Finding 972344 (2023-005)

Material Weakness
Requirement
I
Questioned Costs
-
Year
2023
Accepted
2024-05-06
Audit: 305528
Organization: Mass Transportation Authority (MI)

AI Summary

  • Core Issue: Two contracts were awarded without verifying that the contractors were not debarred or suspended, and two lacked proper documentation for procurement methods.
  • Impacted Requirements: Compliance with federal regulations (2 CFR 200.212, 200.318) regarding contractor verification and procurement documentation was not met.
  • Recommended Follow-Up: Implement stronger internal controls to ensure contractor verification and maintain thorough documentation for all procurement decisions.

Finding Text

Assistance Listing Number, Federal Agency, and Program Name 20.509, U.S. Department of Transportation, Formula Grants for Rural Areas Federal Award Identification Number and Year MI 2020 008 07 Pass through Entity Michigan Department of Transportation (MDOT) Finding Type Material weakness and material noncompliance with laws and regulations Repeat Finding No Criteria Per 2 CFR 200.212 and 200.318, 2 CFR Section 180.300, and 48 CFR Section 52.209 6, recipients must have procedures in place for verifying that an entity with which they plan to enter into a covered transaction is not debarred, suspended, or otherwise excluded. They must also have procedures in place to ensure procurement policies are followed for all contracts that are partially or fully funded with federal funds. Condition Of the 40 contracts with a contractor, 2 were entered into without verification that the entity was not debarred, suspended, or otherwise excluded. Additionally, 2 of the 40 contracts tested did not have documentation to support that either the small purchase procedures were followed or the rationale for a noncompetitive solicitation was documented. Questioned Costs None Identification of How Questioned Costs Were Computed N/A Context Of the sample of 40 contracts procured this year that we selected for testing, 2 of them did not include adequate documentation regarding review that the contractor was not debarred, suspended, or otherwise excluded. The Authority has since confirmed, as of the date of the audit, that that contractor was not on the suspended or debarred list, and, therefore, there are no questioned costs. Also, 2 of the 40 samples selected did not have required support for the procurement method selected based on federal guidelines, as well as the Authority's purchasing policy. Cause and Effect Internal control procedures related to compliance with suspension and debarment requirements and to ensuring the procurement policy is followed and all factors documented properly did not operate effectively. As a result, the Authority did not perform procedures to ensure that a contractor is not debarred, suspended, or otherwise excluded from entering into contracts with federal funding. The Authority has since confirmed, as of the date of the audit, that that contractor was not on the suspended or debarred list, and, therefore, there are no questioned costs. The Authority also did not obtain price quotes, as required by the small purchases provision, or have the appropriate rationale, as required by the noncompetitive solicitation provision, before selecting a vendor for services. That resulted in insufficient documentation to support the procurement for the 1 contract. Recommendation Internal control procedures should be implemented to ensure that all contracts include verification that an entity is not debarred, suspended, or otherwise excluded and that documentation of this review is maintained in the contract file. The Authority should also implement internal control procedures to ensure the proper documentation is kept in the procurement files to support any and all procurement decisions in accordance with the purchasing policy. Views of Responsible Officials and Corrective Action Plan Management will ensure that all contracts include verification that an entity is not debarred, suspended, or otherwise excluded and maintain documentation of this review in the contract file. While our current internal controls already support this practice, we acknowledge that there were instances in which this was unintentionally missed. We are re educating procurement staff regarding the necessity of these verifications. Additionally, the contract in question related to emergency professional services in support of the Authority's response to the global pandemic. Due to the emergent situation, the ideal processes were not followed. We acknowledge that internal controls must be followed for all contracts, regardless of urgency. Furthermore, the contract should have been reevaluated when the public health emergency ended, and the processes used should have been fully documented. We will endeavor to have full documentation in the future.

Categories

Procurement, Suspension & Debarment

Other Findings in this Audit

  • 395890 2023-004
    Material Weakness
  • 395891 2023-004
    Material Weakness
  • 395892 2023-004
    Material Weakness
  • 395893 2023-004
    Material Weakness
  • 395894 2023-004
    Material Weakness
  • 395895 2023-004
    Material Weakness
  • 395896 2023-004
    Material Weakness
  • 395897 2023-004
    Material Weakness
  • 395898 2023-004
    Material Weakness
  • 395899 2023-004
    Material Weakness
  • 395900 2023-004
    Material Weakness
  • 395901 2023-004
    Material Weakness
  • 395902 2023-005
    Material Weakness
  • 395903 2023-006
    Material Weakness
  • 972332 2023-004
    Material Weakness
  • 972333 2023-004
    Material Weakness
  • 972334 2023-004
    Material Weakness
  • 972335 2023-004
    Material Weakness
  • 972336 2023-004
    Material Weakness
  • 972337 2023-004
    Material Weakness
  • 972338 2023-004
    Material Weakness
  • 972339 2023-004
    Material Weakness
  • 972340 2023-004
    Material Weakness
  • 972341 2023-004
    Material Weakness
  • 972342 2023-004
    Material Weakness
  • 972343 2023-004
    Material Weakness
  • 972345 2023-006
    Material Weakness

Programs in Audit

ALN Program Name Expenditures
20.509 Formula Grants for Rural Areas and Tribal Transit Program $3.32M
20.507 Federal Transit_formula Grants $2.40M
20.513 Enhanced Mobility of Seniors and Individuals with Disabilities $88,602
20.513 Covid-19 - Enhanced Mobility of Seniors and Individuals with Disabilities $67,007
20.507 Covid-19 - Federal Transit_formula Grants $25,935