We agree with the auditor’s recommendation of conducting monthly reconciliation and perform a secondary review of all reconciliation and journal entries to verify the accuracy and completeness of the financial statements. Here are our outlined measures to be implemented during the month of December ...
We agree with the auditor’s recommendation of conducting monthly reconciliation and perform a secondary review of all reconciliation and journal entries to verify the accuracy and completeness of the financial statements. Here are our outlined measures to be implemented during the month of December 2023: 1. Establish a structured procedure for reconciling material account balances on a monthly basis. Additionally, the Controller will be responsible for overseeing the reconciliations of key accounts. 2. The Controller will mandate the timely documentation and recording of any required adjusting entries identified during the reconciliation process. Stress the significance of offering clear explanations for the adjustments made. 3. The Controller will review to independently validate the accuracy and completeness of reconciliations, cross-referencing them with supporting documents.
Finding 497366 (2022-003)
Significant Deficiency 2022
Corrective Action Planned: For the fiscal year ending December 31, 2022, the City did not submit an annual single audit report within nine months of year-end. Estimated project costs did not meet the single audit spend threshold for 2022. The requirements were not reassessed until the 2023 single a...
Corrective Action Planned: For the fiscal year ending December 31, 2022, the City did not submit an annual single audit report within nine months of year-end. Estimated project costs did not meet the single audit spend threshold for 2022. The requirements were not reassessed until the 2023 single audit when it was recognized that we did meet the spend threshold for the single audit in 2022. Management has better knowledge of the single audit requirements, and proper procedures should be followed in future years. Name(s) of Contact Person(s) Responsible for Corrective Action: Joy Bisco, Utility Office Manager, Lana Nelson, City Treasurer/Deputy Clerk. Anticipated Completion Date: End of 2023 fiscal year.
Audit Period: June 20, 2022 The finding from the June 30, 2022 Schedule of Findings and Questions Costs is discussed below. The Corrective Action Plan does not include the corrective actions for our discreetly presented component unit, Luna Community College Foundation (LCC Foundation). LCC Foundat...
Audit Period: June 20, 2022 The finding from the June 30, 2022 Schedule of Findings and Questions Costs is discussed below. The Corrective Action Plan does not include the corrective actions for our discreetly presented component unit, Luna Community College Foundation (LCC Foundation). LCC Foundation does not have federal funds in excess of $750,000. The finding is numbered consistently with the numbers assigned in the schedule. FEDERAL PROGRAM INFORMATION: 2022-005 – Return of Title IV Funds (Other Non-Compliance) Funding Agency: U.S. Department of Education Title: Student Financial Assistance Cluster Assistance Listing Number: 84.007, 84.033, 84.063, 84.268 Award Year July 1, 2021 to June 30, 2022 Compliance Requirement: Special Tests and Provisions CONDITION: In our test work over the Return of Title IV funds, we noted the following noncompliance: In 3 out of 9 students examined totaling $1,733, the College did not return the funds to the Department of Education in the required 45 days after the withdrawal date of the student.CRITERIA: According to 34 CFR 668.173(b), return of Title IV funds are required to be deposited or transferred into the Student Financial Assistance account or electronic fund transfers initiated to the Education of Department as soon as possible, but no longer than 45 days after the date the institution determines that the student withdrew.QUESTIONED COSTS: None EFFECT: The College returned Title IV funds to the Department of Education later than the timeframe required by the program requirements. CAUSE: The College was late in sending the returned funds to the Department of Education for a few of our samples examined because the City of Las Vegas was under a fire emergency due to Calf Canyon/Hermit Peak Fire. Upon return to the College offices, it was noted some of the funds to be returned to the Department of Education had not been processed. RECOMMENDATIONS: We recommend that the College policies and procedures to ensure that it regularly checks any student withdrawals and ensure that they send the Return to Title IV funds within the 45 day requirement. MANAGEMENT’S RESPONSE: The College acknowledges the auditors' comments and has taken steps to address the findings. The college’s Financial Aid department has experienced key staff turnover. In FY23, the college contracted with Attain Partners, a third-party service provider, to enhance our policies and procedures, ensuring alignment with best practices and compliance requirements. Attain, with college staff, are conducting a thorough review of the processes used by the Registrar, Bursar, and Financial Aid Office to improve coordination and the timely reporting of R2T4s. RESPONSIBLE PARTY/TIMELINE TO CORRECT: The Return to Title IV (R2T4) policy and procedures will be updated as necessary to remain current, and all staff will be informed of any revisions. The Interim Vice President of Student Services and the Interim Chief Financial Officer, working with Attain contractors, will review and update R2T4 policies by September 30, 2024. Due Date of Completion: September 30, 2024 Responsible Party: Dr. Loretta Montoya If the U.S. Department of Education has questions regarding this plan, please call me at 505-235-1755. Respectfully, Loretta Montoya Dr. Loretta Montoya Interim CFO
Finding 2022-004: Reporting – Material Weakness in Internal Control Over Compliance and Material Noncompliance Name of Contact Person: Stephen Wilson, Finance Director Corrective Action Plan: New controls are being put into place to ensure that all subawards over $30,000 are properly and timely repo...
Finding 2022-004: Reporting – Material Weakness in Internal Control Over Compliance and Material Noncompliance Name of Contact Person: Stephen Wilson, Finance Director Corrective Action Plan: New controls are being put into place to ensure that all subawards over $30,000 are properly and timely reported. Completion Date : June 30, 2025
Federal Award Findings and Questioned Costs: Finding 2022-003: Reporting - Timely Submission of Financial Reports – Significant Deficiency in Internal Control over Compliance and Noncompliance Name of Contact Person: Stephen Wilson, Finance Director Corrective Action Plan: As the Borough is currentl...
Federal Award Findings and Questioned Costs: Finding 2022-003: Reporting - Timely Submission of Financial Reports – Significant Deficiency in Internal Control over Compliance and Noncompliance Name of Contact Person: Stephen Wilson, Finance Director Corrective Action Plan: As the Borough is currently behind on its audit’s we are aware that this will continue to be an issue until we are caught up. Completion Date: June 30, 2025
ACL Centers for Independent Living – Assistance Listing No. 93.435 Type of Finding: Allowable Activities and Allowable Costs – Payroll Disbursements • Material Weakness in Internal Control over Compliance Criteria or specific requirement: Per 2 CFR 200.303, non-Federal entities must “establish and m...
ACL Centers for Independent Living – Assistance Listing No. 93.435 Type of Finding: Allowable Activities and Allowable Costs – Payroll Disbursements • Material Weakness in Internal Control over Compliance Criteria or specific requirement: Per 2 CFR 200.303, non-Federal entities must “establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statues regulations, and the terms and conditions of the Federal award.” Condition: Payroll allocation review is performed annually by ED, which is not timely enough to accurately reflect employee's time worked. Additionally, the allocation performed had logical errors, including one employee’s time missing from the allocation calculation, and using an inappropriate allocation basis. Questioned costs: None Context: All employees included in selection deemed to work positions that are allowable to the program, however the client allocation process unreliable for all sections tested (25). Cause: Allocations to program based on one employee's memory (ED) for full-year organizational operations. Allocations not reviewed for accuracy by other individual. Effect: Currently, all assigned work activities employees engage in are theoretically allowable under the program, however if an employee were to work projects that are not allowable under the Federal award, reimbursement requests could be made for unallowable costs. Repeat Finding: No Recommendation: 1) Have employees enter time by period and ensure time codes reflect type of activities worked that tie to Federal program allocations. 2) Have ED review employee timesheets each pay period. 3) Review allocations by program each pay period. 4) Have a second individual (contract accountant) review allocations to ensure accuracy and completeness. Views of responsible officials: There is no disagreement with the audit finding. Action taken in response to finding: DEC employees enter their time by period and code activities to the corresponding programs. Program Directors, then the ED reviews all employees time sheets and allocations each pay period. DEC’s contract accountant reviews monthly. Name(s) of the contact person(s) responsible for corrective action: Kimberly Meck, Executive Director Planned completion date for corrective action plan: Already implemented.
ACL Centers for Independent Living – Assistance Listing No. 93.435 Type of Finding: Allowable Activities and Allowable Costs – General Disbursements • Significant Deficiency in Internal Control over Compliance Criteria or specific requirement: Per 2 CFR 200.303, non-Federal entities must establish a...
ACL Centers for Independent Living – Assistance Listing No. 93.435 Type of Finding: Allowable Activities and Allowable Costs – General Disbursements • Significant Deficiency in Internal Control over Compliance Criteria or specific requirement: Per 2 CFR 200.303, non-Federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statues regulations, and the terms and conditions of the Federal award. Condition: Documentation not maintained to support one cash disbursement. Questioned costs: None Context: 1/40 of the general disbursements tested lacked indication of approval. Deemed to be an isolated incident as the vendor in question provides physical receipts to DEC, which is an unusual and infrequent method. Limited transactions with said vendor. Cause: Vendor purchases are in-person and physical receipt is obtained. This is unusual for common vendors used and leads to more opportunity for documentation loss. Effect: Reimbursement requests could be made for unallowed expenditures. Repeat Finding: No Recommendation: Review document retention process to ensure all costs that are charged to a federal program are adequately reviewed and documentation of that process is maintained. If documentation is not available, costs should not be charged to the Federal program. Views of responsible officials: There is no disagreement with the audit finding. Action taken in response to finding: This was an isolated incident and DEC now takes steps to digitally record physical receipts with a photograph as soon as possible. Name(s) of the contact person(s) responsible for corrective action: Kimberly Meck, Executive Director Planned completion date for corrective action plan: Already implemented.
ACL Centers for Independent Living – Assistance Listing No. 93.435 Type of Finding: Subrecipient Monitoring/Procurement • Material Weakness in Internal Control over Compliance • Material Noncompliance (Modified Opinion) Criteria or specific requirement: Per 2 CFR Part 200.331, a pass-through entity ...
ACL Centers for Independent Living – Assistance Listing No. 93.435 Type of Finding: Subrecipient Monitoring/Procurement • Material Weakness in Internal Control over Compliance • Material Noncompliance (Modified Opinion) Criteria or specific requirement: Per 2 CFR Part 200.331, a pass-through entity must make case-by-case determinations whether each agreement it makes for the disbursement of Federal program funds casts the party receiving the funds in the role of a subrecipient or a subcontractor. If a subrecipient has been identified, per 2 CFR Part 200, Subpart F, pass through entities must notify subrecipients that they are receiving Federal funds as a subrecipient and must therefore comply with federal statutes, regulations, and the terms and conditions of the award. Additionally, pass through entities must keep documentation of monitoring the subaward. The pass-through entity must have a control process in place to ensure it is in compliance with federal requirements related to subrecipient monitoring. If a subcontractor has been identified (and payment is above the micro-purchase threshold), per 2 CFR Part 200, Subpart D, the entity must have and use documented procurement procedures such as drafting a procurement policy, obtaining qualified bids, performing cost analyses and justifying reason for final selection. Condition: While there existed sophisticated procedures for reviewing, approving and monitoring applicants, they did not meet all of the Federal requirements for either those of subrecipients or subcontractors. Questioned costs: $62,857 In known questioned costs. Context: Upon receipt of the Federal ACL CARES ACT grants, the instructions were to use and disseminate the funds within the community for the purposes of supporting individuals with disabilities who were impacted by COVID and creating professional relationships in further support of individuals with disabilities. DEC was not aware of the Federal Uniform Guidance guidelines requiring DEC to make the determination of whether the vendors meet the characteristics of a subrecipient or a subcontractor and therefore did not follow the required procedures. This is an isolated instance due to the specific nature of the CARES ACT funds as DEC is not able to engage in these activities with other Federal grants. Cause: DEC did not designate these vendors as either subrecipients or subcontractors and therefore did not follow the Federal Uniform Guidance guidelines. Effect: Pass-through entities, subcontractors and/or subrecipients could be out of compliance and misusing Federal funds. Repeat Finding: No Recommendation: CLA recommends DEC review the Uniform Guidance in relation to subrecipients and subcontractors, and for each vendor under contract, make a clear determination of which type of contract they fall under. Contracts should be drafted in conformity with either subrecipients or subcontracts (as directed by the Uniform Guidance). Views of responsible officials: There is no disagreement with the audit finding. Action taken in response to finding: DEC partnered with other organizations on shortterm projects to reach populations of individuals with disabilities who have intersecting identities. Due to vague instructions on using the funds, we were unaware of the need to define funding recipients as either subrecipients or subcontractors. DEC verified the recipient’s WA state business licenses and performed monitoring for each project. These projects were part of DEC’s plan to spend one-time CARES ACT grants. DEC is not authorized to perform activities of this type with any of our other Federal grants. Name(s) of the contact person(s) responsible for corrective action: Kimberly Meck, Executive Director Planned completion date for corrective action plan: If such an opportunity becomes available in the future, DEC will ensure it will follow appropriate Federal regulations for subrecipients and/or subcontractors as required.
View Audit 319773 Questioned Costs: $1
All invoices and documentation related to expenditure of federal funds are now scanned and attached to the accounting entry recording the payable. With regards to the Client Acknowledgement of Receipt of Direct Assistance Forms, we have taken steps to ensure that the documentation is signed at the t...
All invoices and documentation related to expenditure of federal funds are now scanned and attached to the accounting entry recording the payable. With regards to the Client Acknowledgement of Receipt of Direct Assistance Forms, we have taken steps to ensure that the documentation is signed at the time assistance is given and continue to work with the refugees as to the importance of having the proper paperwork on file.
View Audit 319743 Questioned Costs: $1
Hospital Authority of Liberty County (A Component Unit of Liberty County, Georgia) respectfully submits the following corrective action plan for the year ended November 30, 2022. The finding from the November 30, 2022 Schedule of Findings and Questioned Costs is discussed below. The finding is numbe...
Hospital Authority of Liberty County (A Component Unit of Liberty County, Georgia) respectfully submits the following corrective action plan for the year ended November 30, 2022. The finding from the November 30, 2022 Schedule of Findings and Questioned Costs is discussed below. The finding is numbered consistently with the numbers assigned in the schedule. FEDERAL AWARD PROGRAMS AUDIT FINDING Material Weakness - Noncompliance (2022-001) Recommendation: The Authority should continue to improve its understanding of the reporting requirements as specified in the applicable loan document and create a process to ensure all USDA requirements are met. Planned Corrective Action: The Authority has elected to pay off the outstanding balance of the USDA loan. Derek Rozier Chief Financial Officer
View Audit 319660 Questioned Costs: $1
Finding Number: 2022-006 Planned Corrective Action: The Executive Director no longer performs any accounting duties. An accounting firm was hired to bring everything up to date and an Accounting Assistant was hired. A new Fiscal Procedures Manual has been approved by the board. Only one Housing Assi...
Finding Number: 2022-006 Planned Corrective Action: The Executive Director no longer performs any accounting duties. An accounting firm was hired to bring everything up to date and an Accounting Assistant was hired. A new Fiscal Procedures Manual has been approved by the board. Only one Housing Assistance Payment bank account is now used; fraudulent checks were written out of the “general account” that checks are not normally written from, this account has been closed. Anticipated Completion Date: January 1, 2023 Responsible Contact Person: Sherrie Boudinot
View Audit 319623 Questioned Costs: $1
We gave instruction to the Finance Department staff to submit, in a timely manner, all the required financial information, to our external auditors, to comply with the datelines for the submission of the Single Audit Report for the fiscal year 2023-2024, which is March 31, 2025. Responsible Official...
We gave instruction to the Finance Department staff to submit, in a timely manner, all the required financial information, to our external auditors, to comply with the datelines for the submission of the Single Audit Report for the fiscal year 2023-2024, which is March 31, 2025. Responsible Official: Mr. Johnny Millán Burgos, Finance and Budget Director Implementation Date: March 31, 2025
Finding 2022-001: Uniform Guidance Reporting (Significant Deficiency) Condition and Effect: The Uniform Guidance audit of the Corporation’s federal awards for the year ended December 31, 2022 was not completed within nine months following the period-end and as a result, the Corporation did not subm...
Finding 2022-001: Uniform Guidance Reporting (Significant Deficiency) Condition and Effect: The Uniform Guidance audit of the Corporation’s federal awards for the year ended December 31, 2022 was not completed within nine months following the period-end and as a result, the Corporation did not submit its single audit reporting package within the required timeframe. As such, the Corporation did not comply with the aforementioned regulatory requirements. View of Responsible Officials and Planned Corrective Action: Due to staff turnover in 2022, we did not meet the reporting deadline. We have sufficient staffing during 2023 and are actively working to complete the 2023 Uniform Guidance audit of the Corporation’s federal awards for the year ended December 31, 2023 by the due date of September 30, 2024. Name of Contact Person: Maureen Burke, Director of Finance Maureen.Burke@wmchealth.org 845-368-5448 Proposed Completion Date: September 30, 2024
Fremont County was assessed a Federal Awards Finding for the 2022 Audit year by Certified Public Accountants, Logan and Associates, LLC, for Title 2 U.S. Code of Federal Regulations Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (Uniform Gui...
Fremont County was assessed a Federal Awards Finding for the 2022 Audit year by Certified Public Accountants, Logan and Associates, LLC, for Title 2 U.S. Code of Federal Regulations Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (Uniform Guidance) 200.505 and Appendix II to 200. This regulation requires the County to determine that contractors, individuals, businesses receiving Federal funds have not been suspended or debarred from receiving Federal funds. After the assessment Fremont County has identified an area of improvement including internal controls. Staff members have implemented and utilized the Federal Debarred Website, www.SAM.gov, to be in compliance with the Federal Award requirement moving forward with the grant administrator. Staff members will also be encouraged to take annual Federal Award courses provided by Colorado Government Finance Officers Association or other similar entities. Fremont County will continue to enhance and streamline training for new and existing personnel, in the finance department, and implement new preventive controls. Fremont County believes these steps will resolve the procurement, suspension and debarment for all Federal Awards.
Even though the Academy transferred $683,606 of ESSER funds to LKAYA based on the intergovernmental agreement that was in place during that time, the Academy itself did incur ESSER eligible costs that could have been applied against these ESSER dollars if they had remained within the Academy. The co...
Even though the Academy transferred $683,606 of ESSER funds to LKAYA based on the intergovernmental agreement that was in place during that time, the Academy itself did incur ESSER eligible costs that could have been applied against these ESSER dollars if they had remained within the Academy. The costs incurred involved improvements to technology, maintaining and increasing additional staff, curriculum materials, instructional supplies, and staff training to name a few.
View Audit 319292 Questioned Costs: $1
Finding 496178 (2022-001)
Significant Deficiency 2022
CORRECTIVE ACTION PLAN Program: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds Assistance Listing No.: 21.027 Federal Agency: Department of the Treasury ? Pass-through from the State of California Award No.: WWID 4SSO10370 & CA 1910156 Award Year: Fiscal year 2021-2022 Category o...
CORRECTIVE ACTION PLAN Program: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds Assistance Listing No.: 21.027 Federal Agency: Department of the Treasury ? Pass-through from the State of California Award No.: WWID 4SSO10370 & CA 1910156 Award Year: Fiscal year 2021-2022 Category of Finding: Activities Allowed or Unallowed, Allowable Costs Name responsible for correction action plan: Emily Armstrong, Revenue Services Manager The corrective action planned: Payments applied to the 93 water bills and 81 wastewater bills will be reversed on the customer?s accounts. A notice will be issued to customers via mail and email (where possible) of the discrepancy. The funds will be returned to the State pursuant to their outlined procedures. Moving forward, the City will ensure that there is a multi-layered approval process to review the eligibility period of any State funding to identify the correct eligible applicants prior to disbursement. For future funding related to water and/or waster bills, the list of eligible applicants will be compiled by an analyst within the department and will be reviewed by the Revenue Services Manager and Assistant Finance Director prior to disbursement. Anticipated completion date: March 24, 2023
View Audit 319093 Questioned Costs: $1
The Metcalfe County Fiscal Court contracted with an outside entity to manage the CSLFRF disbursements and reporting requirements. We entrusted that we were in compliance for all federal program expenditures where these funds were concerned. Prepared by: County Treasurer Page Edwards Date Prepared:...
The Metcalfe County Fiscal Court contracted with an outside entity to manage the CSLFRF disbursements and reporting requirements. We entrusted that we were in compliance for all federal program expenditures where these funds were concerned. Prepared by: County Treasurer Page Edwards Date Prepared: March 6, 2023 Person Responsible for Corrective Action Plan: Judge/Executive Larry Wilson Anticipated Completion Date: July 1, 2023
View Audit 319058 Questioned Costs: $1
In reference to finding 2022-001, a Material Weakness over Financial Reporting that was found when the fiscal year 2022 report was prepared, the Town had developed the following action plan. The finding found was that prior year adjustments had not be entered into the accounting system by the Town....
In reference to finding 2022-001, a Material Weakness over Financial Reporting that was found when the fiscal year 2022 report was prepared, the Town had developed the following action plan. The finding found was that prior year adjustments had not be entered into the accounting system by the Town. The finance officer has worked with the auditor to get these missed entries processed and to correct the beginning balances from the prior year. The town, finance committee, is working with the auditor to develop a formal procedure sto identify and prepare all adjustments needed to ensure the accuracy of the financial reports. This procedure will be put in place by the close of Fiscal Year 2023. The auditor and the finance officer have already worked to ensure adjustments to the fiscal year 2022 ending balances are completed.
Federal Award Findings Finding 2022-002 Significant Deficiency in Internal Control over Compliance, Noncompliance - Reporting Name of Contact Person: David Andrew, Tribal Administrator Corrective Action Plan: The Native Village will work with an accounting firm to ensure that the SF-SAC is remitt...
Federal Award Findings Finding 2022-002 Significant Deficiency in Internal Control over Compliance, Noncompliance - Reporting Name of Contact Person: David Andrew, Tribal Administrator Corrective Action Plan: The Native Village will work with an accounting firm to ensure that the SF-SAC is remitted to the federal clearinghouse within the 9-month deadline. Proposed Completion Date: December 31, 2023
We agree with the auditor’s recommendation of conducting monthly reconciliation and perform a secondary review of all reconciliation and journal entries to verify the accuracy and completeness of the financial statements. Here are our outlined measures to be implemented during the month of December ...
We agree with the auditor’s recommendation of conducting monthly reconciliation and perform a secondary review of all reconciliation and journal entries to verify the accuracy and completeness of the financial statements. Here are our outlined measures to be implemented during the month of December 2023: 1. Establish a structured procedure for reconciling material account balances on a monthly basis. Additionally, the Controller will be responsible for overseeing the reconciliations of key accounts. 2. The Controller will mandate the timely documentation and recording of any required adjusting entries identified during the reconciliation process. Stress the significance of offering clear explanations for the adjustments made. 3. The Controller will review to independently validate the accuracy and completeness of reconciliations, cross-referencing them with supporting documents.
2022-004—Allowable Costs Corrective Action: FCCH Management shall conduct training of human resource and accounting personnel to ensure they understand the requirement for allowable costs under 2 CFR Part 225 and shall follow the principles in 2 CFR Part 200, Subpart E. Current policies and procedu...
2022-004—Allowable Costs Corrective Action: FCCH Management shall conduct training of human resource and accounting personnel to ensure they understand the requirement for allowable costs under 2 CFR Part 225 and shall follow the principles in 2 CFR Part 200, Subpart E. Current policies and procedures shall be reviewed to ensure adequacy of measures to ensure compliance. FCCH leadership shall also be trained in the elements of allowable cost principles. Person Responsible: Shawna Gonzales, Chief Financial Officer and Abigail Jackson, Human Resources Director Completion Date: December 31, 2024
View Audit 318579 Questioned Costs: $1
Views of Responsible Officials QHS agrees with the finding and accepts the recommendation.
Views of Responsible Officials QHS agrees with the finding and accepts the recommendation.
View Audit 318521 Questioned Costs: $1
AUDITEE’S CORRECTIVE ACTION PLAN As required by Title 2 U.S. Code of Federal Regulations (CFR) Part 200, Uniform Administrative Requirements, Cost principles, and Audit Requirements for Federal Awards (UG), the East Tallahatchie School District has prepared and hereby submits the following correcti...
AUDITEE’S CORRECTIVE ACTION PLAN As required by Title 2 U.S. Code of Federal Regulations (CFR) Part 200, Uniform Administrative Requirements, Cost principles, and Audit Requirements for Federal Awards (UG), the East Tallahatchie School District has prepared and hereby submits the following corrective action plan for the findings included in the Schedule of Findings and Questioned Cost for the year ended June 30, 2022:  Finding 2022-001 Corrective Action Plan Details A. Contact person responsible for corrective action: Name: Raymond Russell Title: Superintendent B. Description of corrective action planned: The district will implement controls and procedures to ensure that all expenditures are properly authorized prior to goods being ordered or services being rendered. C. Anticipated completion date of corrective action: Immediately 2022-002 Corrective Action Plan Details A. Contact person responsible for corrective action: Name: Raymond Russell Title: Superintendent B. Description of corrective action planned: The district will implement policies or procedures to establish an internal control system that will ensure strong financial accountability, proper safeguarding of assets and accurate accounting records. C. Anticipated completion date of corrective action: Immediately 2 2022-003 Corrective Action Plan Details A. Contact person responsible for corrective action: Name: Raymond Russell Title: Superintendent B. Description of corrective action planned: The district will implement policies or procedures to establish an internal control system that will ensure strong financial accountability, proper safeguarding of assets, and accurate accounting records. C. Anticipated completion date of corrective action: Immediately 2022-004 Corrective Action Plan Details A. Contact person responsible for corrective action: Name: Raymond Russell Title: Superintendent B. Description of corrective action planned: The district will implement policies or procedures to establish an internal control system that will ensure strong financial accountability, proper safeguarding of assets, and accurate accounting records. C. Anticipated completion date of corrective action: Immediately 2022-005 Corrective Action Plan Details A. Contact person responsible for corrective action: Name: Raymond Russell Title: Superintendent B. Description of corrective action planned: The district will implement policies or procedures to establish an internal control system that will ensure strong financial accountability, proper safeguarding of assets, and accurate accounting records. C. Anticipated completion date of corrective action: Immediately 3 2022-006 Corrective Action Plan Details A. Contact person responsible for corrective action: Name: Raymond Russell Title: Superintendent B. Description of corrective action planned: The district will implement policies or procedures to establish an internal control system that will ensure strong financial accountability, proper safeguarding of assets and accurate accounting records. C. Anticipated completion date of corrective action: Immediately 2022-007 Corrective Action Plan Details A. Contact person responsible for corrective action: Name: Raymond Russell Title: Superintendent B. Description of corrective action planned: The district will strengthen its internal control systems over reporting to ensure single audit reporting package and data collection form are submitted to the Federal Audit Clearinghouse within established timeframe and financial statements are prepared timely. C. Anticipated completion date of corrective action: Immediately
Finding 2022-003: Internal Controls and Compliance over Reporting (Significant Deficiency) Conditions: The Organization did not submit the quarterly reports within the specified time frame in accordance with the HIAS agreements. Additionally, the Organization did not comply with the required sub...
Finding 2022-003: Internal Controls and Compliance over Reporting (Significant Deficiency) Conditions: The Organization did not submit the quarterly reports within the specified time frame in accordance with the HIAS agreements. Additionally, the Organization did not comply with the required submission date of the data collection form and reporting package to the FAC for the fiscal year ending June 30, 2022. The Organization was not in compliance with the reporting requirements, federal regulations, and guidelines. Effect: The Organization was not in compliance with the reporting requirements, federal regulations, and guidelines, and it could be exposed to a reduction or elimination of funds by the federal awarding agencies. Auditor's Recommendation: JFSSV recommends that the Organization evaluate its policies and procedures regarding report submission to ensure the timely submission of all compliance reports. In addition, the Organization should maintain documentation to support the appropriate and timely submission of the single audit (SF-SAC form). Management Response: We agree with the recommendation and have also submitted the following response: According to the HIAS agreement, the following reporting deadlines are specified for HIAS to their funder PRM: Programmatic and Financial Reporting Deadlines: · HIAS must submit performance and financial reports to PRM thirty (30) days after the end of each reporting period and in accordance with the schedule outlined by PRM. · HIAS must also submit a final program and financial report ninety (90) calendar days after the period of performance end date. To ensure timely submission of the foregoing reports to PRM, the Agency “HIAS” shall submit performance and financial reports to HIAS as follows: Programmatic Reports: The Agency will file monthly R&P Period reports through the IRIS database, as well as other programmatic reports as requested by HIAS. Financial Reports: The Agency agrees to submit financial reports monthly on or before the 15th day of the following month after the books have closed. Financial reports must be submitted using the Arrivals and Expenditure Workbook provided by HIAS. HIAS agrees to make payments on these financial reports on or before the 25th day of the month for invoices submitted on or before the 15th day of the month. To ensure HIAS stays in compliance, JFSSV makes every effort to submit accurate reports on time. Funder HIAS agreed in an email sent to the auditors that invoice submission after the 15th is acceptable. As a result, the organization has never been denied reimbursement funding. Some of the delays with invoice submission were due to the following reasons: · When the 15th falls on a weekend (or Friday) or a company and Jewish holidays. · Additional effort to compile client and expense information due to volume and complexity. · The templates required for reporting and reimbursement have not yet been established. · Budget revisions. Furthermore, consultation reports are not considered "submitted" until they receive approval from HIAS. This process ensures no corrections, and the report is finalized and meets the requirements of HIAS reporting. It can take a few days to review and clarify any questions HIAS may have. JFSSV has presented Harshwal & Company LLP with funder approval on late filings and documentation of reporting submission. To address the specific concerns raised regarding internal controls over compliance and reporting, JFSSV will: Evaluate and Update Policies and Procedures: JFSSV will review HIAS-approved Policies and procedures and ensure documentation on any late invoices due to the items listed above. Enhance Communication and Coordination: JFSSV will continue to communicate and coordinate with HIAS to ensure the timely approval of consultation reports and to clarify any issues promptly. Maintain Comprehensive Documentation: JFSSV will maintain comprehensive documentation to support the submission of the single audit (SF-SAC form) and other compliance reports. JFSSV agrees with the delay in completing the FY22 audit. The unforeseen necessity for an additional auditor, which came to light during the initial audit process, significantly impacted JFSSV's timeline. Although this presented an unexpected challenge, JFSSV swiftly engaged a new auditing firm to restart the audit. Additionally, to ensure efficiency and accuracy moving forward, JFSSV made the decision to transfer our outsourcing accounting department. Furthermore, JFSSV is taking proactive measures to streamline its processes for future audits, with the aim of achieving faster turnarounds and compliance with reporting requirements, federal regulations, and guidelines. JFSSV is committed to maintaining and improving its financial and operational controls. We will monitor corrective actions and adjust our procedures as necessary to prevent similar issues in the future.
Finding 2022-001: Material Weakness in internal controls over compliance for earmarking and material noncompliance for earmarking in the U.S. Refugee Admissions Program: Effect: The Organization may not have met earmarking requirements outlined in the underlying award agreements nor have control...
Finding 2022-001: Material Weakness in internal controls over compliance for earmarking and material noncompliance for earmarking in the U.S. Refugee Admissions Program: Effect: The Organization may not have met earmarking requirements outlined in the underlying award agreements nor have controls to monitor that earmarking requirements were met effectively. Auditor's Recommendation: We recommend that the Organization implement a process to identify the value of direct assistance provided to each eligible refugee as recorded within the financial records. Further, we recommend that internal controls over compliance be implemented to monitor direct aid distribution and meet the earmarking requirements included within the grant terms. Management Response: We agree with the recommendation and have also submitted the following response. In accordance with the U.S. Department of State, Bureau of Population, Refugees, and Migration (PRM) FY 2019 Reception & Placement (R&P) Cooperative Agreement, all affiliates are required to have written documents available for review evidencing the following: · R&P refugee per capita disbursement policy · How refugee per capita funds beyond the $975 minimum are spent (i.e., Flex Funds policy) · Pocket money disbursement policy · Structured training plan for new and existing staff · Policy on protection from sexual exploitation and abuse (PSEA) · Grievance policy · Policy on cultural orientation (CO) delivery and assessment of refugee understanding · Implementation of accountability to affected populations (AAP) framework Jewish Family Services of Silicon Valley ( JFSSV) has adequate policies and procedures and follows the grantor's guidelines on per-capita earmark funds as stated by the Funder. JFSSV will continue to follow the funder-approved policies and procedures, which state the following: “Per capita funds can be paid by the affiliate directly to the third party, or the affiliate may reimburse U.S. ties or clients for purchases as long as receipts are provided evidencing that the purchases were for allowable material needs. If there are per capita funds remaining at the end of the R&P period and all possible material needs have been provided to the case, including paying rent and utilities forward, the affiliate may write a check to the client for the remainder of the funds. The affiliate must ensure that the situation has been thoroughly documented in the case note log and that the case has no outstanding material needs. This option should be considered an exception and used sparingly.” JFSSV makes every effort to provide the minimum amount to all referred clients as required by the funder. JFSSV meets with clients to provide the initial per capita funding and reviews program requirements for the next per capita funding. If the client follows the program, they are funded. Sometimes, clients leave the program or do not provide adequate documents to be funded, resulting in unspent per capita funds. When this occurs, JFSSV follows the Cooperative Agreement #12.9 Availability of Per Capita Funds: A written statement must be submitted on or before December 31, 20xx, as a Post Award Task through [website link] reporting the amount of per capita funds and accrued interest unexpended and available as of September 30, 20xx. This statement must confirm the amount of those funds expended and reported as a part of the quarterly financial reports for October 1, 20xx, through September 30, 20xx. Should the Recipient have any unexpended per capita funds as of the financial report due on March 31, 20xx, such funds must be returned to the Bureau no later than April 30, 20xx. In addition, JFSSV undergoes vigorous monitoring visits, monthly invoice reviews, and program/fiscal audits, which they pass. JFSSV has provided Harshwal & Company LLP with contracts, cooperative agreements, program guidelines, internal Funder-approved policies & procedures, and all testing requirements with client backup. To address the specific concerns raised regarding internal controls over compliance and earmarking requirements, JFSSV will continue to: Enhanced Monitoring Process: JFSSV will continue monitoring processes to track the value of direct assistance provided to each eligible refugee. Internal Controls Implementation: JFSSV will continue reviewing its internal controls to oversee direct aid distribution with the funder and ensure all requirements are met effectively. Documentation and Reporting: JFSSV will continue to review all disbursements to ensure they are thoroughly documented and reported. This will include maintaining receipts, case notes, and other relevant documentation to provide clear evidence of compliance with earmarking requirements.