CORRECTIVE ACTION PLAN JANUARY 10, 2023 The Brevard Health Alliance, Inc. respectfully submits the following corrective action plan for the year ended September 30, 2022. Name and address of independent public accounting firm: Carr, Riggs, and Ingram, LLC 215 Baytree Drive Melbourne, FL 32940 ...
CORRECTIVE ACTION PLAN JANUARY 10, 2023 The Brevard Health Alliance, Inc. respectfully submits the following corrective action plan for the year ended September 30, 2022. Name and address of independent public accounting firm: Carr, Riggs, and Ingram, LLC 215 Baytree Drive Melbourne, FL 32940 Audit Period: Fiscal Year October 1, 2021 - September 30, 2022 The finding from the January 10, 2023 schedule of findings and questioned costs are discussed below. The findings are numbered consistently with the number assigned in the schedule. 2022-001 PROCUREMENT PROCEDURES COVID-19 Health Center Program (Community Health Centers, Migrant Health Centers, Health Care For Homeless and Public Housing Primary Care) ? American Rescue Plan Act Assistance Listing Number: 93.224, Contract Numbers- H8F41284 Department of Health and Human Services (HHS) 2022 Funding Pursuant to 2 CFR ?200.1, Simplified Acquisition Threshold (?SAT?), acquisitions which exceed the SAT of $250,000 must use one of the following procurement methods: the sealed bid method, the competitive proposals method, or the noncompetitive proposal method (sole source). The Alliance did not utilize the sealed bid method or competitive proposals method for a purchase of computer hardware, which exceeded the $250,000 SAT. The Alliance?s procurement policy was not updated to be in compliance 2 CFR 200.1 until April 2022. This purchase began in fiscal year 2021, but the remaining items under the contract were procured in fiscal year 2022. Perspective: The purchase made at the beginning of the year was procured under the old purchasing policy. The policy was updated in April 2022, and the additional purchase exceeding the bid threshold made subsequent to the new purchasing policy was procured under a competitive process. Recommendation: The Alliance should continue to follow its updated procurement policy. Responsible Party: Shannon Wherry, Controller Corrective Action: Management updated the procurement policy April 2022 to comply with the provisions of 2 CFR ?200.1, 2 CFR ?200.67, and 2 CFR ?200.214. The updated policy has been implemented since this occurrence and will continue to be followed.
View Audit 42966 Questioned Costs: $1
Finding 2022-011 ? Special Tests and Provisions: Withdrawal Testing (Significant Deficiency and Noncompliance) Information on the Federal Program: U.S. Department of Education, Student Financial Aid Cluster Criteria: 34 CFR Part 668 establishes rules governing the student withdrawal process includin...
Finding 2022-011 ? Special Tests and Provisions: Withdrawal Testing (Significant Deficiency and Noncompliance) Information on the Federal Program: U.S. Department of Education, Student Financial Aid Cluster Criteria: 34 CFR Part 668 establishes rules governing the student withdrawal process including the determination of withdrawal date, calculation of earned Title IV assistance and return of unearned Title IV aid within 45 days. Condition: We selected a sample of 12 students who withdrew and were receiving financial aid. Of the 12 students tested, there were two instances in which the College incorrectly calculated the percentage of aid earned. Management?s View: The issue occurred due to a timing difference of the date drop forms being submitted to Student Services and the effective drop date entered into Banner. In this instance, the drop forms were submitted on a Friday when the College operates on a half-day schedule. The form was entered the following Monday, and the entry should have been backdated to Friday. This caused Financial Aid?s Title IV return calculation to be off by two days. Corrective Action Plan: Management is in process of updating Policies and Procedures to incorporate Financial Aid into the student drop process. Financial Aid will receive emailed copies of student drop forms as they are submitted to Student Services. Financial Aid will review the dates in Banner prior to finalizing Title IV return calculations to ensure that the dates the forms were submitted match the date the drop was recorded as in Banner. This will take effect immediately as the policies are formally updated. Anticipated Completion Date: September 30, 2023
Finding 50694 (2022-002)
Significant Deficiency 2022
2022-002 - Activities Allowed or Unallowed: To ensure proper documentation of allowed and unallowed activities, Centra plans to enhance its training materials related to coding of expenses and provide management with ongoing training. Additionally, specific coding guides will be developed for future...
2022-002 - Activities Allowed or Unallowed: To ensure proper documentation of allowed and unallowed activities, Centra plans to enhance its training materials related to coding of expenses and provide management with ongoing training. Additionally, specific coding guides will be developed for future grants that lists allowable activities for that grant as well as the proper accounting code combination to be used.
Finding 2022-001 - Controls Over Cash Management (Significant Deficiency) Criteria: According to Title 2 U.S. Code of Federal Regulations (" CFR") Part 200 , paragraph 305, non-federal entities are required to minimize the time that elapses between the transfer of funds from the federal funding sou...
Finding 2022-001 - Controls Over Cash Management (Significant Deficiency) Criteria: According to Title 2 U.S. Code of Federal Regulations (" CFR") Part 200 , paragraph 305, non-federal entities are required to minimize the time that elapses between the transfer of funds from the federal funding source and the disbursement of those funds by the non-federal entity for the program's intended purposes. Condition and Context: As a part of our testing over cash management of funds received from the federal funding source, we examined information showing the dates on which five program-related disbursement of federal funds were received by the Corporation , and we compared those dates to the dates when the Corporation remitted the amounts for the purposes of covering payroll expenses and paying its various contractors. We noted one draw for $1,184,367 that was received from the federal funding source with no payments made to the contractors for which the funds had been appropriated. This resulted in a period of 16 days between receipt of the federal funds and the corresponding payments to the contractors. We also noted one of the five draws tested were for an incorrect amount. The Corporation submitted a draw for $29,997 in error. The overdrawn funds were repaid to the federal funding source. The Corporation prepared a schedule of draws made during 2022 and it was noted that the Corporation drew or repaid an incorrect amount in four months of the year, of which some were corrected in the next period. Effect: As a result of these matters , the Corporation essentially borrowed money from the federal government and potentially delayed payment to vendors. Cause: The condition was caused by an oversight by management that resulted in invoices not being processed for payment unt i l well after the cash had been drawn by the Corporation and resulted in draws to processed for an incorrect amount. Questioned Costs: From our sample tests , the Corporation overdrew $29,997 for the month of May 2022. Recommendation : We recommend that management designate a specific individual to be responsible for monitoring the receipt of federal funds on a daily basis . This person should be tasked with ensuring that funds that have been transferred from the federal funding source are disbursed to the intended contractors within a short period following receipt of these funds and ensuring that the correct draw amounts are submitted. We also in compliance with Federal statutes, regulations and terms and conditions of the Federal award. The Corporation should have controls in place to document that salaries and overtime paid with federal funds were allowable. Timecards supporting hours worked should be approved and pay rates reviewed. Condition and Context: A summary of allowable charges for the grant was prepared for submission. Differences were noted when comparing the summary to timecards. Within the sample of 45, we noted that 31 timecards did not have a documented review. From the sample, we noted that the pay advice form, which reflects pay rate changes, for 2 employees did not indicate signature by an approver and only indicated the requestor's signature. The employees' new pay rate as indicated on the pay advice form was reflected in the payroll expenditure. Additionally, within the sample of 45, we noted 1 employee that did not have a pay advice form or contract to support the pay rate. We noted the following control items: ? 31 out of 45 timecards tested did not have documented review. ? 2 out of 45 employees tested did not have pay advice forms signed by both the requestor and reviewer. Only the requestor signed the form. ? 1 out of 45 employees tested did not have a pay advice form or other supporting documentation for the pay rate. Effect: Payroll expenditures could be inaccurately charged to the federal grant. Cause: The lack of documented timecard and pay rate approval were an oversight. Questioned Costs: None Recommendation: We recommend the Corporation maintain documented approval of all timecards and pay rate increases. Views of Responsible Officials and Planned Corrective Actions: The Transportation Department provides a spreadsheet that details time operators work by route. This process is used to align FTA funding streams with routes driven. The spreadsheet is kept by the Transportation Manager and reviewed by the Director of Transportation. These two positions approve time prior to submitting it for processing. GPTC is engaging its current payroll provider to assist in finding a technological solution to capturing start and end times of each operator. Until we can get this technical solution, an approval form will be submitted by the Transportation Department along with the allocation spreadsheet. As stated above, GPTC experienced a lot of turnover and personnel changes - the Human Resource Department had many. Pay advices are managed by this department. Our recommend that management prepare a schedule of all claims to determine whether there are additional amounts that have been overclaimed. Views of Responsible Officials and Planned Corrective Actions: In 2022, GPTC experienced a lot of turnover and personnel changes in multiple areas. In reassigning responsibilities, the Finance Department was designated as the area to handle FTA fund requests in June 2023. Absorption of these responsibilities required them to get an understanding of the process, formulate procedures for drawdowns, and develop a method for monitoring these dollars. The first drawdowns by the new team occurred in August 2023. FTA dollars are a major source of funding, so managing this process is highly important. GPTC has implemented a review process, as required by the FTA; and developed a spreadsheet for formulating amounts to be drawn. Iniquities in the spreadsheet were remedied in September 2023, and future processing has been good. GPTC realizes that FTA grants are reimbursable. The process requires prepayment of expenses, proof of payment, and reclamation of the FTA's portion of expended funds. So, future funds will be disbursed in a timely fashion. Large dollar amounts that require FTA funding for payment will be disbursed within three days, as required.
View Audit 48407 Questioned Costs: $1
Contact Person Dara A. Lee, Executive Director Corrective Action Plan The Authority plans to review and make the necessary changes to its year-end financial closing procedures to ensure its financial records are reconciled and available in order to submit its financial data within a timely manner. P...
Contact Person Dara A. Lee, Executive Director Corrective Action Plan The Authority plans to review and make the necessary changes to its year-end financial closing procedures to ensure its financial records are reconciled and available in order to submit its financial data within a timely manner. Planned Completion Date for CAP December 31, 2023
Finding 50651 (2022-003)
Significant Deficiency 2022
Gabriel Linares, Community Development (CD) Director, will enhance the department?s policy/desk procedure to ensure timely filing of the CAPER report. In addition, CD staff will research the Section 15011 requirement, and start timely and properly file the required report.
Gabriel Linares, Community Development (CD) Director, will enhance the department?s policy/desk procedure to ensure timely filing of the CAPER report. In addition, CD staff will research the Section 15011 requirement, and start timely and properly file the required report.
See corrective action plan
See corrective action plan
View Audit 53600 Questioned Costs: $1
See corrective action plan
See corrective action plan
View Audit 53600 Questioned Costs: $1
Finding 50643 (2022-005)
Significant Deficiency 2022
Finding 2022-005 ? Assistance #21.027 ? Coronavirus State and Local Fiscal Recovery Funds ? Procurement (Significant Deficiency): Condition: The contracts used by the city did not include required language related to procurement. Recommendations: Revise policies to ensure the City includes the req...
Finding 2022-005 ? Assistance #21.027 ? Coronavirus State and Local Fiscal Recovery Funds ? Procurement (Significant Deficiency): Condition: The contracts used by the city did not include required language related to procurement. Recommendations: Revise policies to ensure the City includes the required procurement language in the contract for each vendor receiving federal funds. Corrective Action Plan: The City of Olathe will review its internal controls, processes, and procedures related to procurement and will update contract policies to include the provisions of Appendix II of 2 CFR 200 in all future contracts for vendors receiving federal funds. Policies and procedures will be reviewed with appropriate staff. Contract Person: Chief Financial Officer Anticipated Completion Date: The City of Olathe has notified appropriate staff of the requirements, which were immediately implemented in response to the auditors? recommendation. Written procedures related to procurement, including updating contract policies to include the provisions of Appendix II of 2 CFR 200 in all future contracts for vendors receiving federal funds, will be updated by September 30, 2023. Management will monitor this issue periodically during the year to ensure compliance.
1347 Morris Avenue Corporation 290 Lenox, 3rd Floor New York, NY 10027 AUDITEE?S CORRECTIVE ACTION PLAN Name and Number of Project 1347 Morris Avenue Corporation, FHA Project Number 012-HD086 Auditor/Audit Firm PKF O?Connor Davies LLP Audit Period June 30, 2022 Finding 2022-001 ? Timely Deposi...
1347 Morris Avenue Corporation 290 Lenox, 3rd Floor New York, NY 10027 AUDITEE?S CORRECTIVE ACTION PLAN Name and Number of Project 1347 Morris Avenue Corporation, FHA Project Number 012-HD086 Auditor/Audit Firm PKF O?Connor Davies LLP Audit Period June 30, 2022 Finding 2022-001 ? Timely Deposit of Surplus Cash A. Comments on Finding and Recommendations Recommendation ? We recommend that management ensures the surplus cash deposit is done timely in the future. B. Actions Taken or Planned Auditee agrees with this finding. Our policy has been to make surplus cash deposits after the final audit has been issued. Going forward our focus will be to work with the auditor and owner to get the audits finalized earlier so adequate time is left for the deposits to be made. In instances where the final is not going to be issued and allow enough time, the deposit will be made based on the reviewed draft. C. Status of Corrective Action on Prior Findings No prior findings. Ezra Mill, CFO
The contractor, Johnson Control provided information that they are a unionized operation and the use the union wages scale that exceeds prevailing wages. We will in the future ensure that any contractor that we used over $2,000.00 will have a formal contract that includes the David-Bacon Act.
The contractor, Johnson Control provided information that they are a unionized operation and the use the union wages scale that exceeds prevailing wages. We will in the future ensure that any contractor that we used over $2,000.00 will have a formal contract that includes the David-Bacon Act.
View Audit 45534 Questioned Costs: $1
Finding #2022-001: For the year ended December 31, 2021, the Corporation did not submit the Data Collection Form to the Federal Audit Clearinghouse in the time period required by Uniform Guidance. Comments on the Finding and Each Recommendation: The Corporation should submit the Data Collection F...
Finding #2022-001: For the year ended December 31, 2021, the Corporation did not submit the Data Collection Form to the Federal Audit Clearinghouse in the time period required by Uniform Guidance. Comments on the Finding and Each Recommendation: The Corporation should submit the Data Collection Form to the Federal Audit Clearinghouse within the required time period. Management agrees to the finding and recommendation. Action(s) Taken or Planned on the Finding: The Data Collection Form was submitted to the Federal Audit Clearinghouse on October 11, 2022, no further action is required.
Program: Low Rent Public Housing AL Number: 14.850 Finding Number: 2022-001 Audit Finding (Copied & Pasted Directly from Auditor?s Report): Condition: During our audit, the Authority transferred PHA cash and charged asset management fees in AMP 2 and AMP 3 in excess of the excess cash amount from th...
Program: Low Rent Public Housing AL Number: 14.850 Finding Number: 2022-001 Audit Finding (Copied & Pasted Directly from Auditor?s Report): Condition: During our audit, the Authority transferred PHA cash and charged asset management fees in AMP 2 and AMP 3 in excess of the excess cash amount from the 2021 audited numbers. Context: AMP 4 and AMP 10 have issues cash flowing and rely on the other AMPS to transfer excess cash every year. In 2021, the other AMPs had less excess cash, so were unable to subsidize AMP 4 and AMP 10 like normal. The Authority did not detect the cash flow issue until after the fiscal year ended. Resulting in noncompliance with the program's rules Cause: Controls were not followed to ensure fungibility rules between each project were followed Criteria: After subsidy (operating) is calculated at a project level, operating subsidy can be transferred as the PHA determines during the PHA's fiscal year to another ACC project(s) if a project's financial information, as described more fully in 240 CFR ? 990.280, produces excess cash flow, and only in the amount up to those excess cash flows. 240 CFR ? 990.205. Corrective Action to Be Taken: Executive Director, Holly Girdwood, is responsible to train/teach the Comptroller, Tara Sheffler, to perform monthly reconciliations to ensure fungibility is properly maintained. This should be completed prior to year-end December 31, 2023. In response to the context, it was our understanding that we could charge asset management fees to all AMPS due to COVID guidelines. Contact Responsible for Corrective Action: Tara Sheffler Comptroller PO Box 988 481 Neshannock Avenue New Castle, PA 16103 724-656-5100 ext. 5100 tsheffler@lawrencecountyha.com
View Audit 43028 Questioned Costs: $1
Finding 2022-001 PROGRAM INCOME ? CFD #93.224 (Significant Deficiency in Internal Control over Compliance) Response: Corrective Action Plan The Operation Department will conduct a verification of the sliding fee scale. In their internal monthly Sliding Fee Discount audit process, the Site Manager is...
Finding 2022-001 PROGRAM INCOME ? CFD #93.224 (Significant Deficiency in Internal Control over Compliance) Response: Corrective Action Plan The Operation Department will conduct a verification of the sliding fee scale. In their internal monthly Sliding Fee Discount audit process, the Site Manager is to review and verify each patient application, to the current Federal Poverty Level, to ensure patient is receiving the correct discount. Attached is a copy of policy and procedure for this corrective action plan.
Recommendation: Training of staff should be performed to bring the staff up to date with the implementation of all residual receipts compliance requirements. Action Taken: The Organization will request approval from HUD to pay back the excess residual receipt balance.
Recommendation: Training of staff should be performed to bring the staff up to date with the implementation of all residual receipts compliance requirements. Action Taken: The Organization will request approval from HUD to pay back the excess residual receipt balance.
View Audit 53857 Questioned Costs: $1
CORRECTIVE ACTION PLAN FOR FINDINGS REPORTED UNDER UNIFORM GUIDANCE Prosser School District No. 116 September 1, 2021 through August 31, 2022 This schedule presents the corrective action the District is planning to take for findings included in this report in accordance with Title 2 U.S. Code of Fe...
CORRECTIVE ACTION PLAN FOR FINDINGS REPORTED UNDER UNIFORM GUIDANCE Prosser School District No. 116 September 1, 2021 through August 31, 2022 This schedule presents the corrective action the District is planning to take for findings included in this report in accordance with Title 2 U.S. Code of Federal Regulations (CFR) Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (Uniform Guidance). Finding ref number: 2022-001 Finding caption: The District did not have adequate internal controls for ensuring compliance with allowable activities and costs and restricted purpose requirements. Name, address, and telephone of District contact person: Amy Hill, Business Manager, 1500 Grant Avenue, Prosser, WA 99350 (509) 786-3323 Corrective action the auditee plans to take in response to the finding: Although the District does not concur with the audit finding, we will take the following corrective steps: 1) Add questions for the student/staff member at the time of device distribution to determine ?unmet need? 2) Document the response 3) Retain the response for the required retention period Given the timing, the District will not be able to implement these changes for the 2022-2023 cycle, so the earliest date of implementation would be the 2023-2024 school year. Anticipated date to complete the corrective action: 9/1/2023
View Audit 53024 Questioned Costs: $1
During CHC's annual audit, Management discovered $80,305.25 of self-pay revenue has been entered into an incorrect quarter in the provider relief reporting portal. This has resulted in a finding in the current year financial statement audit. Management has evaluated the finding and reviewed whether ...
During CHC's annual audit, Management discovered $80,305.25 of self-pay revenue has been entered into an incorrect quarter in the provider relief reporting portal. This has resulted in a finding in the current year financial statement audit. Management has evaluated the finding and reviewed whether any funds need to be repaid and evaluated its controls around future provider relief reporting cycles. It has been determined that even if Self-Pay revenue were reclassified to the correct quarter, lost revenues would have been sufficient to keep the entire award. Therefore, no repayment is necessary. If allowed in future provider relief reporting periods CHC will correct the misreporting. In addition, management will ensure adequate time to review the provider relief reporting prior to the submission deadline. Management believes all necessary steps have been completed to correct the misreporting and believe this matter to be closed.
Finding 50540 (2022-002)
Significant Deficiency 2022
Finding 2022-002 Federal Agency Name: U.S. Department of Treasury Program Names: Emergency Rental Assistance Program (ERA) and Coronavirus State and Local Recovery Funds (CSLRF) CFDA #s: 21.023 and 21.027 Finding Summary: There was no documented control in place to review reports prior to submission...
Finding 2022-002 Federal Agency Name: U.S. Department of Treasury Program Names: Emergency Rental Assistance Program (ERA) and Coronavirus State and Local Recovery Funds (CSLRF) CFDA #s: 21.023 and 21.027 Finding Summary: There was no documented control in place to review reports prior to submission. Responsible Individuals: Brian Sullivan, Chief Programs Officer and Aaron Smith, Chief Bond Programs Director Corrective Action Plan: We will develop and document a process requiring additional review of required federal reporting prior to submission. This review process will be implemented immediately effective with treasury reporting submitted for the quarter ended September 30, 2022. Anticipated Completion Date: September 30, 2022
Finding 50539 (2022-001)
Significant Deficiency 2022
Finding 2022-001 Federal Agency Name: U.S. Department of Housing and Urban Development Program Name: Emergency Solutions Grant Program CFDA #14.231 Finding Summary: As part of the auditors testing for special tests and provisions compliance requirements, they noted that the board approval for the ob...
Finding 2022-001 Federal Agency Name: U.S. Department of Housing and Urban Development Program Name: Emergency Solutions Grant Program CFDA #14.231 Finding Summary: As part of the auditors testing for special tests and provisions compliance requirements, they noted that the board approval for the obligations was outside the 60 day requirement. The board approval was at 124 days. Responsible Individuals: Brian Sullivan, Chief Programs Officer Corrective Action Plan: After receiving additional Emergency Solutions Grant funding under the CARES act, our program team decided to obligate the ESG CARES Act funding to our partners first due to the immediacy of the need. In doing so, the regular ESG funding was sent after the 60-day requirement. Going forward, we will ensure all grant awards are obligated in accordance with the timeline set forth in the compliance requirements. Anticipated Completion Date: June 30, 2022
Finding # 2022-007 Title of Finding Subrecipient Monitoring Contact Person Brook Hinzman Anticipated Completion Date June 2023 Corrective Action planned to be taken: Will comply and monitor subrecipient spending going forward.
Finding # 2022-007 Title of Finding Subrecipient Monitoring Contact Person Brook Hinzman Anticipated Completion Date June 2023 Corrective Action planned to be taken: Will comply and monitor subrecipient spending going forward.
View Audit 47655 Questioned Costs: $1
PLANNED CORRECTIVE ACTIONS: ? CORRECT YEAR-END SPREADSHEET RECONCILIATIONS TO ENSURE PROPER MONITORING ? CONTACT PENNSYLVANIA DEPARTMENT OF EDUCATION TO RECTIFY THE OVERPAYMENT ? CONDUCT REGULAR REVIEW OF ORIGINAL GRANT BUDGETS AND ANY CORRESPONDING REVISIONS WITH MULTIPLE STAFF MEMBERS TO ENSURE TH...
PLANNED CORRECTIVE ACTIONS: ? CORRECT YEAR-END SPREADSHEET RECONCILIATIONS TO ENSURE PROPER MONITORING ? CONTACT PENNSYLVANIA DEPARTMENT OF EDUCATION TO RECTIFY THE OVERPAYMENT ? CONDUCT REGULAR REVIEW OF ORIGINAL GRANT BUDGETS AND ANY CORRESPONDING REVISIONS WITH MULTIPLE STAFF MEMBERS TO ENSURE THAT NO ERRORS EXIST
View Audit 47082 Questioned Costs: $1
Finding: 2022-6 Name of contact person: Dyani Lynch, Supervisor Crisis & Medicaid Transportation Dept. Corrective Action: The Crisis Department will do a monthly review of Crisis and LIEAP policies to stay on top of any changes that may occur between fiscal years and to ensure we are implementing...
Finding: 2022-6 Name of contact person: Dyani Lynch, Supervisor Crisis & Medicaid Transportation Dept. Corrective Action: The Crisis Department will do a monthly review of Crisis and LIEAP policies to stay on top of any changes that may occur between fiscal years and to ensure we are implementing correct procedures. We will also perform self-audits monthly. We will randomly pull two applications from each caseworker to ensure that we are improving on where we?ve made errors and that we are correctly documenting/processing applications. Based on any findings/questions we have during these self-audits, we will contact our state representative for clarifications. Proposed Completion Date: March 31, 2023
View Audit 47077 Questioned Costs: $1
Finding: 2022-4 Name of contact person: Renae Alston Corrective Action: The County will continue to train employees on a monthly basis and as needed when new and updated policies are received. Supervisors and lead workers will continue to conduct second party reviews and utilizing any findings...
Finding: 2022-4 Name of contact person: Renae Alston Corrective Action: The County will continue to train employees on a monthly basis and as needed when new and updated policies are received. Supervisors and lead workers will continue to conduct second party reviews and utilizing any findings to aid in training staff on any necessary policy information. The County added a Quality Control position effective January 1, 2021 to assist with conducting second party reviews and training. During Fiscal Year 2021 an experienced supervisor was hired for adult Medicaid with extensive knowledge of long-term care and SA policy. This has led to internal process changes for the department. The department will continue to implement changes as necessary to achieve the overall improvement of eligibility determinations. Proposed Completion Date: June 30, 2023
View Audit 47077 Questioned Costs: $1
Finding 2022-001 ? Reporting Grantor: Department of Education Program: Education Stabilization Fund Assistance Listing#: 84.425F Award Title: Higher Education Emergency Relief Funding Award Year: 07/1/2021 ? 06/30/2022 Award Number: 204302 - 20A Pass-through Number: Not applicable T...
Finding 2022-001 ? Reporting Grantor: Department of Education Program: Education Stabilization Fund Assistance Listing#: 84.425F Award Title: Higher Education Emergency Relief Funding Award Year: 07/1/2021 ? 06/30/2022 Award Number: 204302 - 20A Pass-through Number: Not applicable The finding above was noted during the Uniform Guidance audit for the year ended June 30, 2022 which is performed in accordance with Government Auditing Standards. Management of American University agrees with this finding and proposes the following Corrective Action Plan. Corrective Action Plan As of June 30, 2021, American University (the University) expended one hundred percent of both the student and institutional allocations of the Coronavirus Response and Relief Supplemental Appropriations Act (CRRSAA). Due to an oversight by management, the final reports were not posted until July 27, 2021, seventeen days after the required reporting date of July 10, 2021. The university revised its internal communication process around reporting for all awards received for Higher Education Emergency Relief Funds having no further reporting findings related to the CRRSAA or American Rescue Plan Act (ARPA) funding. Nicole L. Bresnahan Assistant Vice President, Financial Operations American University Washington, DC 20016