Corrective Action Plans

Browse how organizations respond to audit findings

Total CAPs
48,527
In database
Filtered Results
367
Matching current filters
Showing Page
2 of 15
25 per page

Filters

Clear
Active filters: § 200.502
Finding Number: 2024-001 Condition: The expenditures were reported for the Capital Magnet Fund throughout the award period from the year ended June 30, 2019 to the year ended June 30, 2024 on the schedule of expenditures of federal awards (SEFA) but did not accurately report the amount of administr...
Finding Number: 2024-001 Condition: The expenditures were reported for the Capital Magnet Fund throughout the award period from the year ended June 30, 2019 to the year ended June 30, 2024 on the schedule of expenditures of federal awards (SEFA) but did not accurately report the amount of administrative expenditures incurred during the performance period, and, therefore, the SEFA was not complete and accurate for the year ended June 30, 2019 to the year ended June 30, 2024. Planned Corrective Action: Management has implemented procedures and controls to ensure reports are reviewed prior to submission and distributed funds are reported properly and in the correct period. Contact person responsible for corrective action: Lindsey Dehring, Vice President of Financial Planning & Analysis Anticipated Completion Date: July 31, 2025
Finding 2024-002 – Significant Deficiency Award No.: Assistance List (AL) No. 15.555 and No. 15.704 Federal Grantor: U.S. Department of the Interior, Bureau of Reclamation. AL No. 15.074 Passed-through the Del Puerto Water District Compliance Requirement: Other compliance requirements. Condition: ...
Finding 2024-002 – Significant Deficiency Award No.: Assistance List (AL) No. 15.555 and No. 15.704 Federal Grantor: U.S. Department of the Interior, Bureau of Reclamation. AL No. 15.074 Passed-through the Del Puerto Water District Compliance Requirement: Other compliance requirements. Condition: The Schedule of Expenditures of Federal Awards (SEFA) was not complete, and expenditures reported on the SEFA were revised during the single audit. Criteria2 CFR Part 200, Subpart F (Uniform Guidance) Section 200.502 states, “The auditee should prepare a Schedule of Expenditures of Federal Awards for the period covered by the auditee’s financial statements.” Internal controls over preparation of the SEFA should be in place to ensure accrual basis expenses incurred under each federal program are properly reported as expenses on the SEFA and are properly reported as revenue in the financial statements prior to the start of the single audit. Cause: SEFA was not fully reconciled and finalized until after the single audit began. Effect: Expenses were omitted from the SEFA that should have been included and other expenses were included on the SEFA that were not eligible. The SEFA had to be revised for multiple grants over the course of the audit. This delayed the audit testing and major program determination process and could have resulted in the wrong programs being tested as major programs and the single audit not complying with the Uniform Guidance. Context: The District’s Finance Department was not informed of grant amendments that changed the amount of federal funding available. The expenses reported on the SEFA were revised during the single audit as follows. • AL No. 15.555 San Joaquin River Restoration Program Poso Canal Bridge Replacement: The District estimated additional reimbursable costs of $30,335 existed for the Poso Canal Bridge Replacement grant under a potential new $990,000 grant amendment that was to be signed by the USBR in 2025. The amendment was not approved for the Poso Canal Bridge Replacement but the District included the additional reimbursable expenses on the SEFA. The expenses on the SEFA had to be reduced to reflect the eligible federal grant maximum reimbursable expenses under the approved grant agreement at year-end. • AL No. 15.704 Small Surface Water and Groundwater Storage Projects Orestimba Creek Recharge and Recovery Expansion: An additional grant amendment was identified during the single audit that authorized an additional $1,262,928 of federal funding. The District had eligible expenses during the period of performance to fully claim the additional funding, but did not include the expenses on the SEFA. Recommendation: We recommend additional review procedures be implemented to ensure the SEFA is complete and accurate when the single audit begins, which includes working with program managers to identify each grant awarded, obtain current executed grant agreements and amendments, reconciling all expenses incurred under each federal awards down to the invoice, payroll check and lowest level of any other costs claimed, cutting-off each expense at year-end and claiming the reconciled qualifying expenses within 45 days after quarter end. At year-end, programs should be reviewed for cost adjustments, extensions, and other changes that should be reflected on the SEFA when reconciling expenses for the SEFA. Separate general ledger program codes should be used for each grant on the SEFA that summarizes expenses down to the individual invoice level that should be provided to the auditor for the single audit. If overclaimed amounts are identified, the grantor and/or pass-through agency should be contacted to determine whether to return the funds or apply the overclaimed amounts to future claims. Views of Responsible Officials and Planned Corrective Actions: Prepare a summary of grant expenses to reconcile to claims with performance periods included. Staff has prepared an expense summary for Orestimba Creek Recharge and Recovery project and will be updated moving forward. A similar file will be created for each grant received. Estimated Completion Date of Corrective Action: File started for Orestimba Creek.
Description: The SEFA schedule included unallowable costs. Planned Corrective ActionL CGS will revise its SEFA preparation procedures to ensure that only allowable and properly reimbursable expenditures on federal awards are reported. Additional training will be scheduled for those responsible sta...
Description: The SEFA schedule included unallowable costs. Planned Corrective ActionL CGS will revise its SEFA preparation procedures to ensure that only allowable and properly reimbursable expenditures on federal awards are reported. Additional training will be scheduled for those responsible staff members to ensure that this error does not happen in the future. Anticipated Completion Date: October 1, 2025 Responsible Person: Keith Peregonov, VP for Finance, Human Resources and Operations
Condition: The schedule of expenditures of federal awards (the "SEFA") was not accurate. Planned Corrective Action: To improve accuracy and completeness of the SEFA, the City will enhance its master grant tracking spreadsheet to ensure all grant expenses are calculated correctly and consistently. I...
Condition: The schedule of expenditures of federal awards (the "SEFA") was not accurate. Planned Corrective Action: To improve accuracy and completeness of the SEFA, the City will enhance its master grant tracking spreadsheet to ensure all grant expenses are calculated correctly and consistently. In addition, quarterly reviews will be conducted in partnership with departments to confirm that all federal awards are current and accurately captured. These improvements, along with the updated required quarterly report and request for reimbursement procedures, will allow the City to compile a complete and accurate SEFA. Contact person responsible for corrective action: Grant Accountant and Accounting Manager Anticipated Completion Date: 7/31/2025
Starting during Fiscal Year 2024, the County Finance Department has been preparing and analyzing quarterly draft Single Audit expenditures and other trial balance amounts with participation from grant fiscal staff throughout the County to improve the reporting of expenditures at year-end. There are...
Starting during Fiscal Year 2024, the County Finance Department has been preparing and analyzing quarterly draft Single Audit expenditures and other trial balance amounts with participation from grant fiscal staff throughout the County to improve the reporting of expenditures at year-end. There are also a variety of other initiatives to improve financial reporting and other grant-related processes. An interorganizational Grants Workgroup has been started to have periodic meetings to work on root causes that affect the accounting of grant expenditures. For example, this work group is addressing topics such as expenditure reconciliations, timely recording of grant receivables and revenues throughout the fiscal year to facilitate expenditure analysis at year-end, timely recording of County match and the identification of County match-funded versus grantor-funded (Single Audit reportable) expenditures, and the development of accounting-system reports. County Finance management (Merrie Allen and Ajay Gajjar) will continue to work with the Grants Workgroup and develop improvements that will improve the reporting of grant expenditures.
Condition: The fiscal year 2024 schedule of expenditures of federal awards (SEFA) that was initially provided to the auditors was incorrect because it included expenditures related to fiscal years 2023 and 2025. Planned Corrective Action: The City of Fort Collins has determined that two separate and...
Condition: The fiscal year 2024 schedule of expenditures of federal awards (SEFA) that was initially provided to the auditors was incorrect because it included expenditures related to fiscal years 2023 and 2025. Planned Corrective Action: The City of Fort Collins has determined that two separate and identifiable root causes led to the inclusion of expenditures from fiscal years 2023 and 2025 in the initial fiscal year 2024 SEFA. 1. Improper Accrual of Prepayments: A small number of transactions involving partial prepayments were not properly accrued in accordance with accounting standards. To address this issue, the City will implement a formal review process whereby all reimbursement requests are reviewed by the Grant Accountant prior to submission. This review will include a targeted examination of expenditure listings to identify and ensure appropriate treatment of any transactions requiring accrual as prepayments. 2. Inconsistencies Between Reimbursement Packets and the General Ledger: For the Highway Planning and Construction Cluster, the SEFA preparation process previously relied on reimbursement request packets compiled by departmental staff. In some cases, these packets did not accurately reflect the timing of expenditures recorded in the general ledger. To enhance accuracy, the City will implement a reconciliation procedure requiring the Grant Accountant to cross-reference reimbursement packet data with the general ledger during SEFA preparation. This step will help ensure that all expenditures are properly reported in the appropriate fiscal year. The City is confident that these corrective actions will strengthen internal controls over SEFA preparation and prevent recurrence of similar issues in future reporting periods. Contact person responsible for corrective action: Trevor Nash, Accounting Manager Anticipated Completion Date: 12/31/2025
View of Responsible Officials and Corrective Action Plan: The corrective Action Plan will be carried out in the 2025 Fiscal Year and information will be given to the auditors when requested for the next audit. The Coalition will ensure that all information needed for the SEFA is kept and entered acc...
View of Responsible Officials and Corrective Action Plan: The corrective Action Plan will be carried out in the 2025 Fiscal Year and information will be given to the auditors when requested for the next audit. The Coalition will ensure that all information needed for the SEFA is kept and entered accurately (this process has already begun). When the fiscal year closes out, the Coalition will provide the auditors with a test SEFA to confirm that the information we are collecting throughout the year and are asserting are the correct numbers for our federal grants, is indeed the correct information. Corrective Action Plan Timeline: Completed by December 19, 2025 (Final copy of the SEFA will not be given to the auditors until requested for the Audit).Designation Of Employee Position Responsible For Meeting Deadline: Executive Director will oversee this project and work directly with NMCEH finance staff work closely with the auditors to make sure that the information saved and shared is correct.
The Department of Behavioral Health (DBH) Office of the Chief Financial Officer (OCFO) concurs with this finding. Condition #1 - All FFRs and corresponding programmatic and financial reports will be reviewed by the Accountant, the Accounting Officer, the Agency Fiscal Officer, the Budget staff, and...
The Department of Behavioral Health (DBH) Office of the Chief Financial Officer (OCFO) concurs with this finding. Condition #1 - All FFRs and corresponding programmatic and financial reports will be reviewed by the Accountant, the Accounting Officer, the Agency Fiscal Officer, the Budget staff, and the Grants Program Manager prior to submission to the Federal government. OCFO will utilize a grants matrix that will reflect the respective grants due dates to ensure timely filing of FFRs. The matrix will be reviewed to ensure compliance monthly with each Accountant during the monthly analysis and review process. Condition #2 -DBH will save the SOR tracking sheet that is used to calculate the earmarked amounts for administrative and data costs for the Federal programmatic reports. This will be retained in a central location. Condition #3 - Prior to the submission of the SEFA, the grant expenditures will be reviewed with the Accounting Officer, the AFO, and the Grants program manager for a detailed review of the SEFA to confirm expenditures are correctly categorized by fund and grant, reconciles to the financial system and reflects the amount expended for sub-recipients. Contact: FFR (SF-425) and SEFA: Barbara S. Roberson, Accounting Officer, Human Support Services Cluster PPR Reporting: Sharon Hunt, State Opioid Treatment Authority, DBH Estimated Completion Date: September 2025 See Corrective Action Plan for chart/table
2024-003: Material Weakness and Noncompliance – Preparation of Schedule of Expenditures of Federal Awards (SEFA) Statement of Condition/Criteria: The Code of Federal Regulations requires a non-federal entity to prepare a schedule of expenditures of federal awards (SEFA) for the period covered by th...
2024-003: Material Weakness and Noncompliance – Preparation of Schedule of Expenditures of Federal Awards (SEFA) Statement of Condition/Criteria: The Code of Federal Regulations requires a non-federal entity to prepare a schedule of expenditures of federal awards (SEFA) for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with CFR Section 200.502(a) and must reconcile amounts reported in the SEFA to the amounts reported in the auditee’s financial statements. Planned Corrective Action: County management will develop a closing process to ensure all federal expenditures are identified, recorded, and reconciled on the SEFA.
2024-001 - Material Weakness and Noncompliance, Completeness and Accuracy of Schedule of Expenditures of Federal and State Awards (Repeat Finding 2023-001) Audit Finding: There were several adjustments to the basic financial statements, Schedule of Expenditure of Federal Awards (SEFA) and Schedule o...
2024-001 - Material Weakness and Noncompliance, Completeness and Accuracy of Schedule of Expenditures of Federal and State Awards (Repeat Finding 2023-001) Audit Finding: There were several adjustments to the basic financial statements, Schedule of Expenditure of Federal Awards (SEFA) and Schedule of Expenditures of State Awards (SESA) as originally provided by the Town. The SEFA and SESA balances are required to be reconciled to the basic financial statements prepared in accordance with generally accepted accounting principles in the United States (US GAAP). The Town has failed to adequately perform such reconciliation and as a result of procedures performed by RSM a number of adjustments to expenditures reported on the SEFA and SESA as well as to intergovernmental Revenues reported on the basic financial statements had to be performed. Corrective Action Taken: The Town Finance Department has placed an emphasis on educational meetings with the Board of Education within the area of receiving grants. These issues have resulted from the continual problem of employee turnover of personnel working within the areas of responsibility of grants accounting. All positions in the BOE Finance Department have now been filled, and the Director of Finance at the BOE has implemented monthly reconciliation procedures. From the Town side, the reconciliations between the GAAP financial statements and amounts reported on the SEFA and SESA will be overseen by the Town Comptroller. The Deputy Comptroller and BOE Director of Finance meet regularly to discuss updates and issues and will reconcile the June 30, 2025 reports in the first quarter of FY2026. Name and Phone # of Person Responsible for Implementation Mr. Peter Mynarski, Comptroller 203-622-2226
The Office of Financial Management and Budget (OFMB) has collaborated with County departments and agencies that administer grants to ensure staff are informed of and participate in relevant training opportunities related to State and Federal grants. In addition, OFMB continues to monitor grant activ...
The Office of Financial Management and Budget (OFMB) has collaborated with County departments and agencies that administer grants to ensure staff are informed of and participate in relevant training opportunities related to State and Federal grants. In addition, OFMB continues to monitor grant activity through established agenda review and grant reconciliation processes to identify and address potential errors or omissions and will provide guidance as needed.
Corrective Action Plan Year Ended September 30, 2024 Findings Related to Federal Awards 2024-001 SEFA Control Deficiency Federal Agency: U.S. Department of Treasury Program Titles and Assistance Listing Numbers (ALN): Community Development Financial Institutions Program (ALN 21.033) Federal Gra...
Corrective Action Plan Year Ended September 30, 2024 Findings Related to Federal Awards 2024-001 SEFA Control Deficiency Federal Agency: U.S. Department of Treasury Program Titles and Assistance Listing Numbers (ALN): Community Development Financial Institutions Program (ALN 21.033) Federal Grant Numbers: 22ERP061418 Contact Person: Steven Kaczynski, Controller; skaczynski@newjerseycommunitycapital.org; 732-640-2061 Corrective Action: As noted by our auditor, the submitted expenditures were allowable under the grant. The condition exists such that these expenditures were included within the current period SEFA report because that is when they were determined to be applicable, rather than the period when they were actually incurred (the prior period SEFA report). Going forward, management will ensure to report expenditures in the period they were incurred rather than the period they were applied. Anticipated Completion Date: September 30, 2025
Recommendation: We recommend the organization revisit its policies and procedures surrounding management’s review of grant and other contractual agreements to ensure all federal assistance, including subawards, are properly identified as such at the time the agreements are signed or received, and ar...
Recommendation: We recommend the organization revisit its policies and procedures surrounding management’s review of grant and other contractual agreements to ensure all federal assistance, including subawards, are properly identified as such at the time the agreements are signed or received, and are properly included on the SEFA. ODI agrees with the auditors’ recommendation. Consistent with response to finding 2024-001, we have reviewed the design and implementation of internal controls procedures around accounting for grants and contracts. This has resulted in revision of our new funding form including identifying federal and nonfederal designations in subcontracts from states, and determination of conditions to ensure compliance with U.S. GAAP. Responsible staff member, Laurie Larson-Lewis, Finance Manager, completion date 5/31/2025.
Finding 2024-007 Programs: All Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes; 2023-006 Auditee’s Corrective Action Plan: The city’s legacy financial system did not collect data required for SEFA. Agencies had to provide most details manually a...
Finding 2024-007 Programs: All Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes; 2023-006 Auditee’s Corrective Action Plan: The city’s legacy financial system did not collect data required for SEFA. Agencies had to provide most details manually and work between spreadsheets and multiple systems to input and track receipt grant awards and spend on personnel, supplies and services and sub-recipient awards related to grants. The steps to address this legacy finding have been phased and include the technology implementation, staff training and additional oversight. As noted, the City implemented Workday, an Enterprise Resource Planning (ERP) system, across workstreams so that Financial Accounting, Grants, Procurement, Supplier Accounts, Banking, Payroll and Human Resources are all in one system. As with any ERP, an ongoing process of evaluation and updates are needed to continuously align workflow and business processes. This approach has led to continued improvement over the years as the grants management module is fully implemented in Workday. Since implementation, additional enhancements have been adopted and utilized with a robust workflow process for grant approval, grant budget tracking, and invoice scheduling. In addition to the technology adoption, an increase in citywide grants training and oversight has been implemented. The progress is detailed below: • FY 23 represented the first year in the new system. To compile the SEFA, the City used a hybrid approach to leverage Workday and Agency provided data. o There were some data accuracy challenges from data entry errors. To address those data entry challenges the award modification business process was improved post-implementation to add a GMO review and approval step of award modifications. o As of May 2024, all award modifications now require centralized GMO review to verify data accuracy. o Additional process changes in FY 23 included implementation of the requirement as part of the FY 24 budget preparation process that grant worktags must be created and budgeted for during the City’s annual budget process. The grant worktag creation process includes approvals at the agency program and fiscal levels, as well as at the Department of Finance level. • In FY24 further Award Module enhancements were adopted to provide key new data points in Workday. o Each grant award now includes information: Federal Assistance Listing Number (fna CFDA#), Passthrough Agencies & Passthrough Identifier. o Additionally, in FY 24, GMO, in collaboration with BAPS launched the Grants Workstream Training sessions. These monthly citywide virtual live trainings are on a variety of grant management related topics, averaging 60 attendees per session. Attendees are city agency grant managers and city agency fiscal staff. • In FY 24 and FY 25 the topics covered included: o FY 24 Grant Work tag Preparation o FY 24 SEFA Preparation o Grant Accounting Best Practices and Workday Billing o Award Set-up Best Practice & Potential Pitfalls o Extra Features in Workday (including reporting and how to set up award tasks and deadlines) o Subrecipient Monitoring Best Practices o Cost-reimbursable grant invoicing in Workday o FY 25 SEFA preparation o FY 26 Grant Work tag Preparation o Grant Management Roles and Responsibilities o Specific training on the SEFA, including information on understanding the importance of the SEFA, what information is included and how to review SEFA data, was conducted. Citywide training sessions were held in FY 24 and FY 25 to ensure that the reporting is understood by city agencies, with special emphasis on subrecipient payments being reported properly. The training schedule is ongoing and continuous. • To improve SEFA reporting data, in FY 25 there is an emphasis on subrecipient set up and spending to ensure that functionality is refined to improve uniformity in subrecipient set up. GMO, in conjunction with BAPS, the Bureau of Procurement and city agencies will work to refine subrecipient set up, spending and monitoring, including improved reporting. o GMO has hosted three subrecipient monitoring and management–related trainings since December 2024. Additionally, to improve subrecipient managing and monitoring, GMO modified the award setup business process in Workday to include verification of subaward status before final award setup approval. In FY 25, GMO provided training on how to setup subawards accurately in Workday. As discussed above, these trainings will be ongoing. • Additionally, GMO and the BBMR will collaborate on a subaward dashboard to monitor subrecipient spending data in real time. Contact Person: Michael Moiseyev, Chief Financial Officer, Baltimore City Completion Date: FY26 3rd Quarter- • Design and complete a grants management dashboard within Workday • Ongoing and continuous - GMO will continue to conduct trainings on SEFA reporting and subrecipient management and reporting.
Finding 2024-006 Program: COVID-19 - Disaster Grants – Public Assistance (Presidentially Declared Disasters) Assistance Listing No.: 97.036 Federal Grantor: U.S. Department of Homeland Security Passed-through: California Governor's Office of Emergency Services Award No. and Year: Affects all grant a...
Finding 2024-006 Program: COVID-19 - Disaster Grants – Public Assistance (Presidentially Declared Disasters) Assistance Listing No.: 97.036 Federal Grantor: U.S. Department of Homeland Security Passed-through: California Governor's Office of Emergency Services Award No. and Year: Affects all grant awards included under assistance listing 97.036 on the Schedule of Expenditures of Federal Awards. Compliance Requirements: Other - Title 2 U.S. Code of Federal Regulations (CFR) Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (Uniform Guidance) §200.510(b) - Schedule of Expenditures of Federal Awards Type of Finding: Material Weakness in Internal Control Over Compliance Department’s Management Response: Management agrees with the recommendation that the County enhance internal controls to ensure federal expenditures are reported accurately and completely on the SEFA in accordance with the OMB Uniform Guidance. View of Responsible Officials and Corrective Action: To ensure the completeness of Disaster Grant expenditures reported on the SEFA, the Auditor-Controller’s Office will obtain a listing of all projects from the FEMA Grants Portal. This list will be used to verify that all obligated projects have been accurately reported on the SEFA. Name of Responsible Persons: Jason McGuire, Deputy Director, Auditor-Controller Implementation Date: July 2025
Finding 2024-004 Program: Crime Victim Assistance Assistance Listing No.: 16.575 Federal Grantor: U.S. Department of Justice Passed-through: California Governor’s Office of Emergency Services Award No. and Year: Affects all grant awards included under assistance listing 16.575 on the Schedule of Exp...
Finding 2024-004 Program: Crime Victim Assistance Assistance Listing No.: 16.575 Federal Grantor: U.S. Department of Justice Passed-through: California Governor’s Office of Emergency Services Award No. and Year: Affects all grant awards included under assistance listing 16.575 on the Schedule of Expenditures of Federal Awards. Compliance Requirement: Other - Title 2 U.S. Code of Federal Regulations (CFR) Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (Uniform Guidance) §200.510(b) - Schedule of Expenditures of Federal Awards Type of Finding: Material Weakness in Internal Control Over Compliance Department’s Management Response: Management agrees with the recommendation to enhance internal controls to ensure federal expenditures are reported accurately and completely on the SEFA in accordance with the Uniform Guidance. View of Responsible Officials and Corrective Action: To ensure compliance with §200.510(b) of the Uniform Guidance, the Auditor-Controller’s Office will provide additional detailed instructions when requesting departmental information for the County’s SEFA. In addition, County-wide training will be conducted to assist departments in accurately completing the request. Name of Responsible Persons: Jason McGuire, Deputy Director, Auditor-Controller Implementation Date: August 2025
Finding 555420 (2024-002)
Material Weakness 2024
Views of Responsible Officials and Planned Corrective Action The County has established a document and an internal control structure designed for tracking in the future. Finding resolution timeline: This has been resolved for FY 25 as of 03/20/2025. Designation of employee position responsible fo...
Views of Responsible Officials and Planned Corrective Action The County has established a document and an internal control structure designed for tracking in the future. Finding resolution timeline: This has been resolved for FY 25 as of 03/20/2025. Designation of employee position responsible for meeting this deadline: Andrea Montoya, Deputy County Manager
The University concurs with the recommendation. The University will review and enhance its procedures and internal controls to ensure the SEFA is complete and accurate
The University concurs with the recommendation. The University will review and enhance its procedures and internal controls to ensure the SEFA is complete and accurate
Finding 554902 (2024-001)
Significant Deficiency 2024
CORRECTIVE ACTION PLAN 3/27/2025 US Department of Health and Human Services CARES of NY, Inc. respectfully submits the following corrective action plan for the year ended April 30, 2024. Name and address of independent public accounting firm: Wojeski & Company CPAs, PC 159 Wolf Road Albany, NY 1...
CORRECTIVE ACTION PLAN 3/27/2025 US Department of Health and Human Services CARES of NY, Inc. respectfully submits the following corrective action plan for the year ended April 30, 2024. Name and address of independent public accounting firm: Wojeski & Company CPAs, PC 159 Wolf Road Albany, NY 12205 Audit period: Year ending April 30, 2024 The findings from the April 30, 2024 schedule of findings and questions costs are discussed below. The findings are numbered consistent with the numbers assigned in the schedule. Finding 2024-0001 – Reporting of the Schedule of Expenditure of Federal Awards Recommendation: We recommend that the Organization implement additional processes and procedures to ensure that the SEFA is complete and accurate. Corrective Action plan taken: The corrective action taken was to notify Auditors as soon as the error was realized so that audits could be corrected. There is no need for further corrective action. This incident was isolated and not recurring. The grant for which this finding is associated was a temporary covid grant that has since ended. To prevent future errors for occurring, all new contracts will be reviewed prior to submitting the summary of federal awards to the auditor to ensure that any federally sourced funding is properly identified regardless of grantor. CARES of NY, Inc. will implement a check and balance procedure where the grants director will review the listing prior to audit submission for accuracy. Responsible Person for corrective action plan: Eileen Wiebicke, Chief Financial Officer Anticipated completion date for corrective action plan: 1/24/2025 (date auditors were notified of error) If the US Department of Health and Human Services has questions regarding this plan, please call Eileen Wiebicke at 518-489-4130 x 702.
Finding 554500 (2024-001)
Significant Deficiency 2024
The City internally identify improvement opportunities in managing grants. As a part of the City’s grant oversight improvement efforts, the City began implementing various processes and internal controls surrounding grant monitoring, which improves the SEFA drafting process and mitigates risks of f...
The City internally identify improvement opportunities in managing grants. As a part of the City’s grant oversight improvement efforts, the City began implementing various processes and internal controls surrounding grant monitoring, which improves the SEFA drafting process and mitigates risks of future inaccuracies. These efforts began in early 2024 and include the following: • Creation of a grant policy that provides City staff with guidance, information, and expectations surrounding grants. • Creation of a master grants database that lists the general ledger fund, applicable project ledger references, status, grant type, start/end dates, granting agency, pass-through agency, grant name, assistance listing numbers, grant amounts, and the grant manager for each grant. This database is now used to verify the completeness and accuracy of the SEFA (beginning FY24). • Formal quarterly monitoring. Each quarter, the City will formally review the grants database with department contacts and grant managers to verify the completeness and accuracy of the database. The City is formalizing this process and plans to include department signoffs evidencing the review process. If any items are missing, the missing component will be identified and added to the database on a timely basis. The City will also utilize this quarterly process to review the grants policy to ensure grant managers are aware of the requirements related to their grants. • The City is in the process of formalizing the SEFA drafting process utilized during the FY24 SEFA preparation, which includes additional mitigating procedures such as reviewing all next FY federal receipts to ensure none of them relate to the SEFA year federal expenditures. Personnel Responsible for Implementation: Marvin Lopez Position of Responsible Personnel: Deputy Administrative Services Director (Fiscal Services) Expected Date of Implementation: June 30, 2025
Finding 2024-002 – Significant Deficiency Award No.: 97.036, Disaster Grants-Public Assistance (Presidentially Declared Disasters) Federal Grantor: U.S. Department of Homeland Security, Federal Emergency Management Agency, Passed-through California Governor’s Office of Emergency Services, FEMA-...
Finding 2024-002 – Significant Deficiency Award No.: 97.036, Disaster Grants-Public Assistance (Presidentially Declared Disasters) Federal Grantor: U.S. Department of Homeland Security, Federal Emergency Management Agency, Passed-through California Governor’s Office of Emergency Services, FEMA-4683-DR-CA Compliance Requirement: Other compliance requirements. Condition: The schedule of Expenditures of Federal Awards (SEFA) was not complete, and expenditures reported on the SEFA were revised during the single audit. Criteria: 2 CFR Part 200, Subpart F (Uniform Guidance) Section 200.502 states, “The auditee should prepare a Schedule of Expenditures of Federal Awards for the period covered by the auditee’s financial statements.” Internal controls over the SEFA should be in place ensure accrual basis expenses incurred under the federal program are properly reported as expenses on the SEFA and are properly reported as revenue in the financial statements prior to the start of the single audit. Cause: SEFA was not fully reconciled and finalized until after the single audit began. Effect: The expenses included on the SEFA for program 97.036, Disaster Grants-Public Assistance (Presidentially Declared Disasters), program FEMA-4683-DR-CA, were revised during the single audit and questioned costs in the amount of $131,195 were identified, which could have resulted in the auditor not selecting the correct major program or expenses for testing and could have resulted in the single audit not satisfying the requirements of the Uniform Guidance. Context: The District provided cost estimates to the California Governor’s Office of Emergency Services (CalOES) for the amount of flood damage expenses incurred for FEMA Project 725590 and 710830 that were used by CalOES to reimburse the District. The District did not adequately reconcile the expenses incurred at year-end to expense reports available in the accounting system and did not revise the expense estimates provided to CalOES to the actual amounts incurred during the year, resulting in CalOES overpaying the District and the District using the estimated costs on the SEFA for the single audit. Recommendation: We recommend additional review procedures be implemented to ensure the SEFA is complete and accurate when the single audit begins, which includes reconciling all expenses incurred under each federal award down to the invoice, payroll check and lowest level of other costs claimed, cutting-off each expense at year-end and claiming the reconciled qualifying expenses within 45 days after each quarter end. At year-end, programs should be reviewed for cost adjustments, extensions, and other changes that should be reflected on the SEFA when reconciling expenses for the SEFA. Separate program codes should be used for each grant on the SEFA that summarizes expenses down to the individual invoice level that should be provided to the auditor for the single audit. If overclaimed amounts are identified, the grantor and/or pass-though agency should be contacted to determine whether to return the funds or apply the overclaimed amounts to future claims. Views of Responsible Officials and Planned Corrective Actions: The District will implement a formal reconciliation process to ensure all expenditures incurred under each federal award are accurately recorded before the start of the single audit. A quarterly reconciliation process will be conducted after each quarter-end to review and adjust expenses as necessary. The District will contact FEMA to determine whether the questioned costs may be applied to a future claim or whether the amount needs to be returned to FEMA. Estimated Completion Date of Corrective Action: October 1, 2025
Finding 2024-001: Significant Deficiency Description of Finding: The expenses reported on the Schedule of Expenditures of Federal Awards (SEFA) were revised during the single audit. Statement of Concurrence or Nonconcurrence: We agree with the audit finding. Corrective Action: We will implement ad...
Finding 2024-001: Significant Deficiency Description of Finding: The expenses reported on the Schedule of Expenditures of Federal Awards (SEFA) were revised during the single audit. Statement of Concurrence or Nonconcurrence: We agree with the audit finding. Corrective Action: We will implement additional review procedures to ensure the SEFA is complete and accurate when the single audit begins and we will not record funds used as federal match as federal income and will reconcile the SEFA to the general ledger prior to the beginning of the audit. Name of Contact Person: May Masunaga, Chief Financial Officer, 916-299-6787, MMasunaga@cacapital.org Projected Completion Date: By the start of the next audit for 2024/25.
Preparation of Schedule of Expenditures of Federal Awards Type of Finding: Material Weakness in Internal Control over Financial Reporting/ Compliance • Contact Person Responsible: Frank Antuono, Business Manager • Corrective Action to be Taken: The District will establish formal written policies and...
Preparation of Schedule of Expenditures of Federal Awards Type of Finding: Material Weakness in Internal Control over Financial Reporting/ Compliance • Contact Person Responsible: Frank Antuono, Business Manager • Corrective Action to be Taken: The District will establish formal written policies and procedures for the preparation of the Schedule of Expenditures of Federal Awards (SEFA) in compliance with 2 CFR 200.51 0(a). These procedures will: o Identify all sources of federal revenue o We have added the assigned federal funding source codes to our district budget operation in CSIU, which will now allow us to track these expenditures back to our internally controlled spreadsheets as verification of expenditures. o Track expenditures using dedicated account codes in the general ledger o Assign responsibility for monthly reconciliation and schedule preparation o Include a secondary review of the SEFA by someone other than the preparer The Business Office will undergo training on SEFA requirements and reconciliation practices. These changes will ensure complete and accurate reporting of federal expenditures for all future reporting periods.
Contact Responsible for the Corrective Action: District Manager & Board Treasurer Corrective Action to be Taken: The District has implemented the recommended action, requiring that all internal billing worksheets be reconciled to the QuickBooks general ledger prior to final District Manager approva...
Contact Responsible for the Corrective Action: District Manager & Board Treasurer Corrective Action to be Taken: The District has implemented the recommended action, requiring that all internal billing worksheets be reconciled to the QuickBooks general ledger prior to final District Manager approval. However, to ensure proper documentation, the District will develop and implement a check-off spreadsheet to track when this reconciliation has been completed for each payment request. Additionally, an internal Standard Operating Procedure (SOP) for Billing Worksheet – General Ledger reconciliation will be created to formalize and document the process, ensuring it is retained. Anticipated Completion Date: June 30, 2025
Condition: The SEFA for the year ended June 30, 2024 was not accurately prepared, as it originally included federal expenditures that were not on the cash basis. Planned Corrective Action: The corrective actions implemented for capital grants will be expanded to include the operating grants. Contact...
Condition: The SEFA for the year ended June 30, 2024 was not accurately prepared, as it originally included federal expenditures that were not on the cash basis. Planned Corrective Action: The corrective actions implemented for capital grants will be expanded to include the operating grants. Contact person responsible for corrective action: Joseph Khouzami Anticipated Completion Date: March 1, 2025
« 1 3 4 15 »