Corrective Action Plan: Management agrees that all six R2T4s were completed late and funds were returned late or post-withdraw disbursements were not made timely. The Financial Aid Director will work with University officials to ensure that the Financial Aid Office is informed of enrollment status c...
Corrective Action Plan: Management agrees that all six R2T4s were completed late and funds were returned late or post-withdraw disbursements were not made timely. The Financial Aid Director will work with University officials to ensure that the Financial Aid Office is informed of enrollment status changes timely. The Financial Aid Director and the CFO will meet with the third-party administrator to resolve the amount of time it is taking for them to review and approve the R2T4s and return funds or award post-withdraw disbursements. The following monetary issues are in the The first student identified above is due a $1,849 Federal Pell Grant post withdraw disbursement that was not offered or disbursed. $1,849 was posted to the student’s account on February 29, 2024. For the third student identified above, the R2T4 was sent to the third-party administrator for review in November 2023. The University has an ongoing audit being performed by the Department of Education. Based on advice from the University’s Department of Education contact, the resolution for this student should wait until the Department’s audit is complete. For the fourth student identified above, the R2T4 was not completed timely and the incorrect number of days in the semester was used in the calculation. A R2T4 was submitted to the third-party administrator in November 2023. On February 29, 2024, the student’s account show the following amounts were returned to the source: $990 of unsubsidized loan funds, $2,227 of subsidized loan funds, and $1,310 of PLUS Loan funds. For the sixth student identified above, the Student Financial Aid Director missed a notification from the third-party administrator asking for additional files. The information was supplied to the third-party administrator in November 2023. $862 was returned to the source on December 4, 2023. Anticipated Completion Date: The corrective action will be completed by June 30, 2024. Contact Person: cliff Bristow, Director of Financial Aid 405-912-9037
View Audit 299875 Questioned Costs: $1
Corrective Action Plan: The Student Financial Aid Director corrected the enrollment status and withdrawal date for the students in question in November 2023. Procedures have been improved to ensure the information is communicated timely to the third-party servicer and that third-party servicer repor...
Corrective Action Plan: The Student Financial Aid Director corrected the enrollment status and withdrawal date for the students in question in November 2023. Procedures have been improved to ensure the information is communicated timely to the third-party servicer and that third-party servicer reports the changes to NSLDS timely. Anticipated Completion Date: The corrective action was completed in November 2023. Contact Person: Cliff Bristow, Director of Financial Aid 405-912-9037
View Audit 299875 Questioned Costs: $1
2023-004 Return to Title IV (R2T4) Recommendation: We recommend that the University review its policies and procedures to ensure R2T4 calculations are performed accurately. Explanation of disagreement with audit finding: There is no disagreement with the audit finding. Planned completion date for co...
2023-004 Return to Title IV (R2T4) Recommendation: We recommend that the University review its policies and procedures to ensure R2T4 calculations are performed accurately. Explanation of disagreement with audit finding: There is no disagreement with the audit finding. Planned completion date for corrective action plan: Effective immediately Reason for finding: The University policies were not in alignment with the with the federal policies and best practices. Action taken in response to finding: Hodges University is updating its policies to follow the federal policies and best practices in order to remain compliant; that update will reflect as an addendum to the catalog. Name(s) of the contact person(s) responsible for corrective action: Nicole Hurley, Director of University Registrar, Olker Alva, Director of Students Financial Services, and Diana Schultz, SVP of Student Affairs and Financial Services and Provost
View Audit 299868 Questioned Costs: $1
2023-003 240-Day Requirement for Unclaimed Checks Recommendation: We recommend that the University review its procedures related to outstanding student checks to ensure they are being returned to the Department of Education within 240 days. Explanation of disagreement with audit finding: There is no...
2023-003 240-Day Requirement for Unclaimed Checks Recommendation: We recommend that the University review its procedures related to outstanding student checks to ensure they are being returned to the Department of Education within 240 days. Explanation of disagreement with audit finding: There is no disagreement with the audit finding. Reason for finding: The University continuously attempted to refund the student checks. Action taken in response to finding: The Financial Aid and Student Accounts offices will work diligently to ensure the University's compliance with the federal regulations and deadlines regarding unclaimed properties. Name(s) of the contact person(s) responsible for corrective action: Olker Alva, Director of Students Financial Services, and Diana Schultz, SVP of Student Affairs and Financial Services and Provost Planned completion date for corrective action plan: April 30, 2024
View Audit 299868 Questioned Costs: $1
Action taken in response to finding: Create a third party verification policy and procedure SOP. Name(s) of the contact person(s) responsible for corrective action: Doryan Campo Planned completion date for corrective action plan: April 2024
Action taken in response to finding: Create a third party verification policy and procedure SOP. Name(s) of the contact person(s) responsible for corrective action: Doryan Campo Planned completion date for corrective action plan: April 2024
View Audit 299848 Questioned Costs: $1
2023-004 Significant deficiency Name of contact person: Michelle Raymond, Management Agent Corrective Action: Costs not allowable under USDA Rural Development guidelines will be paid from the Organization’s good shepherd reserve account. Proposed implementation date: The corrective action pla...
2023-004 Significant deficiency Name of contact person: Michelle Raymond, Management Agent Corrective Action: Costs not allowable under USDA Rural Development guidelines will be paid from the Organization’s good shepherd reserve account. Proposed implementation date: The corrective action plan will be implemented immediately.
View Audit 299827 Questioned Costs: $1
Finding 387731 (2023-001)
Significant Deficiency 2023
Reference Number: 2023-001 Awarding Agency: U.S. Department of Housing and Urban Development Program Name: Community Development Block Grants/Entitlement Grants Assistance Listing Number: 14.218 Award Number: B-20-MC-06-0011 Award Year: Fiscal Year Ended June 30, 2021 Category of Finding: Wa...
Reference Number: 2023-001 Awarding Agency: U.S. Department of Housing and Urban Development Program Name: Community Development Block Grants/Entitlement Grants Assistance Listing Number: 14.218 Award Number: B-20-MC-06-0011 Award Year: Fiscal Year Ended June 30, 2021 Category of Finding: Wage Rate Requirements Type of Finding: Significant Deficiency in Internal Control Over Compliance Status: Corrective Action in Progress Corrective Action Plan: The City concurs with the recommendation. To ensure compliance, the City will carefully review and verify the required certified payroll before authorizing payment and disbursement of funds for the federally funded projects. Responsible Party for Corrective Action Plan: Project managers responsible for federally funded projects Implementation Date of Corrective Action Plan: January 1, 2024
View Audit 299799 Questioned Costs: $1
Corrective Action Plan - Online Purchases. Contact Person - Executive Director. Corrective Action Planned - The PHA will ensure that supporting documentation is maintained for all online purhases. Anticipated Completion Date - Within the next fiscal year.
Corrective Action Plan - Online Purchases. Contact Person - Executive Director. Corrective Action Planned - The PHA will ensure that supporting documentation is maintained for all online purhases. Anticipated Completion Date - Within the next fiscal year.
View Audit 299775 Questioned Costs: $1
Corrective Action Plan - Unauthorized ACH Payments. Contact Person - Executive Director. Corrective Action Planned - The PHA will ensure that all ACH payments are adequately documented and approved. Anticipated Completion Date - Within the next fiscal year.
Corrective Action Plan - Unauthorized ACH Payments. Contact Person - Executive Director. Corrective Action Planned - The PHA will ensure that all ACH payments are adequately documented and approved. Anticipated Completion Date - Within the next fiscal year.
View Audit 299775 Questioned Costs: $1
Return to Title IV Recommendation: We recommend the University review the R2T4 requirements and implement procedures to ensure the R2T4 calculations are using the correct withdrawal dates and are completed accurately. Explanation of disagreement with audit finding: There is no disagreement with ...
Return to Title IV Recommendation: We recommend the University review the R2T4 requirements and implement procedures to ensure the R2T4 calculations are using the correct withdrawal dates and are completed accurately. Explanation of disagreement with audit finding: There is no disagreement with the audit finding. Action taken in response to finding: The university is researching ways to ensure accuracy in the data entry of withdrawal dates into the system of record. The current process is manual data entry by advising staff creating an opportunity for human input error. Options are being reviewed and could include an integration between the system of record and the eForm the data is collected on or a report that will compare the withdrawal date entered into the system to the source data. Repeat finding, see 2022-002: CAP Completed. Prior year finding had to do with manual data entry directly into the R2T4 calculation. No repeat findings were found in this area of data entry. Name(s) of the contact person(s) responsible for corrective action: Brenda Clark, Director of Financial aid Planned completion date for corrective action plan: December 2023
View Audit 299743 Questioned Costs: $1
Finding 2023-001 - U.S. Department of Education (USD), Title IV Student Financial Aid Programs: We observed the following conditions in connection with our testing of the various U.S. Department of Education, Title IV, Student Financial Assistance Programs: a) Seven (7) out of 25 students had credit...
Finding 2023-001 - U.S. Department of Education (USD), Title IV Student Financial Aid Programs: We observed the following conditions in connection with our testing of the various U.S. Department of Education, Title IV, Student Financial Assistance Programs: a) Seven (7) out of 25 students had credit balances created by Title IV funds that were not refunded to the student or a Title IV program within the allotted 14 days. All seven (7) students were later refunded shortly after the allotted 14 days. b) Two (2) students were not paid Federal Work-study funds according to the total hours worked and the correct amount paid per hour. Questioned costs were $490. The two (2) students were subsequently paid the correct amounts. Corrective Action – We concur with the auditor’s finding. EWU’s student subsidiary ledger has been fully converted into our newly purchased global ERP system, Colleague, for fiscal year 2024. In the past, there were several manual processes amongst various departments to ensure the disbursement of student refunds. Our new system integrates all the student financial information allowing us to streamline our process for more efficiency. This process digitizes our student refund disbursements allowing for students to receive eRefunds. In addition, the new system allows for the Office of Student Accounts to exercise full oversight of the student refund process. Subsequently, our new system greatly enhances the University’s ability to provide more timely disbursements of student refunds. In addition to the newly adopted student refund process, the business office has since updated the Business and Finance organizational structure to provide an additional oversight over payroll disbursement to ensure students are receiving timely and accurate disbursements from the Federal work-study program. The business office reconciles with the financial aid department monthly on all financial aid awards.
View Audit 299677 Questioned Costs: $1
We agree with the recommendation that expenses should have been reviewed not only in total but should also been reviewed under the two categories of expenses (1) General and Administrative Expenses and (2) Health Care-Related Expenses and the additional subcategories of expenses as defined in HRSA’s...
We agree with the recommendation that expenses should have been reviewed not only in total but should also been reviewed under the two categories of expenses (1) General and Administrative Expenses and (2) Health Care-Related Expenses and the additional subcategories of expenses as defined in HRSA’s Post-Payment Notice of Reporting Requirements for PRF grants to ensure that individual expenses were not double counted. While management will attempt to see if we can refile expenses in the HRSA PRF portal to clearly show that more than enough qualified expenses exist to apply to funding received under both PRF grants and FEMA awards, our understanding is that the PRF portal is closed and restatements cannot be made. Management believes while expense reporting was duplicated for both of these funding sources, because more than enough expenses exist in total to be applied to both sources of funding, this is a reporting matter only and no funds need to be returned under either program. Further, there was numerous and changing guidance from HRSA as to whether expenses needed to be applied to PRF grants prior to applying lost revenue to these grants. Effective with PRF Reporting Period 2, lost revenue was first applied to PRF grants. Fresno did not apply expenses incurred to PRF grants after the date of June 30, 2021, thus this issue does not exist for costs incurred during periods subsequent to June 30, 2021.
View Audit 299676 Questioned Costs: $1
A: COMMENTS ON FINDING AND RECOMMENDATION(S): VALOR CHRISTIAN COLLEGE OCCURS WITH THE FINDING B: ACTIONS TAKEN OR PLANNED: VALOR COLLEGE HAS IMPLEMENTED A POLICY THAT WILL INCREASE AWARENESS OF STUDENTS WHO STOP ATTENDING THEIR COURSES. THEY POLICY CONTAINS TIGHTER RESTRICTIONS ON THE TRACKING OF AT...
A: COMMENTS ON FINDING AND RECOMMENDATION(S): VALOR CHRISTIAN COLLEGE OCCURS WITH THE FINDING B: ACTIONS TAKEN OR PLANNED: VALOR COLLEGE HAS IMPLEMENTED A POLICY THAT WILL INCREASE AWARENESS OF STUDENTS WHO STOP ATTENDING THEIR COURSES. THEY POLICY CONTAINS TIGHTER RESTRICTIONS ON THE TRACKING OF ATTENDANCE AND WITHDRAWAL OF STUDENTS WHO FAIL TO PARTICIPATE. IN ADDITION, CAMPUS IVY HAS SCHEDULED A WEEKLY REVIEW OF RETURN OF TITLE IV FORMS TO ENSURE REFUNDS AND POST WITHDRAWAL DISBURSEMENTS ARE SCHEDULED IN A TIMELY MANNER.
View Audit 299675 Questioned Costs: $1
A: COMMENTS ON FINDING AND RECOMMENDATION(S): VALOR CHRISTIAN COLLEGE OCCURS WITH THE FINDING B: ACTIONS TAKEN OR PLANNED: VALOR COLLEGE WILL INCREASE CONTROLS OVER INADVERTENT OVERPAYMENTS CREATED WHEN A STUDENT WITHDRAWS WITHOUT NOTIFICATION AFTER THE FUNDS HAVE BEEN ORDERED BUT BEFORE THEY DISBUR...
A: COMMENTS ON FINDING AND RECOMMENDATION(S): VALOR CHRISTIAN COLLEGE OCCURS WITH THE FINDING B: ACTIONS TAKEN OR PLANNED: VALOR COLLEGE WILL INCREASE CONTROLS OVER INADVERTENT OVERPAYMENTS CREATED WHEN A STUDENT WITHDRAWS WITHOUT NOTIFICATION AFTER THE FUNDS HAVE BEEN ORDERED BUT BEFORE THEY DISBURSE. VALOR COLLEGE HAS REFUNDED $1,048 DUE FOR THE INCORRECT REFUNDS. FOR THE R2T4, CAMPUS IVY HAS ADDED A SECOND LAYER OF REVIEW TO THE R2T4 PROCESS. THE CURRENT CAMPUS IVY POLICY IS TO REQUIRE THE CLIENT TO SUBMIT A REFUND REQUEST FORM FOR ANY INELIGIBLE FUNDS THAT WERE DISBURSED, ALONG WITH THE R2T4. IF THE STUDENT IS THEN DUE A PWD, THE FUNDS WOULD THEN BE RESCHEDULED BASED ON THE R2T4 AND OFFERED TO THE STUDENT. THIS WILL PREVENT THE RETENTION OF INELIGIBLE FUNDS.
View Audit 299675 Questioned Costs: $1
Action taken in response to finding: NCLE will: 1) Run a list (through Paychex) of employees that have been terminated and/or hired within the last pay period prior and the current pay period 2) Identify names on list with any employee who is currently receiving pay within the current pay period. 3...
Action taken in response to finding: NCLE will: 1) Run a list (through Paychex) of employees that have been terminated and/or hired within the last pay period prior and the current pay period 2) Identify names on list with any employee who is currently receiving pay within the current pay period. 3) Any employee on the list whether new hire and/or terminated verify that the amount being paid to the employee is correct. 4) Termed employee may still have ELT (Earned Leave Time) accrued and is due payment within the current pay period. The termed employee may have worked partial hours within the current pay period. Salary termed employee is due full payment within the last pay period the employee worked. 5) A new hire employee who is salaried will receive a pro-rated rate of pay for the first payroll. 6) Upon termination and/or new hire being enacted Management will forward termination and/or new hire notices to the Human Resource Department. 7) Human Resource Department will be entering (into Paychex) termination and/or new hire data as soon as they are received from management Names of the contact persons responsible for corrective action: Sue Firkus, CFO and Tim Nolan CEO Planned completion date for corrective action plan: Approved by our Board and Policy Council on February 26, 2024. Will be implemented immediately following this approval. The full current year within which we are operating as well as each upcoming fiscal year will be covered by this plan.
View Audit 299674 Questioned Costs: $1
The Organization is committed to ensuring that appropriate review procedures are in place when reconciling accounts in order to adhere to proper reporting of receipts and disbursements on their reports.
The Organization is committed to ensuring that appropriate review procedures are in place when reconciling accounts in order to adhere to proper reporting of receipts and disbursements on their reports.
View Audit 299646 Questioned Costs: $1
Department of Health and Human Services BRHC respectfully submits the following corrective action plan for the year ended June 30, 2023. Audit period: July 1, 2022 through June 30, 2023 The findings from the schedule of findings and questioned costs are discussed below. The findings are numbered con...
Department of Health and Human Services BRHC respectfully submits the following corrective action plan for the year ended June 30, 2023. Audit period: July 1, 2022 through June 30, 2023 The findings from the schedule of findings and questioned costs are discussed below. The findings are numbered consistently with the numbers assigned in the schedule. FINDINGS—FEDERAL AWARD PROGRAMS AUDITS U.S. Department of Health and Human Services 2023-001 Provider Relief Funding – Assistance Listing No. 93.498 Recommendation: We recommend the Organization review calculations to ensure that the proper amounts are used. Explanation of disagreement with audit finding: There is no disagreement with the audit finding. Action taken in response to finding: Blue Ridge’s inventory system reports item prices based on average purchase price. Blue Ridge’s materials management staff has a process in place to update inventory item prices on an as-needed basis. In the event a price is in error, the issuance price is manually updated with a credit given to the department where expense was incorrectly reported. For future reporting of inventory issuance costs, an additional level of review will be added to validate cost reported are accurate. Name(s) of the contact person(s) responsible for corrective action: Pat Moll, Chief Financial Officer Planned completion date for corrective action plan: 03/27/2024 If the Department of Health and Human Services has questions regarding this plan, please call Pat Moll, CFO at 828-580-5003.
View Audit 299640 Questioned Costs: $1
Community Partners acknowledges that while subrecipient monitoring was performed for federal subrecipients by hiring third party CPAs, the monitoring was based on randomly selected samples and a risk assessment was not included in the monitoring plan. Current leadership has enhanced the subrecipient...
Community Partners acknowledges that while subrecipient monitoring was performed for federal subrecipients by hiring third party CPAs, the monitoring was based on randomly selected samples and a risk assessment was not included in the monitoring plan. Current leadership has enhanced the subrecipient monitoring plan by ensuring that risk assessments are incorporated into any future subrecipient monitoring. The person responsible for the corrective action detailed above will be Joyce Williams, Chief Financial and Operations Officer, (213) 346‐3202. We anticipate corrective action will be completed by June 30, 2024.
View Audit 299626 Questioned Costs: $1
Finding 387470 (2023-002)
Significant Deficiency 2023
Community Partners acknowledges that while subrecipient monitoring was performed for federal subrecipients by hiring third party CPAs, the monitoring was based on randomly selected samples and a risk assessment was not included in the monitoring plan. Current leadership has enhanced the subrecipient...
Community Partners acknowledges that while subrecipient monitoring was performed for federal subrecipients by hiring third party CPAs, the monitoring was based on randomly selected samples and a risk assessment was not included in the monitoring plan. Current leadership has enhanced the subrecipient monitoring plan by ensuring that risk assessments are incorporated into any future subrecipient monitoring. The person responsible for the corrective action detailed above will be Joyce Williams, Chief Financial and Operations Officer, (213) 346‐3202. We anticipate corrective action will be completed by June 30, 2024.
View Audit 299626 Questioned Costs: $1
Contact Person: Interim Executive Director Fred Bazemore Corrective Action: The Organization agrees with the finding and is working to establish a clear understanding of the grant reimbursement process to ensure the proper amounts are charged to each grant. Anticipated Completion Date: This correcti...
Contact Person: Interim Executive Director Fred Bazemore Corrective Action: The Organization agrees with the finding and is working to establish a clear understanding of the grant reimbursement process to ensure the proper amounts are charged to each grant. Anticipated Completion Date: This corrective action will be implemented by June 30, 2024.
View Audit 299575 Questioned Costs: $1
Finding # 2023-023 Title of Finding Equipment and Real Property Management Contact Person Sarah Wills and Christine Miller Anticipated Completion Date FY 2024 Corrective Action planned to be taken: The Board will establish procedures that will ensure compliance with requirements of the United State...
Finding # 2023-023 Title of Finding Equipment and Real Property Management Contact Person Sarah Wills and Christine Miller Anticipated Completion Date FY 2024 Corrective Action planned to be taken: The Board will establish procedures that will ensure compliance with requirements of the United States Department of Education's equipment management requirements and the requirements applicable to the ESSER program.
View Audit 299573 Questioned Costs: $1
Finding # 2023-022 Title of Finding Activities Allowed or Unallowed Contact Person Jody Johnson, Sarah Wills and Christine Miller Anticipated Completion Date FY 2024 Corrective Action planned to be taken: The Board has developed procedures to ensure that all purchase orders are approved before ord...
Finding # 2023-022 Title of Finding Activities Allowed or Unallowed Contact Person Jody Johnson, Sarah Wills and Christine Miller Anticipated Completion Date FY 2024 Corrective Action planned to be taken: The Board has developed procedures to ensure that all purchase orders are approved before orders are placed, all expenditures are properly authorized by the respective program director and supporting documentation is adequately maintained. The Board is using a requisition form in Droplet to achieve this goal. All employees authorized to make or approve purchases have been trained on purchasing procedures outlined in the Purchasing Policies and Procedures Manual for Local Educational Agencies in the State of West Virginia by the WVDE Office of School Finance on 2/23/2024.
View Audit 299573 Questioned Costs: $1
Finding # 2023-021 Title of Finding Special Tests and Provisions Contact Person Anthony McDaniels Anticipated Completion Date FY 2024 Corrective Action planned to be taken: The Board will develop a Food Service Collection Policy and attempt to collect the outstanding balances on the receivables rel...
Finding # 2023-021 Title of Finding Special Tests and Provisions Contact Person Anthony McDaniels Anticipated Completion Date FY 2024 Corrective Action planned to be taken: The Board will develop a Food Service Collection Policy and attempt to collect the outstanding balances on the receivables related to the National School Lunch Program.
View Audit 299573 Questioned Costs: $1
The College will purchase a new physical inventory system to replace the existing system. During the beginning of COVID 19, the staff member working on equipment inventory was no longer assigned to the inventory management process Morris College. A new staff member has been assigned to the inventory...
The College will purchase a new physical inventory system to replace the existing system. During the beginning of COVID 19, the staff member working on equipment inventory was no longer assigned to the inventory management process Morris College. A new staff member has been assigned to the inventory process as of March 15, 2024
View Audit 299554 Questioned Costs: $1
Management will take necessary steps to adhere to the procurement policy. A new procurement policy has been implemented that complies with federal procurement regulations and is currently in effect as of July 1, 2023.
Management will take necessary steps to adhere to the procurement policy. A new procurement policy has been implemented that complies with federal procurement regulations and is currently in effect as of July 1, 2023.
View Audit 299554 Questioned Costs: $1