Finding 2023-003 Matching, Level of Effort, Earmarking, Program Income and Reporting Aging Cluster (ALN 93.044/93.045/93.053) Corrective Action: Management is in agreement with the finding. Management will ensure the necessary reports are filed with the granting agency in a timely fashion and amoun...
Finding 2023-003 Matching, Level of Effort, Earmarking, Program Income and Reporting Aging Cluster (ALN 93.044/93.045/93.053) Corrective Action: Management is in agreement with the finding. Management will ensure the necessary reports are filed with the granting agency in a timely fashion and amounts reported are accurate. Management anticipates corrective action to be in place by 01/01/2025. Responsible party: Mary Bateman, Controller.
Auditor Description of Condition and Effect. We selected a sample of disbursements that were charged to the grant. Of this sample, 5 out of 40 disbursements had questioned costs. Two disbursements had amounts submitted for reimbursement but no actual costs were incurred by the Organization. Another ...
Auditor Description of Condition and Effect. We selected a sample of disbursements that were charged to the grant. Of this sample, 5 out of 40 disbursements had questioned costs. Two disbursements had amounts submitted for reimbursement but no actual costs were incurred by the Organization. Another two disbursements included expenses for other clubs outside the grant agreement that was charged to the grant. The last disbursement was missing supporting documentation for the costs charged to the grant. As a result of this condition, the Organization did not fully comply with the requirements of the Uniform Guidance. Auditor Recommendation. We recommend that the Organization verify that costs submitted for reimbursement are valid and allowable expenses. Additionally, the Organization needs to properly allocate costs in accordance with the grant agreements. Corrective Action. Management concurs with the finding. The Organization will ensure valid and allowable expenses, including proper allocation of costs, are remitted through enhancement of the current review processes. Responsible Person. Stacy Holman, Chief Financial Officer. Anticipated Completion Date. December 31, 2024.
Finding 2023-003: Finding Type: Major Federal Award Program Audit, Significant Deficiency Response: 1. Name of person responsible for the corrective action: Deborah Burr, Programs Manager, or Mary Forsyth, Business Manager 2. Corrective Action Planned: The Business Manager has established a FSRS...
Finding 2023-003: Finding Type: Major Federal Award Program Audit, Significant Deficiency Response: 1. Name of person responsible for the corrective action: Deborah Burr, Programs Manager, or Mary Forsyth, Business Manager 2. Corrective Action Planned: The Business Manager has established a FSRS.gov account and uploaded 2023 subaward information in 2024. Going forward, the Programs Manager will report subaward data through FSRS.gov to ensure compliance with FFATA for 2024 and going forward for any new subawards. 3. Anticipated Completion Date: December 31, 2024
Finding 2023-002: Finding Type: Major Federal Award Program Audit, Significant Deficiency Response: 1. Name of person responsible for the corrective action: Deborah Burr, Programs Manager 2. Corrective Action Planned: In 2024, we have already taken corrective action to look up and save date-stam...
Finding 2023-002: Finding Type: Major Federal Award Program Audit, Significant Deficiency Response: 1. Name of person responsible for the corrective action: Deborah Burr, Programs Manager 2. Corrective Action Planned: In 2024, we have already taken corrective action to look up and save date-stamped documentation for our subawardees and contractors for the 2023 audit year, ensuring no entities are disbarred, suspended, or otherwise excluded from working with us on a federal award. Going forward, our Programs Manager will ensure subawardees and contractors in 2024 and beyond are verified through SAM.gov as stated in our 2024 Fiscal Policies. 3. Anticipated Completion Date: December 31, 2024
ʻAha Pūnana Leo is reviewing grants and awards from federal and nonfederal sources and identifies and tracks all federal funds. We will strengthen our internal controls over reviewing the accuracy and completeness of the SEFA for financial reporting purposes. We have since implemented an additional ...
ʻAha Pūnana Leo is reviewing grants and awards from federal and nonfederal sources and identifies and tracks all federal funds. We will strengthen our internal controls over reviewing the accuracy and completeness of the SEFA for financial reporting purposes. We have since implemented an additional review step in the grant set-up process to specifically address the proper classification of revenue for each new funding source.
Beginning in April 2023, the College began ongoing conversations with its bondholders for relief of aniticipated Bond covenant defaults. Initials communications informed bondholders of the need for their support to implement strategic changes to the College's business model and to hence address and ...
Beginning in April 2023, the College began ongoing conversations with its bondholders for relief of aniticipated Bond covenant defaults. Initials communications informed bondholders of the need for their support to implement strategic changes to the College's business model and to hence address and avoid covenant defaults. The College's independent auditors required an executed forbearance agreement to be in place prior to issuing the financial statements for the 2023 fiscal year. The terms and scope of the Forbearance Agreement have been negotiated with the bondholders, and as of October 17, 2024 a final version of the Agreement has been fully executed. As the agreement was executed and shared with the auditors, the Colleges 2023 audited financial statements were prepared for issuance. The college administration believes that this is a one-time event and does not anticipate a similar situation in upcoming years.
Upon discovery (during 2023) of the failure of the College to determine the amount of excess cash it had retained, and to timely return it ot the Secretary of Education, the College immediately implemented a corrective action plan that included a strengthening of procedures with corresponding intern...
Upon discovery (during 2023) of the failure of the College to determine the amount of excess cash it had retained, and to timely return it ot the Secretary of Education, the College immediately implemented a corrective action plan that included a strengthening of procedures with corresponding internal controls, and the immediate return of any excess cash. The Correction Action Plan included Student Financial Aid training sessions for Business Office Staff responsible for Title IV cash management oversight. To further address this situation, the College engaged an independent consultant to assist in the review and revisiion of existing Business Office Title IV policies and procedures, which were immediately adopted and implemented.
Upon discovery (during 2023) of the failure of the College to perform monthly reconciliations, the College immediately implemented a corrective action plan that included a strengthening of procedures with corresponding internal controls, with immediate return of any excess cash. The Corrective Actio...
Upon discovery (during 2023) of the failure of the College to perform monthly reconciliations, the College immediately implemented a corrective action plan that included a strengthening of procedures with corresponding internal controls, with immediate return of any excess cash. The Corrective Action Plan included Student Financial Aid training sessions for Business Office Staff responsible for Title IV cash management oversight. To further address this situation, the College engaged an independent consultant to assist in the review and revision of existing Business Office Title IV policies and procedures, which were immediately adopted and implemented
The Organization is working diligently to complete annual audits in a timely manner.
The Organization is working diligently to complete annual audits in a timely manner.
w management has taken over and will ensure that the auditors receive audit documentation in a timely manner.
w management has taken over and will ensure that the auditors receive audit documentation in a timely manner.
Finding 513098 (2023-003)
Significant Deficiency 2023
Finding 2023-003: For the year ended June 30, 2022, the Corporation did not submit audited financial statements to the Federal Audit Clearinghouse within 30 days after receipt of the auditor's report on October 6, 2022. The audited financial statements were submitted to the Federal Audit Clearinghou...
Finding 2023-003: For the year ended June 30, 2022, the Corporation did not submit audited financial statements to the Federal Audit Clearinghouse within 30 days after receipt of the auditor's report on October 6, 2022. The audited financial statements were submitted to the Federal Audit Clearinghouse on July 5, 2024. Comments on the Finding and Each Recommendation: The Corporation should submit audited financial statements to the Federal Audit Clearinghouse within the time frames required. Action(s) taken or planned on the finding: The audited financial statements have been submitted to the Federal Audit Clearinghouse.
Finding 513096 (2023-002)
Significant Deficiency 2023
Finding 2023-002: The Corporation did not furnish HUD with a complete annual financial report within 90 days following the year ended June 30, 2023. Comments on the Finding and Each Recommendation: The Corporation should ensure the annual financial report is filed within 90 days of year end. Action(...
Finding 2023-002: The Corporation did not furnish HUD with a complete annual financial report within 90 days following the year ended June 30, 2023. Comments on the Finding and Each Recommendation: The Corporation should ensure the annual financial report is filed within 90 days of year end. Action(s) taken or planned on the finding: The audited financial statements have been submitted to HUD.
Finding 513094 (2023-001)
Significant Deficiency 2023
Finding 2023-001: During the year ended June 30, 2023, the Corporation did not make the require deposits to the reserve for replacements. Comments on the Finding and Each Recommendation: Management should make a deposit to the reserve for replacements for $4,846 for the delinquent deposits. In futur...
Finding 2023-001: During the year ended June 30, 2023, the Corporation did not make the require deposits to the reserve for replacements. Comments on the Finding and Each Recommendation: Management should make a deposit to the reserve for replacements for $4,846 for the delinquent deposits. In future periods, management should fund the reserve for replacements on an annual basis as required by the HUD regulatory agreement or request HUD approval for a suspension of deposits. Action(s) taken or planned on the finding: Management made a deposit of $4,846 on July 20, 2023 for the delinquent deposits.
View Audit 331057 Questioned Costs: $1
Finding 513085 (2023-004)
Material Weakness 2023
FINDING 2023-004 Finding Subject: COVID-19 – Coronavirus State and Local Fiscal Recovery Funds – Procurement and Suspension and Debarment Summary of Finding: Suspension and Debarment – Allen County did not have documentation that vendors’ suspension and debarment status were verified through either ...
FINDING 2023-004 Finding Subject: COVID-19 – Coronavirus State and Local Fiscal Recovery Funds – Procurement and Suspension and Debarment Summary of Finding: Suspension and Debarment – Allen County did not have documentation that vendors’ suspension and debarment status were verified through either a) checking the Excluded Parties List System (EPLS), b) collecting a certification, or c) adding a clause or condition to the covered transaction agreement. Procurement – Allen County did not ensure purchases between $10,000 and $150,000 had received the adequate number of quotes or documented why an adequate number of quotes was not received. Contact Person Responsible for Corrective Action: Chris Cloud, Chief of Staff Contact Phone Number and Email Address: 260-449-4752 / chris.cloud@allencounty.us Views of Responsible Officials: We concur with the finding. Description of Corrective Action Plan: To correct Finding 2023-004 for Suspension and Debarment, the Chief of Staff to the Board of Commissioners will check the EPLS on SAM.gov every time a contract is placed before the Board of Commissioners for signature not containing the appropriate suspension and debarment language or a county department starts a project with a vendor using State and Local Fiscal Recovery Funds (SLFRF). If a vendor is not found in EPLS, a certification will be solicited from the vendor prior to contract signing or purchase of goods or services verifying that they have not been suspended or disbarred. A new verification must be sought for every contract or purchase. Documentation will be kept on file by the Controller to the Board of Commissioners who is responsible for reviewing claims submitted for payment utilizing SLFRF. To correct Finding 2023-004 for Procurement, the Chief of Staff to the Board of Commissioners will instruct departments who may be spending between $10,000-$150,000 of SLFRF that price or rate quotations must be obtained from an adequate number of qualified sources. When departments submit a claim to the Controller of the Board of Commissioners for payment, they must also provide a cover sheet outlining a) rationale for the method of procurement, b) copies of quotes received, and c) a justification for the selected vendor. This information will be reviewed and if everything is in order, the cover sheet will be uploaded, along with the accompanying invoices, in the Workflow payment system as part of the record. Anticipated Completion Date: This CAP will be completed by December 31, 2024
Finding 513084 (2023-003)
Material Weakness 2023
FINDING 2023-003 Finding Subject: COVID-19 – Coronavirus State and Local Fiscal Recovery Funds – Reporting Summary of Finding: The County submitted the four required quarterly P&E reports and the annual Recovery Plan Performance Report during the audit period; however, a single employee prepared and...
FINDING 2023-003 Finding Subject: COVID-19 – Coronavirus State and Local Fiscal Recovery Funds – Reporting Summary of Finding: The County submitted the four required quarterly P&E reports and the annual Recovery Plan Performance Report during the audit period; however, a single employee prepared and submitted each report without a review or oversight process in place to prevent, or detect and correct, errors. Contact Person Responsible for Corrective Action: Chris Cloud, Chief of Staff Contact Phone Number and Email Address: 260-449-4752 / chris.cloud@allencounty.us Views of Responsible Officials: We concur with the finding. Description of Corrective Action Plan: To correct Finding 2023-003, the Chief of Staff to the Board of Commissioners will have the Controller to the Board of Commissioners review the P&E Reports and the Recovery Plan Performance Report prior to being electronically submitted to the Department of Treasury via its State and Local Fiscal Recovery Funds portal. If errors are discovered by the Controller, the Chief of Staff will correct the electronic entry prior to submission. Anticipated Completion Date: This CAP will be completed by October 31, 2024, the deadline for submitting the third quarter 2024 P&E Report.
Finding 513083 (2023-002)
Material Weakness 2023
FINDING 2023-002 Finding Subject: Coronavirus State and Local Fiscal Recovery Funds - Reporting Federal Agency: Department of the Treasury Summary of Finding: (copied from SBOA Findings document provided) The Allen County Department of Health (Department of Health), a department within Allen County,...
FINDING 2023-002 Finding Subject: Coronavirus State and Local Fiscal Recovery Funds - Reporting Federal Agency: Department of the Treasury Summary of Finding: (copied from SBOA Findings document provided) The Allen County Department of Health (Department of Health), a department within Allen County, was awarded the Health Issues and Challenges grant through the Indiana Department of Health financed through the American Rescue Plan Act (ARPA) for the purposes of funding programs that focus on the improvement of chronic disease, specifically, elevated blood lead level reduction. As part of sound management of the Federal award, the Department of Health was responsible for implementing a system of internal control that would ensure compliance with the applicable requirements. The Department of Health did not properly design or implement such a system. The Department of Health was required to submit data through the online portal, National Electronic Disease Surveillance System (NEDSS) Base System (NBS), monthly beginning in October 2022. The submitted data included program specific metrics relating to patient case management of certified Elevated Blood Lead Levels (EBLLs). The Department of Health was also required to ensure environmental investigation activities completed, including risk assessments and environmental inspections, were documented in the Indiana I-LEAD database monthly by a licensed Lead Risk Assessor. Environmental investigation activities performed by the Department of Health were documented in the Indiana I-LEAD database by a licensed Lead Risk Assessor who was an employee of the Department of Health. Similarly, case management activities performed were documented in the NEDSS Base System (NBS). Once activities were documented in the I-LEAD and NBS systems, the activities were further documented in a spreadsheet by the Lead Risk Assessor (for I-LEAD activities) and the Case Management Coordinator (for NBS activities). The spreadsheet was reviewed by the Director of the Environmental Services Division and the Finance Director monthly. The Finance Director then used the spreadsheet to prepare the monthly reimbursement requests and sent the monthly reimbursement requests to the Indiana Department of Health. We determined through inquiry with the Director of the Environmental Services Division and the Finance Director that while there was a review of the monthly spreadsheet, there was not a second review of the spreadsheet back to the activities reported in I-LEAD and NBS for accuracy. Additionally, the Finance Director prepared and submitted the reimbursement requests to the State without a second review or oversight process in place to prevent, or detect and correct, errors prior to submission. The lack of internal controls was a systemic issue throughout the audit period. Recommendation We recommend that management of the Health Department design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place to ensure reports are complete and accurate. ………………………… Contact Person Responsible for Corrective Action: JENNIFER MILLER (Finance Director) Contact Phone Number and Email Address: 260-449-7358 (Jennifer.miller@allencounty.us) Views of Responsible Officials: We concur with the finding Explanation and Reasons for Disagreement: N/A Description of Corrective Action Plan: We were unaware of a requirement for a secondary review of each document/spreadsheet/database input/task that was conducted prior to submission to the Finance Director (defining the completed cases for which to invoice the State), and a requirement for a secondary review of the invoice/billing documents prior to submission to the State. We were informed that the State review process (as was described to SBOA staff) was the check and balance needed which ensured we had appropriately entered the data into the required database(s) and that we had then subsequently billed for those very same appropriately completed and entered cases. However, when we were informed of the outcomes of the SBOA audit and the subsequent need for a corrective action plan (CAP) relative to their findings, we moved quickly to begin the development of the CAP -- as we do now understand that despite the inaccurate instructions we were given, we did not appropriately do what the law requires locally relative to ensuring accurate completion of duties under grant contracts before submission for reimbursement. THE PLAN (which will be added as a new “Grants” section in our existing Finance Internal Controls policies): For all grants (reimbursable or deliverables-based), once a contract is near completion or upon execution, a primary and secondary staff member will be identified for each step of the database entry (as an example, and this will follow whatever the duties are defined by the grant and a primary responsible staff member will be defined per grant duty needs) as well as for the invoicing/billing documentation process. The primary staff member(s) will be responsible for doing what is defined in the grant contract (a duty, task, data entry, invoice creation, etc.) and the secondary staff member will be responsible for verifying the work of the primary staff member(s). (In some cases, when there are diverse duties and more than one primary staff member is needed to do the duties of the grant, there may be several primary staff members assigned to various duties as needed) If disparities are encountered (such as errors or omissions) in any step related to the above duties, they will first be reported the primary staff member for likely easy correction or resolution. If a pattern exists or repetitive errors are identified through the review and verification process, the secondary reviewer will report the issue(s) to the Department Administrator to make a determination as to whether the primary staff member’s duties are transferred to another staff member, or if the person is simply re-educated. The goal will be to ensure there is an appropriate check and balance step (as well as remediation/correction step if warranted) in place for all tasks and documentation completion as it relates to grant-funded duties and invoicing. Anticipated Completion Date: We will follow this practice for any new grants accepted by the Allen County Department of Health effective 9/17/2024.
Finding 513082 (2023-001)
Material Weakness 2023
FINDING 2023-001 Finding Subject: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds - Activities Allowed or Unallowed, Allowable Costs/Cost Principles, Period of Performance, and Procurement and Suspension and Debarment Summary of Finding: (copied from SBOA Findings document provided) The...
FINDING 2023-001 Finding Subject: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds - Activities Allowed or Unallowed, Allowable Costs/Cost Principles, Period of Performance, and Procurement and Suspension and Debarment Summary of Finding: (copied from SBOA Findings document provided) The Allen County Department of Health (Department of Health), a department within Allen County, was awarded the Health Issues and Challenges grant through the Indiana Department of Health financed through the American Rescue Plan Act (ARPA) for the purpose of funding programs that focus on the improvement of chronic disease, specifically, elevated blood lead level reduction. The Health Issues and Challenges grant is a reimbursable grant, whereby the County received reimbursement on a percase basis at a stated rate for Case Management and Environmental Investigation activities performed. The Department of Health received federal receipts related to the grant in the amount of $130,479 during 2023. As part of sound management of the Federal award, the Department of Health was responsible for implementing a system of internal control that would ensure compliance with the applicable requirements. The Department of Health did not properly design or implement such a system. Receipts of the program were adequately identified through the use of an account number within the County Health Fund (285) in the Allen County's ledger (ledger) which was unique to the Health Issues and Challenges grant receipts. However, the ledger did not adequately identify the expenditures of the grant program within the County Health Fund. Through inquiry with the Department of Health employees and review of unitprepared support of grant expenditures, we determined expenditures were made with grant funds during the audit period, however, we were unable to distinguish between the expenditures of the Health Issues and Challenges grant and all other activities of the Department of Health in the County Health Fund. Due to the lack of separate identification of expenditures in the financial records, we were not able to establish a population from which to audit the Health Issues and Challenges grant for compliance with the following compliance requirements of the program: 􀁸 Activities Allowed or Unallowed 􀁸 Allowable Costs/Cost Principles 􀁸 Period of Performance 􀁸 Procurement and Suspension and Debarment As such, the full award amount of $130,479, as reported on the Schedule of Expenditures of Federal Awards, was determined to be questioned costs. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Recommendation: We recommend that management of the Health Department establish a system of internal controls to ensure that grant award funds are adequately accounted for and tracked in such a manner as to determine the activity, receipts and disbursement, associated with the grant. ………………………… Contact Person Responsible for Corrective Action: JENNIFER MILLER (Finance Director) Contact Phone Number and Email Address: 260-449-7358 (Jennifer.miller@allencounty.us) Views of Responsible Officials: We concur with the finding Explanation and Reasons for Disagreement: N/A Description of Corrective Action Plan: When we were informed of the outcomes of the SBOA audit and the subsequent needs for a corrective action plan (CAP) relative to their findings, we moved quickly to begin the development of the CAP. We feel this finding/issue could be easily remedied by following our normal procedure for grants, whereby we develop a new fund, craft a Fund Ordinance for approval by the Allen County Commissioners to establish said new fund, and then subsequently track all expenditures and reimbursements in the separate fund vs. utilizing a line item for deposits in the main Health Fund as was done with this grant (which lacked the ability to denote exact salary expenditures and such next to each payment as it was all done within the larger fund for all staff and expenses. We were not aware of this need. THE PLAN (which will be added as a new “Grants” section in our existing Finance Internal Controls policies): For all grants (reimbursable or deliverables-based), once a contract is near completion or upon execution, a separate fund will be created through development and approval of a local fund ordinance. All expenditures allowed by said grant and all reimbursements received by the grant funder will be tracked solely and only within the separate grant fund that is tied to the signed contract from the funder. If there are staff payments for salaries or benefits being reimbursed by a grant, we will ensure that: (1) the hours/minutes per staff member per pay period for all work associated with these grant duties are tracked appropriately so as to ensure we are invoicing the grant funder for the exact and accurate work hours (regardless of whether or not the grant contract specifies this be tracked or reimbursed per minute/hour, as most do not require this); and (2) these amounts will be noted alongside the expenditures in the grant fund for clarity upon invoicing or auditing. Anticipated Completion Date: We will follow this practice for any new grants accepted by the Allen County Department of Health effective 9/17/2024. This is the standard practice for most grants we have accepted, and therefore, we will not vary from this practice in the future even if given permission to do so.
View Audit 331014 Questioned Costs: $1
Due to turnover of the Commission's accounting staff, the Commission was unable to have the annual audit completed within the required timeframe, and subsequently was also late in submission of the FAC report. The Commission has hired internal staff to help with the audit preparation and contracted ...
Due to turnover of the Commission's accounting staff, the Commission was unable to have the annual audit completed within the required timeframe, and subsequently was also late in submission of the FAC report. The Commission has hired internal staff to help with the audit preparation and contracted with an accounting firm that has provided the Commission a CPA to conduct audit preparation and other financial services as requested. The Commission will work on getting financial information in a timely fashion and submit the reporting package in accordance with the guidelines. Anticipated completion date: November 30, 2024.
Finding 2023-003 Condition: The organization did not properly maintain documentation to support the pay rate authorization. Corrective Action Plan: Management will conduct internal audits to randomly select pay statements and verify there are pay rate authorization documents to support the pay r...
Finding 2023-003 Condition: The organization did not properly maintain documentation to support the pay rate authorization. Corrective Action Plan: Management will conduct internal audits to randomly select pay statements and verify there are pay rate authorization documents to support the pay rate in the pay statements. Person responsible: Finance Director and Human Resources Manager Completion date: Starting 4th quarter of 2024 and through 2025 until management is satisfied the problem is resolved.
Finding 2023-002 Condition: The organization did not properly maintain documentation to support the qualification and sliding fee discount received. Corrective Action Plan: Management will conduct internal audits to randomly select encounters with a sliding fee discount and will verify the slidi...
Finding 2023-002 Condition: The organization did not properly maintain documentation to support the qualification and sliding fee discount received. Corrective Action Plan: Management will conduct internal audits to randomly select encounters with a sliding fee discount and will verify the sliding fee documentation is on file and properly completed. Person responsible: Finance Director and Revenue Cycle Manager Completion date: Starting 4th quarter of 2024 and through 2025 until management is satisfied the problem is resolved.
Management's Response: We concur. View of Responsible Officials and Corrective Action Plan Corrective action plan to ensure enrollment reporting is completed timely and accurately I. The admissions team sends a list of all enrolled students 2. Financial aid will manually enter the student's informat...
Management's Response: We concur. View of Responsible Officials and Corrective Action Plan Corrective action plan to ensure enrollment reporting is completed timely and accurately I. The admissions team sends a list of all enrolled students 2. Financial aid will manually enter the student's information into campus IVY 3. Campus IVY updates the student's status in NSLDS every 30 days. 4. If a student withdraws from Community Christian College, financial aid will manually update the student status into campus IVY 5. NSLDS is updated upon completion of the withdrawal This process will ensure that Community Christian College updates enrollment statuses for every student timely
Management's Response: We concur. View of Responsible Officials and Corrective Action Plan The following is the procedure that the College will be implementing to ensure that student withdrawal calculations are performed accurately and returned within 30 days: I. The registrar will send a list to f...
Management's Response: We concur. View of Responsible Officials and Corrective Action Plan The following is the procedure that the College will be implementing to ensure that student withdrawal calculations are performed accurately and returned within 30 days: I. The registrar will send a list to financial aid of all students that have dropped by end of day every Thursday of each week. The list will include date of determination (DOD) and last date of attendance (LOA) of each student b. DOD wiII be within 14 days of student LOA 2. Upon receipt of the list financial aid will complete the following for each student: a. Gather student's current ledger card b. Gather student's current Transcript c. Complete a cover sheet which indicated the current loan period of the student. d. Financial aid will send over items to yd patty processor in order for R2t4 calculation to be completed (Campus IVY) no later than Wednesday of the following week by end of business day. 3. Campus IVY will complete the R2T4 3-5 business days upon receipt and conduct the following: a. If a refund is required- campus IVY will schedule the refund, update student account and send to school. b. School (student accounts) will review the refund, update student account and monies will be placed in the operations account and sent back to GS. c. If a refund is not required based on the R2T4 results, Campus IVY will notate the student account. This corrective action plan will allow Community Christian College to complete the drop process for each student within 30 days from LOA.
Management's Response: We concur. View of Responsible Officials and Corrective Action Plan I. Campus IVY will aid with the data collection for the FISAP 2. Campus IVY will run a disbursement repo11 showing how much FA was disbursed prior year and record 3. Campus IVY will run !SIR report to show eli...
Management's Response: We concur. View of Responsible Officials and Corrective Action Plan I. Campus IVY will aid with the data collection for the FISAP 2. Campus IVY will run a disbursement repo11 showing how much FA was disbursed prior year and record 3. Campus IVY will run !SIR report to show eligible applicant and record 4. School will run population repo11 out of Populi and record 5. Campus IVY will run a report to show the amount of FSEOG disbursed prior year and record 6. Once all data is collected, a comparison year to year will take place 7. A comparison of student population as well as amount used 8. The result will allow the school to determine the amount of FSEOG is needed for upcoming year. This correction action plan will allow Community Christian College to repo11 FISAP figures properly with suppo11ing documentation.
Management's Response: We concur. View of Responsible Officials and Corrective Action Plan The following is the procedure that the College will be implemented to ensure that student withdnrn al calculations are performed accurately and returned within 30 days: I. The registrar will send a list to fi...
Management's Response: We concur. View of Responsible Officials and Corrective Action Plan The following is the procedure that the College will be implemented to ensure that student withdnrn al calculations are performed accurately and returned within 30 days: I. The registrar will send a list to financial aid of all students that have dropped by end of day every Thursday of each week. a. The list will include date of determination (DOD) and last date of attendance (LOA) of each student b. DOD will be within 14 days of student LOA 2. Upon receipt of the list financial aid will complete the following for each student: a. Gather student's current ledger card b. Gather student's current Transcript c. Complete a cover sheet which indicated the current loan period of the student. d. Financial aid will send over items to 3rd party processor in order for R2t4 calculation to be completed (Campus IVY) no later than Wednesday of the following week by end of business day. 3. Campus IVY will complete the R2T4 3-5 business days upon receipt and conduct the following: a. If a refund is required- campus IVY will schedule the refund, update student account and send to school. b. School (student accounts) will review the refund, update student account and monies will be placed in the operations account and sent back to GS. c. If a refund is not required based on the R2T4 results, Campus IVY will notate the student account. This corrective action plan will allow Community Christian College to complete the drop process for each student within 30 days from LOA.
Finding 2023-003 Deadline for Federal Single Audit – Reporting - Noncompliance and Significant Deficiency in Internal Control Over Compliance Name of Contact Person: Sarah J. Villalon, CFO Planned Corrective Action: Management agrees with the finding and plans to establish processes and procedures t...
Finding 2023-003 Deadline for Federal Single Audit – Reporting - Noncompliance and Significant Deficiency in Internal Control Over Compliance Name of Contact Person: Sarah J. Villalon, CFO Planned Corrective Action: Management agrees with the finding and plans to establish processes and procedures to ensure the audit is completed timely and the reporting package is submitted within the required timeframe. Anticipated Completion Date: March 31, 2025