounting firm was hired to catch the school district up on grant requests. This accountant requested funds on a quarterly basis. On July 1, 2025, the District hired a Federal Grants Director to work with the Business Manager to complete the grant catch up process and to create a system that documents each expenditure and the timing of the requests. Once the system is in place cash requests will be completed monthly.
View Audit 370564 Questioned Costs: $1
Reporting: The College agrees with the finding. To address the repeat finding, the College will implement a standardized reporting check list and a calendar utilizing its Asana Project Management tool to track and monitor all required federal and grant deadlines.
Reporting: The College agrees with the finding. To address the repeat finding, the College will implement a standardized reporting check list and a calendar utilizing its Asana Project Management tool to track and monitor all required federal and grant deadlines.
Cash Management: The College agrees with the finding. To strengthen internal controls over cash management, the College will establish written guidelines that will clearly define timelines, responsibilities, and approval processes for drawdown and disbursements. The College will reconcile drawdowns ...
Cash Management: The College agrees with the finding. To strengthen internal controls over cash management, the College will establish written guidelines that will clearly define timelines, responsibilities, and approval processes for drawdown and disbursements. The College will reconcile drawdowns to expenditures on a monthly/quarterly basis.
Allowable Costs/ Cost Principles: The College agrees with the finding. To address the repeat finding, the College will evaluate and strengthen internal controls by updating its policies/procedures addressing activities allowed or unallowed requirements. The College will conduct regular refresher tra...
Allowable Costs/ Cost Principles: The College agrees with the finding. To address the repeat finding, the College will evaluate and strengthen internal controls by updating its policies/procedures addressing activities allowed or unallowed requirements. The College will conduct regular refresher training to ensure proper and full use and utilization of its document management system and all other College systems.
Reporting College of the Marshall Islands acknowledges the finding and agrees that both the Section II source data file of the Annual Performance Report (APR) and the required Final Performance Report could not be provided during the audit. This occurred due to inadequate internal controls and the l...
Reporting College of the Marshall Islands acknowledges the finding and agrees that both the Section II source data file of the Annual Performance Report (APR) and the required Final Performance Report could not be provided during the audit. This occurred due to inadequate internal controls and the limitations of the previous manual filing system, which led to incomplete retention and difficulty retrieving submitted reports during the audit fieldwork. To correct this, the College has upgraded and institutionalized a cloud-based filing system to ensure all source data files, APR submissions, and Final Performance Reports are properly stored, organized, and easily accessible. Internal control policies and procedures have been strengthened to require that all performance reports are submitted on time, with verified source data and confirmation of successful submission retained in the system. The TRIO Office has established a reporting calendar, supervisory review process, and digital archive protocol to ensure all APR and final reports are prepared, submitted, and properly retained. With the upgraded systems and the support of newly hired skilled staff, the College is now better equipped to meet federal reporting requirements. Staff have been trained— and will continue to be trained twice a year—on performance reporting procedures and federal reporting standards to prevent recurrence of similar issues in future audits.
Eligibility College of the Marshall Islands acknowledges the finding and agrees that several participant files lacked the required eligibility documentation, including proof of citizenship/residency, verification of academic support needed, documentation of age and grade level at initial selection, ...
Eligibility College of the Marshall Islands acknowledges the finding and agrees that several participant files lacked the required eligibility documentation, including proof of citizenship/residency, verification of academic support needed, documentation of age and grade level at initial selection, and confirmation of first-generation or low- income status. These gaps resulted from weak internal controls and the limitations of the previous manual filing system, which hindered proper tracking and retention of eligibility records during the audit fieldwork. To address these deficiencies, the College has upgraded and institutionalized a cloud-based filing system to ensure complete, organized, and easily retrievable participant eligibility documentation. Internal control policies and procedures have been strengthened to require that all eligibility documents including citizenship/residency proof, age and grade verification, academic support need assessments, and first-generation/low-income eligibility forms—are obtained, reviewed, and approved before a student is enrolled and receives any program benefits or stipends. The TRIO Office has implemented a new eligibility checklist and supervisory review process to verify completeness and compliance for every participant file. With the upgraded systems and the support of newly hired skilled staff, the College is now better positioned to maintain accurate eligibility records. Staff have been trained and will continue to be trained twice a year on federal eligibility requirements and documentation standards to prevent recurrence of similar issues in future audits.
View Audit 370531 Questioned Costs: $1
Allowable Costs/Cost Principle The College of the Marshall Islands acknowledges the finding and agrees that some payroll and non-payroll expenditures charged to the TRIO Upward Bound program lacked sufficient supporting documentation, including missing employment contracts, timesheets, and student m...
Allowable Costs/Cost Principle The College of the Marshall Islands acknowledges the finding and agrees that some payroll and non-payroll expenditures charged to the TRIO Upward Bound program lacked sufficient supporting documentation, including missing employment contracts, timesheets, and student meal listings, as well as discrepancies between paid hours/rates and approved documentation. These gaps arose primarily from inadequate internal controls and the limitations of the previous manual filing system, which hindered timely verification during the audit fieldwork. To address this, the College has upgraded and institutionalized a cloud-based filing system to ensure complete, organized, and easily accessible documentation for all program expenditures. Internal controls have been strengthened to require proper supporting documents including signed employment contracts, verified timesheets, approval for incentive and leave payments, and student listings—before any program costs are processed or reported. With the upgraded systems and the support of newly hired skilled staff, the College is now better equipped to ensure accuracy and compliance. Staff have been trained—and will continue to be trained twice a year—on federal cost principles and documentation standards to prevent recurrence of similar issues in future audits.
View Audit 370531 Questioned Costs: $1
Activities Allowed or Unallowed & Allowable Costs/Cost Principles College of the Marshall Islands acknowledges the finding and agrees that the noted questioned costs arose from missing supporting documentation and employment contracts due to limitations in the previous manual filing system, which ma...
Activities Allowed or Unallowed & Allowable Costs/Cost Principles College of the Marshall Islands acknowledges the finding and agrees that the noted questioned costs arose from missing supporting documentation and employment contracts due to limitations in the previous manual filing system, which made timely retrieval difficult during the audit fieldwork. The College has since upgraded and institutionalized a cloud-based filing system to improve recordkeeping, accessibility, and documentation retention for all program expenditures. Internal controls have been strengthened to ensure that all stipends, salaries, and benefits charged to the TRIO Upward Bound program are fully supported by proper documentation, verified, and reviewed before payment and reporting. With the upgraded systems and the support of newly hired skilled staff, the College is now better equipped to ensure compliance. Staff have been trained—and will continue to be trained twice a year—on federal grant cost principles and documentation requirements to prevent recurrence of similar issues in future audits.
View Audit 370531 Questioned Costs: $1
Reporting College of the Marshall Islands acknowledges the finding and agrees that there were deficiencies in the submission and reconciliation of required reports—including missing Form SG1 expenditure budget breakdowns, missing and delayed Form SG2 performance and financial evaluation reports, and...
Reporting College of the Marshall Islands acknowledges the finding and agrees that there were deficiencies in the submission and reconciliation of required reports—including missing Form SG1 expenditure budget breakdowns, missing and delayed Form SG2 performance and financial evaluation reports, and variances between the reported expenditures and the SEFA amounts. These issues primarily resulted from the limitations of the previous manual filing and reporting system, which hindered timely retrieval and review of supporting documents during the audit fieldwork. To address this, the College has upgraded and institutionalized a cloud-based filing and reporting system to ensure all supporting documents and reports are systematically organized, accessible, and securely retained. Internal controls have been strengthened to enforce timely preparation, review, and submission of required Form SG1 and SG2 reports, and to ensure accurate reconciliation of reported expenditures against SEFA. With the upgraded systems and the support of newly hired skilled staff, the College is now better equipped to maintain proper documentation and meet federal reporting requirements. In addition, staff have been trained and will continue to be trained twice a year on federal reporting standards and sub- award requirements to prevent similar issues from recurring in future audits.
Procurement and Suspension and Debarment College of the Marshall Islands acknowledges the finding and confirms that the gaps noted resulted mainly from the previous manual filing system and limited internal procurement controls. The College has since upgraded and institutionalized a cloud-based fili...
Procurement and Suspension and Debarment College of the Marshall Islands acknowledges the finding and confirms that the gaps noted resulted mainly from the previous manual filing system and limited internal procurement controls. The College has since upgraded and institutionalized a cloud-based filing system to ensure complete documentation, proper retention, and easy retrieval of procurement records. Internal control policies and procedures have been strengthened to ensure compliance with the RMI Procurement Code, including vendor selection documentation, verification of suspension and debarment status, and equitable distribution of micro- purchases. In addition, newly hired staff dedicated to Procurement and Accounts Payable have been onboarded to improve oversight and compliance. With these new systems, strengthened controls, and added staffing capacity, the College is now better positioned to maintain full compliance. Staff have been trained—and will continue to be trained twice a year—on procurement requirements and federal regulations to prevent recurrence of similar issues in future audits.
View Audit 370531 Questioned Costs: $1