Auditor Description of Condition and Effect. We selected a sample of disbursements that were charged to the grant. Of this sample, 5 out of 40 disbursements had questioned costs. Two disbursements had amounts submitted for reimbursement but no actual costs were incurred by the Organization. Another ...
Auditor Description of Condition and Effect. We selected a sample of disbursements that were charged to the grant. Of this sample, 5 out of 40 disbursements had questioned costs. Two disbursements had amounts submitted for reimbursement but no actual costs were incurred by the Organization. Another two disbursements included expenses for other clubs outside the grant agreement that was charged to the grant. The last disbursement was missing supporting documentation for the costs charged to the grant. As a result of this condition, the Organization did not fully comply with the requirements of the Uniform Guidance. Auditor Recommendation. We recommend that the Organization verify that costs submitted for reimbursement are valid and allowable expenses. Additionally, the Organization needs to properly allocate costs in accordance with the grant agreements. Corrective Action. Management concurs with the finding. The Organization will ensure valid and allowable expenses, including proper allocation of costs, are remitted through enhancement of the current review processes. Responsible Person. Stacy Holman, Chief Financial Officer. Anticipated Completion Date. December 31, 2024.
Finding 513098 (2023-003)
Significant Deficiency 2023
Finding 2023-003: For the year ended June 30, 2022, the Corporation did not submit audited financial statements to the Federal Audit Clearinghouse within 30 days after receipt of the auditor's report on October 6, 2022. The audited financial statements were submitted to the Federal Audit Clearinghou...
Finding 2023-003: For the year ended June 30, 2022, the Corporation did not submit audited financial statements to the Federal Audit Clearinghouse within 30 days after receipt of the auditor's report on October 6, 2022. The audited financial statements were submitted to the Federal Audit Clearinghouse on July 5, 2024. Comments on the Finding and Each Recommendation: The Corporation should submit audited financial statements to the Federal Audit Clearinghouse within the time frames required. Action(s) taken or planned on the finding: The audited financial statements have been submitted to the Federal Audit Clearinghouse.
Finding 513096 (2023-002)
Significant Deficiency 2023
Finding 2023-002: The Corporation did not furnish HUD with a complete annual financial report within 90 days following the year ended June 30, 2023. Comments on the Finding and Each Recommendation: The Corporation should ensure the annual financial report is filed within 90 days of year end. Action(...
Finding 2023-002: The Corporation did not furnish HUD with a complete annual financial report within 90 days following the year ended June 30, 2023. Comments on the Finding and Each Recommendation: The Corporation should ensure the annual financial report is filed within 90 days of year end. Action(s) taken or planned on the finding: The audited financial statements have been submitted to HUD.
Finding 513094 (2023-001)
Significant Deficiency 2023
Finding 2023-001: During the year ended June 30, 2023, the Corporation did not make the require deposits to the reserve for replacements. Comments on the Finding and Each Recommendation: Management should make a deposit to the reserve for replacements for $4,846 for the delinquent deposits. In futur...
Finding 2023-001: During the year ended June 30, 2023, the Corporation did not make the require deposits to the reserve for replacements. Comments on the Finding and Each Recommendation: Management should make a deposit to the reserve for replacements for $4,846 for the delinquent deposits. In future periods, management should fund the reserve for replacements on an annual basis as required by the HUD regulatory agreement or request HUD approval for a suspension of deposits. Action(s) taken or planned on the finding: Management made a deposit of $4,846 on July 20, 2023 for the delinquent deposits.
View Audit 331057 Questioned Costs: $1
Finding 513082 (2023-001)
Material Weakness 2023
FINDING 2023-001 Finding Subject: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds - Activities Allowed or Unallowed, Allowable Costs/Cost Principles, Period of Performance, and Procurement and Suspension and Debarment Summary of Finding: (copied from SBOA Findings document provided) The...
FINDING 2023-001 Finding Subject: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds - Activities Allowed or Unallowed, Allowable Costs/Cost Principles, Period of Performance, and Procurement and Suspension and Debarment Summary of Finding: (copied from SBOA Findings document provided) The Allen County Department of Health (Department of Health), a department within Allen County, was awarded the Health Issues and Challenges grant through the Indiana Department of Health financed through the American Rescue Plan Act (ARPA) for the purpose of funding programs that focus on the improvement of chronic disease, specifically, elevated blood lead level reduction. The Health Issues and Challenges grant is a reimbursable grant, whereby the County received reimbursement on a percase basis at a stated rate for Case Management and Environmental Investigation activities performed. The Department of Health received federal receipts related to the grant in the amount of $130,479 during 2023. As part of sound management of the Federal award, the Department of Health was responsible for implementing a system of internal control that would ensure compliance with the applicable requirements. The Department of Health did not properly design or implement such a system. Receipts of the program were adequately identified through the use of an account number within the County Health Fund (285) in the Allen County's ledger (ledger) which was unique to the Health Issues and Challenges grant receipts. However, the ledger did not adequately identify the expenditures of the grant program within the County Health Fund. Through inquiry with the Department of Health employees and review of unitprepared support of grant expenditures, we determined expenditures were made with grant funds during the audit period, however, we were unable to distinguish between the expenditures of the Health Issues and Challenges grant and all other activities of the Department of Health in the County Health Fund. Due to the lack of separate identification of expenditures in the financial records, we were not able to establish a population from which to audit the Health Issues and Challenges grant for compliance with the following compliance requirements of the program: 􀁸 Activities Allowed or Unallowed 􀁸 Allowable Costs/Cost Principles 􀁸 Period of Performance 􀁸 Procurement and Suspension and Debarment As such, the full award amount of $130,479, as reported on the Schedule of Expenditures of Federal Awards, was determined to be questioned costs. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Recommendation: We recommend that management of the Health Department establish a system of internal controls to ensure that grant award funds are adequately accounted for and tracked in such a manner as to determine the activity, receipts and disbursement, associated with the grant. ………………………… Contact Person Responsible for Corrective Action: JENNIFER MILLER (Finance Director) Contact Phone Number and Email Address: 260-449-7358 (Jennifer.miller@allencounty.us) Views of Responsible Officials: We concur with the finding Explanation and Reasons for Disagreement: N/A Description of Corrective Action Plan: When we were informed of the outcomes of the SBOA audit and the subsequent needs for a corrective action plan (CAP) relative to their findings, we moved quickly to begin the development of the CAP. We feel this finding/issue could be easily remedied by following our normal procedure for grants, whereby we develop a new fund, craft a Fund Ordinance for approval by the Allen County Commissioners to establish said new fund, and then subsequently track all expenditures and reimbursements in the separate fund vs. utilizing a line item for deposits in the main Health Fund as was done with this grant (which lacked the ability to denote exact salary expenditures and such next to each payment as it was all done within the larger fund for all staff and expenses. We were not aware of this need. THE PLAN (which will be added as a new “Grants” section in our existing Finance Internal Controls policies): For all grants (reimbursable or deliverables-based), once a contract is near completion or upon execution, a separate fund will be created through development and approval of a local fund ordinance. All expenditures allowed by said grant and all reimbursements received by the grant funder will be tracked solely and only within the separate grant fund that is tied to the signed contract from the funder. If there are staff payments for salaries or benefits being reimbursed by a grant, we will ensure that: (1) the hours/minutes per staff member per pay period for all work associated with these grant duties are tracked appropriately so as to ensure we are invoicing the grant funder for the exact and accurate work hours (regardless of whether or not the grant contract specifies this be tracked or reimbursed per minute/hour, as most do not require this); and (2) these amounts will be noted alongside the expenditures in the grant fund for clarity upon invoicing or auditing. Anticipated Completion Date: We will follow this practice for any new grants accepted by the Allen County Department of Health effective 9/17/2024. This is the standard practice for most grants we have accepted, and therefore, we will not vary from this practice in the future even if given permission to do so.
View Audit 331014 Questioned Costs: $1
Due to turnover of the Commission's accounting staff, the Commission was unable to have the annual audit completed within the required timeframe, and subsequently was also late in submission of the FAC report. The Commission has hired internal staff to help with the audit preparation and contracted ...
Due to turnover of the Commission's accounting staff, the Commission was unable to have the annual audit completed within the required timeframe, and subsequently was also late in submission of the FAC report. The Commission has hired internal staff to help with the audit preparation and contracted with an accounting firm that has provided the Commission a CPA to conduct audit preparation and other financial services as requested. The Commission will work on getting financial information in a timely fashion and submit the reporting package in accordance with the guidelines. Anticipated completion date: November 30, 2024.
Finding 2023-003 Deadline for Federal Single Audit – Reporting - Noncompliance and Significant Deficiency in Internal Control Over Compliance Name of Contact Person: Sarah J. Villalon, CFO Planned Corrective Action: Management agrees with the finding and plans to establish processes and procedures t...
Finding 2023-003 Deadline for Federal Single Audit – Reporting - Noncompliance and Significant Deficiency in Internal Control Over Compliance Name of Contact Person: Sarah J. Villalon, CFO Planned Corrective Action: Management agrees with the finding and plans to establish processes and procedures to ensure the audit is completed timely and the reporting package is submitted within the required timeframe. Anticipated Completion Date: March 31, 2025
Finding 2023-002 Reporting - Noncompliance and Significant Deficiency in Internal Control Over Compliance Name of Contact Person: Sarah J. Villalon, CFO Planned Corrective Action: Management agrees with the finding and will complete the missing information in future progress reports submitted to the...
Finding 2023-002 Reporting - Noncompliance and Significant Deficiency in Internal Control Over Compliance Name of Contact Person: Sarah J. Villalon, CFO Planned Corrective Action: Management agrees with the finding and will complete the missing information in future progress reports submitted to the State of Alaska. Anticipated Completion Date: December 31, 2024
When the City of Redfield was made aware of the late filing, the filing was completed within 24 hours.
When the City of Redfield was made aware of the late filing, the filing was completed within 24 hours.
When federal compliance issues arise, the City Finance Officer will communicate them to the Mayor.
When federal compliance issues arise, the City Finance Officer will communicate them to the Mayor.
2023-001 – ALN 14.871 – Housing Voucher Cluster – Activities Allowed and Unallowed Planned Corrective Action: The Executive Director acknowledges the finding and is following the auditor’s recommendation as presented in the Audit Report. Person Responsible for Correction of Finding: Lisa Shaffer, Ex...
2023-001 – ALN 14.871 – Housing Voucher Cluster – Activities Allowed and Unallowed Planned Corrective Action: The Executive Director acknowledges the finding and is following the auditor’s recommendation as presented in the Audit Report. Person Responsible for Correction of Finding: Lisa Shaffer, Executive Director Anticipated Completion Date: December 31, 2024 2023-002 – Significant Deficiency in Internal Controls over Financial Reporting Planned Corrective Action: The Executive Director acknowledges the finding and is following the auditor’s recommendation as presented in the Audit Report. Person Responsible for Correction of Finding: Lisa Shaffer, Executive Director Anticipated Completion Date: December 31, 2024
View Audit 330764 Questioned Costs: $1
Finding 2023-002 – Wage Rate Requirements Contact Person Responsible for Corrective Action: Alison Gamache, Director of Finance Corrective Action: As of 9/1/2023 all prime construction contracts in excess of $2,000 awarded by the school district will include a provision for compliance with the Davis...
Finding 2023-002 – Wage Rate Requirements Contact Person Responsible for Corrective Action: Alison Gamache, Director of Finance Corrective Action: As of 9/1/2023 all prime construction contracts in excess of $2,000 awarded by the school district will include a provision for compliance with the Davis-Bacon Act. The school district will also provide a copy of the current prevailing wage determination issued by the Department of Labor in each solicitation. The contracts will also include a provision for compliance with the Copeland "Anti-Kickback" Act. Anticipated Completion Date: By June 30, 2025
Condition: The District did not meet its financial covenants required under the program during the year, and we, as the auditors, were unable to properly calculate the required financial covenants because of potential missing or misstated financial statement information due to the adverse opinion on...
Condition: The District did not meet its financial covenants required under the program during the year, and we, as the auditors, were unable to properly calculate the required financial covenants because of potential missing or misstated financial statement information due to the adverse opinion on the 2022 financial statements and related disclaimer of opinion included in our accompanying 2023 Independent Auditor's report. Response: The hospital has financial covenants including: • Maintaining 35 days cash on hand. We are currently at 26 Days Cash on Hand. The hospital has been as low as 6 Days Cash on Hand. To increase our Cash on Hand, we have brought all Revenue Cycle efforts in house, trained new staff, formed cross functional teams with the clinical documentation staff, set goals and work weekly with our teams to gently resolve challenges and move forward. These efforts have rewarded the hospital with increased Days Cash on Hand and improved quality processes in Revenue Cycle. • Lack of account reconciliation causing large numbers of year end entries. The accounting staff were not involved in Balance Sheet account reconciliation. These accounts are now being reconciled and monitored monthly. The GASB 87 rules were not adopted due to the staff not being trained. Upon our switch to WIPFLI as our new auditors, we have adopted GASB 87 (starting in FY 2023). In addition, we make the GASB 87 adjustments monthly. • One covenant requires that we maintain strong internal controls. Since the new administration have begun, each month, new internal controls are being established throughout the hospital, Finance department, Materials Management and the Revenue Cycle. • On covenant requires a positive bottom line. The hospital has been loosing money primarily due to the change in administration, lack of routine processes, recruitment challenges, lack of accuracy in our accounting and revenue cycle. Throughout the hospital and RHC’s, improvement teams are working to both improve quality processes, reduce costs, establish a culture to allow recruitment and improve our bottom line. The hospital has been transparent with the agency and our Board of Directors throughout our change process. More work continues. Segregation of duties We have a small staff. However, we have carefully been analyzing the duties and capabilities of each person. Then we have made changes to increase the segregation of duties to improve our internal controls. We improve internal controls with monthly goals. We will continue to both develop our staff, analyze segregation of duties and tighten our internal controls. We are very proud of our accomplishments. Access Internal Controls The previous administration did not have focused reviews of access to data. We have starting in FY 2024 created a team approach to reviewing job functions, access to information and the limits we need to place on the access. One of the findings has been that we had too many people with edit access to areas that were not essential to their job duties. We meet bi-monthly and review roles, data requirements and view only or edit capabilities. The process is arduous and slow, but we are steadily make progress. There have been revisions, surprises and accomplishment. Responsible Party: Meagan Weber, CEO, Carolyn Davies, CFO & Brent Peirick, COO Estimated Completion Date: 6/30/2026
Condition: The District did not meet its financial reporting obligations under the grant during the year. The District did not complete the 2022 audit and file the Data Collection Form (SF-SAC) by the due date of March 31, 2024. Response: The hospital has new administration, a new finance team and h...
Condition: The District did not meet its financial reporting obligations under the grant during the year. The District did not complete the 2022 audit and file the Data Collection Form (SF-SAC) by the due date of March 31, 2024. Response: The hospital has new administration, a new finance team and has implemented additional internal controls. The 2022 financial statement audit is complete and the 2022 single audit will be issued prior to 12/31/2024. The 2024 audit is currently in progress and anticipated to be issued prior to 12/31/2024. Responsible Party: Carolyn Davies, CFO Estimated Completion Date: 12/31/2024
Finding No . 2023-002: Annual Audit Submission Assistance Listing Program Title and Number: All Federal Agency: All Pass-through Entity: All Description of Finding: As per the Code of Federal Regulations, Section 200.512 - Report Submission, the audit must be completed and the data collection form a...
Finding No . 2023-002: Annual Audit Submission Assistance Listing Program Title and Number: All Federal Agency: All Pass-through Entity: All Description of Finding: As per the Code of Federal Regulations, Section 200.512 - Report Submission, the audit must be completed and the data collection form and reporting package must be submitted within the earlier of 30 calendar days after receipt of the auditors’ report, or nine months after the end of the audit period. The due date for the submission was July 31, 2024. Statement of Concurrence or Nonconcurrence: Management agrees with the auditors' findings. Corrective Action: Management identified the prior two years of this finding as a lack of proper staffing, which has been corrected. Management will meet the timeliness standards in subsequent fiscal years. Name of Contact Person: Mark E. Kovitch, CFO mkovitch@NewOppInc.org 203-575-4293 Projected Completion Date: July 31, 2025
Finding No . 2023-001: Financial Reporting Assistance Listing Program Title and Number: All Federal Agency: All Pass-through Entity: All Description of Finding: In fiscal year 2023, the Organization’s accounting processes and internal controls over financial reporting did not meet timeliness standar...
Finding No . 2023-001: Financial Reporting Assistance Listing Program Title and Number: All Federal Agency: All Pass-through Entity: All Description of Finding: In fiscal year 2023, the Organization’s accounting processes and internal controls over financial reporting did not meet timeliness standards. As a result, the financial close process including the grant schedule was not completed within the standard period. Statement of Concurrence or Nonconcurrence: Management agrees with the auditors' findings. Corrective Action: Management identified the prior two years of this finding as a lack of proper staffing, which has been corrected. Management will meet the timeliness standards in subsequent fiscal years. Name of Contact Person: Mark E. Kovitch, CFO mkovitch@NewOppInc.org 203-575-4293 Projected Completion Date: July 31, 2025
DCH Management's response and corrective action plan During the COVID-19 pandemic, DCH Health System (DCH) developed a methodology to identify eligible costs following the Health and Human Services (HHS) produced COVID-19 Provider Relief Fund (PRF) Reporting Requirements and FAQ guidance. DCH's met...
DCH Management's response and corrective action plan During the COVID-19 pandemic, DCH Health System (DCH) developed a methodology to identify eligible costs following the Health and Human Services (HHS) produced COVID-19 Provider Relief Fund (PRF) Reporting Requirements and FAQ guidance. DCH's methodology identified costs used to prevent, prepare for and respond to coronavirus that fell into the following categories: COVID-19 specific costs, direct and indirect incremental costs due to COVID-19, and calculated lost revenue. To calculate direct and indirect incremental costs due to COVID-19 for DCH Regional Medical Center, DCH leveraged HHS FAQ guidance from October 28, 2020, that introduced examples demonstrating how providers could calculate marginally increased expenses related to coronavirus using a reasonable methodology of comparing pre-pandemic to post-pandemic average expenses for an office visit. DCH utilized this method to calculate both direct and indirect incremental costs due to COVID-19 on a per-patient discharge basis, which is akin to an office visit for a hospital, per the HHS FAQ guidance. Though this specific example was removed in subsequent versions of the FAQ, HHS never communicated that the guidance that DCH relied upon to calculate incremental expenses was incorrect. DCH's view is that the total cost of patient discharge includes direct patient care and indirect costs (overhead and general administrative costs (G&A) costs). Indirect costs (e.g., facilities, maintenance, utilities, and management salaries) were incurred by DCH to prepare, prevent and respond to COVID-19, consistent with the intention of the purpose of the PRF to provide financial support to providers who experienced lost revenues and increased expenses during the pandemic to maintain national health system capacity.' For instance, the ability to serve COVID-19 patients relied on incurring utility expenses to keep ventilators and other equipment functioning, which the organization utilized more than the norm, which resulted in higher utility costs. These costs were vital for accommodating COVID-19 patients during the pandemic, just as they were necessary for serving other patient types before the onset of COVID-19. These incremental indirect costs were also not reimbursed through other resources. DCH allocated indirect costs in accordance with other accepted government rules as defined in various government regulations such as 2 CFR and the Federal Acquisition Regulation. The indirect costs allocated to patient care costs were considered part of the total cost of patient discharge. In addition, though DCH calculated lost revenue, DCH did not report on lost revenue as part of the system's use of funds through the HHS portal (please note that there was one reporting period where Fayette had to report separately from DCH because of targeted funds received. Fayette did report lost revenue in that period based on a budget to actual calculation). DCH believes that the funds identified and reported are consistent with HHS guidance and the spirit of the law to maintain national health system capacity. It is DCH's understanding that Single Audit Finding for 2022-001 was particularly focused on DCH's approach to identifying indirect incremental costs due to COVID-19, citing these expenses as ineligible costs that were included in the HHS PRF portal submission. Similarly, DCH did not report lost revenues, resulting in 'inaccurate lost revenues reported.' Both FORVIS and DCH acknowledge that DCH incurred eligible expenses and lost revenue sufficient to cover the PRF funds received. Therefore, based on the FORVIS finding DCH implemented processes to submit future PRF reports as suggested in the Single Audit Finding 2022-001., which includes identifying specific individual expenses incurred during the reporting period to prevent, prepare for and respond to COVID-19, rather than utilizing the initial HHS guidance for calculating incremental costs due to COVID-19. In addition, DCH included lost revenue in the portal submission. Through the Single Audit 2022-001, DCH was requested to provide additional information in the form of lost revenues to cover expenses of $24 million. DCH provided documentation to HRSA auditors and received the final Management Decision Letter (MDL) dated August 20, 2024 completing the review of the audit stating the auditors concurred with the finding in the SAR and determined that the procedural and monetary finding were satisfactorily resolved. In the Single Audit 2023-001, DCH's leadership worked collectively with FORVIS auditors to review the findings from 2022-001 and had in-depth discussions regarding the itemized expenses. Both DCH and FORVIS acknowledged that between lost revenues and detailed expenses DCH was able to cover the monies received. DCH provided a detailed expense listing and FORVIS reviewed as part of the audit process. In the findings, FORVIS documented total expenditures reported in the portal were less than actual expenditures incurred. The audit for 2023-001 resulted in an unmodified report of the financial statements with a material weakness reported due to the reported portal expense being lower than the expenses actually incurred. DCH reported information in the portal related to Phase 4 with guidance based on HHS guidelines. DCH changed processes in future portal submissions to report as suggested in Single Audit Finding 2022-001 an9 in concurrence 2023-001. Since reporting had been completed prior to findings, only future submissions could be changed. Phase 5 submissions were also reviewed with no findings reported by Forvis.
Federal Funding Accountability and Transparency Act- CDBG Community Development Block Grants/Entitlement Grants – Assistance Listing No. 14.218 Recommendation: We recommend the City review the various grant requirements and laws surrounding the CDBG grant program and ensure that any written internal...
Federal Funding Accountability and Transparency Act- CDBG Community Development Block Grants/Entitlement Grants – Assistance Listing No. 14.218 Recommendation: We recommend the City review the various grant requirements and laws surrounding the CDBG grant program and ensure that any written internal control or procedure manuals include all of the required compliance requirements. We also recommend that the City ensure multiple individuals are trained on the administration of the grant. Explanation of disagreement with audit finding: There is no disagreement with the audit finding. Action taken in response to finding: This process will be added to the CDBG Policy and Procedure Manual to address the audit findings and improve reporting oversight. Name(s) of the contact person(s) responsible for corrective action: Tammy Stratz Planned completion date for corrective action plan: 10/14/2024
It is not cost effective to have an internal control system designed to provide for the preparation of the financial statements and accompanying notes. We have an individual designated to review the auditor prepared financial statements, schedule of expenditures, notes and adjustments.
It is not cost effective to have an internal control system designed to provide for the preparation of the financial statements and accompanying notes. We have an individual designated to review the auditor prepared financial statements, schedule of expenditures, notes and adjustments.
View Audit 330446 Questioned Costs: $1
Material Weakness and Noncompliance – Written Policies Required by the Uniform Guidance Statement of Condition/Criteria: Delta County does not have written policies and procedures to implement the requirements of 2 CFR section 200 for the administration of federal awards. 2 CFR 200.303(a) establishe...
Material Weakness and Noncompliance – Written Policies Required by the Uniform Guidance Statement of Condition/Criteria: Delta County does not have written policies and procedures to implement the requirements of 2 CFR section 200 for the administration of federal awards. 2 CFR 200.303(a) establishes that the auditee must establish and maintain effective internal controls over the federal awards that Provide assurance that the entity is managing the federal awards in compliance with federal statutes, regulations, and the conditions of the federal award. Planned Corrective Action: County management will develop written policies and procedures for grants. Contact person responsible for corrective action: Ashleigh Young, County Controller/Administrator Anticipated Completion Date: March 2025
Since taking over the financial management of ELFHCC in December 2022, the sliding fee schedule policy has been updated and training has been implemented and ongoing to assure accurate sliding fee discounts are appropriately distributed onto a patient’s account. Check lists of what is required from ...
Since taking over the financial management of ELFHCC in December 2022, the sliding fee schedule policy has been updated and training has been implemented and ongoing to assure accurate sliding fee discounts are appropriately distributed onto a patient’s account. Check lists of what is required from each patient applying for a sliding fee discount have been prepared and staff trained on how to enter the proof requirement into ELFHCC’s patient record
Since taking over the financial management of ELFHCC in December 2022 we have reorganized the financial reporting process and have been able to ensure meaningful analysis on a regular and continual basis. Policies and procedures have been created, changed, updated and Board approved. All financial r...
Since taking over the financial management of ELFHCC in December 2022 we have reorganized the financial reporting process and have been able to ensure meaningful analysis on a regular and continual basis. Policies and procedures have been created, changed, updated and Board approved. All financial reporting is prepared, analyzed and presented each month without delay.
We are working in implementing adequate internal control procedures in order to comply with the submission of all required information for the Single Audit for Fiscal Year 2024.
We are working in implementing adequate internal control procedures in order to comply with the submission of all required information for the Single Audit for Fiscal Year 2024.
We are working in implementing adequate internal control procedures in order to comply with the submission of all required information for the Single Audit for Fiscal Year 2024.
We are working in implementing adequate internal control procedures in order to comply with the submission of all required information for the Single Audit for Fiscal Year 2024.
2023-003: Reporting Response: Transitions in Women’s Coalition of St. Croix (WCSC) financial personnel during and after year-end resulted delays to the audit process for the audit period ending September 30, 2023. To address this problem, WCSC hired a fiscal consultan...
2023-003: Reporting Response: Transitions in Women’s Coalition of St. Croix (WCSC) financial personnel during and after year-end resulted delays to the audit process for the audit period ending September 30, 2023. To address this problem, WCSC hired a fiscal consultant in August 2022 to oversee the fiscal office, prepare and complete all grant reports, and to coordinate all fiscal audits. WCSC also hired a full-time bookkeeper in October 2022 to conduct day-to-day financial transactions and to assist with audit and grant reporting. WCSC has already engaged its Auditors to conduct the FY2024 audit, which will be completed by April 30th, 2025 Estimated Completion Date: April 30th, 2025. Contact: Carolyn Forno, Fiscal Officer