Audit Period: Fiscal Year July 1, 2022 - June 30,2023 Re: Lima UMADAOP respectively submits the following corrective action plan for the year ended June 30, 2023. 2023-001 Reporting (Significant Deficiency) Recommendation: We suggest that Management engage in quarterly monitoring of their feder...
Audit Period: Fiscal Year July 1, 2022 - June 30,2023 Re: Lima UMADAOP respectively submits the following corrective action plan for the year ended June 30, 2023. 2023-001 Reporting (Significant Deficiency) Recommendation: We suggest that Management engage in quarterly monitoring of their federal expenditures. This proactive strategy will aid management in preparing the Schedule of Expenditures of Federal Awards (SEFA) at year-end, as the amounts will have undergone partial scrutiny for completeness and accuracy throughout the year. Corrective Action Plan: The Agency will review and strengthen all controls and make any necessary changes moving forward. The Accountant will provide any necessary training to the Bookkeeper as well as monitor and review all expenditures on monthly basis. The Accountant and the CEO will review the Schedule of Expenditures of Federal Awards (SEFA) on a quarterly basis to confirm the completeness and accuracy for all future audits. Responsible Party: CEO, Accountant, Bookkeeper Date Expected to be Corrected: Immediately
View Audit 301491 Questioned Costs: $1
Somerset County Public Schools respectfully submits the following Corrective Action Plan for the year ended June 30, 2023. Audit Period: July 1, 2022 through June 30, 2023 The finding from the schedule of findings and questioned costs is discussed below. The finding is numbered consistently with the...
Somerset County Public Schools respectfully submits the following Corrective Action Plan for the year ended June 30, 2023. Audit Period: July 1, 2022 through June 30, 2023 The finding from the schedule of findings and questioned costs is discussed below. The finding is numbered consistently with the number assigned in the schedule. FINDING- MAJOR FEDERAL AWARD PROGRAM AUDIT U.S Department of Agriculture 2023-001 Paper/Chemical Product Contract Recommendation: The Board should follow its established procedure and policy providing for competitive bids. Explanation of disagreement with audit finding: There is no disagreement with the audit finding. Action taken in response to finding: The Board has entered into a competitively sourced contract with FPC Holding, Inc. as of December 2023 for the purchase of these products. Name of contact person responsible for corrective action: Linda R. Johnson, Director of Finance Planned completion date for corrective action plan: December 1, 2023
View Audit 301442 Questioned Costs: $1
Condition and Criteria: PHA and HUD procurement policies require the documentation of the bid process in varying degrees based on the size of the contract or purchase. The PHA is also required to include Davis Bacon requirements in the contracts and monitor its compliance by the contractors. The C...
Condition and Criteria: PHA and HUD procurement policies require the documentation of the bid process in varying degrees based on the size of the contract or purchase. The PHA is also required to include Davis Bacon requirements in the contracts and monitor its compliance by the contractors. The CMR cited disbursements without procurement files totaling $226,057.43. During the audit, we were not provided with copies of the procurement records for these contracts. It also appears that the Davis Bacon standards were not included in the contracts and, as a result, those standards were not monitored.Auditor’s Recommendation: Documentation of expenses and the related procurement should be maintained and accessible for review. In addition, contracts should include Davis Bacon requirements and those requirements should be monitored by the Authority. Grantee Response: We are scheduling training for our staff related to the procurement and contract requirements and will begin better documenting both the procurement and the monitoring. Anticipated Completion Date: June 30, 2024
View Audit 301395 Questioned Costs: $1
FINDING 2023-003 Finding Subject: Child Nutrition Cluster - Allowable Activities and Allowable Costs Summary of Finding: The School Corporation had not properly designed or implemented a system of internal control, which would include appropriate segregation of duties, that would likely be effective...
FINDING 2023-003 Finding Subject: Child Nutrition Cluster - Allowable Activities and Allowable Costs Summary of Finding: The School Corporation had not properly designed or implemented a system of internal control, which would include appropriate segregation of duties, that would likely be effective in preventing, or detecting and correcting noncompliance related to allowable activities and allowable costs. The School Corporation purchased two pieces of equipment that were over $5,000 each in Fiscal Year 2023 without approval from the Federal awarding agency or pass-through entity. The first piece of equipment was a liftgate in the amount of $6,906, and the second piece of equipment was a vehicle in the amount of $7,500 for a combined total of $14,406. The financial management system of each non-federal entity must provide written procedures for determining allowability of costs in accordance with the federal regulations and the terms and conditions of the Federal Award. The policy should provide clear guidance as to what costs constitute appropriate direct and indirect charges to federal awards as well as provide for consistency in charging practices across the School Corporation. The School Corporation did not have an allowable costs policy outlining the School Corporation's processes and policies with regards to costs charged to federal grants. Contact Person Responsible for Corrective Action: Amy K. Sivley Contact Phone Number and Email Address: 260-563-2151; sivleya@apaches.k12.in.us Views of Responsible Officials: We concur with the finding. Explanation and Reasons for Disagreement: n/a Description of Corrective Action Plan: Retrain Food Service Director and Assistant Food Service Director on the process for purchasing equipment. The district will also develop and pass an Allowable Costs Policy. Anticipated Completion Date: To be completed by July 1, 2024
View Audit 301362 Questioned Costs: $1
Finding Number 2023-220: The Department failed to provide necessary supporting documentation for five Adoption Assistance Title IV-E eligibility determinations. Federal Programs: 93.659 – Adoption Assistance Related to Prior Finding: N/A Agency’s view: The Department agrees with this finding. ...
Finding Number 2023-220: The Department failed to provide necessary supporting documentation for five Adoption Assistance Title IV-E eligibility determinations. Federal Programs: 93.659 – Adoption Assistance Related to Prior Finding: N/A Agency’s view: The Department agrees with this finding. Corrective Action: The department agrees with the finding related to the critical importance of obtaining and maintaining documentation for all necessary background checks. Although the department was ultimately able to verify background checks were completed, we agree that we were unable to readily pull the needed documentation on these in a timely manner. The department will assure supporting documentation for Adoption Assistance Title IV-E eligibility determinations are maintained within the electronic filing system by adding an additional verification to the current process. When a supervisor reviews a departmental adoption for finalization, they will verify that a copy of the Enhanced Criminal History Background clearance letter for all adults residing in the home is uploaded to the prospective adoptive parents’ profile in eCabinet (the electronic case management system), and the signed copy of the adoption assistance agreement is uploaded to the child’s profile. The application process for Adoption Assistance Title IV-E eligibility for private adoptions will be updated to include the addition of the Enhanced Criminal History Background clearance letters for all adults residing in the home to the child’s eCabinet file. When a supervisor approves an adoption assistance agreement for a private adoption, they will verify a copy of the signed adoption assistance agreement is uploaded to the adoptive child’s profile. This will be completed by August 2024. Anticipated Corrective Action Date: August 2024 Responsible for Corrective Action: Cameron Gilliland, Division Administrator Cameron.Gilliland@dhw.idaho.gov 208-334-0641 Kelly Combs, Bureau Chief, Compliance Kelly.Combs@dhw.idaho.gov 208-334-5814
View Audit 301345 Questioned Costs: $1
Finding Number 2023-218: The Department failed to provide necessary documentation to support the eligibility determination for two foster care providers within the Foster Care -Title IV—E program. Federal Programs: 93.658 – Foster Care Title IV-E Related to Prior Finding: N/A Agency’s view: The D...
Finding Number 2023-218: The Department failed to provide necessary documentation to support the eligibility determination for two foster care providers within the Foster Care -Title IV—E program. Federal Programs: 93.658 – Foster Care Title IV-E Related to Prior Finding: N/A Agency’s view: The Department agrees with this finding. Corrective Action: The department agrees with the finding related to the critical importance of obtaining and maintaining documentation for all necessary background checks. Although the department was ultimately able to verify background checks were completed, we agree that we were unable to readily pull the needed documentation on these in a timely manner. To correct the issue, the department will add an additional point of verification that the Enhanced Criminal History Background Check clearance letter from the Background Check Unit’s system is uploaded to eCabinet, by having supervisors view the document within eCabinet prior to approving the initial foster care license. Supervisors will also confirm that all ICPC home studies address results of background checks for all adults in the home and any additional potential caregivers. This will be completed April 2024. Anticipated Corrective Action Date: April 2024 Responsible for Corrective Action: Cameron Gilliland, Division Administrator Cameron.Gilliland@dhw.idaho.gov 208-334-0641 Kelly Combs, Bureau Chief, Compliance Kelly.Combs@dhw.idaho.gov 208-334-5814
View Audit 301345 Questioned Costs: $1
Finding Number 2023-216: The Department did not have appropriate documentation to support allowability of transactions for the Foster Care Title IV-E program. Federal Programs: 93.658 – Foster Care Title IV-E Related to Prior Finding: N/A Agency’s view: The Department agrees with this finding. ...
Finding Number 2023-216: The Department did not have appropriate documentation to support allowability of transactions for the Foster Care Title IV-E program. Federal Programs: 93.658 – Foster Care Title IV-E Related to Prior Finding: N/A Agency’s view: The Department agrees with this finding. Corrective Action: A new feature was added to ESPI on 1/9/24 to record the reason (purpose) for certain service types, including transportation. The system is programmed to disallow Title IV-E if the reason listed does not meet IV-E eligibility criteria (see image below). An additional control will be added to the system to have the same control procedure used for a medical service type and education service type. Further development is underway for additional control procedures and should be completed by April of 2025. P-card transactions do not process through ESPI. Quarterly reports will be obtained to review any P-card transactions that utilized Title IV-E to confirm appropriate documentation is on record. This will be completed by April 30, 2024. Anticipated Corrective Action Date: April 30, 2024 Responsible for Corrective Action: Cameron Gilliland, Division Administrator Cameron.Gilliland@dhw.idaho.gov 208-334-0641 Kelly Combs, Bureau Chief, Compliance Kelly.Combs@dhw.idaho.gov 208-334-5814
View Audit 301345 Questioned Costs: $1
Finding 2023-002 - Federal Grant Expenditure: Allowable Costs Views of Reponsible Officials and Planned Corrective Action-Management will review expenses and general ledger for accurate data entry to program. Receipts for monthly expenses will be submitted with expenditure reports for program person...
Finding 2023-002 - Federal Grant Expenditure: Allowable Costs Views of Reponsible Officials and Planned Corrective Action-Management will review expenses and general ledger for accurate data entry to program. Receipts for monthly expenses will be submitted with expenditure reports for program personnel review prior to approval.
View Audit 301342 Questioned Costs: $1
The Food Bank is aware of the issue brought to them by external auditors during the expense testing phase of the audit for the fiscal year ended June 30, 2023. The issue under review is that the indirect payroll costs did not follow the cost allocation plan for three quarters of the fiscal year. Sta...
The Food Bank is aware of the issue brought to them by external auditors during the expense testing phase of the audit for the fiscal year ended June 30, 2023. The issue under review is that the indirect payroll costs did not follow the cost allocation plan for three quarters of the fiscal year. Staff turnover within the finance department during the period contributed to this error. To avoid this error going forward, the Food Bank has filled open positions so that the department is fully staffed and has brought on a Chief Financial Officer. In addition, processes have been set in place for managerial review of allocations on a quarterly basis. Actions to correct the finding have been completed. For inquiries regarding this finding, please contact Allyson Tutor, CFO at 858-863-5114 who is responsible for the corrective action.
View Audit 301284 Questioned Costs: $1
Response: CES subtracted previous Supportive Services costs that were not allowable in the December 31, 2023 quarterly report. CES has attached the supporting documentation that supports the correction of Supportive Services costs. CES reviewed the GPMS YB Participants Status and Contact Report, at...
Response: CES subtracted previous Supportive Services costs that were not allowable in the December 31, 2023 quarterly report. CES has attached the supporting documentation that supports the correction of Supportive Services costs. CES reviewed the GPMS YB Participants Status and Contact Report, attached in Appendix H, and compared the list to all the Participant on the books and removed any participant direct costs with attached Journal Entry, Appendix I.
View Audit 301283 Questioned Costs: $1
Corrective Action Plan - Past due tenant accounts receivable. Contact person - Executive Director. Corrective action planned - The PHA is working to obtain workout agreements on all past due balances. Anticipated completion date - Within the next fiscal year.
Corrective Action Plan - Past due tenant accounts receivable. Contact person - Executive Director. Corrective action planned - The PHA is working to obtain workout agreements on all past due balances. Anticipated completion date - Within the next fiscal year.
View Audit 301280 Questioned Costs: $1
Finding 390520 (2023-001)
Significant Deficiency 2023
Management's Response In error, an incorrect formula was used for applying 10 percent indirect cost on our grant draw spreadsheet; 1/12th of the indirect cost budget versus 10 percent of the monthly direct costs. Some months, the amount drawn for indirect cost was higher than 10 percent and other m...
Management's Response In error, an incorrect formula was used for applying 10 percent indirect cost on our grant draw spreadsheet; 1/12th of the indirect cost budget versus 10 percent of the monthly direct costs. Some months, the amount drawn for indirect cost was higher than 10 percent and other months lower than 10 percent of direct costs. When notified of error, immediate correction was made to indirect cost grant balance and grant draw spreadsheet. Views of Reponsible Officials and Corrective Action See response for finding 2023-001 Anticipated Completion Date Completed on March 22, 2024
View Audit 301275 Questioned Costs: $1
During October 2023, the $350 deposit was paid to the reserve for replacement account.
During October 2023, the $350 deposit was paid to the reserve for replacement account.
View Audit 301274 Questioned Costs: $1
March 27, 2024 Federal Audit Clearinghouse Re: Corrective Action Plan for Community Action Partnership of Mercer County To whom it may concern: Views of Responsible Officials and Planned Corrective Actions: 2023-01 There is no disagreement with the audit finding regarding costs allowed or allow...
March 27, 2024 Federal Audit Clearinghouse Re: Corrective Action Plan for Community Action Partnership of Mercer County To whom it may concern: Views of Responsible Officials and Planned Corrective Actions: 2023-01 There is no disagreement with the audit finding regarding costs allowed or allowable reviewed. The Organization’s fiscal policy manual policies and procedures states Audit costs are direct charged to each program and are billed separately to each program at a cost of 2% of the total budget of the program or grant. This policy has been enforced for years with an agreement between auditors and the organization. Management will review and update the Organization’s fiscal policy manual and procedures for consistency and compliance with GAAP and Uniform Guidance. Employee Responsible for Corrective Action: Michelle Clarke Completion Date: May 31, 2024 Respectfully Submitted, Michelle Clarke VP/CFO
View Audit 301273 Questioned Costs: $1
Corrective Action Planned: The identified payments relate to postage expenditures recorded in the Child Support Enforcement Grant. Postage expenditures are controlled in the State's mailing system through mail codes. Agencies send approved postage budgets to the Department of Administrative Service...
Corrective Action Planned: The identified payments relate to postage expenditures recorded in the Child Support Enforcement Grant. Postage expenditures are controlled in the State's mailing system through mail codes. Agencies send approved postage budgets to the Department of Administrative Services (DAS), who then creates a new mail code or adds additional funding to existing codes in the system. All mail processed through the mailing system is charged to these individual mail codes. A monthly expenditure report from the mailing system is interfaced with NH First, and the DAS uploads a journal entry to the general ledger to record these expenditures. The review and approvals for these postage transactions occur upfront at the agency level, not through a NH First approval workflow. DHHS and DAS will work together to document adequate evidence of this upfront review and approval.
View Audit 301259 Questioned Costs: $1
NHED concurs with the finding identified with the expenditures of $3605. The NHED will have the LEA’s submitting for indirect costs after September 30th upload an invoice and back up documentation into GMS. The NHED concurs with the findings identified with expenditures of $5,172. There were i...
NHED concurs with the finding identified with the expenditures of $3605. The NHED will have the LEA’s submitting for indirect costs after September 30th upload an invoice and back up documentation into GMS. The NHED concurs with the findings identified with expenditures of $5,172. There were in fact some items that were charged outside the period of performance. This happened prior to us receiving the FY22 audit finding and putting in place new controls to prevent. We have since put into place DOE-OBM-33 to ensure payments are being reviewed closely to the period of performance at multiple times. We have also corrected any items charged to the wrong CAN. The NHED concurs with the findings identified with expenditures of $816. We will look into the district returning these funds or other enforcement actions. In addition to the DOE-OBM-033 process, the Division of Learner Support has created and implemented a transfer of funds procedure.
View Audit 301259 Questioned Costs: $1
2023-008 COVID-19, Education Stabilization Fund: Higher Education Emergency Relief Fund - Student Aid Portion and Institutional Portion – Federal Assistance Listing Nos. 84.425E and 84.425F – Cash Management Recommendation: We recommend the University formally document, establish controls and monito...
2023-008 COVID-19, Education Stabilization Fund: Higher Education Emergency Relief Fund - Student Aid Portion and Institutional Portion – Federal Assistance Listing Nos. 84.425E and 84.425F – Cash Management Recommendation: We recommend the University formally document, establish controls and monitor advances in federal funds to ensure time elapsing between the transfer of funds and disbursement is minimized and any interest required to be remitted is calculated and returned on a timely basis. Explanation of disagreement with audit finding: There is no disagreement with the audit finding. Action taken in response to finding: The University will formally document, establish controls and monitor advances in federal funds to ensure time elapsing between the transfer of funds and disbursement is minimized and any interest required to be remitted is calculated and returned on a timely basis. Name(s) of the contact person(s) responsible for corrective action: Assistant Controller, Clifton Smith, II Planned completion date for corrective action plan: June 2024
View Audit 301226 Questioned Costs: $1
Cluster name: WIOA Cluster Assistance Listings number and program names: 17.258 WIOA Adult Program 17.259 WIOA Youth Program 17.278 WIOA Dislocated Worker Formula Grants Contact person: Billy Francis, Executive Director, Coconino Workforce Development Board, County Administration Anticipated complet...
Cluster name: WIOA Cluster Assistance Listings number and program names: 17.258 WIOA Adult Program 17.259 WIOA Youth Program 17.278 WIOA Dislocated Worker Formula Grants Contact person: Billy Francis, Executive Director, Coconino Workforce Development Board, County Administration Anticipated completion date: June 30, 2024 Concur. The County Administration Department acknowledges the work experience (WEX) requirement was not met for the Workforce Innovation and Opportunity Act (WIOA) Youth Program Year 2021 allocation. The Department has a tracking mechanism in the financial system and other records to account for the percentage of youth expenditures made on WEX activities. Due to an oversight, the percentage of WEX expenditures in relation to the total allocation was not monitored by staff. Additionally, the amount of WEX funding allocated to the Youth program service provider was insufficient to meet the requirement. The Department will write procedures for the monitoring of earmarking requirements, including WEX, to ensure the roles and responsibilities of staff and key stakeholders are clearly defined. The calculation of funds allocated to the service provider will factor in the level of WEX expenditures needed for the County to meet the requirement. The Department will work with the WIOA Youth program service provider to employ best practices and strategies to recruit eligible in-school and out-of-school youth in need of WEX activities to further their skills and job readiness. The Department will monitor WEX expenditures made by the service provider and provide technical assistance as needed. If the Department projects the County will not meet the threshold for a certain program year allocation, it will seek technical assistance from the Arizona Department of Economic Security.
View Audit 301196 Questioned Costs: $1
Assistance Listings number and program name: 10.691 Good Neighbor Authority Contact persons: Lucinda Andreani, Deputy County Manager and Flood Control District Administrator Anticipated completion date: June 30, 2025 Concur. The Coconino County Flood Control District (FCD) acknowledges price was no...
Assistance Listings number and program name: 10.691 Good Neighbor Authority Contact persons: Lucinda Andreani, Deputy County Manager and Flood Control District Administrator Anticipated completion date: June 30, 2025 Concur. The Coconino County Flood Control District (FCD) acknowledges price was not considered as a factor for contractor selection in the procurement of construction services for the Good Neighbor Authority program in accordance with 2 CFR 200 Subpart D Procurement Standards. A procurement was completed for construction-manager at-risk (CMAR) services, authorized by A.R.S. 28-7366, because the FCD believed at that time that the method would also satisfy the federal standards. The CMAR method bases selection on qualification and competence, does not allow for pricing to be requested or considered before making the selection, and transfers the risk of budget overages to the contractor by agreement to a Guaranteed Maximum Price (GMP). After selecting the contractor for Good Neighbor Authority construction projects, the FCD worked closely with the County’s contracted engineering firm to ensure that the GMP was reasonable and cost efficiencies were identified and implemented throughout all stages of the project. The County believes the prices paid as a result of the procurement are reasonable and no excess federal expenditures were made due to the non-federal procurement method that was used in error. FCD fiscal and management staff will receive formal training on 2 CFR 200 Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, also known as the Uniform Guidance, to ensure its requirements are understood. Additionally, the FCD will implement written internal procurement procedures to be used for future procurements so that they are made in accordance with all applicable laws, regulations and policies. The County Finance Department has a designated grant accounting team specializing in compliance with Federal award requirements. The FCD will request technical assistance from this team prior to initiating any procurement with Federal funds to help make sure Federal regulations are considered and met. The Finance Department will provide training to all departments on Uniform Guidance requirements. Training will also be provided on the County’s procurement policies and procedures to help departments gain a complete understanding of the requirements for acquiring goods and services with federal funds. In line with the County’s decentralized finance model in which financial management staff are located within the departments, the responsibility to meet requirements specific to certain federal awards rests with the department that manages the award. The Finance Department will identify the source of funding for procurements requested by departments. Staff who are knowledgeable about Federal procurement requirements and the County’s procurement policies and procedures will review and approve the procurements involving federal awards.
View Audit 301196 Questioned Costs: $1
Cluster name: TRIO Cluster Assistance Listing number and name: 84.042 TRIO – Student Support Services 84.047 TRIO – Upward Bound Award numbers and years: P047A171009, September 1, 2017 through August 31, 2022 P047A170820, September 1, 2017 through August 31, 2023 P042A200873, P042A201342, and...
Cluster name: TRIO Cluster Assistance Listing number and name: 84.042 TRIO – Student Support Services 84.047 TRIO – Upward Bound Award numbers and years: P047A171009, September 1, 2017 through August 31, 2022 P047A170820, September 1, 2017 through August 31, 2023 P042A200873, P042A201342, and P042A200859, September 1, 2020 through August 31, 2025 P047A221154 and P047A221160, September 1, 2022 through August 31, 2027 Federal Agency: U.S. Department of Education Compliance Requirements: Eligibility Questioned costs: $5,612 Name of contact persons: Kristina Winterstein, Associate Controller, District Business Services Anticipated completion date: June 30, 2024 The District is aware of the importance of maintaining effective internal control over federal awards and ensuring compliance with applicable federal regulations. The District will work with the TRIO project directors at each college to review and revise existing procedures to require an independent and knowledgeable employee review and approve student eligibility determinations prior to awarding program services to them. The District will enhance communication and training efforts to ensure that the TRIO project directors and all staff administering the TRIO programs understand all eligibility requirements and related district-wide policies and procedures. As of March 21, 2024, the questioned costs for the program have been resolved.
View Audit 301142 Questioned Costs: $1
Assistance Listing number and name: 84.031 Higher Education – Institutional Aid Award numbers and years: P031S160090, October 1, 2016 through September 30, 2023 P031S190167, October 1, 2019 through September 30, 2024 P031S200096 and P031S200081, October 1, 2020 through September 30, 2025 P031C2...
Assistance Listing number and name: 84.031 Higher Education – Institutional Aid Award numbers and years: P031S160090, October 1, 2016 through September 30, 2023 P031S190167, October 1, 2019 through September 30, 2024 P031S200096 and P031S200081, October 1, 2020 through September 30, 2025 P031C210057 and P031C210077, October 1, 2021 through September 30, 2026 P031S220015 and P031S220179, October 1, 2022 through September 30, 2027 Federal Agency: U.S. Department of Education Compliance Requirements: Reporting and special tests and provisions Questioned costs: Unknown Name of contact persons: Kristina Winterstein, Associate Controller, District Business Services Diana Aguirre-Rosales, Fiscal Director, Maricopa Community Colleges Foundation Anticipated completion date: December 31, 2024 The District is aware of the importance of ensuring that reports submitted are reviewed for accuracy prior to submission and implemented new processes for report review and submission in November 2023. On February 7, 2024, after multiple requests, the U.S. Department of Education (ED) provided the District with access to ED’s reporting system, which will allow the District to timely submit reports. The District will coordinate with the Maricopa Community Colleges Foundation to ensure that the endowment contracts include all necessary federal regulation information and that the investment and disbursement of funds are in accordance with federal regulations.
View Audit 301142 Questioned Costs: $1
Cluster Name: Student Financial Assistance Cluster Assistance Listing number and name: 84.007 Federal Supplemental Educational Opportunity Grants 84.033 Federal Work-Study Program 84.038 Federal Perkins Loan Program-Federal Capital Contributions 84.063 Federal Pell Grant Program 84.268 Fed...
Cluster Name: Student Financial Assistance Cluster Assistance Listing number and name: 84.007 Federal Supplemental Educational Opportunity Grants 84.033 Federal Work-Study Program 84.038 Federal Perkins Loan Program-Federal Capital Contributions 84.063 Federal Pell Grant Program 84.268 Federal Direct Student Loans Award Year: July 1, 2021 through June 30, 2022 Federal Agency: U.S. Department of Education Compliance Requirements: Special tests and provisions Questioned Costs: Unknown Name of Contact Persons: Joshua Lindenberg, District Director of Financial Aid Anticipated Completion Date: December 31, 2024 The Maricopa County Community College District understands the importance of reporting accurate student enrollment statuses and all student enrollment status changes to the National Student Loan Database (NSLDS) for the Pell and Direct Loan programs. System improvements were completed in June 2023 to reduce and prevent enrollment reporting errors. The District will continue to enhance internal controls by expanding procedures to proactively monitor, detect, and correct unresolved enrollment reporting errors and will conduct semi-annual quality assurance reviews of student accounts to ensure enrollment data is reported appropriately to the NSLDS. The district will assess and enhance the existing enrollment reporting transmission schedule, documenting and disseminating a final copy to staff to ensure optimal efficiencies and reduce enrollment reporting errors caused by the timing of data transmission and error processing.
View Audit 301142 Questioned Costs: $1
The Supply Chain Depa11ment will ensure appropriate consideration to competitors are given and adequate documentation is obtained with respect to procurement of professional services and sole source products in accordance with the Uniform Guidance 2 CFR section 200.320(t). • Additionally, the docume...
The Supply Chain Depa11ment will ensure appropriate consideration to competitors are given and adequate documentation is obtained with respect to procurement of professional services and sole source products in accordance with the Uniform Guidance 2 CFR section 200.320(t). • Additionally, the documentation will be approved by the Director of Special Education as well as the Supervisor of Supply Chain and retained as evidence of the internal controls over procurement. Timeline: Effective immediately Responsible Person:Amber Miller, Supply Chain Supervisor
View Audit 301090 Questioned Costs: $1
Management concurs with the audit finding. Capital Region Medical Center has sufficient unreimbursed lost revenues to replace the unallowable expenses reported. Capital Region Medical Center federal grant processes will begin to follow the University of Missouri grant policies beginning January 1,...
Management concurs with the audit finding. Capital Region Medical Center has sufficient unreimbursed lost revenues to replace the unallowable expenses reported. Capital Region Medical Center federal grant processes will begin to follow the University of Missouri grant policies beginning January 1, 2024.
View Audit 301083 Questioned Costs: $1
Finding 390159 (2023-003)
Significant Deficiency 2023
Finding Reference Number: SA2023-003 Cash Management - Draw Down of Community Development Block Grant Funds in Advance of Disbursement Assistance Listing Number: 14.218 Assistance Listing Title: Community Development Block Grant – Entitlement Grants COVID-19 - Community Development Bloc...
Finding Reference Number: SA2023-003 Cash Management - Draw Down of Community Development Block Grant Funds in Advance of Disbursement Assistance Listing Number: 14.218 Assistance Listing Title: Community Development Block Grant – Entitlement Grants COVID-19 - Community Development Block Grants/Entitlement Grants-CV Federal Agency: Department of Housing and Urban Development Federal Award Identification Number: B-22-MC-06-0010 COVID-19 - B-20-MW-06-0010 • Fiscal Year of Initial Finding: 2023 • Name(s) of the contact person: Traci Cho, Accountant • Corrective Action Plan: The City will review the retentions payable when preparing the IDIS drawdown to ensure that retentions are not included in the drawdown amount. • Anticipated Completion Date: 06/30/24
View Audit 301060 Questioned Costs: $1