Finding 502738 (2023-007)
Significant Deficiency 2023
United States Department of Education 2023-007 Student Financial Aid Cluster – Assistance Listing No. 84.063 Condition: Students were disbursed Pell funds inaccurately. Auditors’ Recommendation: We recommend the University implement policies to review all student award packages at the start of the ...
United States Department of Education 2023-007 Student Financial Aid Cluster – Assistance Listing No. 84.063 Condition: Students were disbursed Pell funds inaccurately. Auditors’ Recommendation: We recommend the University implement policies to review all student award packages at the start of the academic year to ensure no over and under awards exist. Explanation of disagreement with audit finding: There is no disagreement with the audit finding. Action taken in response to finding: Summer 2023 Martin University’s main power source was struck by lightning. This caused all Summer processing, that had not yet been backed up on our servers, to be deleted from the system. All transactions that took place at that time had to be manually re-entered. During that manual process, there appears to be a human error in inputting the dates. SIS dates will be corrected to original and actual COD disbursement dates. Name(s) of the contact person(s) responsible for corrective action: Qiana Hall, Associate VP of Enrollment Services Planned completion date for corrective action plan: November 30, 2024
View Audit 324814 Questioned Costs: $1
The County will obtain and review periodic financial statements and/or underlying documentation and obtain a copy of the annual audit report in accordance with Uniform Guidance.
The County will obtain and review periodic financial statements and/or underlying documentation and obtain a copy of the annual audit report in accordance with Uniform Guidance.
View Audit 324806 Questioned Costs: $1
Finding 2023-001 Federal Program Funds Utilized for Non-Federal Programs Recommendation: The Authority should locate additional sources of non-federal funds or reduce costs sufficiently so that the program can have enough cash to cover ongoing operations. Explanation of disagreement with audit findi...
Finding 2023-001 Federal Program Funds Utilized for Non-Federal Programs Recommendation: The Authority should locate additional sources of non-federal funds or reduce costs sufficiently so that the program can have enough cash to cover ongoing operations. Explanation of disagreement with audit finding: There is no disagreement with the audit finding. Action taken in response to finding: The Authority has reevaluated its cost allocation plan, and restructured various department to better align staffing. This process helps ensure the COCC and funds are being properly charged for actual costs incurred. The Authority is also redeveloping its entire portfolio. This process had been and will continue to bring in developer and management fees to the COCC to help reduce the due to/due from activity. Name(s) of the contact person(s) responsible for corrective action: Cia Cook, Deputy Executive Director & CFO Planned completion date for corrective action plan: June 30, 2025
View Audit 324736 Questioned Costs: $1
B. Finding 2023-002 Mortgage Insurance for the Purchase or Refinancing of Existing Multifamily Housing Projects (Section 207/223(f)) (CFDA# 14.155) Allowable costs/cost principles The Project disbursed $47,837 of legal costs that were not operating expenses for the pro...
B. Finding 2023-002 Mortgage Insurance for the Purchase or Refinancing of Existing Multifamily Housing Projects (Section 207/223(f)) (CFDA# 14.155) Allowable costs/cost principles The Project disbursed $47,837 of legal costs that were not operating expenses for the project. (1) Comments on the Finding and Each Recommendation Management concurs with this finding and the current management agent has ensured that $47,837 was reimbursed from entity non-project funds. (2) Actions Taken on the Finding The funds were reimbursed from entity non-project funds.
View Audit 324633 Questioned Costs: $1
A. Finding 2023-001 Mortgage Insurance for the Purchase or Refinancing of Existing Multifamily Housing Projects (Section 207/223(f)) (CFDA# 14.155) Residual Receipts The Project did not deposit their residual receipts deposit of $31,573 from prior year surplus cash wit...
A. Finding 2023-001 Mortgage Insurance for the Purchase or Refinancing of Existing Multifamily Housing Projects (Section 207/223(f)) (CFDA# 14.155) Residual Receipts The Project did not deposit their residual receipts deposit of $31,573 from prior year surplus cash within the required deadline of 90 days after year end. (1) Comments on the Finding and Each Recommendation Management concurs with this finding, agrees with the auditor recommendation, and has made the required residual receipts deposit. (2) Actions Taken on the Finding The funds have been deposited to residual receipts.
View Audit 324633 Questioned Costs: $1
Action taken in response to finding: 1. Create a standard procedure for tracking grant expenses: Completed 2. Train staff on procedures: Completed 3. Create an independent review process for all grant tracking: In progress Name of the contact person responsible for corrective action: Keith Flores, C...
Action taken in response to finding: 1. Create a standard procedure for tracking grant expenses: Completed 2. Train staff on procedures: Completed 3. Create an independent review process for all grant tracking: In progress Name of the contact person responsible for corrective action: Keith Flores, CFO Planned completion date for corrective action plan: End of 2024
View Audit 324609 Questioned Costs: $1
Action taken in response to finding: 1. Create procedure to verify vendors are not suspended or debarred: in progress a. Develop steps in the vendor diligence and procurement process to verify that the vendor is not suspended or debarred. b. Identify role or job that will handle responsibility for f...
Action taken in response to finding: 1. Create procedure to verify vendors are not suspended or debarred: in progress a. Develop steps in the vendor diligence and procurement process to verify that the vendor is not suspended or debarred. b. Identify role or job that will handle responsibility for following procedure. c. Formalize the process into a written procedure and add to the procurement or other relevant policy. d. Conduct periodic audits to assess adherence to the procedure and train as necessary to ensure compliance. Name of the contact person responsible for corrective action: Keith Flores, CFO Planned completion date for corrective action plan: End of 2024
View Audit 324609 Questioned Costs: $1
Action taken in response to finding: 1. Review Current Procurement Policy: in progress a. Conduct a comprehensive review of Promise Healthcare’s existing procurement policy. b. Identify and revise and discrepancies or non-compliance with the requirements of the Uniform Guidance. c. Integrate industr...
Action taken in response to finding: 1. Review Current Procurement Policy: in progress a. Conduct a comprehensive review of Promise Healthcare’s existing procurement policy. b. Identify and revise and discrepancies or non-compliance with the requirements of the Uniform Guidance. c. Integrate industry best practices into revised policy to enhance compliance and efficiency 2. Training and Education: to start a. Provide training sessions for staff authorized to purchase along with relevant personnel on the revised procurement policy and procedures and raise awareness of the requirements of the Uniform Guidance and implications of non-compliance. b. Establish training on documentation standards for procurement activities including requisitions, solicitations, evaluations and contract awards. c. Establish training and procedure for retention of procurement-related documentation 3. Internal Controls and oversight: to start a. Implement mechanisms for monitoring and oversight to ensure compliance with the procurement policy. b. Conduct periodic internal audits to assess adherence to procurement procedures and identify areas for improvement or corrective action Name of the contact person responsible for corrective action: Keith Flores, CFO Planned completion date for corrective action plan: Winter 2025
View Audit 324609 Questioned Costs: $1
Action taken in response to finding: 1. Create a grant matrix to track employee grant allocations in one file: Complete 2. Utilize the matrix to apply allocation to each employee on every payroll occurrence: In Progress 3. Review the matrix with grant project managers monthly to ensure accuracy and ...
Action taken in response to finding: 1. Create a grant matrix to track employee grant allocations in one file: Complete 2. Utilize the matrix to apply allocation to each employee on every payroll occurrence: In Progress 3. Review the matrix with grant project managers monthly to ensure accuracy and capture changes: In Progress 4. Maintain records of for each payroll of grant matrix application: In progress Name of the contact person responsible for corrective action: Keith Flores, CFO Planned completion date for corrective action plan: End of 2024
View Audit 324609 Questioned Costs: $1
Action Taken: The Senior Programs have undergone significant improvements in the last 6 months following an audit by the federal funder which resulted in a corrective action plan (CAP) and a repayment of $54,228. Plans were implemented during the spring of 2024 in response to the CAP which resulted...
Action Taken: The Senior Programs have undergone significant improvements in the last 6 months following an audit by the federal funder which resulted in a corrective action plan (CAP) and a repayment of $54,228. Plans were implemented during the spring of 2024 in response to the CAP which resulted in an overhaul of the processes in place to properly develop the volunteer checklists and assure all records for staff and volunteers are now compliant. Our Quality and Compliance and Finance team worked closely with the new Program Manager to assure that we will be fully compliant and remain so.
View Audit 324497 Questioned Costs: $1
Sufficient Documentation for Noncompetitive Proposals for Pacific Fisheries Data Program, 11.437 Recommendation: CLA recommends increased internal monitoring to ensure that noncompetitive procurements are sufficiently justified and that internal Sole Source Justification Forms are completed correct...
Sufficient Documentation for Noncompetitive Proposals for Pacific Fisheries Data Program, 11.437 Recommendation: CLA recommends increased internal monitoring to ensure that noncompetitive procurements are sufficiently justified and that internal Sole Source Justification Forms are completed correctly and retained for all vendors procured under noncompetitive methods. Explanation of disagreement with audit finding: There is no disagreement with the audit finding. Action taken in response to finding: The Commission will modify its subcontractor request form and PO form to require competitive supporting documents or non-competitive justification documents to be attached with the subcontractor request or PO form. Contract Specialist and Purchasing Specialist will review request package to ensure all required paperwork completed properly before moving forward with the process. In the pipe line, Requisition Module in Navision Software will be designed to put a hard stop if a purchase order of $10,000 or greater is missing supporting document for competitive/non-competitive procurements. Name(s) of the contact person(s) responsible for corrective action: Kathy Ameral and Michael Arredondo. Planned completion date for corrective action plan: October 15, 2023
View Audit 324412 Questioned Costs: $1
August 31, 2024 To: Clausell & Associates, P.C. From: Tabirus Lockhart, Chief Financial Officer of Enrichment Services Programs, Inc. Below is the Agency’s corrective action plan as it relates to the findings for the fiscal year ending July 31, 2023, Single Audit Act audit. Comment #2023-001 INT...
August 31, 2024 To: Clausell & Associates, P.C. From: Tabirus Lockhart, Chief Financial Officer of Enrichment Services Programs, Inc. Below is the Agency’s corrective action plan as it relates to the findings for the fiscal year ending July 31, 2023, Single Audit Act audit. Comment #2023-001 INTERNAL CONTROLS OVER FINANCIAL STATEMENT PREPARATION, GRANT CLOSE-OUT, AND COMPLIANCE WITH RELATED PROVISIONS OF GRANTS AND CONTRACTS SHOULD BE IMPROVED GENERAL (Repeat) Views of Responsible Officials and Planned Corrective Actions: We concur with this finding - Management is in the process of assessing the organizational structure, capacity to provide adequate financial reporting. With Board review and approval of the Agency’s financial funding sources, the Agency will hire additional fiscal clerk to further support financial requirements and segregation of duties to ensure adequate internal controls are fully implemented. The CFO will have the overall responsibility of properly reconciling and closing out the accounting system and grant activity each month in an efficient and timely manner to eliminate the risk of significant errors occurring. Budget-to-actual schedules will be an integral part of the grant accountant analyst’s basic responsibilities. The fiscal policies and procedures will be updated with the enhancements implemented within the fiscal department. Staff will be trained on revised policies and procedures and Uniform Guidance regulations. The new automated financial systems, will support financial reporting to meet GAAP requirements and to provide informative reports for Board and Management. All enhancements will be implemented by December 31, 2024. Implementation Date: The plan correction date will be completed no later than December 31, 2024. Responsible Person: Tabirus Lockhart, CFO, will be responsible for the corrective action. Comment #2023-002 INTERNAL CONTROLS OVER FINANCIAL STATEMENT PREPARATION, GRANT CLOSE-OUT, AND COMPLIANCE WITH RELATED PROVISIONS OF GRANTS AND CONTRACTS SHOULD BE IMPROVED HEAD START AND EARLY HEAD START, LIHEAP, LIHWAP, CSBG, ASTHO FAL # 93.600, 93.568, 93.499, 93.569, 93.185 (Questioned Costs - Undetermined) Views of Responsible Officials and Planned Corrective Actions: We concur with the finding. Management and staff are in the process of assessing and updating the policies and procedures over the accounting and reporting of federal and state grants and contracts. In connection with training staff on the new and updated accounting system, we are providing on-going training on the requirements of the Uniform Guidance and the specific requirements for each individual grant award as outlined in each applicable Compliance Supplement issued by Office of Management and Budget (OMB). We are currently reconciling all cash accounts, completing and amending, were necessary, all SF-425 reports and other external reports required by each funding source (state and federal). We anticipate completing this corrective action by December 31, 2024. See also the response to Comment #2023-01. Implementation Date: The plan correction date will be completed no later than December 31, 2024. Responsible Person: Tabirus Lockhart, CFO, will be responsible for the corrective action.
View Audit 324385 Questioned Costs: $1
CORRECTIVE ACTION PLAN Audit Firm: Winkel Green & Company LLP Audit Period: January 1, 2023 through December 31, 2023 CAP Prepared by: Name: Beth Fetzer-Rice Position: Executive Director Current Findings on the Schedule of Findings, Questioned Costs and Recommendations 1. Fin...
CORRECTIVE ACTION PLAN Audit Firm: Winkel Green & Company LLP Audit Period: January 1, 2023 through December 31, 2023 CAP Prepared by: Name: Beth Fetzer-Rice Position: Executive Director Current Findings on the Schedule of Findings, Questioned Costs and Recommendations 1. Finding 2023-001 a. Comments on the Finding and Recommendation. Uniform Guidance stipulates that reimbursements are paid to subrecipients in a timely manner. The Organization did not pay subrecipients in a timely manner for the months of January through June 2023, resulting in $261,999 of untimely reimbursements. b. Action Taken or Planned on the Finding The Organization met with subrecipients prior to December 31, 2023 to establish increased control processes, including outlining documentation requirements, timeframes for reimbursement submission, identifying correct staff contacts for timely communications, and formalizing a timeframe for approving/distributing subrecipient disbursements. The Organization has paid all reimbursements through December 2023 as of February 2024.
View Audit 324321 Questioned Costs: $1
Finding 502031 (2023-005)
Significant Deficiency 2023
SIGNIFICANT DEFICIENCY IN INTERNAL CONTROL OVER COMPLIANCE 2023 – 005 Payroll Disbursements Recommendation: Management should continue to follow established controls to ensure the appropriate compensation of its employees at approved rates. Explanation of disagreement with audit finding: There is...
SIGNIFICANT DEFICIENCY IN INTERNAL CONTROL OVER COMPLIANCE 2023 – 005 Payroll Disbursements Recommendation: Management should continue to follow established controls to ensure the appropriate compensation of its employees at approved rates. Explanation of disagreement with audit finding: There is no disagreement with this finding. Action taken in response to finding: As of July 1, 2023, the Organization was acquired by Brightpoint, a social service organization with complimentary operations. The finance leadership of the acquiring organization has robust internal controls is experienced to resolve this finding in the subsequent year. Name of the contact person responsible for corrective action: Ed Balogh, Controller Planned completion date for corrective action plan: June 30, 2024. If the U.S. Department of Health and Human Services has questions regarding this plan, please call Ed Balogh, Controller, at 312-424-0200.
View Audit 324229 Questioned Costs: $1
1. Cleveland UMADAOP will obtain written prior approval for any expenditure deviations from the originally approved budget. This topic will be covered when training occurs during the quarterly review of grant guidelines. 2. As part of its updated financial policies and procedures, Cleveland UMADAOP...
1. Cleveland UMADAOP will obtain written prior approval for any expenditure deviations from the originally approved budget. This topic will be covered when training occurs during the quarterly review of grant guidelines. 2. As part of its updated financial policies and procedures, Cleveland UMADAOP will seek to document all financial activity to ensure compliance with grant and federal guidelines. 3. As part of the updated financial policies and procedures, Cleveland UMADAOP will seek written confirmation from funders whenever there is a deviation from the terms outlined in the original award documentation. 4. As part of the updated financial policies Cleveland UMADAOP will be using the services of a virtual accounting firm that specializes in: a) standardized monthly financial reporting packages that will be reconciled to the approved budgets; b) standardized monthly close processes that lock transactions at the end of each month; and c) electronic document retention for A/P and A/R among other services.
View Audit 324194 Questioned Costs: $1
1. A critical aspect of Cleveland UMADAOP’s updating of financial policies and procedures will be training on the proper and timely completion of federal forms 2. Weekly meetings will be held with Program Directors with a standard agenda item of upcoming due dates within the subsequent four weeks. 3...
1. A critical aspect of Cleveland UMADAOP’s updating of financial policies and procedures will be training on the proper and timely completion of federal forms 2. Weekly meetings will be held with Program Directors with a standard agenda item of upcoming due dates within the subsequent four weeks. 3. During these meetings, Directors will be required to provide status updates and draft submissions when applicable. 4. Once a quarter, a federal compliance requirement will be selected to have a deep dive review. 5. An HQ Administrative Assistant will be hired to monitor compliance as well as adherence to deadlines and will prepare a monthly report for the Executive Director’s review.
View Audit 324194 Questioned Costs: $1
Cleveland UMADAOP will be using the services of a virtual accounting firm that specializes in: a) standardized monthly financial reporting packages that will be reconciled to the approved budgets; b) standardized monthly close processes that lock transactions at the end of each month; and c) electro...
Cleveland UMADAOP will be using the services of a virtual accounting firm that specializes in: a) standardized monthly financial reporting packages that will be reconciled to the approved budgets; b) standardized monthly close processes that lock transactions at the end of each month; and c) electronic document retention for A/P and A/R among other services.
View Audit 324194 Questioned Costs: $1
Authority Response and Planned Corrective Action: The Authority accepts the recommendation of the auditor. The Authority will increase oversight in the Section 8 Housing Choice Vouchers and Mainstream Vouchers programs to ensure that established internal control policies related to HQS inspections ...
Authority Response and Planned Corrective Action: The Authority accepts the recommendation of the auditor. The Authority will increase oversight in the Section 8 Housing Choice Vouchers and Mainstream Vouchers programs to ensure that established internal control policies related to HQS inspections are being followed on a timely basis. Donald Paredez, Executive Director, is responsible for implementing this corrective action by December 31, 2024.
View Audit 324142 Questioned Costs: $1
Authority Response and Planned Corrective Action: The Authority agrees with the finding and will increase oversight related to the maintenance of tenant files to better monitor adequacy with compliance requirements. Donald Paredez, Executive Director, is responsible for implementing this corrective ...
Authority Response and Planned Corrective Action: The Authority agrees with the finding and will increase oversight related to the maintenance of tenant files to better monitor adequacy with compliance requirements. Donald Paredez, Executive Director, is responsible for implementing this corrective action by December 31, 2024.
View Audit 324142 Questioned Costs: $1
Authority Response and Planned Corrective Action: Management agrees with the Auditors' finding and will implement the required updates and safeguards to ensure that the Authority complies with Section 19 of the ACC to remedy the aforementioned deficiencies. Donald Paredez, Executive Director, is res...
Authority Response and Planned Corrective Action: Management agrees with the Auditors' finding and will implement the required updates and safeguards to ensure that the Authority complies with Section 19 of the ACC to remedy the aforementioned deficiencies. Donald Paredez, Executive Director, is responsible for implementing this corrective action by December 31, 2024.
View Audit 324142 Questioned Costs: $1
We appreciate the auditor's identification of the material weakness in our internal controls over the documentation of approved pay rates related to our federal award. We understand the importance of maintaining adequate internal controls to prevent, detect, and correct misstatements on a timely bas...
We appreciate the auditor's identification of the material weakness in our internal controls over the documentation of approved pay rates related to our federal award. We understand the importance of maintaining adequate internal controls to prevent, detect, and correct misstatements on a timely basis. 1. Documentation Process: We will implement a documentation process to ensure that all employee pay rates related to our federal award are documented and approved by management. Specifically, we will: a. Assign responsibility for documenting and approving employee pay rates related to our federal award to a specific staff member. b. Establish a process for documenting and approving employee pay rates related to our federal award, including the use of a standardized form. c. Ensure that all employee pay rates related to our federal award are documented and approved before payroll is processed. d. Investigate and resolve any discrepancies identified during the documentation and approval process related to our federal award. e. Document the documentation and approval process related to our federal award and ensure that all documentation is maintained. 2. Internal Controls: We will strengthen our internal controls over the documentation of approved pay rates to ensure that misstatements are prevented, detected, and corrected on a timely basis. Specifically, we will: a. Establish a process for reviewing all employee pay rates by management. b. Ensure that all staff members responsible for documenting and approving employee pay rates are trained on the new process and the importance of maintaining adequate internal controls. c. Document the new process and internal controls in a written policy and procedure manual. 3. Personnel: We will ensure that personnel changes do not impact our internal controls over the documentation of approved pay rates. Specifically, we will: a. Cross-train staff members to ensure that there is adequate coverage for all employee pay rates. b. Establish a process for documenting and communicating changes in personnel responsibilities related to the documentation and approval of employee pay rates. We believe that these corrective actions will effectively address the material weakness identified by the auditor and strengthen our internal controls over the documentation of approved pay rates. We are committed to ensuring the accuracy and integrity of our financial reporting and maintaining the trust of our stakeholders. Person Responsible: Anthony Jayesingha Date Corrected: 7/31/2023
View Audit 324071 Questioned Costs: $1
Finding 2023-001 Federal Agency: U.S. Department of Housing and Urban Development Federal Program Titles: Section 8 Housing Choice Vouchers Program Assistance Listing Number: 14.871 Noncompliance – N. Special Tests and Provisions - Housing Quality Standards Non Compliance Material to the Financial ...
Finding 2023-001 Federal Agency: U.S. Department of Housing and Urban Development Federal Program Titles: Section 8 Housing Choice Vouchers Program Assistance Listing Number: 14.871 Noncompliance – N. Special Tests and Provisions - Housing Quality Standards Non Compliance Material to the Financial Statements: No Significant Deficiency in Internal Control over Compliance for Special Tests and Provisions Criteria: Housing Quality Standards Inspections. The PHA must inspect the unit leased to a family at least biennially to determine if the unit meets the Housing Quality Standards (HQS) and the PHA must conduct quality control re-inspections. The PHA must prepare a unit inspection report (24 CFR sections 982.158(d) and 982.405(b)). For units that fail inspection the PHA must correct all life threatening HQS deficiencies within 24 hours and all other deficiencies within 30 days. Condition: Based upon inspection of the Authority’s files and on discussion with management, there was a failed inspection that did not pass reinspection within 30 days without penalty. Context: There were approximately six hundred ninety four (694) failed inspections during the audit period. Of a sample size of twenty-five (25) failed inspections, one (1) unit did not pass reinspection within 30 days. HAP was not abated nor was the tenant transferred. Known Questioned Costs: $4,107 Our sample size is statistically valid. Cause: There is a significant deficiency in internal controls over the compliance for the special tests and provisions type of compliance related to HQS inspections. Effect: The Section 8 Housing Choice Vouchers Program is in non-compliance with the special tests and provisions type of compliance related to HQS inspections. Recommendation: We recommend the Authority design and implement a corrective action plan that will assure compliance with the Uniform Guidance and the compliance supplement. Authority Response: The Authority accepts the recommendation of the auditor and will make the necessary changes to its inspection process to ensure enforcement of Housing Quality Standards (or any subsequent replacement). Irene Melton, Director of Finance, is responsible for implementing this corrective action by December 31, 2024
View Audit 324070 Questioned Costs: $1
Finding 501894 (2023-002)
Material Weakness 2023
Management will undertake the following corrective actions to address the material weakness identified: 1. Provide additional training to staff involved in payroll processing. 2. Establish procedures and implement more precise controls to ensure that expenditures are properly reviewed and approved b...
Management will undertake the following corrective actions to address the material weakness identified: 1. Provide additional training to staff involved in payroll processing. 2. Establish procedures and implement more precise controls to ensure that expenditures are properly reviewed and approved before being charged to a federal award.
View Audit 324039 Questioned Costs: $1
Management concurs with the audit finding of underfunded security deposits and will deposit funds back to the cash account as cash flow permits.
Management concurs with the audit finding of underfunded security deposits and will deposit funds back to the cash account as cash flow permits.
View Audit 324038 Questioned Costs: $1
Finding 2023‐004 – Material Weakness, Material Noncompliance – Allowable Costs/Activities Name of Contact Person: George Czerwionka, Director of Finance Corrective Action: Management will improve policies and procedures to record the purchase of gift cards as a prepaid transactions and expense the g...
Finding 2023‐004 – Material Weakness, Material Noncompliance – Allowable Costs/Activities Name of Contact Person: George Czerwionka, Director of Finance Corrective Action: Management will improve policies and procedures to record the purchase of gift cards as a prepaid transactions and expense the gift cards when all allowable cost criteria are met. We will also get input from our funders when necessary. Proposed Completion Date: October 31, 2024