  • Core Issue: The Authority failed to ensure timely repairs for units with failed inspections, violating HUD regulations.
  • Impacted Requirements: Compliance with 24 CFR sections 982.158(d) and 982.404 regarding timely correction of Housing Quality Standards (HQS) deficiencies.
  • Recommended Follow-Up: Review and improve HQS inspection policies to enforce timely repairs and necessary actions for non-compliance.

Finding Text

Finding 2022-004 ? Failed Inspections Federal Agency: U.S. Department of Housing and Urban Development Federal Program Title: Housing Choice Voucher Program Assistance Listing Number: 14.871 Award Period: 7/1/21-6/30/22 Type of Finding: Significant Deficiency in Internal Control Over Compliance Criteria: 24 CFR sections 982.158(d) and 982.404 state that for units under HAP contract that fail to meet HQS, the PHA must require the owner to correct any life threatening HQS Deficiencies within 24 hours after the inspections and all other HQS deficiencies within 30 calendar days or within a specified PHA-approved extension. If the owner does not correct the cited HAQ deficiencies within the specified correction period, the PHA must stop (abate) HAPs beginning no later than the first of the month following the specified correction period or must terminate the HAP contract. The owner is not responsible for a breach of HQS as a result of the family's failure to pay for utilities for which the family is responsible under the lease or for tenant damage. For family-caused defects, if the family does not correct the cited HQS deficiencies within the specified correction period, the PHA must take prompt and vigorous action to enforce the family obligations. Context: During our testing of 60 files for failed inspection criteria, we noted the following: - 4 files tested had repairs that were not completed timely. Questioned Costs: Unable to determine. Cause: The Authority conducted 995 annual/biennial inspections during the audit period in an effort to correct timeliness of annual inspections. Though inspection results monitoring was in place, in some instances, the Authority did not follow up timely on failed inspection results. Effect: The Authority is not in compliance with HUD regulations. Repeat Finding: No Recommendation: The Authority should review their HQS inspection policies to ensure that all repairs are made timely and if not, that the necessary actions are taken by the Authority. View of Responsible Officials: There is no disagreement with this audit finding.

Categories

HUD Housing Programs Subrecipient Monitoring Significant Deficiency Internal Control / Segregation of Duties

Other Findings in this Audit

  • 23868 2022-001
    Significant Deficiency Repeat
  • 23869 2022-002
    Significant Deficiency Repeat
  • 23870 2022-003
    Material Weakness Repeat
  • 23871 2022-004
    Significant Deficiency Repeat
  • 23872 2022-001
    Significant Deficiency Repeat
  • 23873 2022-002
    Significant Deficiency Repeat
  • 23874 2022-003
    Material Weakness Repeat
  • 23875 2022-004
    Significant Deficiency Repeat
  • 600310 2022-001
    Significant Deficiency Repeat
  • 600311 2022-002
    Significant Deficiency Repeat
  • 600312 2022-003
    Material Weakness Repeat
  • 600314 2022-001
    Significant Deficiency Repeat
  • 600315 2022-002
    Significant Deficiency Repeat
  • 600316 2022-003
    Material Weakness Repeat
  • 600317 2022-004
    Significant Deficiency Repeat

Programs in Audit

ALN Program Name Expenditures
14.871 Section 8 Housing Choice Vouchers $9.04M
14.856 Lower Income Housing Assistance Program_section 8 Moderate Rehabilitation $330,481
14.182 Section 8 New Construction and Substantial Rehabilitation $275,551
14.871 Emergency Housing Voucher $187,157
10.415 Rural Rental Housing Debt $99,369
10.427 Rural Rental Assistance Payments $70,850
10.415 Rural Rental Housing Subsidy $11,532
14.239 Home/tenant Based Assistance $0