Finding Text
FINDING 2023-003
Subject: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds - Reporting
Federal Agency: Department of the Treasury
Federal Program: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds
Assistance Listings Number: 21.027
Federal Award Number and Year (or Other Identifying Number): FY2023
Compliance Requirement: Reporting
Audit Finding: Significant Deficiency
Condition and Context
Recipients are required to submit quarterly or annually Project and Expenditure (P&E) reports to
the U.S. Department of the Treasury (Treasury). The reporting periods, as well as the respective due dates,
are based upon type of recipient and its population, as well as the recipient's allocation amount. Information
to be reported includes projects funded, expenditures, and contracts for the appropriate reporting period.
The Town was classified as a metropolitan town with a population below 250,000 residents that
received an allocation of less than $10 million in COVID-19 - Coronavirus State and Local Fiscal Recovery
Funds (SLFRF). As such, the initial P&E report, covering the period from March 3, 2021 to March 31, 2022,
was required to be submitted to the Treasury by April 30, 2022. The subsequent annual reports are to
cover one calendar year and must be submitted to the Treasury by April 30 each year.
The Town submitted one P&E report during the audit period as required; however, there were no
internal controls in place that would likely be effective in preventing, or detecting and correcting,
noncompliance related to the P&E report. The Clerk-Treasurer prepared and submitted the report without
an oversight or review process.
The lack of internal controls and noncompliance were systematic issues throughout the audit
period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
INDIANA STATE BOARD OF ACCOUNTS 20
TOWN OF BROWNSBURG
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Coronavirus State and Local Fiscal Recovery Funds Compliance and Reporting Guidance, page
10, states in part:
". . . 10. Reporting. All recipients of federal funds must complete financial, performance, and
compliance reporting as required and outlined in Part 2 of this guidance. Expenditures may be
reported on a cash or accrual basis, as long as the methodology is disclosed and consistently
applied. Reporting must be consistent with the definition of expenditures pursuant to
2 CFR 200.1. Your organization should appropriately maintain accounting records for
compiling and reporting accurate, compliant financial data, in accordance with appropriate
accounting standards and principles. . . ."
31 CFR 35.4(c) states in part: "Reporting and requests for other information. During the period of
performance, recipients shall provide to the Secretary periodic reports providing detailed accounting of the
uses of funds, . . ."
Cause
The Town did not implement an effectively designed system of internal controls over reporting.
There was no indication of internal controls in place over Reporting.
Effect
Without the proper implementation of an effectively designed system of internal controls over
Reporting, the Town cannot ensure that the reports submitted are materially accurate and correct. If there
was a proper implementation of an effectively designed system of internal controls over Reporting, the
Town would be able to detect any errors prior to submission.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the Town design and implement a proper system of internal
controls, including policies and procedures to ensure that the Town provides the Treasury with complete
and accurate information for the P&E report.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.