Section 200.305 outlines the rules for federal payments to states and other recipients. It requires that payments minimize delays between fund transfers and disbursements, mandates advance payments for recipients who demonstrate proper financial management, and emphasizes timely payments to contractors.
View full section details →
FY End: 2023-06-30
University of Cincinnati
Compliance Requirement: C
Assistance Listing Number, Federal Agency, and Program Name - Research and Development Cluster: - 20.232, U.S. Department of Transportation, Commercial Driver's License Program Implementation Grant - 93.350, U.S. Department of Health and Human Services, National Center for Advancing Translational Sciences - 93.279, U.S. Department of Health and Human Services, Drug Abuse and Addiction Research Programs - 93.853, U.S. Department of Health and Human Services, Extramural Research Programs in the Ne...

Assistance Listing Number, Federal Agency, and Program Name - Research and Development Cluster: - 20.232, U.S. Department of Transportation, Commercial Driver's License Program Implementation Grant - 93.350, U.S. Department of Health and Human Services, National Center for Advancing Translational Sciences - 93.279, U.S. Department of Health and Human Services, Drug Abuse and Addiction Research Programs - 93.853, U.S. Department of Health and Human Services, Extramural Research Programs in the Neurosciences and Neurological Disorders - 93.866, U.S. Department of Health and Human Services, Aging Research Non-Research and Development Cluster: - 17.268, Department of Labor, H-1B Job Training Federal Award Identification Number and Year - Research and Development Cluster: - 20.323 - FM-CDL-0435-20-01-00 - 93.350 - UTR001425B - 93.279 - OSU SPC-1000006389 UM1DA; UDA013732E - 93.853 - SUBK00007313 SLEEP SMART; UNS110772A - 93.866 - RAG072592A 17.268: HG-33044-19-60-A-39, 2019 Pass-through Entity - 93.279 - The Ohio State University; 93.853 - University of Michigan Finding Type - Significant deficiency Repeat Finding - No Criteria - As outlined in 2 CFR 200.305(b)(3), when the reimbursement method is used for payment, organizations must make a payment within 30 calendar days after receipt of the billing unless the federal awarding agency or pass-through entity reasonably believes the request to be improper. Condition - Out of 28 payments to subrecipients that were tested, 12 were made after the 30-calendar-day requirement, 10 and 2 from the R&D Cluster and ALN 17.268, respectively. Questioned Costs - N/A Identification of How Questioned Costs Were Computed - The issue identified was related solely to timeliness of payments. Context - In all samples tested, payment was made to the subrecipient; however, the delayed payments ranged from 39 - 242 days between the invoice being received by the University and payment being made to the subrecipient. Cause and Effect - The University does have formal general accounts payable and cash disbursement processes in place; however, there are no specific controls in place to ensure that subrecipients are paid within the 30-day requirement. Although all of the payments were ultimately made, the lack of controls resulted in several late payments. Recommendation - The University should implement a control to ensure that payments are made within the required time frame. Views of Responsible Officials and Corrective Action Plan - Accounts payable personnel will review all vendor invoices to determine whether an invoice is related to a federal award expenditure. For federal award expenditures, accounts payable will manually change the payment terms to 30 calendar days or less to ensure compliance. Periodically, accounts payable will review open federal award payables to verify payment terms have been properly set for the 30-day compliance requirement. The Controller’s and Accounts Payable offices will also explore creating a more efficient long-term solution, whereby the 30-day terms could be automatically set during the purchase order creation process. This would eliminate any manual updates to the payment terms by accounts payable personnel. The Sponsored Research Services Accounting Office will send reminders to all college business officers and principal investigators (PIs) to highlight the need for prompt review and approval of federal award invoices. This language will be incorporated into the SRS Best Grant Practices training classes, as well as the University’s fundamentals of sponsored administration training courses.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.

FY End: 2023-06-30
Boise State University
Compliance Requirement: C
Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal co...

Criteria or specific requirement: The Federal Government requires that when the reimbursement method is used, the Federal awarding agency or pass-through entity must make payment within 30 calendar days after receipt of the billing, unless the Federal awarding agency or pass-through entity reasonably believes the request to be improper (2 CFR section 200.305(b)(3)). Per Uniform Guidance 2 CFR 200.303, nonfederal entities receiving federal awards are required to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Condition: The University did not make payment to Subrecipients within the required 30 calendar days after receipt of the billing. Context: Nine exceptions were identified in a sample of forty subrecipient draw requests. Of the nine exceptions noted, exceptions ranged from 31 days to 90 days. Questioned costs: None. Cause: There was a misunderstanding of processes from backup staff. Additionally, there were delays in the department resulting in invoices not being processed timely. Lastly, approvals from the respective Principal Investigators were not being routed correctly. Effect: Subrecipients did not receive their reimbursement timely and in accordance with federal regulations. Repeat finding: No Recommendation: We recommend the University evaluate its procedures and implement an additional control to review and approve the subrecipient reimbursements timely. Views of responsible officials: Management agrees with the finding and has developed a plan to correct the finding.