Finding 1145832 (2024-002)

Significant Deficiency
Requirement
E
Questioned Costs
$1
Year
2024
Accepted
2025-06-30

AI Summary

  • Core Issue: Inadequate controls over tenant selection and waiting list management led to noncompliance with HUD regulations.
  • Impacted Requirements: Failure to maintain accurate documentation and chronological order for tenant selection as mandated by HUD and OHFA guidelines.
  • Recommended Follow-Up: Implement data verification processes during system migrations, reconstruct missing data, and establish a written policy for waitlist management.

Finding Text

Inadequate Controls over Tenant Selection and Waiting List Management: Internal Control Weakness Impacting HUD Compliance Findings Resolution Status: In Process Information on Universe Population Size: 32 Tenants Sample Size Information: 3 Samples Auditor Non-Compliance Code Drop-Down: Eligibility Criteria: - HUD Occupancy Handbook 4350.3 REV-1 (Chapter 4: Waiting List and Tenant Selection) Owners must develop a method to maintain documentation of the waiting list composition, application status, and actions taken. Once unit size and preference order are determined, owners must select applicants from the waiting list in chronological order to fill vacancies. - Ohio Housing Finance Agency (OHFA) Program Compliance Handbook – The marketing requirement for low-income units can be met through various strategies, one of which is maintaining a waiting list and selecting residents from the list in accordance with established procedures. Condition: During eligibility testing, we were unable to verify compliance with HUD regulations requiring selection from the waiting list in accordance with the administrative plan (24 CFR section 891.410 and 24 CFR 982.204). The waitlist application dates generated from the Project’s software reflect the initial data load from RealPage to Fortress and did not include essential waitlist notes. This lack of documentation prevented us from verifying that tenant selection adhered to HUD requirements and selected from waiting list in correct order. Cause of Condition: The issue occurred due to an incomplete data transfer during the migration from RealPage to Fortress. Internal controls over the data migration process were insufficient to ensure that all required information, such as waitlist notes, was successfully transferred. Potential Effect of Condition: - Noncompliance with HUD regulations for maintaining an accurate and chronological waitlist. - Inability to demonstrate compliance with tenant selection requirements, which may result in findings of noncompliance, questioned costs, or penalties. - Increased risk of unfair or improper tenant selection due to incomplete records. Questioned costs: The auditors have identified questioned costs of $8,510 for annual rental subsidies. These questioned costs pertain only to the sample tested. Reporting Views of Responsible Officials: The Organization agrees with the findings and recommendations and will adhere to the corrective action plan. Context: In all 3 cases reviewed (100% of the sample), auditors were unable to verify compliance with HUD's requirements regarding tenant selection from the waiting list due to incomplete data. The underlying issue stemmed from a system migration from RealPage to Fortress, during which key documentation—specifically waitlist notes and chronological application data—was not properly transferred. As a result, the project lacked adequate evidence to demonstrate that tenant selection was made in accordance with HUD regulations and the organization’s administrative plan. This indicates a potentially systemic issue with data integrity and control procedures during software transitions, rather than isolated instances of noncompliance. Recommendation: 1. Implement a process to review and verify the accuracy and completeness of data during system migrations, including waitlist information and notes. 2. Reconstruct missing waitlist data by reviewing available source records, if feasible. 3. Develop and document a written policy for waitlist maintenance and data integrity to ensure ongoing compliance with HUD regulations. Management Response: Management is currently conducting a comprehensive review of the process to ensure alignment with compliance requirements and identify areas for improvement.

Categories

Questioned Costs HUD Housing Programs Allowable Costs / Cost Principles Eligibility Reporting Internal Control / Segregation of Duties Matching / Level of Effort / Earmarking

Other Findings in this Audit

  • 569389 2024-001
    Significant Deficiency
  • 569390 2024-002
    Significant Deficiency
  • 569391 2024-003
    Significant Deficiency
  • 1145831 2024-001
    Significant Deficiency
  • 1145833 2024-003
    Significant Deficiency

Programs in Audit

ALN Program Name Expenditures
14.155 Mortgage Insurance for the Purchase Or Refinancing of Existing Multifamily Housing Projects $1.06M
14.195 Project-Based Rental Assistance (pbra) $294,479