Corrective Action Plans

Browse how organizations respond to audit findings

Total CAPs
61,799
In database
Filtered Results
23,815
Matching current filters
Showing Page
577 of 953
25 per page

Filters

Clear
Active filters: Questioned Costs
We concur. Procedures will be put in place and reporting will be modified and improved to ensure deadlines are met.
We concur. Procedures will be put in place and reporting will be modified and improved to ensure deadlines are met.
Finding Summary: In connection with the audit procedures performed, it was noted that there was one expenditure amount that was incurred prior to the period of performance. Responsible Individuals: Christa Beauchat, Chief Financial Officer Corrective Action Plan: Management is revising its processes...
Finding Summary: In connection with the audit procedures performed, it was noted that there was one expenditure amount that was incurred prior to the period of performance. Responsible Individuals: Christa Beauchat, Chief Financial Officer Corrective Action Plan: Management is revising its processes to ensure that an adequate review of the period of performance is occurring over the expenditures of each federal award contract (verification that any expenditure charged to a federal award has actually been incurred during the federal award’s contract period). Anticipated Completion Date: Ongoing
FIDING NO. 2023-003 PROCUREMENT SUSPENSION AND DEBARMENT CONDITION We examined one hundred percent (100%) of the disbursed made and charged to HEERF Institutional Aid for the fiscal year 2022-2023 and noted the following: 1) UPM did not have documentation related Schools are prohibited from contrac...
FIDING NO. 2023-003 PROCUREMENT SUSPENSION AND DEBARMENT CONDITION We examined one hundred percent (100%) of the disbursed made and charged to HEERF Institutional Aid for the fiscal year 2022-2023 and noted the following: 1) UPM did not have documentation related Schools are prohibited from contracting with or making subawards under covered transactions to parties that are suspended or debarred. 2) UPM made five (5) payments for $100,406.71 in advance for goods or services not received at the disbursement date. RECOMMENDATION The Institution should reinforce the established procedures and adhere to them before any payment is made for goods or services. The amount of $100,406.71 should be reimbursed to the U.S. Department of Education. In addition, UPM should be included in its procedures steps to adopting regulations, to verify that the vendor entity is not suspended or debarred or otherwise excluded from participating in the transaction. Corrective Action Plan: The UPM requested the documents from potential vendors that authorized them to do business in Puerto Rico. The selected company, Vitaltek, provided documents showing that it was established and compliant with the law, precisely the evidence that they were not debarred or suspended. The UPM has a procurement process titled " Reglamento para la Adquisici6n de Equipos, Materiales y Servicios No Personales de la Universidad Pentecostal MIZPA" that states the process for verifying debarment and suspension. Prepayments The UPM has analyzed each prepayment, and we have evidence that the services, equipment. and materials have been received. In addition to having the purchase orders, contract, and invoices, we have the equipment in our facilities in good condition and inspected per our internal procedures, titled "Reglamento para la Administraci6n de Propiedad Mueble (Equipo) de la Universidad Pentecostal Mizpa." Vitaltek was the only company that provided a quote and was selected due to the COVID-19 emergency. Their purchase condition required a prepayment for ordering and obtaining products. Regarding the Service Contract for the photocopiers, we recognize that it was paid in advance; however, to date, all services related to this contract that we have required have been offered in compliance with each of the clauses and agreements signed. The acquisition of this type of equipment comes with a multiyear plan and maintenance services included in the package, which is the industry standard and necessary for the institution's administrative and academic operations. Understanding the seriousness of the correct administration of these funds, the Dean of Administration will periodically evaluate compliance with any contract. If it is not complied with, we will proceed through legal action to quickly recover these funds. The UPM understands that it should not reimburse this money to the United States Department of Education because there is sufficient evidence to demonstrate that the funds have been used within legal parameters, that they have strengthened the University in academic and administrative and that from now on we will observe the following to comply with such an essential and necessary reservation. Corrective action plan to follow: All employees. including those in the office of the presidency, have been finally and firmly alerted that advance payments should be avoided or only considered in emergency situations. All employees authorized to reach contractual agreements will be trained on this topic, and the internal procedures will be reviewed and edited to address prepayments and emergency processes. We will appoint an employee in charge of managing all compliance documentation so that, together with the Dean of Administration and Finance, they can locate and group all the relevant standards and regulatory procedures and have the power to guide so that each of its recommendations is willingly observed. This will be supported by the requirements that always accompany each award. In addition, these officers will have the power to make external consultations with professionals familiar with these matters.
View Audit 295919 Questioned Costs: $1
Special Tests and Provisions Education Stabilization Fund: Assistance Listing No. 84.425 Recommendation: We recommend that for future construction contracts financed by federal education funds PLA verify that subcontractors comply with prevailing wage requirements. Explanation of disagreement with a...
Special Tests and Provisions Education Stabilization Fund: Assistance Listing No. 84.425 Recommendation: We recommend that for future construction contracts financed by federal education funds PLA verify that subcontractors comply with prevailing wage requirements. Explanation of disagreement with audit finding: There is no disagreement with the audit finding. Action taken in response to finding: PLA will train operations and business office staff on the compliance requirements under Davis-Bacon to ensure construction contracts are entered into with qualified contractors and obtain and retain appropriate certified payroll documentation during the construction period. Name(s) of the contact person(s) responsible for corrective action: Carlo Hershberger, Director of Finance and Accounting; Javier Dimas, Vice-President of Operations; Martha Arellano, Procurement Manager and Buyer Planned completion date for corrective action plan: April 1, 2024 If the United States Department of Education has questions regarding this plan, please call Eva Spilker, Chief Financial Officer, at 410-598-3087.
View Audit 295918 Questioned Costs: $1
Management states there was a procurement policy in place during this time but will now document that policy consistent with the federal laws and regulations.
Management states there was a procurement policy in place during this time but will now document that policy consistent with the federal laws and regulations.
FINDING 2023-005 Subject: Child Nutrition Cluster (CNC) – Internal Controls Federal Agency: Department of Agriculture Federal Program: School Breakfast Program, National School Lunch Program Assistance Listing Number: 10.553, 10.555 Pass-Through Entity: Indiana Department of Education Compliance Req...
FINDING 2023-005 Subject: Child Nutrition Cluster (CNC) – Internal Controls Federal Agency: Department of Agriculture Federal Program: School Breakfast Program, National School Lunch Program Assistance Listing Number: 10.553, 10.555 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Findings: Material Weakness Condition: An effective internal control system was not in place at the School Corporation in order to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirements. Context: During testing of reporting, we identified a control breakdown in the claim submission process. Although student meal data is summarized at the school level and reviewed by both the Food Services Bookkeeper and the Food Services Director, there is not a review of the actual claim submission prior to being submitted to the portal. Due to the breakdown in controls, we identified that the October 2022 revision claim overstated breakfasts served by 10 meals. Views of Responsible Official: We concur with the finding. Description of Corrective Action Plan: The Director of Food Services will input the monthly claims into the state reporting system. This will be checked by the bookkeeper prior to submission to ensure data was entered correctly. Responsible Party and Timeline for Completion: Beginning January 2024
View Audit 295916 Questioned Costs: $1
FINDING 2023-003 Subject: Child Nutrition Cluster (CNC) – Internal Controls Federal Agency: Department of Agriculture Federal Program: School Breakfast Program, National School Lunch Program Assistance Listing Number: 10.553, 10.555 Pass-Through Entity: Indiana Department of Education Compliance Req...
FINDING 2023-003 Subject: Child Nutrition Cluster (CNC) – Internal Controls Federal Agency: Department of Agriculture Federal Program: School Breakfast Program, National School Lunch Program Assistance Listing Number: 10.553, 10.555 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Allowable Costs Audit Findings: Material Weakness Condition: The School Corporation did not have adequate internal controls in place to ensure that the School Corporation complied with the allowable cost requirements. Context: During our testing of the School Corporation’s compliance with the allowable costs requirements for CNC, we noted the following exceptions in our testing of 120 disbursements (60 vendor and 60 payroll): 1. The School Corporation paid $233 of sales tax across three vendor food purchases. 2. For two employee payroll selections, we were unable to trace their rate of pay to a Board approved wage rate ordinance or contract. The total amount paid out to the two employees was $2,635. FINDING 2023-003 (Continued) 3. We identified one employee that the School Corporation incorrectly paid one hour more than what the timecard stated, resulting in an overpayment of $14. Views of Responsible Official: We concur with the finding. Description of Corrective Action Plan: Food Service Director will review and signature all fund 800 expenditures prior to disbursement. All Food Service employee wages will align with the board approved rates. Payroll will be signed as reviewed by direct supervisors and the Business Office prior to remittance. Responsible Party and Timeline for Completion: Implement immediately
View Audit 295916 Questioned Costs: $1
Finding Number 2023-003 • Significant deficiency in internal controls over compliance related to procurement. Federal Agency: U.S. Department of Commerce Program Title: Pacific Fisheries Data Program Assistance Listing Number: 11.437 Award Nu...
Finding Number 2023-003 • Significant deficiency in internal controls over compliance related to procurement. Federal Agency: U.S. Department of Commerce Program Title: Pacific Fisheries Data Program Assistance Listing Number: 11.437 Award Numbers: NOAA-NMFS-AK-2023-2007663 Award Period: October 1, 2022 to September 30, 2027 Criteria • 2 U.S. Code of Federal Regulations (CFR) Part 200 Uniform Administrative Requirements, Procurement Standards require that awardees use documented procurement procedures for the acquisition of property or services required under a Federal award or subaward. Condition/Context for Evaluation • IPHC's internal controls over procurement do not include the controls and procedures required by 2 CFR 200. Questioned Costs • Not applicable. Cause • IPHC has not yet modified its procurement policies with the requirements of the 2 CFR Part 200 Procurement Standards. Effect or Potential Effect • As a result, IPHC cannot be certain that procurements were conducted in accordance with the 2 CFR Part 200 Procurement Standards. Repeat Finding • Not applicable. Recommendation • We recommend that IPHC update its procurement policy to include all procurement requirements of 2 CFR Part 200. - Procurement standards 2 CFR 200 Subpart D or 200.318-200.327 - Requirement for documented policies consistent with standards 200.318(a) Contact Person(s): • Executive Director: David Wilson (david.wilson@iphc.int); • Assistant Director: Andrea Keikkala (andrea.keikkala@iphc.int) Explanation and specific reasons for disagreement with the audit finding or that corrective action is not required (if applicable): Not applicable. Corrective action planned: As this was the IPHC’s first full GAAP Audit, Single Audit of federal grant funds, and also our first year transitioned from a Cash-basis of accounting to an Accrual-basis of accounting, there are a number of policies and procedures that are in the process of being amended. It will take the Secretariat several months to bring our written process guides into alignment with “2 U.S. Code of Federal Regulations (CFR) Part 200”, as well as our Financial Regulations (2021) that will be considered for amendment at the upcoming 100th Session of the IPHC Finance and Administration Committee (FAC100) and subsequent 100th Session of the IPHC Annual Meeting (AM100) in late January 2024. During the 2nd quarter of FY2024 (1 January – 31 March 2024) the IPHC will undertake a thorough review of “2 U.S. Code of Federal Regulations (CFR) PART 200—UNIFORM ADMINISTRATIVE REQUIREMENTS, COST PRINCIPLES, AND AUDIT REQUIREMENTS FOR FEDERAL AWARDS” and update our procurement policies and processes accordingly. Anticipated completion date: Deadline: 1 April 2024.
View Audit 295898 Questioned Costs: $1
Finding Number 2023-002 • Significant deficiency in internal controls over compliance related to allowable costs and period of performance. Criteria • 2 U.S. CFR Part 200 Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards require that costs must be neces...
Finding Number 2023-002 • Significant deficiency in internal controls over compliance related to allowable costs and period of performance. Criteria • 2 U.S. CFR Part 200 Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards require that costs must be necessary and reasonable for the performance of the Federal Award, that costs be determined in accordance with GAAP, and that costs be adequately documented including the allocation of those costs. Condition/Context for Evaluation • IPHC’s internal controls over non-payroll charges to the Federal Award did not include review for allowability, accrual in the proper period, or that adequate documentation existed to support the amounts charged or allocated. Three out of 25 nonpayroll disbursements tested did not include evidence supporting one or more of these controls. Questioned Costs • $2,674 Cause • IPHC’s operation of internal controls were not sufficient to ensure allowable costs were charged in accordance with 2 U.S. CFR 200 Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards. Effect or Potential Effect • As a result, charges were made to Federal awards that were not allowable. Repeat Finding • Not applicable. Recommendation • We recommend that IPHC ensure internal controls include reviewing costs charged to the Federal Award for conformity with 2 U.S. CFR Part 200 Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards for allowability, allocability, and reasonableness. o Allowability 200.403, 200.404, 200.405 o Allowable budget period – 200.403 (h) Contact Person(s): • Executive Director: David Wilson (david.wilson@iphc.int); • Assistant Director: Andrea Keikkala (andrea.keikkala@iphc.int) Explanation and specific reasons for disagreement with the audit finding or that corrective action is not required (if applicable): Not applicable. Corrective action planned: We acknowledge that the deficiencies identified, while minor in dollar value to the grant, represent areas for improvement. The specific issues identified were: 1. Field office rental: A field office rental statement was partially charged to the incorrect fiscal year. Reason: The landlord submitted the invoice for payment after the year-end close (FY2022) and was subsequently fully charged to FY2023, instead of being split across fiscal years. 2. Postage (2 elements): The IPHC loads postage stamps on a stamps.com account to process missing logbook notices to vessel owners, a function that pertains to a grant. Clear delineation of the cost of the stamps allocated to the grant and the stamps allocated to activities that do not qualify under the grant were not enumerated. The employee that requested the stamps in the procurement software did so because the lead team member was not available. When procuring the stamps the face-value of a stamp was used at $0.60 instead of $0.57, a discount the organization receives due to bulk purchase and stamp.com membership. The cost of this error was $9.96. At the start of FY2023, we used a single operating Fund (Fund 30 – Statistics) to record income and expenses for data related activities that included some grant funds. During the course of the year, we commenced the development of the new 5-year grant application with NOAA Fisheries to cover IPHC’s Directed Commercial Catch Sampling of Pacific halibut in Alaska (IPHC Grant 802) (Grant Number: NOAA-NMFS-AK-2023-2007663) from FY2022-FY2026. During this grant renewal/development process, a decision was taken to split Fund 30 – Statistics into two, with Fund 35 AK Cost-Recovery being created. This new Fund 35 was developed to contain only those expenses and income that were deemed as eligible under the grant rules. Over the course of the year, the Secretariat categorized income and expenses between the two Funds, which involved recoding some transactions coded to Fund 30 at the start of the fiscal year, to Fund 35 later in the year. For FY2024, we will continue to undertake monthly reconciliation and month-end close processes to ensure charges are appropriately coded and attributed. In addition, the year-end reconciliation and close processes will support the attestation of funds spent under the grant within one month of the fiscal year ending. This proactive approach aims to ensure timely completion for the single audit, allowing for comprehensive scrutiny of costs assigned to the grant before incorporating financial statements for review during the single audit process. Further, we will ensure preliminary scrutiny and month-end close of financial reports pertaining to grant funds before loading them to the auditors for review. Finally, our procedures have already been improved to ensure that costs charged to the federal awards are charged to the appropriate activity code and are allowable under federal cost principles. Anticipated completion date: Completed - 1 December 2023, and annually by year-end closeout.
View Audit 295898 Questioned Costs: $1
Criteria: 2 CFR Section 200.303 of the Uniform Guidance requires the non-Federal entity to establish and maintain effective internal controls over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regul...
Criteria: 2 CFR Section 200.303 of the Uniform Guidance requires the non-Federal entity to establish and maintain effective internal controls over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations and the terms and conditions of the Federal award. Condition: During testing of credit card purchases, we noted that supervisor approvals of expense reports were not timely obtained. Cause: Lack of timely review of credit card expense reports and transactions by supervisors for approval. Agency Response: Program directors/approvers of expense reports must go in by the 5th of the month after month end to approve/reject all employee expense reports assigned to them. The Financial Data Clerk will go in by the 6th of the month note the staff who has not approved their expense reports. The clerk will then communicate with the Director of Finance who in turn will send notification to the staff who is listed as approver. Once the staff is notified they will be given a 48 hour turn around to approve/reject, in the event they do not comply disciplinary action will be taken. After the 48 hours if report is not approved, Finance leadership will go into the system and review the report for approval or rejection. Responsible parties will be Alejandra Nunez, Financial Data Clerk and Lisette DeLeon, CFO, Cynthia Timm, Director of Finance, and Program designated expense report approvers. This will be implemented by February 2024.
Contact Person Stephanie Hunter, Business Manager/Naomi Obrigewitch, Accounting Manager Corrective Action Plan During the 2022-2023 fiscal year, Dickinson Public Schools was in the transition of the administration assistant position for the Director of Curriculum and Instruction. In addition, the bu...
Contact Person Stephanie Hunter, Business Manager/Naomi Obrigewitch, Accounting Manager Corrective Action Plan During the 2022-2023 fiscal year, Dickinson Public Schools was in the transition of the administration assistant position for the Director of Curriculum and Instruction. In addition, the business office created and hired a new position of a grant specialist. With the changes in these two departments, Dickinson Public Schools will create a more streamlined process to ensure that grant documentation is completed as outlined in all federal grant guidelines. Completion Date 2023-2024 fiscal year
Federal Agency Name: Department of Agriculture & Department of Health and Human Services Program Name: Community Facilities Loans and Grants Cluster Federal Financial Assistance Listing #10.766 Compliance Requirement: Special Tests and Provisions Finding Summary: The Hospital did not maintain a res...
Federal Agency Name: Department of Agriculture & Department of Health and Human Services Program Name: Community Facilities Loans and Grants Cluster Federal Financial Assistance Listing #10.766 Compliance Requirement: Special Tests and Provisions Finding Summary: The Hospital did not maintain a reserve account or request the Department of Agriculture’s (USDA) permission prior to entering into new debt in compliance with their debt agreements. As of June 30, 2023, the Hospital should have USDA debt reserves at least equal to $417,954. Responsible Individuals: Eric Salmonson, CFO Corrective Action Plan: Management agrees with the finding. The Hospital has reviewed the internal controls and implemented improvements related to their USDA debt. They have also funded our USDA debt reserve account and worked with USDA to become compliant with all debt requirements. Anticipated Completion Date: March 5, 2024
Finding 2023-003: Student Financial Assistance Cluster Gramm-Leach-Bliley Act-Student Information Security Management Response: Management agrees with the finding. The Vice President of Information Technology will ensure that specific actions and strategic initiatives have been implemented to ensure...
Finding 2023-003: Student Financial Assistance Cluster Gramm-Leach-Bliley Act-Student Information Security Management Response: Management agrees with the finding. The Vice President of Information Technology will ensure that specific actions and strategic initiatives have been implemented to ensure full compliance with the GLBA requirements for the 2023-2024 fiscal year. Corrective Action Plan: We have undertaken a thorough review of our current information security practices and policies. This document outlines the specific actions and strategic initiatives that have been implemented or are planned for implementation to ensure full compliance with the GLBA requirements for the 23/24 fiscal audit. Summary: 1. Element-Specific Actions: Responses to Elements 1 through 9 demonstrate active and ongoing improvements in our information security infrastructure, highlighting key areas such as risk assessment, staff training, vendor management, and incident response protocols. 2. Policy Implementation: A suite of critical security policies, including areas like Access Control, Incident Response, and Encryption, will be rolled out by the 23/24 audit cycle, significantly strengthening our security posture. 3. Security Operations Center (SOC): The establishment of a SOC by the upcoming June 24 board meeting marks a pivotal step in enhancing our real-time security monitoring and response capabilities. 4. Third-Party Compliance Review: The involvement of Deep Seas in a thorough review of our documentation and policies before the next audit cycle ensures an additional layer of scrutiny and compliance assurance. This plan reflects our commitment to not only address the current audit findings but also to continuously evolve our security practices to protect customer information and maintain compliance with GLBA standards.
View Audit 295826 Questioned Costs: $1
Federal Agency Name: Department of Health and Human Services Program Name: COVID-19 Provider Relief Fund and American Rescue Plan Federal Financial Assistance Listing #93.498 Compliance Requirement: Reporting Finding Summary: The Medical Center’s lost revenue calculation did not take into considera...
Federal Agency Name: Department of Health and Human Services Program Name: COVID-19 Provider Relief Fund and American Rescue Plan Federal Financial Assistance Listing #93.498 Compliance Requirement: Reporting Finding Summary: The Medical Center’s lost revenue calculation did not take into consideration budgeted 340B revenue, but included actual 340B revenue, and did not take into consideration Period 1 questioned costs that were replaced with excess lost revenue. In addition, the calculation was not reviewed and approved by a separate individual outside of the preparer. The Medical Center’s special report submitted to the Department of Health and Human Services for Period 4 TIN #420680487 was not reviewed and approved by a separate individual outside of the preparer. Responsible Individuals: Ben Stevens, CFO Corrective Action Plan: Management agrees with the finding. The Medical Center created a “Federal Reporting Review Policy” dated March 9, 2023 as a result of working with HRSA and the 2021FY audit. This policy was approved and is now in process. Anticipated Completion Date: No future reports are anticipated to be filed under this program.
Federal Agency Name: Department of Health and Human Services Program Name: COVID-19 Provider Relief Fund and American Rescue Plan Federal Financial Assistance Listing #93.498 Compliance Requirement: Activities Allowed or Unallowed and Allowable Costs/Costs Principles and Reporting Finding Summary: ...
Federal Agency Name: Department of Health and Human Services Program Name: COVID-19 Provider Relief Fund and American Rescue Plan Federal Financial Assistance Listing #93.498 Compliance Requirement: Activities Allowed or Unallowed and Allowable Costs/Costs Principles and Reporting Finding Summary: Winneshiek Medical Center claimed expenses that had been reimbursed by another source. The Medical Center is a critical access hospital which means that a portion of their expenditures are covered by Medicare. The Medical Center did not decrease their expenses for the portion that was reimbursed by Medicare. The Medical Center’s special report submitted to the Department of Health and Human Services for Period 4 TIN #420680487 reported these expenses that were reimbursed by other sources which made the report inaccurate as well. Responsible Individuals: Ben Stevens, CFO Corrective Action Plan: Management agrees with the finding. The Medical Center created a “Federal Reporting Review Policy” dated March 9, 2023 as a result of working with HRSA and the 2021FY audit. This policy was approved and is now in process. Anticipated Completion Date: No future reports are anticipated to be filed under this program.
View Audit 295813 Questioned Costs: $1
The Assistant Superintendent has created a spreadsheet for Early Head Start payroll that shows rate of pay, number of hours, longevity and benefits available with corresponding account numbers. This spreadsheet will be used during the program grant year to verify that payroll charges by employee to...
The Assistant Superintendent has created a spreadsheet for Early Head Start payroll that shows rate of pay, number of hours, longevity and benefits available with corresponding account numbers. This spreadsheet will be used during the program grant year to verify that payroll charges by employee to the Early Head Start program are consistent with approved contracts .
View Audit 295810 Questioned Costs: $1
CORRECTIVE ACTION PLAN (CAP): 1. Explanation of Disagreement with Audit Finding There is no disagreement with the finding. 2. Actions Planned in Response to Finding The District's internal controls related to payroll will continue to improve. 3. Official Responsible for Ensuring CAP Linh Phan, Mana...
CORRECTIVE ACTION PLAN (CAP): 1. Explanation of Disagreement with Audit Finding There is no disagreement with the finding. 2. Actions Planned in Response to Finding The District's internal controls related to payroll will continue to improve. 3. Official Responsible for Ensuring CAP Linh Phan, Manager, Accounting and Finance, Grants Accounting 4. Planned Completion Date for CAP The planned completion date for the CAP is June 30, 2024. 5. Plan to Monitor Completion of CAP The Finance Department management will be monitoring the corrective action plan.
CORRECTIVE ACTION PLAN (CAP): 1. Explanation of Disagreement with Audit Finding There is no disagreement with the finding. 2. Actions Planned in Response to Finding The District's internal controls related to payroll will continue to improve. 3. Official Responsible for Ensuring CAP Linh Phan, Mana...
CORRECTIVE ACTION PLAN (CAP): 1. Explanation of Disagreement with Audit Finding There is no disagreement with the finding. 2. Actions Planned in Response to Finding The District's internal controls related to payroll will continue to improve. 3. Official Responsible for Ensuring CAP Linh Phan, Manager, Accounting and Finance, Grants Accounting 4. Planned Completion Date for CAP The planned completion date for the CAP is June 30, 2024. 5. Plan to Monitor Completion of CAP The Finance Department management will be monitoring the corrective action plan.
View Audit 295796 Questioned Costs: $1
Finding 2023-008: Annual Report Card, High School Graduation Rate We agree with the auditor's comments, and the following actions will be taken to ensure that when a student is removed from the graduation cohort proper documentation is obtained and maintained to support the student’s removal from th...
Finding 2023-008: Annual Report Card, High School Graduation Rate We agree with the auditor's comments, and the following actions will be taken to ensure that when a student is removed from the graduation cohort proper documentation is obtained and maintained to support the student’s removal from the graduation cohort. Office Managers and Data Clerks need comprehensive training sessions on the importance of the removal of students from a graduation cohort as a federal requirement. These sessions will specifically focus on imparting knowledge about acceptable documentation for the removal of students from a graduation cohort. Staff members will receive guidance on the proper documentation required for various cohort codes, aiming to enhance accuracy in cohort reporting. Secondly, the district will actively support school sites in establishing a record retention process. This involves ensuring that when a student is removed from the graduation cohort, there is consistent and substantiated documentation in place in a centralized drive that can be accessed by all stakeholders. The emphasis lies on maintaining accurate and accessible records to support cohort reporting.
Checklists used during file review will be maintained in each client file. Checklists are available on Lane County's website under provider tools. When program ends, staff will store files in bankers boxes labeled by program, fiscal year and destruction date based on program requirements.
Checklists used during file review will be maintained in each client file. Checklists are available on Lane County's website under provider tools. When program ends, staff will store files in bankers boxes labeled by program, fiscal year and destruction date based on program requirements.
Contact Person: Donald Hollings, Controller Corrective Action: The Finance Office provided Financial Aid with the incorrect amount to report on the annual FISAP for 2022-2023. The amount reported was $22,069,69,744 rather than $19,859,744. The $22,069,744 was inverted and incorrect. The College w...
Contact Person: Donald Hollings, Controller Corrective Action: The Finance Office provided Financial Aid with the incorrect amount to report on the annual FISAP for 2022-2023. The amount reported was $22,069,69,744 rather than $19,859,744. The $22,069,744 was inverted and incorrect. The College will add another level of review before submitting the FISAP to mitigate this type of error. Anticipated Completion Date: May 31, 2024
Contact Person: Lane Estes, VP for Administration and Interim VP for Finance Corrective Action: The College acknowledges the Uniform Guidance Audit for the year ended May 31, 2022 was not submitted timely to the Federal Audit Clearinghouse. The College’s Uniform Guidance Audit for the year ended Ma...
Contact Person: Lane Estes, VP for Administration and Interim VP for Finance Corrective Action: The College acknowledges the Uniform Guidance Audit for the year ended May 31, 2022 was not submitted timely to the Federal Audit Clearinghouse. The College’s Uniform Guidance Audit for the year ended May 31, 2022, was delayed as the College was negotiating with the State of Alabama a funding arrangement that did not materialize as the legislative approval outlined. The Uniform Guidance Audit for the year ended May 31, 2022 has now been completed and submitted. The Uniform Guidance for the year ended May 31, 2023 was due on February 29, 2024 and the College requested an extension. The Uniform Guidance Audit for the year ended May 31, 2023, is scheduled to be completed by March 31, 2024 and will be submitted promptly to the Federal Audit Clearinghouse. Anticipated Completion Date: March 31, 2024
Corrective Action Plan: Due to unexpected turnover, a secondary review was not performed to verify the preparation of the ESSER reporting. To strengthen the oversight of financial management of the School, Academica Nevada, the School’s management company, filled all open positions and realigned sta...
Corrective Action Plan: Due to unexpected turnover, a secondary review was not performed to verify the preparation of the ESSER reporting. To strengthen the oversight of financial management of the School, Academica Nevada, the School’s management company, filled all open positions and realigned staff responsibilities to reduce individual workloads and provide additional oversight and review. In addition, a financial controller has been added to ensure that secondary reviews occur on all required filings and reconciliations. Personnel Responsible for Corrective Action: Nachum Golodner, Academica Director of Accounting Anticipated Completion Date: June 30, 2024
Corrective Action Plan: A process was put in place in May 2023 to ensure all principal approvals are documented in writing or electronic approval in the system, which can be date stamped by the system. Payroll will not be run, nor grants submitted, until proper approval is received. Personnel Respon...
Corrective Action Plan: A process was put in place in May 2023 to ensure all principal approvals are documented in writing or electronic approval in the system, which can be date stamped by the system. Payroll will not be run, nor grants submitted, until proper approval is received. Personnel Responsible for Corrective Action: Nachum Golodner, Academica Director of Accounting Anticipated Completion Date: June 30, 2024
Corrective Action Plan: A process was put in place in May 2023 to ensure all principal approvals are documented in writing or electronic approval in the system, which can be date stamped by the system. Payroll will not be run, nor grants submitted, until proper approval is received. Personnel Respon...
Corrective Action Plan: A process was put in place in May 2023 to ensure all principal approvals are documented in writing or electronic approval in the system, which can be date stamped by the system. Payroll will not be run, nor grants submitted, until proper approval is received. Personnel Responsible for Corrective Action: Nachum Golodner, Academica Director of Accounting Anticipated Completion Date: June 30, 2024