Finding 397045 (2023-001)
Significant Deficiency 2023
Management Views and Corrective Action Plan Year Ending December 31, 2023 Finding 2023-001 - Inappropriate Amounts Included in Loan Notification Letters (Significant Deficiency) Grantor: U.S. Department of Education Program: Student Financial Assistance Cluster Assistance Listing #: 84.268 Award T...
Management Views and Corrective Action Plan Year Ending December 31, 2023 Finding 2023-001 - Inappropriate Amounts Included in Loan Notification Letters (Significant Deficiency) Grantor: U.S. Department of Education Program: Student Financial Assistance Cluster Assistance Listing #: 84.268 Award Title: Federal Direct Loan Program Award Years: 7/2022 – 6/2024 Management agrees with the finding and proposes the following corrective action plan: Corrective Action Plan The first instance where disbursement dates and amounts were not included in the communication because the system incorrectly captured the student’s name rather than the date and amount of disbursements was caused by a system update. When PeopleSoft system updates are installed, they sometimes affect the data tables where our notification letters pull from. In this instance an update changed a table referenced in the query used to compile loan notification letters. The letter for this student was sent out before the query could be updated to correct for this change. Because of this issue, management has decided to have all loan notification letters compiled manually, effective January 2024, until a consultant can be brought in to help address the issue. Once the system configuration is corrected, we will return to using automated letters, but will continue to review a sample of loan notification letters each semester as an additional control. The second instance where loan disbursement letters were not sent due to the system not being updated to reflect the new academic was the result of a training issue. During 2023, the College made system changes to address prior year audit findings. These changes were made during the 2022-23 academic year and when the 2023-24 academic year started the system settings were not updated. The financial aid staff responsible for setting up the new academic year in the system will receive additional system setup training to ensure this type of issue does not happen in future academic years. Timing Starting in May 2024, Riley Niemand, Financial Aid Manager will work with a consultant to correct the automated loan notification letter process and to implement a process to review loan notification letters after a system update. This process will be completed by August 31, 2024. In May 2024, Chris Reitz, Controller, will also implement a financial aid review process to ensure loan notifications are completely, accurately, and timely sent to the student and/or parent each semester. System setup training to individuals involved in the process of setting up the new academic year in the system will be completed by Chris Reitz and Riley Niemand in May 2024. Sincerely, S. Christopher Reitz Director of Financial Services and Controller creitz@ensign.edu 801-524-8109
Finding 397024 (2023-002)
Significant Deficiency 2023
Moving forward, internal controls have been updated to require all projects that necessitate prevailing wage rates have the proper backup and documentation.
Moving forward, internal controls have been updated to require all projects that necessitate prevailing wage rates have the proper backup and documentation.
Federal Agency Name: U.S. Department of Transportation; Pass-through Number: Federal Aviation Administration; Assistance Listing Number: 20.106; Program Name: Airport Improvement Grant; Significant Deficiency in Internal Control Over Compliance – Compliance Requirement – Reporting Finding Summa...
Federal Agency Name: U.S. Department of Transportation; Pass-through Number: Federal Aviation Administration; Assistance Listing Number: 20.106; Program Name: Airport Improvement Grant; Significant Deficiency in Internal Control Over Compliance – Compliance Requirement – Reporting Finding Summary: The required SF-425 annual reports due December 31, 2022, were submitted late. Corrective Action Planned: The City concurs with the auditors’ findings. The City has corrected this reporting issue. The annual reports due December 31, 2023, were submitted on time. Responsible Individual(s): Mark Hagedorn, Finance Manager/Treasurer; Brooks Slyter, Assistant Finance Manager; Ian Turner, Airport Director; Bruce Young, Assistant Airport Director – Finance & Administration Anticipated Completion Date: December 2023
Finding 396743 (2023-001)
Significant Deficiency 2023
The Town will work to formalize written policies and procedures related to federal awards as required under Uniform Guidance. This action will be performed by the Finance Team, with approval of the Finance Committee and Select Board. We anticipate that the policies and procedures will be completed b...
The Town will work to formalize written policies and procedures related to federal awards as required under Uniform Guidance. This action will be performed by the Finance Team, with approval of the Finance Committee and Select Board. We anticipate that the policies and procedures will be completed by June 30, 2024.
Identification: 93.301 United States Department of Health and Human Services, COVID‐19 Small Hospital Improvement Program; Noncompliance Finding/Significant Deficiency, Cash Management Corrective Action Plan: The Foundation will work with the Kansas Department of Health and Environment (KDHE) to ret...
Identification: 93.301 United States Department of Health and Human Services, COVID‐19 Small Hospital Improvement Program; Noncompliance Finding/Significant Deficiency, Cash Management Corrective Action Plan: The Foundation will work with the Kansas Department of Health and Environment (KDHE) to return the interest earned on advances of federal grant awards and establish procedures to track interest earned on advances of federal grant awards in future periods. Anticipated completion date: The Foundation is currently working with KDHE to return the interest earned on federal grant awards and anticipates completion during 2024.
Housing Opportunities for Persons with AIDS – Assistance Listing No. 14.241 Recommendation: We recommend the Organization designs controls to ensure the general ledger detail for each grant is reconciled to the monthly draw requests before they are submitted to the grantor for reimbursement. Explana...
Housing Opportunities for Persons with AIDS – Assistance Listing No. 14.241 Recommendation: We recommend the Organization designs controls to ensure the general ledger detail for each grant is reconciled to the monthly draw requests before they are submitted to the grantor for reimbursement. Explanation of disagreement with audit finding: There is no disagreement with the audit finding. Action taken in response to finding: ATGC will delay the billing of any expense reimbursements until the general ledger activity has been reconciled ensuring all related expenses properly allocated within the ATGC General Ledger. Name(s) of the contact person(s) responsible for corrective action: Simpson Huggins Planned completion date for corrective action plan: June 30, 2024
View Audit 306347 Questioned Costs: $1
Identifying Number: 2023-001 Finding: Swope Health Services and Subsidiaries expended federal funding on an invoice with a service period outside of the Period of Availability for Period 5 of the Provider Relief Fund. Corrective Actions Taken or Planned: Management will evaluate and alter the ac...
Identifying Number: 2023-001 Finding: Swope Health Services and Subsidiaries expended federal funding on an invoice with a service period outside of the Period of Availability for Period 5 of the Provider Relief Fund. Corrective Actions Taken or Planned: Management will evaluate and alter the accounts payable invoice review process as necessary to mitigate the risk of inaccurate recording of prepaid expenditures, as was the case in this finding. Management will consider the need to reorganize the assignment of duties as they pertain to the processing and review of invoices and vendor payments to ensure a sufficient level of review of material transactions to ensure accurate accounting of vendor payments. Person Responsible: Naimish Patel, CFO Anticipated Completion Date: Plan to be completed by December 31, 2024
View Audit 306320 Questioned Costs: $1
Finding 396652 (2023-002)
Significant Deficiency 2023
Management's Response: The City agrees with the audit recommendations Responsible Party: Jody Picarells, Chief Financial Officer Corrective Action Plan: The corrective action plan will consist of the following measures: 1. Ensure staff are trained on proper submission of the PR29-CDBG Cash on Ha...
Management's Response: The City agrees with the audit recommendations Responsible Party: Jody Picarells, Chief Financial Officer Corrective Action Plan: The corrective action plan will consist of the following measures: 1. Ensure staff are trained on proper submission of the PR29-CDBG Cash on Hand Quarterly Report to include due dates for review and timely submission. 2. Ensure adequate staff are available, any combination of permanent, temporary or contracted positions, and assigned the task of timely submission of the PR29-CDBG Cash on Hand Quarterly Report. Proposed Implementation Date: May 31, 2024
Finding Number: 2023-002 Condition: Not all patients received updated adjustments based on the new schedule. Planned Corrective Action: Previously the sliding fee scale/medical care discount applications and adjustments were performed by billing department staff. Unfortunately, billing department d...
Finding Number: 2023-002 Condition: Not all patients received updated adjustments based on the new schedule. Planned Corrective Action: Previously the sliding fee scale/medical care discount applications and adjustments were performed by billing department staff. Unfortunately, billing department did not follow the policies implemented by Management that were in place to manage the sliding fee scale/medical care discount program. Moving forward the sliding fee scale/medical care discount program will be managed and processed by the finance department. The finance department will ensure that the original policies to manage this program will be followed going forward. Contact person responsible for corrective action: Financial Analyst, Courtney Miller Anticipated Completion Date: 6/1/2024
View Audit 306236 Questioned Costs: $1
Finding Number: 2023-001 Condition: The Company received funds for costs that were reasonable, allowable and allocable to the award, but did not disburse the funds for all costs within three business days and did not immediately return the funds. Planned Corrective Action: The Finance Department man...
Finding Number: 2023-001 Condition: The Company received funds for costs that were reasonable, allowable and allocable to the award, but did not disburse the funds for all costs within three business days and did not immediately return the funds. Planned Corrective Action: The Finance Department manager will ensure that any funds drawn are distribute and paid out within three business days. The Company distributes payments to vendors on Friday and all draws will be performed on the Tuesday, Wednesday, or Thursday of the week when a payment is scheduled for that Friday. Contact person responsible for corrective action: Finance Manager, Celeste Kubiak Anticipated Completion Date: 06/01/2024
Federal Agency Name: Department of Health and Human Services Program Name: Block Grants for Community Mental Health Services CFDA # 93.958 Finding Summary: There was no formal documentation of review and approval of wage rates prior to the submission of the reimbursement request to SAMHSA for three ...
Federal Agency Name: Department of Health and Human Services Program Name: Block Grants for Community Mental Health Services CFDA # 93.958 Finding Summary: There was no formal documentation of review and approval of wage rates prior to the submission of the reimbursement request to SAMHSA for three months selected for testing. Responsible Individuals: Mohamed Omar, MBA, MS, Chief Administrative Officer and Mark Copps, Finance Director / Controller Corrective Action Plan: During 2023, management implemented a formal documentation of the review including the appropriate level of management sign off and date of review on the supporting documentation. Anticipated Completion Date: October 2023
Finding 396481 (2023-001)
Significant Deficiency 2023
Internal Control Over Federal Awards – Allowability of Costs and Allowable Activities Auditor Description of Condition and Effect: Costs must meet certain general criteria to be allowable under federal awards. One criterion is that the costs be adequately documented. Several of the payroll expenses ...
Internal Control Over Federal Awards – Allowability of Costs and Allowable Activities Auditor Description of Condition and Effect: Costs must meet certain general criteria to be allowable under federal awards. One criterion is that the costs be adequately documented. Several of the payroll expenses that were selected for testing did not have employee timecards with evidence that they were reviewed and authorized for payment by their immediate supervisor. As a result of this condition, the Transit does not have adequate documentation demonstrating that an individual with appropriate knowledge of the transaction has reviewed that the transaction is allowable, free of error, and necessary and reasonable for the performance of the federal award. Auditor Recommendation: We recommend that the Transit ensures policies and procedures are followed to provide documented proof of review by management over key transactions such as payroll. Corrective Action: We concur with the finding and management will work to show documented review over payroll transactions.
Timesheet processes with an emphasis on the approval process will be highlighted through employee newsletter and reinforced with and by managers.
Timesheet processes with an emphasis on the approval process will be highlighted through employee newsletter and reinforced with and by managers.
The process for Executive Director review and approval of report data will be reinstated effective immediately.
The process for Executive Director review and approval of report data will be reinstated effective immediately.
Finding 2023-003 Federal Agency Name: Legal Services Corporation Program Name: Legal Services Corporation – Basic Field Grant FFAL#: 09-542026 Finding Summary: Testing identified one instance where a case was improperly entered into Legal Server as no application was completed. Responsible Individ...
Finding 2023-003 Federal Agency Name: Legal Services Corporation Program Name: Legal Services Corporation – Basic Field Grant FFAL#: 09-542026 Finding Summary: Testing identified one instance where a case was improperly entered into Legal Server as no application was completed. Responsible Individuals: Lea Wroblewski, Executive Director. Corrective Action Plan: ERLS will train staff on application procedures, modify outreach procedures, and will not enter interested clients in Legal Server until an application is completed. Completion Date: May 2024
Finding 2023-002 Federal Agency Name: Legal Services Corporation Program Name: Legal Services Corporation – Basic Field Grant FFAL#: 09-542026 Finding Summary: The Organization did not perform an annual IT risk assessment during 2023 and did not test an emergency disaster prevention and recovery pl...
Finding 2023-002 Federal Agency Name: Legal Services Corporation Program Name: Legal Services Corporation – Basic Field Grant FFAL#: 09-542026 Finding Summary: The Organization did not perform an annual IT risk assessment during 2023 and did not test an emergency disaster prevention and recovery plan as required in Section 2.5.3 of the LSC Financial Guide. Responsible Individuals: Lea Wroblewski, Executive Director. Corrective Action Plan: The Executive Director shared the risk assessment guidelines with the 3rd party IT consultants, CMIT Solutions of Sioux Falls, who is familiar with technology utilized by ERLS. CMIT Solutions will conduct an annual risk assessment, help create an emergency disaster prevention and recovery plan, and help ensure that risk assessment guidelines are followed. ERLS will continue to follow the implementation of the recommendations from the 2022 Technology Assessment. Completion Date: December 2024
Finding 396413 (2023-002)
Significant Deficiency 2023
Finding 2023-002 Reporting – Internal Control and Compliance over Reporting (Significant Deficiency) Criteria: CODE OF FEDERAL REGULATIONS, Title 49 – TRANSPORTATION, Part 18 – UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND COOPERATIVE AGREEMENTS TO STATE AND LOCAL GOVERNMENTS, Subpart C – P...
Finding 2023-002 Reporting – Internal Control and Compliance over Reporting (Significant Deficiency) Criteria: CODE OF FEDERAL REGULATIONS, Title 49 – TRANSPORTATION, Part 18 – UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND COOPERATIVE AGREEMENTS TO STATE AND LOCAL GOVERNMENTS, Subpart C – Post-Award Requirements: 18.41 Financial Report (a) General (4), Due date. When reports are required on a quarterly or semiannual basis, they will be due 30 days after the reporting period. When required on an annual basis, they will be due 90 days after the grant year. Final reports will be due 90 days after the expiration or termination of grant support. 18.58 (a) General. The Federal agency will close out the award when it determines that all applicable administrative actions and all required work of the grant has been completed. 18.50 (b) Reports. Within 90 days after the expiration or termination of the grant, the grantee must submit all financial, performance, and other reports required as a condition of the grant. Upon request by the grantee, Federal agencies may extend this time frame. These may include but are not limited to: (1) Final performance or progress report, (2) Financial Status Report (SF 269) or Outlay Report and Request for Reimbursement for Construction Programs (SF-271) (as applicable), (3) Final request for payment (SF-270) (if applicable), and (4) Invention disclosure (if applicable). U.S. OFFICE OF MANAGEMENT AND BUDGET CIRCULAR A-133—AUDITS OF STATES, LOCAL GOVERNMENTS, AND NON-PROFIT ORGANIZATIONS (OMB Circular A-133), Subpart C— Auditees, Section .300—Auditee Responsibilities (b) Maintain internal control over federal programs that provides reasonable assurance that the auditee is managing federal awards in compliance with laws, regulations, and the provisions of contracts or grant agreements that could have a material effect on each of its federal programs. Condition: For the Airport Improvement Program (AIP), the City did not submit the reports within the required deadline: Report Type Award Number Period Ending Date Due Date Submitted SF-425 Financial 3-06-0034-018-2020 5/2/2022 8/2/2022 11/8/2022 SF-425 Financial 3-06-0034-021-2020 5/2/2022 8/2/2022 11/8/2022 Two (2) financial reports were tested and all reports were not submitted by the required deadline. City’s Corrective Action Plan: The City will take steps to improve identification and monitoring of required grantor reporting deadlines. Corrective Action Plan (Continued) Contact person responsible for corrective action: Sandra Fonseca, Interim Finance Director Anticipated completion date: June 30, 2024
Finding 396357 (2023-047)
Significant Deficiency 2023
Finding: 2023-047 - DPA obligated more than 10 percent of the FFY 22 grant award during the second fiscal year of the award. Questioned Costs: None Assistance Listing Number: 93.568 Assistance Listing Title: LIHEAP Views of Responsible Officials (state whether your agency agrees or disagrees wit...
Finding: 2023-047 - DPA obligated more than 10 percent of the FFY 22 grant award during the second fiscal year of the award. Questioned Costs: None Assistance Listing Number: 93.568 Assistance Listing Title: LIHEAP Views of Responsible Officials (state whether your agency agrees or disagrees with the finding; if you disagree, briefly explain why): DOH agrees with the finding. Corrective Action (corrective action planned): The Division of Public Assistance (DPA) expanded administrative personnel to enhance oversight and compliance. A comprehensive staff training plan will ensure understanding and adherence to compliance measures. Completion Date (list anticipated completion date): DOH anticipates the finding will be resolved in FY2025. Agency Contact (name of person responsible for corrective action): Josie Stern, Assistant Commissioner
Finding 396354 (2023-044)
Significant Deficiency 2023
Finding: 2023-044 - Internal control weaknesses were identified over logical access to the system used to process energy assistance applications. Questioned Costs: None Assistance Listing Number: 93.568 Assistance Listing Title: Low-Income Home Energy Assistance Program (LIHEAP) Views of Respon...
Finding: 2023-044 - Internal control weaknesses were identified over logical access to the system used to process energy assistance applications. Questioned Costs: None Assistance Listing Number: 93.568 Assistance Listing Title: Low-Income Home Energy Assistance Program (LIHEAP) Views of Responsible Officials (state whether your agency agrees or disagrees with the finding; if you disagree, briefly explain why): DOH agrees with the finding. Corrective Action (corrective action planned): The Division of Public Assistance (DPA) will incorporate LIHEAP cases to be reviewed into the monthly sampling plan. DPA continues to address systems related internal control deficiencies. The division will work with the vendor to develop a reconciliation while state staff training will be strengthened. Completion Date (list anticipated completion date): DOH anticipates the finding will be resolved in FY2025. Agency Contact (name of person responsible for corrective action): Josie Stern, Assistant Commissioner
Finding 396353 (2023-043)
Significant Deficiency 2023
Finding: 2023-043 - The audit reviewed 25 TANF case files for beneficiaries who were single custodial parents caring for a child who is under 6 years of age and had their benefits reduced or terminated. Of the 25 cases, there were exceptions noted with 4 of them (16 percent). The following errors we...
Finding: 2023-043 - The audit reviewed 25 TANF case files for beneficiaries who were single custodial parents caring for a child who is under 6 years of age and had their benefits reduced or terminated. Of the 25 cases, there were exceptions noted with 4 of them (16 percent). The following errors were noted: • Two were assessed a penalty for too long due to untimely review of the case. • Two cases lacked sufficient documentation to support the penalty decision. Questioned Costs: None Assistance Listing Number: 93.558 Assistance Listing Title: TANF Views of Responsible Officials (state whether your agency agrees or disagrees with the finding; if you disagree, briefly explain why): DOH agrees with the finding. Corrective Action (corrective action planned): DPA will review and strengthen processes, procedures, and provide training for staff and supervisors. The division continues to work through public health emergency (PHE) priorities and mandates, PHE unwinding, and continues to experience staffing shortages. This will likely impact the ability to immediately execute the corrective action plan. Completion Date (list anticipated completion date): DOH anticipates the finding will be resolved in FY2025. Agency Contact (name of person responsible for corrective action): Josie Stern, Assistant Commissioner
Finding 396351 (2023-041)
Significant Deficiency 2023
Finding: 2023-041 - The audit reviewed 60 TANF case files for clients that were not engaged in work activities. Of the 60 cases, there were exceptions noted with 9 of them (15 percent). The following errors were noted: • Five were not assessed a penalty timely even though documentation showed that a...
Finding: 2023-041 - The audit reviewed 60 TANF case files for clients that were not engaged in work activities. Of the 60 cases, there were exceptions noted with 9 of them (15 percent). The following errors were noted: • Five were not assessed a penalty timely even though documentation showed that a penalty should have been assessed. • Two cases lacked sufficient documentation to determine whether a penalty should have been assessed. • Two cases’ benefit payments were incorrectly calculated based on the documentation. Questioned Costs: None Assistance Listing Number: 93.558 Assistance Listing Title: TANF Views of Responsible Officials (state whether your agency agrees or disagrees with the finding; if you disagree, briefly explain why): DOH agrees with the finding. Corrective Action (corrective action planned): DPA continues to strengthen processes, procedures, and training for staff and supervisors. The division continues to work through public health emergency (PHE) priorities and mandates, PHE unwinding, and continues to experience staffing shortages. This will likely impact the ability to immediately execute the corrective action plan. Completion Date (list anticipated completion date): DOH anticipates the finding will be resolved in FY2025. Agency Contact (name of person responsible for corrective action): Josie Stern, Assistant Commissioner
Finding 396350 (2023-040)
Significant Deficiency 2023
Finding: 2023-040 - One of the sixty cases tested (1.6 percent) had reported work activities that could not be supported by appropriate documentation which resulted in these work activities being reported inaccurately in the ACF-199 report. Questioned Costs: None Assistance Listing Number: 93.558 ...
Finding: 2023-040 - One of the sixty cases tested (1.6 percent) had reported work activities that could not be supported by appropriate documentation which resulted in these work activities being reported inaccurately in the ACF-199 report. Questioned Costs: None Assistance Listing Number: 93.558 Assistance Listing Title: TANF Views of Responsible Officials (state whether your agency agrees or disagrees with the finding; if you disagree, briefly explain why): DOH agrees with the finding. Corrective Action (corrective action planned): The division has initiated reconciliation of the ACF-199 to identify the cause of inaccuracy and to correct the report. The agency will determine appropriate internal controls to be implemented to ensure supporting documentation reflects accurate data that supports ACF-199 reporting. Completion Date (list anticipated completion date): DOH anticipates the finding will be resolved in FY2025. Agency Contact (name of person responsible for corrective action): Josie Stern, Assistant Commissioner
Finding 396348 (2023-038)
Significant Deficiency 2023
Finding: 2023-038 - Two of sixty Temporary Assistance for Needy Families (TANF) recipient case files tested lacked documentation supporting the eligibility of the recipient. The following errors were noted: • One case did not include child support documentation in the case file. • One case was for a...
Finding: 2023-038 - Two of sixty Temporary Assistance for Needy Families (TANF) recipient case files tested lacked documentation supporting the eligibility of the recipient. The following errors were noted: • One case did not include child support documentation in the case file. • One case was for a person who was part of a family who had received assistance under TANF for more than the 60 months in another state and moved to Alaska and continued to receive assistance. Questioned Costs: $7,909 Assistance Listing Number: 93.558 Assistance Listing Title: TANF Views of Responsible Officials (state whether your agency agrees or disagrees with the finding; if you disagree, briefly explain why): DOH agrees with the finding. Corrective Action (corrective action planned): The division intends to implement quality control and training efforts using the statewide care review teams and statewide eligibility and learning specialist (SEALS) team. The division continues to work through public health emergency (PHE) priorities and mandates, PHE unwinding, and continues to experience staffing shortages. This will likely impact the ability to immediately execute the corrective action plan. Completion Date (list anticipated completion date): DOH anticipates the finding will be resolved in FY2025. Agency Contact (name of person responsible for corrective action): Josie Stern, Assistant Commissioner
View Audit 305957 Questioned Costs: $1
Finding 396339 (2023-051)
Significant Deficiency 2023
Finding: 2023-051 - Sixty Medicaid and sixty CHIP recipients were randomly selected for eligibility testing. Auditors found inaccurate or unsupported eligibility determinations by State staff for 5 percent of Medicaid cases tested and 6 percent of CHIP cases tested. Testing revealed the following er...
Finding: 2023-051 - Sixty Medicaid and sixty CHIP recipients were randomly selected for eligibility testing. Auditors found inaccurate or unsupported eligibility determinations by State staff for 5 percent of Medicaid cases tested and 6 percent of CHIP cases tested. Testing revealed the following errors: Medicaid: • One case was ineligible for the whole year and benefits were available the whole year. • Two cases lacked documentation supporting the request and use of income and benefit information through the Income Eligibility and Verification System for determining eligibility and benefits. CHIP: • One case’s application hasn’t been processed as of 6/30/2023 but benefits were paid during the year ended June 30, 2023. • One case was a child that had turned 19 in a previous year but benefits continued to be paid during the year ended June 30, 2023. • Two cases had unresolved help desk tickets about how to close a case, which led to the cases remaining open and benefits to be paid for one of the cases during the year ended June 30, 2023. Questioned Costs: AL 93.767: $ 167; AL 93.778: $ 960 Assistance Listing Number: 93.767; 93.775, 93.777, 93.778 Assistance Listing Title: CHIP; Medicaid Cluster Views of Responsible Officials (state whether your agency agrees or disagrees with the finding; if you disagree, briefly explain why): DOH agrees with the finding but not the questioned costs. CMS has notified the state that financial recoveries based on eligibility errors can only be pursued when identified by programs operating under CMS’ Payment Error Rate Measurement (PERM) program, under section 1903(u) of the Social Security Act and regulations at 42 CFR Part 431, Subpart Q. Corrective Action (corrective action planned): The division will continue to strengthen online staff development and training offerings available in the department’s electronic training portal, including courses on MAGI/CHIP Medicaid and ARIES. The agency continues to streamline the Statewide Case Review Team and the case review guidelines with the goal of increasing timeliness and accuracy. The division continues to work through public health emergency (PHE) priorities and mandates, PHE unwinding, and continues to experience staffing shortages. This will likely impact the ability to immediately execute the corrective action plan. Completion Date (list anticipated completion date): DOH anticipates the finding will be resolved in FY2025. Agency Contact (name of person responsible for corrective action): Josie Stern, Assistant Commissioner
View Audit 305957 Questioned Costs: $1
Finding 396338 (2023-050)
Significant Deficiency 2023
Finding: 2023-050 - Sixty Medicaid and sixty CHIP recipients were randomly selected for eligibility testing. Testing revealed the following errors: Medicaid: • Twelve of the sixty recipients tested (20 percent), the State did not process applications in a timely manner or redetermine eligibility. Th...
Finding: 2023-050 - Sixty Medicaid and sixty CHIP recipients were randomly selected for eligibility testing. Testing revealed the following errors: Medicaid: • Twelve of the sixty recipients tested (20 percent), the State did not process applications in a timely manner or redetermine eligibility. The delays for completion of processing of the applications ranged from 46 days to 279 days as of June 30, 2023. CHIP: • Six of the sixty recipients tested (10 percent), the State did not process applications in a timely manner or redetermine eligibility. The delays for completion of processing of the applications ranged from 56 days to 225 days as of June 30, 2023. • One of the sixty recipients tested (1.6 percent), the beneficiary was due to have eligibility redetermined, however no information was submitted to the State for review and staff did not independently conduct a redetermination. For recipients following the Modified Adjusted Gross Income methodology, the State should have attempted to redetermine eligibility through electronic interfaces. Questioned Costs: None Assistance Listing Number: 93.767; 93.775, 93.777, 93.778 Assistance Listing Title: CHIP; Medicaid Cluster Views of Responsible Officials (state whether your agency agrees or disagrees with the finding; if you disagree, briefly explain why): DOH agrees with the finding. Corrective Action (corrective action planned): DPA will assess available resources to address timeliness of eligibility redeterminations. The division will also continue eligibility redeterminations in accordance with CMS approved public health emergency (PHE) unwinding requirements and plans. Completion Date (list anticipated completion date): DOH anticipates the finding will be resolved in FY2025. Agency Contact (name of person responsible for corrective action): Josie Stern, Assistant Commissioner