The City will work with all HOPWA subrecipients to ensure that a complete and accurate CAPER is completed in the appropriate format as required by HUD. This will include a focus on inputting the correct (eg, actual expended vs. award amount) funding amount.
The City will work with all HOPWA subrecipients to ensure that a complete and accurate CAPER is completed in the appropriate format as required by HUD. This will include a focus on inputting the correct (eg, actual expended vs. award amount) funding amount.
Based on prior year (FY22) findings, the City established the following procedures to ensure payment requests received from subrecipients are paid within 30 days of receipt of a complete request for reimbursement: 1. Department of Human Service Programs (DHSP) Contract Manager reviews invoices withi...
Based on prior year (FY22) findings, the City established the following procedures to ensure payment requests received from subrecipients are paid within 30 days of receipt of a complete request for reimbursement: 1. Department of Human Service Programs (DHSP) Contract Manager reviews invoices within 5 business days of receipt of request for reimbursement from subrecipient. a. If invoice is complete, original date of receipt is recorded. b. If invoice is incomplete, subrecipient is notified of items or documentation that is missing and receipt date is updated to reflect date of receipt of complete invoice. 2. Contract Manager approves payment request and submits to DHSP Fiscal staff for processing. 3. Fiscal staff processes and submits to Auditing Department as Priority payment. Four of the 19 sampled payment requests were received or processed after receipt of the FY22 audit findings, and all of those requests for reimbursement were paid within 30 days of receipt.
Activities Allowed and Unallowed / Allowable Costs and Cost Principles New payroll allocation procedures were implemented during fiscal 2023 in an effort to streamline the allocation process. Starting in fiscal 2024, management has reverted to the fiscal 2022 payroll allocation procedures to ensure...
Activities Allowed and Unallowed / Allowable Costs and Cost Principles New payroll allocation procedures were implemented during fiscal 2023 in an effort to streamline the allocation process. Starting in fiscal 2024, management has reverted to the fiscal 2022 payroll allocation procedures to ensure that the proper percentages are used in calculating charges to our contracts and grants. The procedures used in fiscal 2022 and prior resulted in clean audit opinions and can be trusted to allocate payroll properly. The allocation errors noted during the audit were corrected in the subsequent fiscal year.
View Audit 309953 Questioned Costs: $1
Noncompliance: Activities Allowed/Unallowed; Allowable Costs/Activities; Reporting A. Comments on Findings and Recommendations: We concur with the auditor’s findings and recommendations regarding reporting of project expenses and unidentified errors in project reconciliations completed by staff. ...
Noncompliance: Activities Allowed/Unallowed; Allowable Costs/Activities; Reporting A. Comments on Findings and Recommendations: We concur with the auditor’s findings and recommendations regarding reporting of project expenses and unidentified errors in project reconciliations completed by staff. B. Actions Taken or Planned: Management concurs. Large fiber installation project still in process at year-end. Subsequent reconciliations have been completed. Controls and other project processes have been improved to ensure more timely reconciliation of material charge-outs to the timing of the installation of material. Anticipated completion date: Completed Contact information for this finding: Amanda Burnett, Chief Financial Officer, 573-471-5821
View Audit 309920 Questioned Costs: $1
Material Weakness in Internal Control A. Comments on Findings and Recommendations: We concur with the auditor’s findings and recommendations regarding reporting of project expenses and unidentified errors in project reconciliations completed by staff. B. Actions Taken or Planned: Management...
Material Weakness in Internal Control A. Comments on Findings and Recommendations: We concur with the auditor’s findings and recommendations regarding reporting of project expenses and unidentified errors in project reconciliations completed by staff. B. Actions Taken or Planned: Management concurs. Large fiber installation project still in process at year-end. Subsequent reconciliations have been completed. Controls and other project processes have been improved to ensure more timely reconciliation of material charge-outs to the timing of the installation of material. Anticipated completion date: Completed Contact information for this finding: Amanda Burnett, Chief Financial Officer, 573-471-5821
View Audit 309920 Questioned Costs: $1
Management Corrective Action Plan For the Year Ended December 31, 2023 Community Roots Housing US Department of Homeland Security auditee identification number: PMDC-PJ-10-WA-2018-010 Audit Firm: Clark Nuber PS Audit Period: Year ended December 31, 2023 Finding 2023-001 – Significant deficiency in i...
Management Corrective Action Plan For the Year Ended December 31, 2023 Community Roots Housing US Department of Homeland Security auditee identification number: PMDC-PJ-10-WA-2018-010 Audit Firm: Clark Nuber PS Audit Period: Year ended December 31, 2023 Finding 2023-001 – Significant deficiency in internal controls over compliance related to special tests and provisions. Requirement: Per the requirements contained in 24 CFR Part 982, property owners must perform housing quality inspections at the time of initial occupancy and at least annually thereafter to ensure that the units are decent, safe, and sanitary. Finding: Out of 12 units selected for testing, 2 units did not have documentation supporting that a housing quality standards inspection was completed during 2023. Recommendation: CRH should implement the necessary internal controls to ensure annual inspections are performed and documented. Comments Community Roots Housing agrees with this finding and recommendation. Corrective Action Plan Community Roots Housing maintains detailed listings of annual inspection work orders, including unit numbers and when they were finished. This listing is prepared by the maintenance department. An additional control will be added to include secondary review and oversight by the Director of Property Management. This review will occur quarterly, starting in the with the second quarter of 2024, to ensure that all inspections are completed before the end of 2024, and annually thereafter. The Director of Maintenance and the Director of Property Management will be responsible for ensuring these tasks are carried out. Corrective Action Plan prepared by: Leslie Woodworth, Chief Financial Officer, 206-895-2030
In Finding 2023-008, it was reported that the Organization did not properly apply the sliding fee discounts for certain patients with visits to the Organization during the year ended December 31, 2023. Management recognizes the importance of complying with sliding fee guidelines. In response to F...
In Finding 2023-008, it was reported that the Organization did not properly apply the sliding fee discounts for certain patients with visits to the Organization during the year ended December 31, 2023. Management recognizes the importance of complying with sliding fee guidelines. In response to Finding 2023-008, proper training will be given to employees and sliding fee discounts will be reviewed by a supervisor on a periodic basis the ensure compliance with the sliding fee scale.
In Finding 2023-005, a condition was noted that during the year, the Organization made a draw of federal funds that were not disbursed in a timely manner for program expenditures. Management recognizes the importance of the requirements to disburse federal funds in a timely manner. In response to...
In Finding 2023-005, a condition was noted that during the year, the Organization made a draw of federal funds that were not disbursed in a timely manner for program expenditures. Management recognizes the importance of the requirements to disburse federal funds in a timely manner. In response to Finding 2023-005, procedures will be established to minimize the time elapsing between the transfer of funds to the Organization from the U.S. Treasury and the issuance of payments for program purposes by the Organization.
Finding 402308 (2023-001)
Significant Deficiency 2023
Allowable Activities and Costs – Assistance Listing No. 93.224/93.527 Recommendation: CLA recommends that the Organization consider completing time and effort attestation forms electronically to ensure none get lost or misplaced and are returned timely. Explanation of disagreement with audit finding...
Allowable Activities and Costs – Assistance Listing No. 93.224/93.527 Recommendation: CLA recommends that the Organization consider completing time and effort attestation forms electronically to ensure none get lost or misplaced and are returned timely. Explanation of disagreement with audit finding: There is no disagreement with the audit finding. Action taken in response to finding: Infinity Health’s current policy to support compliance with time and effort requirements is to obtain a statement from each employee with any time allocated for a grant, certifying the time spent on grant activities on a quarterly basis. Beginning 12/1/2023, Infinity Health has implemented a new electronic document management system which will improve our ability to track and monitor timely completion of time and effort statements each quarter. Name(s) of the contact person(s) responsible for corrective action: Kyle Ahlenstorf, CEO, and Michelle Leonard, CFO. Planned completion date for corrective action plan: June 30, 2024
Finding 2023-003 Condition A submission selected for testing did not agree to the underlying general ledger for the corresponding period. Multiple reports were not submitted within the contracts stated time frame Corrective Action Plan Corrective Action Planned: The finance staff are reconciling...
Finding 2023-003 Condition A submission selected for testing did not agree to the underlying general ledger for the corresponding period. Multiple reports were not submitted within the contracts stated time frame Corrective Action Plan Corrective Action Planned: The finance staff are reconciling the general ledger to the financial status reports or other grant billings each month. Name(s) of Contact Person(s) Responsible for Corrective Action: The Director of Accounting, Dawn Bonderczuk, and the Grant Accountant. Anticipated Completion Date: July 31, 2024.
View Audit 309873 Questioned Costs: $1
Finding 2023-002 Condition The Organization did not have timely approval of non-payroll expenditures to support preparation of reliable financial reports to grantors. Corrective Action Plan Corrective Action Planned: Improvements have already been made to this process in the current year rega...
Finding 2023-002 Condition The Organization did not have timely approval of non-payroll expenditures to support preparation of reliable financial reports to grantors. Corrective Action Plan Corrective Action Planned: Improvements have already been made to this process in the current year regarding the timely submission of supporting documentation and authorization and this will continue to be an area of focus in both operations and finance. Name(s) of Contact Person(s) Responsible for Corrective Action: The Director of Accounting, Dawn Bonderczuk, and the Account Payable Clerk or Accountant. Anticipated Completion Date: July 31, 2024.
The Comprehensive Cancer Center (CCC) has implemented a Corrective Action Plan on November 2023 and has significantly improved the submission of the Single Audit Report FY 2023 and the data collection. The result of the implementation of the corrective action plan for FY 2023 allows the CCC to begin...
The Comprehensive Cancer Center (CCC) has implemented a Corrective Action Plan on November 2023 and has significantly improved the submission of the Single Audit Report FY 2023 and the data collection. The result of the implementation of the corrective action plan for FY 2023 allows the CCC to begin the financial statement and Single Audit of FY 2024 on time. We establish a procedure to ensure that the information required to be disclosed in the Single Audit is scheduled. Despite efforts to complete the Single Audit FY 2023 on March 31, 2024, CCCUPR Management and auditors agreed that they require two (2) additional months to complete the process. To ensure the timely completeness of the Financial Statement and Single audit of FY 2024 before March 31, 2025 we implement the following aggressive work plan:  Management closing and submission Final Trial Balance to Auditors August 8, 2024.  Completion and Delivery to Auditors PBC items October 31, 2024.  Distribution of Financial Statement and Single Audit Draft for review (management and Auditors) November 11, 2024  Final review of the Draft by the auditors – November 15, 2024.  Final Issuance of Financial Statement, Single Audit, and data collection November 30, 2024.
Views of Responsible Officials and Planned Corrective Actions: As a componenent of changing our accounting department, we will revisit the current policy by 7/1/24 to ensure screenings are conducted and filed as required prior to engaging relationships. We will also perform restrospective screenings...
Views of Responsible Officials and Planned Corrective Actions: As a componenent of changing our accounting department, we will revisit the current policy by 7/1/24 to ensure screenings are conducted and filed as required prior to engaging relationships. We will also perform restrospective screenings by 6/30/24.
Views of Responsible Officials: As of 7/1/204, NEW's accounting has been outsourced and a new accounting system will be utilized. The accounting department has been restructured to ensure accounts are properly reconciled each month.
Views of Responsible Officials: As of 7/1/204, NEW's accounting has been outsourced and a new accounting system will be utilized. The accounting department has been restructured to ensure accounts are properly reconciled each month.
Management concurs with the finding and agrees with the recommendation. Management is currently working with HUD to obtain approval to reimburse the Community's operating cash account from the residual receipts fund.
Management concurs with the finding and agrees with the recommendation. Management is currently working with HUD to obtain approval to reimburse the Community's operating cash account from the residual receipts fund.
View Audit 309788 Questioned Costs: $1
May 7, 2024 U.S. Department of Education American Academy McAllister Institute of Funeral Services, Inc. respectfully submits the following corrective action plan for the year ended September 30, 2023. Auditors: CohnReznick 1301 Avenue of the Americas New York, NY 10019 Audit period: October 1...
May 7, 2024 U.S. Department of Education American Academy McAllister Institute of Funeral Services, Inc. respectfully submits the following corrective action plan for the year ended September 30, 2023. Auditors: CohnReznick 1301 Avenue of the Americas New York, NY 10019 Audit period: October 1, 2022 to September 30, 2023 The findings from the fiscal year 2023 schedule of findings and questioned costs are discussed below. The findings are numbered consistently with the numbers assigned in the schedule. FINDINGS-FINANCIAL STATEMENT AUDIT SIGNIFICANT DEFICIENCY 2023-001 Federal Direct Loan Program Student Recommendation: We recommended in the prior year that the Institute review and revise its procedures to put controls in place to ensure required notifications regarding Federal Direct Loan Program proceeds are provided to par-ticipating students. Action Plan: We agree with both the finding and the recommendation. In the Summer 2023 semester, a system was implemented to send out the required notifications regarding Federal Direct Loan Program proceeds that have been applied to a participating student's account. If the U.S. Department of Education has questions regarding this plan, please call Robert Graber at 732-547-9549.
ResponseMews: We respectfully disagree with this audit finding. The state approved Betabox's request for an allocation from the GEER fund, conditional upon submission of financial reports. The state specified to our Board the vendor that these funds were to be used for, so it was believed that no fu...
ResponseMews: We respectfully disagree with this audit finding. The state approved Betabox's request for an allocation from the GEER fund, conditional upon submission of financial reports. The state specified to our Board the vendor that these funds were to be used for, so it was believed that no further procurement process was required. Corrective Action Planned: Going forward we will get legal advice before accepting any funds that are to be used for a specific vendor. We will also make sure that appropriate procurement procedures are followed for future purchases. Anticipated Completion Date: June 2024 Contact Person(s): Ashley Montgomery, CSFO
View Audit 309754 Questioned Costs: $1
Response/Views: We agree with the finding as it is stated. Corrective Action Planned: We shall comply accordingly for future federal fund projects requiring Davis-Bacon reporting. Anticipated Completion Date: NIA. The project has already taken place Contact Person(s): Cassandra Allen 334.864.9343
Response/Views: We agree with the finding as it is stated. Corrective Action Planned: We shall comply accordingly for future federal fund projects requiring Davis-Bacon reporting. Anticipated Completion Date: NIA. The project has already taken place Contact Person(s): Cassandra Allen 334.864.9343
View Audit 309744 Questioned Costs: $1
Finding 2023-002 Federal Agency Name: Department of Health and Human Services Program Name: COVID-19 Provider Relief Fund (PRF) and American Rescue Plan (ARP) Rural Distribution CFDA #93.498 Finding Summary: The Medical Center had a revenue calculation error of $192,326 on the HHS special report wit...
Finding 2023-002 Federal Agency Name: Department of Health and Human Services Program Name: COVID-19 Provider Relief Fund (PRF) and American Rescue Plan (ARP) Rural Distribution CFDA #93.498 Finding Summary: The Medical Center had a revenue calculation error of $192,326 on the HHS special report with no impact to the actual lost revenues as the quarter with the error did not result in any lost revenue being reported (i.e., lost revenue claimed was accurate on the HHS special report but key line items were misstated). Responsible Individuals: Cathy Huss, CFO Corrective Action Plan: All tracking documents that have calculations will be reviewed by the CEO if the CFO compiles for accuracy and vice versa. The reviewer will sign off by email that they have reviewed and agree with the calculations. The calculation of lost revenues will be updated with our next reporting to HHS. Anticipated Completion Date: 6/30/2023
Recommendation: Adhere to the Accountability section of the University’s Procedural Manual – Fixed Asset & Inventory Control. The requirements of the OMB’s Uniform Guidance are already addressed in your currently adopted policies (A Fixed assets physical inventory is required every two years). Prope...
Recommendation: Adhere to the Accountability section of the University’s Procedural Manual – Fixed Asset & Inventory Control. The requirements of the OMB’s Uniform Guidance are already addressed in your currently adopted policies (A Fixed assets physical inventory is required every two years). Properly plan and execute the complete physical count. Update the property listing to reflect the complete physical count records. Make sure the property listing is clear and concise. Action Taken: The Fixed Asset Coordinator and Property and Supply Clerk will ensure physical inventories will be done in a timely manner and in accordance with the OMB Uniform Guidance.
Internal Controls over Compliance and Compliance with the Period of Performance Compliance Requirement     Contact: Chris Holmes   Title: Controller  Phone Number: 202-235-1938  Estimated Completion Date – done  Corrective Action  The results of the 2023 audit will be shared with appropriate...
Internal Controls over Compliance and Compliance with the Period of Performance Compliance Requirement     Contact: Chris Holmes   Title: Controller  Phone Number: 202-235-1938  Estimated Completion Date – done  Corrective Action  The results of the 2023 audit will be shared with appropriate staff and reiterated in training to ensure that adequate attention and guidance is provided on the allowability of trailing costs and the unallowability of newly incurred costs. During 2023, PSI resumed delivering in person training to its global finance and program staff and will continue to offer training during 2024.
View Audit 309693 Questioned Costs: $1
Allegations of Fraud    Contact: Kim Schwartz Title: Senior Vice-President and Chief Financial Officer  Phone Number: 202 235 1879 Estimated Completion Date – ongoing   Corrective Action  PSI keeps managing fraud risk through combination of preventative, detective and monitoring controls, a...
Allegations of Fraud    Contact: Kim Schwartz Title: Senior Vice-President and Chief Financial Officer  Phone Number: 202 235 1879 Estimated Completion Date – ongoing   Corrective Action  PSI keeps managing fraud risk through combination of preventative, detective and monitoring controls, and reinforces PSI’s expectations regarding ethical behavior through training and communications. PSI will continue to proactively report and investigate allegations of fraud and to raise awareness of the actions to be taken when there is suspicion of fraud. PSI Global Internal Audit and Investigations team will continue to share lessons learned from the work performed. Given the challenging operating environments in which PSI implements its programs, there is an ongoing risk of fraud, which PSI actively monitors, investigates, and mitigates.
Internal Control over Compliance and Compliance with Activities Allowed or Unallowed and Allowable Costs and Cost Principles   Contact: Chris Holmes   Title: Controller  Phone Number: 202-235-1938  Estimated Completion Date – ongoing  Corrective Action  The results of the 2023 audit will be ...
Internal Control over Compliance and Compliance with Activities Allowed or Unallowed and Allowable Costs and Cost Principles   Contact: Chris Holmes   Title: Controller  Phone Number: 202-235-1938  Estimated Completion Date – ongoing  Corrective Action  The results of the 2023 audit will be shared with appropriate staff and reiterated in training to ensure that adequate attention and guidance is provided on recording expenses within the correct accounting period. During 2023, PSI resumed delivering in person training to its global finance and program staff and will continue to offer training during 2024 to address such issues.
Finding No: 2023-001 Federal Agency: U.S. Department of Health and Human Services Assistance Listing Number: 93.498 Program: COVID 19 – Provider Relief Fund and American Rescue Plan (ARP) Rural Distribution Compliance Requirement: Activities allowed or unallowed/allowable costs Award Year: January 1...
Finding No: 2023-001 Federal Agency: U.S. Department of Health and Human Services Assistance Listing Number: 93.498 Program: COVID 19 – Provider Relief Fund and American Rescue Plan (ARP) Rural Distribution Compliance Requirement: Activities allowed or unallowed/allowable costs Award Year: January 1, 2020 through December 31, 2022 (a) Criteria or Requirement 2 CFR 200.303 requires non-federal entities receiving federal awards to establish and maintain internal controls designed to reasonably ensure compliance with federal laws, regulations, and program compliance requirements. Effective internal control should include procedures to ensure federal expenditures are accurately and completely reported on the SEFA. (b) Condition Found The System did not have adequate controls related to determining allowability of expenditures for the Provider Relief Fund and American Rescue Plan (ARP) Rural Distribution Grant. Our testing identified one charge within the population that had been charged incorrectly to the federal program. This charge was for government contract labor totaling $126,313 that was determined to be an unallowable expenditure that should have been removed prior to submission to the federal agency. In addition, during our testwork over expenses, we selected for testing a sample of 40 expenses charged to the program. One of our samples related to COVID lab tests was identified with a cost that should have been zero as the tests were voided and the vendor invoice reflected a zero balance; however, a standard test was inappropriately charged to the federal program in excess of the vendor invoice. Further, one sample was identified as having the incorrect price applied to the cost due to the drug being purchased from a different vendor, which had a lower price. This resulted in a higher price being charged to the federal program.The resulting impact of the above two items was $508 inappropriately charged to the federal program. In addition, the System was unable to provide evidence of management review and approval for three of the 40 expenses sampled. These three disbursements were for allowable costs under the terms and conditions of the program. (c) Cause The System’s review process in place over the recording of these costs did not operate effectively to prevent unallowable charges and inaccurate amounts from being submitted for reimbursement by the federal agency. The System was unable to provide evidence of certain management reviews and approvals due to system limitations that only maintain electronic approvals (via email) for 365 days. (d) Effect Federal funds were expended for unallowable purposes or for inaccurate amounts and evidence of the effective operation of management review controls was not maintained in accordance with Federal requirements. (e) Questioned Cost Expenditures related to contract labor and other costs of $126,821. (f) Statistical Sample The sample was not intended to be, and was not, a statistically valid sample. (g) Repeat Finding in the Prior Year Not a repeat finding (h) Recommendation We recommend that the System strengthen controls over the management review process to prevent unallowable costs and inaccurate amounts from being charged to Federal programs. (i) View of Responsible Officials The Monthly Cost Capture detail for the Provider Relief Fund and American Rescue Plan (ARP) Rural Distribution (ALN No. 93.498) reporting was developed to appropriately track expenditures that qualified under the grant. A wide variety of costs from across the company were charged to a COVID cost department. These costs originated in a variety of ways. While the overall amounts were tracked and reviewed, a comprehensive 100% review was not conducted. As a result, the government labor expenditure and the cost for a COVID lab specimen that spilled in transit were inappropriately included. Additionally, a higher cost per unit was used to allocate for a specific drug used by COVID inpatients. Furthermore, there were three Morris and Dickson invoices that were submitted to AP electronically approving payment via email, but the emails automatically delete after 365 days. (j) Corrective Action Plan The expenditures for the Provider Relief Fund and American Rescue Plan (ARP) Rural Distribution (ALN No. 93.498) were reported through the PRF Reporting Portal using quarterly financial data. The portal restricted the entry of expenses up to the awarded amount plus interest earned. Consequently, we have sufficient expenses to cover any ineligible expenditures identified in this audit. As the program has concluded, no further actions are required for COVID drug and COVID lab test findings, as these were already accounted for in system reports that are now obsolete due to surpassing the Period of Availability dates. A new process will be implemented for manager sign-off on Morris and Dickson invoices submitted to AP electronically to ensure proper approval evidence is captured and documented correctly. Anticipated Completion Date: 6/30/2024 Name of Contact Person for Corrective Action: Sharon Nobles, Chief Financial Officer
View Audit 309685 Questioned Costs: $1
The Housing Services Manager will run a report on the 2nd Monday of each month identifying the new admissions that were completed four months prior. An EIV system check will be completed for each new admission and compared with the income that was submitted during the family' s initial interview. On...
The Housing Services Manager will run a report on the 2nd Monday of each month identifying the new admissions that were completed four months prior. An EIV system check will be completed for each new admission and compared with the income that was submitted during the family' s initial interview. Once the report has been reviewed for accuracy, the Chief Operating Officer will review and sign off. The report will be filed and maintained by the Housing Services Manager.