2 CFR 200 § 200.320

Findings Citing § 200.320

Procurement methods.

Total Findings
5,457
Across all audits in database
Showing Page
2 of 110
50 findings per page
About this section
Section 200.320 outlines three procurement methods: informal (for small purchases), formal (sealed bids or proposals), and noncompetitive. Recipients and subrecipients must follow documented procedures for these methods, ensuring compliance with federal standards, affecting organizations that receive federal funds.
View full section details →
FY End: 2024-12-31
Federation of American Societies for Experimental Biology
Compliance Requirement: I
Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of proc...

Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. Furthermore: §200.320 (f) Methods of procurement to be followed, states that procurement by noncompetitive proposals is procurement through solicitation of a proposal from only one source and may be used only when certain requirements have been met. Additionally, §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award states that non-Federal entities are subject to the non-procurement debarment and suspension regulations implementing Executive Orders 12549 and 12689, 2 CFR part 180. These regulations restrict awards, subawards, and contracts with certain parties that are debarred, suspended, or otherwise excluded from or ineligible for participation in Federal assistance programs or activities. The non-Federal entity must verify that the person with whom you intend to do business is not excluded or disqualified, by (a) checking SAM Exclusions; (b) collecting a certification from that person; (c) adding a clause or condition to the covered transaction with that person. Condition: During our audit, we noted that while FASEB has formal procurement policies under §200.318(i) and §200.320(f), it did not provide sufficient records detailing the procurement history or justification for noncompetitive selections in our sample. Additionally, FASEB lacks formal policies on suspension and debarment, and SAM exclusion screening documentation was not provided for the sampled contracts and vendors. Cause: FASEB’s procedures did not provide for the formalization and retention of procurement records and vendor screenings consistent with the expectations outlined in 2 CFR 200. Effect or Potential Effect: Purchases of goods and services could be made above the prevailing market rates if the prescribed procurement procedures are not adhered to. Finally, FASEB could inadvertently enter into a contractual relationship with an entity that is suspended, debarred or otherwise included on the US Federal sanction list. Questioned Costs: N/A. Context: Our audit work in this area consisted of internal control testwork over a random sample of expenditures. We consider our samples to be representative of the respective populations, and thus, are statistically valid samples. Identification as a Repeat Finding, if Applicable: N/A Recommendation: We then recommend that FASEB develop and adhere to formal policies (as applicable) related to § 200.318 (i) General procurement standards, §200.320 (f) Methods of procurement to be followed, as well as §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award. All procurement actions and SAM exclusion screenings should be clearly documented in writing and maintained in the vendor or contractor files.

FY End: 2024-12-31
Federation of American Societies for Experimental Biology
Compliance Requirement: I
Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of proc...

Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. Furthermore: §200.320 (f) Methods of procurement to be followed, states that procurement by noncompetitive proposals is procurement through solicitation of a proposal from only one source and may be used only when certain requirements have been met. Additionally, §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award states that non-Federal entities are subject to the non-procurement debarment and suspension regulations implementing Executive Orders 12549 and 12689, 2 CFR part 180. These regulations restrict awards, subawards, and contracts with certain parties that are debarred, suspended, or otherwise excluded from or ineligible for participation in Federal assistance programs or activities. The non-Federal entity must verify that the person with whom you intend to do business is not excluded or disqualified, by (a) checking SAM Exclusions; (b) collecting a certification from that person; (c) adding a clause or condition to the covered transaction with that person. Condition: During our audit, we noted that while FASEB has formal procurement policies under §200.318(i) and §200.320(f), it did not provide sufficient records detailing the procurement history or justification for noncompetitive selections in our sample. Additionally, FASEB lacks formal policies on suspension and debarment, and SAM exclusion screening documentation was not provided for the sampled contracts and vendors. Cause: FASEB’s procedures did not provide for the formalization and retention of procurement records and vendor screenings consistent with the expectations outlined in 2 CFR 200. Effect or Potential Effect: Purchases of goods and services could be made above the prevailing market rates if the prescribed procurement procedures are not adhered to. Finally, FASEB could inadvertently enter into a contractual relationship with an entity that is suspended, debarred or otherwise included on the US Federal sanction list. Questioned Costs: N/A. Context: Our audit work in this area consisted of internal control testwork over a random sample of expenditures. We consider our samples to be representative of the respective populations, and thus, are statistically valid samples. Identification as a Repeat Finding, if Applicable: N/A Recommendation: We then recommend that FASEB develop and adhere to formal policies (as applicable) related to § 200.318 (i) General procurement standards, §200.320 (f) Methods of procurement to be followed, as well as §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award. All procurement actions and SAM exclusion screenings should be clearly documented in writing and maintained in the vendor or contractor files.

FY End: 2024-12-31
Federation of American Societies for Experimental Biology
Compliance Requirement: I
Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of proc...

Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. Furthermore: §200.320 (f) Methods of procurement to be followed, states that procurement by noncompetitive proposals is procurement through solicitation of a proposal from only one source and may be used only when certain requirements have been met. Additionally, §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award states that non-Federal entities are subject to the non-procurement debarment and suspension regulations implementing Executive Orders 12549 and 12689, 2 CFR part 180. These regulations restrict awards, subawards, and contracts with certain parties that are debarred, suspended, or otherwise excluded from or ineligible for participation in Federal assistance programs or activities. The non-Federal entity must verify that the person with whom you intend to do business is not excluded or disqualified, by (a) checking SAM Exclusions; (b) collecting a certification from that person; (c) adding a clause or condition to the covered transaction with that person. Condition: During our audit, we noted that while FASEB has formal procurement policies under §200.318(i) and §200.320(f), it did not provide sufficient records detailing the procurement history or justification for noncompetitive selections in our sample. Additionally, FASEB lacks formal policies on suspension and debarment, and SAM exclusion screening documentation was not provided for the sampled contracts and vendors. Cause: FASEB’s procedures did not provide for the formalization and retention of procurement records and vendor screenings consistent with the expectations outlined in 2 CFR 200. Effect or Potential Effect: Purchases of goods and services could be made above the prevailing market rates if the prescribed procurement procedures are not adhered to. Finally, FASEB could inadvertently enter into a contractual relationship with an entity that is suspended, debarred or otherwise included on the US Federal sanction list. Questioned Costs: N/A. Context: Our audit work in this area consisted of internal control testwork over a random sample of expenditures. We consider our samples to be representative of the respective populations, and thus, are statistically valid samples. Identification as a Repeat Finding, if Applicable: N/A Recommendation: We then recommend that FASEB develop and adhere to formal policies (as applicable) related to § 200.318 (i) General procurement standards, §200.320 (f) Methods of procurement to be followed, as well as §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award. All procurement actions and SAM exclusion screenings should be clearly documented in writing and maintained in the vendor or contractor files.

FY End: 2024-12-31
Federation of American Societies for Experimental Biology
Compliance Requirement: I
Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of proc...

Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. Furthermore: §200.320 (f) Methods of procurement to be followed, states that procurement by noncompetitive proposals is procurement through solicitation of a proposal from only one source and may be used only when certain requirements have been met. Additionally, §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award states that non-Federal entities are subject to the non-procurement debarment and suspension regulations implementing Executive Orders 12549 and 12689, 2 CFR part 180. These regulations restrict awards, subawards, and contracts with certain parties that are debarred, suspended, or otherwise excluded from or ineligible for participation in Federal assistance programs or activities. The non-Federal entity must verify that the person with whom you intend to do business is not excluded or disqualified, by (a) checking SAM Exclusions; (b) collecting a certification from that person; (c) adding a clause or condition to the covered transaction with that person. Condition: During our audit, we noted that while FASEB has formal procurement policies under §200.318(i) and §200.320(f), it did not provide sufficient records detailing the procurement history or justification for noncompetitive selections in our sample. Additionally, FASEB lacks formal policies on suspension and debarment, and SAM exclusion screening documentation was not provided for the sampled contracts and vendors. Cause: FASEB’s procedures did not provide for the formalization and retention of procurement records and vendor screenings consistent with the expectations outlined in 2 CFR 200. Effect or Potential Effect: Purchases of goods and services could be made above the prevailing market rates if the prescribed procurement procedures are not adhered to. Finally, FASEB could inadvertently enter into a contractual relationship with an entity that is suspended, debarred or otherwise included on the US Federal sanction list. Questioned Costs: N/A. Context: Our audit work in this area consisted of internal control testwork over a random sample of expenditures. We consider our samples to be representative of the respective populations, and thus, are statistically valid samples. Identification as a Repeat Finding, if Applicable: N/A Recommendation: We then recommend that FASEB develop and adhere to formal policies (as applicable) related to § 200.318 (i) General procurement standards, §200.320 (f) Methods of procurement to be followed, as well as §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award. All procurement actions and SAM exclusion screenings should be clearly documented in writing and maintained in the vendor or contractor files.

FY End: 2024-12-31
Federation of American Societies for Experimental Biology
Compliance Requirement: I
Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of proc...

Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. Furthermore: §200.320 (f) Methods of procurement to be followed, states that procurement by noncompetitive proposals is procurement through solicitation of a proposal from only one source and may be used only when certain requirements have been met. Additionally, §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award states that non-Federal entities are subject to the non-procurement debarment and suspension regulations implementing Executive Orders 12549 and 12689, 2 CFR part 180. These regulations restrict awards, subawards, and contracts with certain parties that are debarred, suspended, or otherwise excluded from or ineligible for participation in Federal assistance programs or activities. The non-Federal entity must verify that the person with whom you intend to do business is not excluded or disqualified, by (a) checking SAM Exclusions; (b) collecting a certification from that person; (c) adding a clause or condition to the covered transaction with that person. Condition: During our audit, we noted that while FASEB has formal procurement policies under §200.318(i) and §200.320(f), it did not provide sufficient records detailing the procurement history or justification for noncompetitive selections in our sample. Additionally, FASEB lacks formal policies on suspension and debarment, and SAM exclusion screening documentation was not provided for the sampled contracts and vendors. Cause: FASEB’s procedures did not provide for the formalization and retention of procurement records and vendor screenings consistent with the expectations outlined in 2 CFR 200. Effect or Potential Effect: Purchases of goods and services could be made above the prevailing market rates if the prescribed procurement procedures are not adhered to. Finally, FASEB could inadvertently enter into a contractual relationship with an entity that is suspended, debarred or otherwise included on the US Federal sanction list. Questioned Costs: N/A. Context: Our audit work in this area consisted of internal control testwork over a random sample of expenditures. We consider our samples to be representative of the respective populations, and thus, are statistically valid samples. Identification as a Repeat Finding, if Applicable: N/A Recommendation: We then recommend that FASEB develop and adhere to formal policies (as applicable) related to § 200.318 (i) General procurement standards, §200.320 (f) Methods of procurement to be followed, as well as §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award. All procurement actions and SAM exclusion screenings should be clearly documented in writing and maintained in the vendor or contractor files.

FY End: 2024-12-31
Federation of American Societies for Experimental Biology
Compliance Requirement: I
Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of proc...

Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. Furthermore: §200.320 (f) Methods of procurement to be followed, states that procurement by noncompetitive proposals is procurement through solicitation of a proposal from only one source and may be used only when certain requirements have been met. Additionally, §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award states that non-Federal entities are subject to the non-procurement debarment and suspension regulations implementing Executive Orders 12549 and 12689, 2 CFR part 180. These regulations restrict awards, subawards, and contracts with certain parties that are debarred, suspended, or otherwise excluded from or ineligible for participation in Federal assistance programs or activities. The non-Federal entity must verify that the person with whom you intend to do business is not excluded or disqualified, by (a) checking SAM Exclusions; (b) collecting a certification from that person; (c) adding a clause or condition to the covered transaction with that person. Condition: During our audit, we noted that while FASEB has formal procurement policies under §200.318(i) and §200.320(f), it did not provide sufficient records detailing the procurement history or justification for noncompetitive selections in our sample. Additionally, FASEB lacks formal policies on suspension and debarment, and SAM exclusion screening documentation was not provided for the sampled contracts and vendors. Cause: FASEB’s procedures did not provide for the formalization and retention of procurement records and vendor screenings consistent with the expectations outlined in 2 CFR 200. Effect or Potential Effect: Purchases of goods and services could be made above the prevailing market rates if the prescribed procurement procedures are not adhered to. Finally, FASEB could inadvertently enter into a contractual relationship with an entity that is suspended, debarred or otherwise included on the US Federal sanction list. Questioned Costs: N/A. Context: Our audit work in this area consisted of internal control testwork over a random sample of expenditures. We consider our samples to be representative of the respective populations, and thus, are statistically valid samples. Identification as a Repeat Finding, if Applicable: N/A Recommendation: We then recommend that FASEB develop and adhere to formal policies (as applicable) related to § 200.318 (i) General procurement standards, §200.320 (f) Methods of procurement to be followed, as well as §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award. All procurement actions and SAM exclusion screenings should be clearly documented in writing and maintained in the vendor or contractor files.

FY End: 2024-12-31
Federation of American Societies for Experimental Biology
Compliance Requirement: I
Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of proc...

Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. Furthermore: §200.320 (f) Methods of procurement to be followed, states that procurement by noncompetitive proposals is procurement through solicitation of a proposal from only one source and may be used only when certain requirements have been met. Additionally, §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award states that non-Federal entities are subject to the non-procurement debarment and suspension regulations implementing Executive Orders 12549 and 12689, 2 CFR part 180. These regulations restrict awards, subawards, and contracts with certain parties that are debarred, suspended, or otherwise excluded from or ineligible for participation in Federal assistance programs or activities. The non-Federal entity must verify that the person with whom you intend to do business is not excluded or disqualified, by (a) checking SAM Exclusions; (b) collecting a certification from that person; (c) adding a clause or condition to the covered transaction with that person. Condition: During our audit, we noted that while FASEB has formal procurement policies under §200.318(i) and §200.320(f), it did not provide sufficient records detailing the procurement history or justification for noncompetitive selections in our sample. Additionally, FASEB lacks formal policies on suspension and debarment, and SAM exclusion screening documentation was not provided for the sampled contracts and vendors. Cause: FASEB’s procedures did not provide for the formalization and retention of procurement records and vendor screenings consistent with the expectations outlined in 2 CFR 200. Effect or Potential Effect: Purchases of goods and services could be made above the prevailing market rates if the prescribed procurement procedures are not adhered to. Finally, FASEB could inadvertently enter into a contractual relationship with an entity that is suspended, debarred or otherwise included on the US Federal sanction list. Questioned Costs: N/A. Context: Our audit work in this area consisted of internal control testwork over a random sample of expenditures. We consider our samples to be representative of the respective populations, and thus, are statistically valid samples. Identification as a Repeat Finding, if Applicable: N/A Recommendation: We then recommend that FASEB develop and adhere to formal policies (as applicable) related to § 200.318 (i) General procurement standards, §200.320 (f) Methods of procurement to be followed, as well as §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award. All procurement actions and SAM exclusion screenings should be clearly documented in writing and maintained in the vendor or contractor files.

FY End: 2024-12-31
Federation of American Societies for Experimental Biology
Compliance Requirement: I
Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of proc...

Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. Furthermore: §200.320 (f) Methods of procurement to be followed, states that procurement by noncompetitive proposals is procurement through solicitation of a proposal from only one source and may be used only when certain requirements have been met. Additionally, §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award states that non-Federal entities are subject to the non-procurement debarment and suspension regulations implementing Executive Orders 12549 and 12689, 2 CFR part 180. These regulations restrict awards, subawards, and contracts with certain parties that are debarred, suspended, or otherwise excluded from or ineligible for participation in Federal assistance programs or activities. The non-Federal entity must verify that the person with whom you intend to do business is not excluded or disqualified, by (a) checking SAM Exclusions; (b) collecting a certification from that person; (c) adding a clause or condition to the covered transaction with that person. Condition: During our audit, we noted that while FASEB has formal procurement policies under §200.318(i) and §200.320(f), it did not provide sufficient records detailing the procurement history or justification for noncompetitive selections in our sample. Additionally, FASEB lacks formal policies on suspension and debarment, and SAM exclusion screening documentation was not provided for the sampled contracts and vendors. Cause: FASEB’s procedures did not provide for the formalization and retention of procurement records and vendor screenings consistent with the expectations outlined in 2 CFR 200. Effect or Potential Effect: Purchases of goods and services could be made above the prevailing market rates if the prescribed procurement procedures are not adhered to. Finally, FASEB could inadvertently enter into a contractual relationship with an entity that is suspended, debarred or otherwise included on the US Federal sanction list. Questioned Costs: N/A. Context: Our audit work in this area consisted of internal control testwork over a random sample of expenditures. We consider our samples to be representative of the respective populations, and thus, are statistically valid samples. Identification as a Repeat Finding, if Applicable: N/A Recommendation: We then recommend that FASEB develop and adhere to formal policies (as applicable) related to § 200.318 (i) General procurement standards, §200.320 (f) Methods of procurement to be followed, as well as §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award. All procurement actions and SAM exclusion screenings should be clearly documented in writing and maintained in the vendor or contractor files.

FY End: 2024-12-31
Federation of American Societies for Experimental Biology
Compliance Requirement: I
Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of proc...

Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. Furthermore: §200.320 (f) Methods of procurement to be followed, states that procurement by noncompetitive proposals is procurement through solicitation of a proposal from only one source and may be used only when certain requirements have been met. Additionally, §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award states that non-Federal entities are subject to the non-procurement debarment and suspension regulations implementing Executive Orders 12549 and 12689, 2 CFR part 180. These regulations restrict awards, subawards, and contracts with certain parties that are debarred, suspended, or otherwise excluded from or ineligible for participation in Federal assistance programs or activities. The non-Federal entity must verify that the person with whom you intend to do business is not excluded or disqualified, by (a) checking SAM Exclusions; (b) collecting a certification from that person; (c) adding a clause or condition to the covered transaction with that person. Condition: During our audit, we noted that while FASEB has formal procurement policies under §200.318(i) and §200.320(f), it did not provide sufficient records detailing the procurement history or justification for noncompetitive selections in our sample. Additionally, FASEB lacks formal policies on suspension and debarment, and SAM exclusion screening documentation was not provided for the sampled contracts and vendors. Cause: FASEB’s procedures did not provide for the formalization and retention of procurement records and vendor screenings consistent with the expectations outlined in 2 CFR 200. Effect or Potential Effect: Purchases of goods and services could be made above the prevailing market rates if the prescribed procurement procedures are not adhered to. Finally, FASEB could inadvertently enter into a contractual relationship with an entity that is suspended, debarred or otherwise included on the US Federal sanction list. Questioned Costs: N/A. Context: Our audit work in this area consisted of internal control testwork over a random sample of expenditures. We consider our samples to be representative of the respective populations, and thus, are statistically valid samples. Identification as a Repeat Finding, if Applicable: N/A Recommendation: We then recommend that FASEB develop and adhere to formal policies (as applicable) related to § 200.318 (i) General procurement standards, §200.320 (f) Methods of procurement to be followed, as well as §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award. All procurement actions and SAM exclusion screenings should be clearly documented in writing and maintained in the vendor or contractor files.

FY End: 2024-12-31
Federation of American Societies for Experimental Biology
Compliance Requirement: I
Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of proc...

Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. Furthermore: §200.320 (f) Methods of procurement to be followed, states that procurement by noncompetitive proposals is procurement through solicitation of a proposal from only one source and may be used only when certain requirements have been met. Additionally, §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award states that non-Federal entities are subject to the non-procurement debarment and suspension regulations implementing Executive Orders 12549 and 12689, 2 CFR part 180. These regulations restrict awards, subawards, and contracts with certain parties that are debarred, suspended, or otherwise excluded from or ineligible for participation in Federal assistance programs or activities. The non-Federal entity must verify that the person with whom you intend to do business is not excluded or disqualified, by (a) checking SAM Exclusions; (b) collecting a certification from that person; (c) adding a clause or condition to the covered transaction with that person. Condition: During our audit, we noted that while FASEB has formal procurement policies under §200.318(i) and §200.320(f), it did not provide sufficient records detailing the procurement history or justification for noncompetitive selections in our sample. Additionally, FASEB lacks formal policies on suspension and debarment, and SAM exclusion screening documentation was not provided for the sampled contracts and vendors. Cause: FASEB’s procedures did not provide for the formalization and retention of procurement records and vendor screenings consistent with the expectations outlined in 2 CFR 200. Effect or Potential Effect: Purchases of goods and services could be made above the prevailing market rates if the prescribed procurement procedures are not adhered to. Finally, FASEB could inadvertently enter into a contractual relationship with an entity that is suspended, debarred or otherwise included on the US Federal sanction list. Questioned Costs: N/A. Context: Our audit work in this area consisted of internal control testwork over a random sample of expenditures. We consider our samples to be representative of the respective populations, and thus, are statistically valid samples. Identification as a Repeat Finding, if Applicable: N/A Recommendation: We then recommend that FASEB develop and adhere to formal policies (as applicable) related to § 200.318 (i) General procurement standards, §200.320 (f) Methods of procurement to be followed, as well as §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award. All procurement actions and SAM exclusion screenings should be clearly documented in writing and maintained in the vendor or contractor files.

FY End: 2024-12-31
Federation of American Societies for Experimental Biology
Compliance Requirement: I
Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of proc...

Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. Furthermore: §200.320 (f) Methods of procurement to be followed, states that procurement by noncompetitive proposals is procurement through solicitation of a proposal from only one source and may be used only when certain requirements have been met. Additionally, §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award states that non-Federal entities are subject to the non-procurement debarment and suspension regulations implementing Executive Orders 12549 and 12689, 2 CFR part 180. These regulations restrict awards, subawards, and contracts with certain parties that are debarred, suspended, or otherwise excluded from or ineligible for participation in Federal assistance programs or activities. The non-Federal entity must verify that the person with whom you intend to do business is not excluded or disqualified, by (a) checking SAM Exclusions; (b) collecting a certification from that person; (c) adding a clause or condition to the covered transaction with that person. Condition: During our audit, we noted that while FASEB has formal procurement policies under §200.318(i) and §200.320(f), it did not provide sufficient records detailing the procurement history or justification for noncompetitive selections in our sample. Additionally, FASEB lacks formal policies on suspension and debarment, and SAM exclusion screening documentation was not provided for the sampled contracts and vendors. Cause: FASEB’s procedures did not provide for the formalization and retention of procurement records and vendor screenings consistent with the expectations outlined in 2 CFR 200. Effect or Potential Effect: Purchases of goods and services could be made above the prevailing market rates if the prescribed procurement procedures are not adhered to. Finally, FASEB could inadvertently enter into a contractual relationship with an entity that is suspended, debarred or otherwise included on the US Federal sanction list. Questioned Costs: N/A. Context: Our audit work in this area consisted of internal control testwork over a random sample of expenditures. We consider our samples to be representative of the respective populations, and thus, are statistically valid samples. Identification as a Repeat Finding, if Applicable: N/A Recommendation: We then recommend that FASEB develop and adhere to formal policies (as applicable) related to § 200.318 (i) General procurement standards, §200.320 (f) Methods of procurement to be followed, as well as §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award. All procurement actions and SAM exclusion screenings should be clearly documented in writing and maintained in the vendor or contractor files.

FY End: 2024-12-31
Federation of American Societies for Experimental Biology
Compliance Requirement: I
Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of proc...

Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. Furthermore: §200.320 (f) Methods of procurement to be followed, states that procurement by noncompetitive proposals is procurement through solicitation of a proposal from only one source and may be used only when certain requirements have been met. Additionally, §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award states that non-Federal entities are subject to the non-procurement debarment and suspension regulations implementing Executive Orders 12549 and 12689, 2 CFR part 180. These regulations restrict awards, subawards, and contracts with certain parties that are debarred, suspended, or otherwise excluded from or ineligible for participation in Federal assistance programs or activities. The non-Federal entity must verify that the person with whom you intend to do business is not excluded or disqualified, by (a) checking SAM Exclusions; (b) collecting a certification from that person; (c) adding a clause or condition to the covered transaction with that person. Condition: During our audit, we noted that while FASEB has formal procurement policies under §200.318(i) and §200.320(f), it did not provide sufficient records detailing the procurement history or justification for noncompetitive selections in our sample. Additionally, FASEB lacks formal policies on suspension and debarment, and SAM exclusion screening documentation was not provided for the sampled contracts and vendors. Cause: FASEB’s procedures did not provide for the formalization and retention of procurement records and vendor screenings consistent with the expectations outlined in 2 CFR 200. Effect or Potential Effect: Purchases of goods and services could be made above the prevailing market rates if the prescribed procurement procedures are not adhered to. Finally, FASEB could inadvertently enter into a contractual relationship with an entity that is suspended, debarred or otherwise included on the US Federal sanction list. Questioned Costs: N/A. Context: Our audit work in this area consisted of internal control testwork over a random sample of expenditures. We consider our samples to be representative of the respective populations, and thus, are statistically valid samples. Identification as a Repeat Finding, if Applicable: N/A Recommendation: We then recommend that FASEB develop and adhere to formal policies (as applicable) related to § 200.318 (i) General procurement standards, §200.320 (f) Methods of procurement to be followed, as well as §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award. All procurement actions and SAM exclusion screenings should be clearly documented in writing and maintained in the vendor or contractor files.

FY End: 2024-12-31
Federation of American Societies for Experimental Biology
Compliance Requirement: I
Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of proc...

Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. Furthermore: §200.320 (f) Methods of procurement to be followed, states that procurement by noncompetitive proposals is procurement through solicitation of a proposal from only one source and may be used only when certain requirements have been met. Additionally, §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award states that non-Federal entities are subject to the non-procurement debarment and suspension regulations implementing Executive Orders 12549 and 12689, 2 CFR part 180. These regulations restrict awards, subawards, and contracts with certain parties that are debarred, suspended, or otherwise excluded from or ineligible for participation in Federal assistance programs or activities. The non-Federal entity must verify that the person with whom you intend to do business is not excluded or disqualified, by (a) checking SAM Exclusions; (b) collecting a certification from that person; (c) adding a clause or condition to the covered transaction with that person. Condition: During our audit, we noted that while FASEB has formal procurement policies under §200.318(i) and §200.320(f), it did not provide sufficient records detailing the procurement history or justification for noncompetitive selections in our sample. Additionally, FASEB lacks formal policies on suspension and debarment, and SAM exclusion screening documentation was not provided for the sampled contracts and vendors. Cause: FASEB’s procedures did not provide for the formalization and retention of procurement records and vendor screenings consistent with the expectations outlined in 2 CFR 200. Effect or Potential Effect: Purchases of goods and services could be made above the prevailing market rates if the prescribed procurement procedures are not adhered to. Finally, FASEB could inadvertently enter into a contractual relationship with an entity that is suspended, debarred or otherwise included on the US Federal sanction list. Questioned Costs: N/A. Context: Our audit work in this area consisted of internal control testwork over a random sample of expenditures. We consider our samples to be representative of the respective populations, and thus, are statistically valid samples. Identification as a Repeat Finding, if Applicable: N/A Recommendation: We then recommend that FASEB develop and adhere to formal policies (as applicable) related to § 200.318 (i) General procurement standards, §200.320 (f) Methods of procurement to be followed, as well as §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award. All procurement actions and SAM exclusion screenings should be clearly documented in writing and maintained in the vendor or contractor files.

FY End: 2024-12-31
Federation of American Societies for Experimental Biology
Compliance Requirement: I
Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of proc...

Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. Furthermore: §200.320 (f) Methods of procurement to be followed, states that procurement by noncompetitive proposals is procurement through solicitation of a proposal from only one source and may be used only when certain requirements have been met. Additionally, §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award states that non-Federal entities are subject to the non-procurement debarment and suspension regulations implementing Executive Orders 12549 and 12689, 2 CFR part 180. These regulations restrict awards, subawards, and contracts with certain parties that are debarred, suspended, or otherwise excluded from or ineligible for participation in Federal assistance programs or activities. The non-Federal entity must verify that the person with whom you intend to do business is not excluded or disqualified, by (a) checking SAM Exclusions; (b) collecting a certification from that person; (c) adding a clause or condition to the covered transaction with that person. Condition: During our audit, we noted that while FASEB has formal procurement policies under §200.318(i) and §200.320(f), it did not provide sufficient records detailing the procurement history or justification for noncompetitive selections in our sample. Additionally, FASEB lacks formal policies on suspension and debarment, and SAM exclusion screening documentation was not provided for the sampled contracts and vendors. Cause: FASEB’s procedures did not provide for the formalization and retention of procurement records and vendor screenings consistent with the expectations outlined in 2 CFR 200. Effect or Potential Effect: Purchases of goods and services could be made above the prevailing market rates if the prescribed procurement procedures are not adhered to. Finally, FASEB could inadvertently enter into a contractual relationship with an entity that is suspended, debarred or otherwise included on the US Federal sanction list. Questioned Costs: N/A. Context: Our audit work in this area consisted of internal control testwork over a random sample of expenditures. We consider our samples to be representative of the respective populations, and thus, are statistically valid samples. Identification as a Repeat Finding, if Applicable: N/A Recommendation: We then recommend that FASEB develop and adhere to formal policies (as applicable) related to § 200.318 (i) General procurement standards, §200.320 (f) Methods of procurement to be followed, as well as §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award. All procurement actions and SAM exclusion screenings should be clearly documented in writing and maintained in the vendor or contractor files.

FY End: 2024-12-31
Federation of American Societies for Experimental Biology
Compliance Requirement: I
Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of proc...

Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. Furthermore: §200.320 (f) Methods of procurement to be followed, states that procurement by noncompetitive proposals is procurement through solicitation of a proposal from only one source and may be used only when certain requirements have been met. Additionally, §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award states that non-Federal entities are subject to the non-procurement debarment and suspension regulations implementing Executive Orders 12549 and 12689, 2 CFR part 180. These regulations restrict awards, subawards, and contracts with certain parties that are debarred, suspended, or otherwise excluded from or ineligible for participation in Federal assistance programs or activities. The non-Federal entity must verify that the person with whom you intend to do business is not excluded or disqualified, by (a) checking SAM Exclusions; (b) collecting a certification from that person; (c) adding a clause or condition to the covered transaction with that person. Condition: During our audit, we noted that while FASEB has formal procurement policies under §200.318(i) and §200.320(f), it did not provide sufficient records detailing the procurement history or justification for noncompetitive selections in our sample. Additionally, FASEB lacks formal policies on suspension and debarment, and SAM exclusion screening documentation was not provided for the sampled contracts and vendors. Cause: FASEB’s procedures did not provide for the formalization and retention of procurement records and vendor screenings consistent with the expectations outlined in 2 CFR 200. Effect or Potential Effect: Purchases of goods and services could be made above the prevailing market rates if the prescribed procurement procedures are not adhered to. Finally, FASEB could inadvertently enter into a contractual relationship with an entity that is suspended, debarred or otherwise included on the US Federal sanction list. Questioned Costs: N/A. Context: Our audit work in this area consisted of internal control testwork over a random sample of expenditures. We consider our samples to be representative of the respective populations, and thus, are statistically valid samples. Identification as a Repeat Finding, if Applicable: N/A Recommendation: We then recommend that FASEB develop and adhere to formal policies (as applicable) related to § 200.318 (i) General procurement standards, §200.320 (f) Methods of procurement to be followed, as well as §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award. All procurement actions and SAM exclusion screenings should be clearly documented in writing and maintained in the vendor or contractor files.

FY End: 2024-12-31
Federation of American Societies for Experimental Biology
Compliance Requirement: I
Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of proc...

Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. Furthermore: §200.320 (f) Methods of procurement to be followed, states that procurement by noncompetitive proposals is procurement through solicitation of a proposal from only one source and may be used only when certain requirements have been met. Additionally, §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award states that non-Federal entities are subject to the non-procurement debarment and suspension regulations implementing Executive Orders 12549 and 12689, 2 CFR part 180. These regulations restrict awards, subawards, and contracts with certain parties that are debarred, suspended, or otherwise excluded from or ineligible for participation in Federal assistance programs or activities. The non-Federal entity must verify that the person with whom you intend to do business is not excluded or disqualified, by (a) checking SAM Exclusions; (b) collecting a certification from that person; (c) adding a clause or condition to the covered transaction with that person. Condition: During our audit, we noted that while FASEB has formal procurement policies under §200.318(i) and §200.320(f), it did not provide sufficient records detailing the procurement history or justification for noncompetitive selections in our sample. Additionally, FASEB lacks formal policies on suspension and debarment, and SAM exclusion screening documentation was not provided for the sampled contracts and vendors. Cause: FASEB’s procedures did not provide for the formalization and retention of procurement records and vendor screenings consistent with the expectations outlined in 2 CFR 200. Effect or Potential Effect: Purchases of goods and services could be made above the prevailing market rates if the prescribed procurement procedures are not adhered to. Finally, FASEB could inadvertently enter into a contractual relationship with an entity that is suspended, debarred or otherwise included on the US Federal sanction list. Questioned Costs: N/A. Context: Our audit work in this area consisted of internal control testwork over a random sample of expenditures. We consider our samples to be representative of the respective populations, and thus, are statistically valid samples. Identification as a Repeat Finding, if Applicable: N/A Recommendation: We then recommend that FASEB develop and adhere to formal policies (as applicable) related to § 200.318 (i) General procurement standards, §200.320 (f) Methods of procurement to be followed, as well as §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award. All procurement actions and SAM exclusion screenings should be clearly documented in writing and maintained in the vendor or contractor files.

FY End: 2024-12-31
Federation of American Societies for Experimental Biology
Compliance Requirement: I
Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of proc...

Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. Furthermore: §200.320 (f) Methods of procurement to be followed, states that procurement by noncompetitive proposals is procurement through solicitation of a proposal from only one source and may be used only when certain requirements have been met. Additionally, §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award states that non-Federal entities are subject to the non-procurement debarment and suspension regulations implementing Executive Orders 12549 and 12689, 2 CFR part 180. These regulations restrict awards, subawards, and contracts with certain parties that are debarred, suspended, or otherwise excluded from or ineligible for participation in Federal assistance programs or activities. The non-Federal entity must verify that the person with whom you intend to do business is not excluded or disqualified, by (a) checking SAM Exclusions; (b) collecting a certification from that person; (c) adding a clause or condition to the covered transaction with that person. Condition: During our audit, we noted that while FASEB has formal procurement policies under §200.318(i) and §200.320(f), it did not provide sufficient records detailing the procurement history or justification for noncompetitive selections in our sample. Additionally, FASEB lacks formal policies on suspension and debarment, and SAM exclusion screening documentation was not provided for the sampled contracts and vendors. Cause: FASEB’s procedures did not provide for the formalization and retention of procurement records and vendor screenings consistent with the expectations outlined in 2 CFR 200. Effect or Potential Effect: Purchases of goods and services could be made above the prevailing market rates if the prescribed procurement procedures are not adhered to. Finally, FASEB could inadvertently enter into a contractual relationship with an entity that is suspended, debarred or otherwise included on the US Federal sanction list. Questioned Costs: N/A. Context: Our audit work in this area consisted of internal control testwork over a random sample of expenditures. We consider our samples to be representative of the respective populations, and thus, are statistically valid samples. Identification as a Repeat Finding, if Applicable: N/A Recommendation: We then recommend that FASEB develop and adhere to formal policies (as applicable) related to § 200.318 (i) General procurement standards, §200.320 (f) Methods of procurement to be followed, as well as §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award. All procurement actions and SAM exclusion screenings should be clearly documented in writing and maintained in the vendor or contractor files.

FY End: 2024-12-31
Federation of American Societies for Experimental Biology
Compliance Requirement: I
Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of proc...

Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. Furthermore: §200.320 (f) Methods of procurement to be followed, states that procurement by noncompetitive proposals is procurement through solicitation of a proposal from only one source and may be used only when certain requirements have been met. Additionally, §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award states that non-Federal entities are subject to the non-procurement debarment and suspension regulations implementing Executive Orders 12549 and 12689, 2 CFR part 180. These regulations restrict awards, subawards, and contracts with certain parties that are debarred, suspended, or otherwise excluded from or ineligible for participation in Federal assistance programs or activities. The non-Federal entity must verify that the person with whom you intend to do business is not excluded or disqualified, by (a) checking SAM Exclusions; (b) collecting a certification from that person; (c) adding a clause or condition to the covered transaction with that person. Condition: During our audit, we noted that while FASEB has formal procurement policies under §200.318(i) and §200.320(f), it did not provide sufficient records detailing the procurement history or justification for noncompetitive selections in our sample. Additionally, FASEB lacks formal policies on suspension and debarment, and SAM exclusion screening documentation was not provided for the sampled contracts and vendors. Cause: FASEB’s procedures did not provide for the formalization and retention of procurement records and vendor screenings consistent with the expectations outlined in 2 CFR 200. Effect or Potential Effect: Purchases of goods and services could be made above the prevailing market rates if the prescribed procurement procedures are not adhered to. Finally, FASEB could inadvertently enter into a contractual relationship with an entity that is suspended, debarred or otherwise included on the US Federal sanction list. Questioned Costs: N/A. Context: Our audit work in this area consisted of internal control testwork over a random sample of expenditures. We consider our samples to be representative of the respective populations, and thus, are statistically valid samples. Identification as a Repeat Finding, if Applicable: N/A Recommendation: We then recommend that FASEB develop and adhere to formal policies (as applicable) related to § 200.318 (i) General procurement standards, §200.320 (f) Methods of procurement to be followed, as well as §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award. All procurement actions and SAM exclusion screenings should be clearly documented in writing and maintained in the vendor or contractor files.

FY End: 2024-12-31
Federation of American Societies for Experimental Biology
Compliance Requirement: I
Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of proc...

Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. Furthermore: §200.320 (f) Methods of procurement to be followed, states that procurement by noncompetitive proposals is procurement through solicitation of a proposal from only one source and may be used only when certain requirements have been met. Additionally, §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award states that non-Federal entities are subject to the non-procurement debarment and suspension regulations implementing Executive Orders 12549 and 12689, 2 CFR part 180. These regulations restrict awards, subawards, and contracts with certain parties that are debarred, suspended, or otherwise excluded from or ineligible for participation in Federal assistance programs or activities. The non-Federal entity must verify that the person with whom you intend to do business is not excluded or disqualified, by (a) checking SAM Exclusions; (b) collecting a certification from that person; (c) adding a clause or condition to the covered transaction with that person. Condition: During our audit, we noted that while FASEB has formal procurement policies under §200.318(i) and §200.320(f), it did not provide sufficient records detailing the procurement history or justification for noncompetitive selections in our sample. Additionally, FASEB lacks formal policies on suspension and debarment, and SAM exclusion screening documentation was not provided for the sampled contracts and vendors. Cause: FASEB’s procedures did not provide for the formalization and retention of procurement records and vendor screenings consistent with the expectations outlined in 2 CFR 200. Effect or Potential Effect: Purchases of goods and services could be made above the prevailing market rates if the prescribed procurement procedures are not adhered to. Finally, FASEB could inadvertently enter into a contractual relationship with an entity that is suspended, debarred or otherwise included on the US Federal sanction list. Questioned Costs: N/A. Context: Our audit work in this area consisted of internal control testwork over a random sample of expenditures. We consider our samples to be representative of the respective populations, and thus, are statistically valid samples. Identification as a Repeat Finding, if Applicable: N/A Recommendation: We then recommend that FASEB develop and adhere to formal policies (as applicable) related to § 200.318 (i) General procurement standards, §200.320 (f) Methods of procurement to be followed, as well as §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award. All procurement actions and SAM exclusion screenings should be clearly documented in writing and maintained in the vendor or contractor files.

FY End: 2024-12-31
Federation of American Societies for Experimental Biology
Compliance Requirement: I
Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of proc...

Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. Furthermore: §200.320 (f) Methods of procurement to be followed, states that procurement by noncompetitive proposals is procurement through solicitation of a proposal from only one source and may be used only when certain requirements have been met. Additionally, §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award states that non-Federal entities are subject to the non-procurement debarment and suspension regulations implementing Executive Orders 12549 and 12689, 2 CFR part 180. These regulations restrict awards, subawards, and contracts with certain parties that are debarred, suspended, or otherwise excluded from or ineligible for participation in Federal assistance programs or activities. The non-Federal entity must verify that the person with whom you intend to do business is not excluded or disqualified, by (a) checking SAM Exclusions; (b) collecting a certification from that person; (c) adding a clause or condition to the covered transaction with that person. Condition: During our audit, we noted that while FASEB has formal procurement policies under §200.318(i) and §200.320(f), it did not provide sufficient records detailing the procurement history or justification for noncompetitive selections in our sample. Additionally, FASEB lacks formal policies on suspension and debarment, and SAM exclusion screening documentation was not provided for the sampled contracts and vendors. Cause: FASEB’s procedures did not provide for the formalization and retention of procurement records and vendor screenings consistent with the expectations outlined in 2 CFR 200. Effect or Potential Effect: Purchases of goods and services could be made above the prevailing market rates if the prescribed procurement procedures are not adhered to. Finally, FASEB could inadvertently enter into a contractual relationship with an entity that is suspended, debarred or otherwise included on the US Federal sanction list. Questioned Costs: N/A. Context: Our audit work in this area consisted of internal control testwork over a random sample of expenditures. We consider our samples to be representative of the respective populations, and thus, are statistically valid samples. Identification as a Repeat Finding, if Applicable: N/A Recommendation: We then recommend that FASEB develop and adhere to formal policies (as applicable) related to § 200.318 (i) General procurement standards, §200.320 (f) Methods of procurement to be followed, as well as §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award. All procurement actions and SAM exclusion screenings should be clearly documented in writing and maintained in the vendor or contractor files.

FY End: 2024-12-31
Federation of American Societies for Experimental Biology
Compliance Requirement: I
Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of proc...

Finding 2024-001 Procurement and Suspension and Debarment (Significant Deficiency) Information on the Federal Programs: Research and Development Cluster Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): § 200.318 (i) General procurement standards, states that the non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include but are not necessarily limited to the following: rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. Furthermore: §200.320 (f) Methods of procurement to be followed, states that procurement by noncompetitive proposals is procurement through solicitation of a proposal from only one source and may be used only when certain requirements have been met. Additionally, §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award states that non-Federal entities are subject to the non-procurement debarment and suspension regulations implementing Executive Orders 12549 and 12689, 2 CFR part 180. These regulations restrict awards, subawards, and contracts with certain parties that are debarred, suspended, or otherwise excluded from or ineligible for participation in Federal assistance programs or activities. The non-Federal entity must verify that the person with whom you intend to do business is not excluded or disqualified, by (a) checking SAM Exclusions; (b) collecting a certification from that person; (c) adding a clause or condition to the covered transaction with that person. Condition: During our audit, we noted that while FASEB has formal procurement policies under §200.318(i) and §200.320(f), it did not provide sufficient records detailing the procurement history or justification for noncompetitive selections in our sample. Additionally, FASEB lacks formal policies on suspension and debarment, and SAM exclusion screening documentation was not provided for the sampled contracts and vendors. Cause: FASEB’s procedures did not provide for the formalization and retention of procurement records and vendor screenings consistent with the expectations outlined in 2 CFR 200. Effect or Potential Effect: Purchases of goods and services could be made above the prevailing market rates if the prescribed procurement procedures are not adhered to. Finally, FASEB could inadvertently enter into a contractual relationship with an entity that is suspended, debarred or otherwise included on the US Federal sanction list. Questioned Costs: N/A. Context: Our audit work in this area consisted of internal control testwork over a random sample of expenditures. We consider our samples to be representative of the respective populations, and thus, are statistically valid samples. Identification as a Repeat Finding, if Applicable: N/A Recommendation: We then recommend that FASEB develop and adhere to formal policies (as applicable) related to § 200.318 (i) General procurement standards, §200.320 (f) Methods of procurement to be followed, as well as §200.213 Reporting a determination that a non-Federal entity is not qualified for a Federal award. All procurement actions and SAM exclusion screenings should be clearly documented in writing and maintained in the vendor or contractor files.

FY End: 2024-12-31
City of Durango
Compliance Requirement: I
Finding 2024-001 Federal Program: Formula Grants for Rural Areas and Tribal Transit Assistance Listing Number: 20.509 Compliance Requirement: Procurement and Suspension and Debarment Type of Finding: Significant Deficiency in Internal Control over Compliance Criteria: Per 2 CFR §200.318(i), non-Federal entities must maintain records sufficient to detail the history of procurement, including the rationale for the method of procurement and the basis for contractor selection. For sole source ...

Finding 2024-001 Federal Program: Formula Grants for Rural Areas and Tribal Transit Assistance Listing Number: 20.509 Compliance Requirement: Procurement and Suspension and Debarment Type of Finding: Significant Deficiency in Internal Control over Compliance Criteria: Per 2 CFR §200.318(i), non-Federal entities must maintain records sufficient to detail the history of procurement, including the rationale for the method of procurement and the basis for contractor selection. For sole source procurements, 2 CFR §200.320(c) outlines specific conditions under which noncompetitive procurement is allowable and requires written justification. Additionally, 2 CFR §200.303 requires non-Federal entities to establish and maintain effective internal control over federal awards that provides reasonable assurance that the entity is managing the award in compliance with federal statutes, regulations, and the terms and conditions of the award. Condition: During our review of procurement procedures, we noted that the entity selected a sole source vendor but did not maintain documentation supporting the justification for the noncompetitive procurement. While the procurement itself did not violate Uniform Guidance requirements, the absence of supporting documentation indicates a weakness in internal controls over procurement recordkeeping. Cause: Although the entity has established procedures for documenting sole source procurement decisions, those procedures were not followed in this instance. This appears to have been an isolated oversight rather than a systemic issue. Effect: Although the procurement may have met the criteria for a sole source, the lack of documentation limits transparency and may hinder the entity’s ability to demonstrate compliance in future audits. Repeat Finding from Prior Year: No Recommendation: We recommend that management strengthen internal controls over procurement documentation by implementing procedures to ensure that all sole source procurements are supported by written justifications and retained in accordance with Uniform Guidance requirements. Views of Responsible Officials: Management agrees with the finding.

FY End: 2024-12-31
Town of Paoli
Compliance Requirement: I
FINDING 2024-003 Subject: Water and Waste Disposal Systems for Rural Communities - Procurement and Suspension and Debarment Federal Agency: Department of Agriculture Federal Program: Water and Waste Disposal Systems for Rural Communities Assistance Listings Number: 10.760 Federal Award Number and Year (or Other Identifying Number): FY2024 Compliance Requirement: Procurement and Suspension and Debarment Audit Findings: Material Weakness, Other Matters INDIANA STATE BOARD OF ACCOUNTS 17 TOWN OF PA...

FINDING 2024-003 Subject: Water and Waste Disposal Systems for Rural Communities - Procurement and Suspension and Debarment Federal Agency: Department of Agriculture Federal Program: Water and Waste Disposal Systems for Rural Communities Assistance Listings Number: 10.760 Federal Award Number and Year (or Other Identifying Number): FY2024 Compliance Requirement: Procurement and Suspension and Debarment Audit Findings: Material Weakness, Other Matters INDIANA STATE BOARD OF ACCOUNTS 17 TOWN OF PAOLI SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Repeat Finding This is a repeat finding from the immediately prior audit report. The prior audit finding number was 2023-002. Condition and Context As part of sound management of the federal award, the Town was responsible for implementing a system of internal controls that would ensure compliance with the applicable requirements. The Town had not properly designed or implemented such a system, which would include appropriate segregation of duties, that would likely be effective in preventing, or detecting and correcting, noncompliance. The Town entered into contracts with three vendors in a prior year to provide goods and services for the duration of the Town's wastewater plant construction project. The total contract expenditures for all three vendors fell under the simplified acquisition threshold. The Town paid all three vendors with grant funds during the audit period, and all three were selected for testing accordingly. For two of the vendors, the Town properly procured the goods and services through the bidding process. For the third vendor, with disbursements totaling $106,269 in 2024, the Town was unable to provide any documentation that the procurement method used was appropriate or that the procurement provided full and open competition or rationale to support the determination to limit competition. Additionally, the history of the procurement, including rationale for the method of procurement, selection of the vendor, and the basis for the price, was not adequately documented. The lack of internal controls and noncompliance were isolated to one vendor throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.318 states in part: "(a) The non-Federal entity must have and use documented procurement procedures, consistent with State, local, and tribal laws and regulations and the standards of this section, for the acquisition of property or services required under a Federal award or subaward. The non-Federal entity's documented procurement procedures must conform to the procurement standards identified in §§ 200.317 through 200.327. . . . (i) The non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include, but are not necessarily limited to, the following: Rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. . . ." INDIANA STATE BOARD OF ACCOUNTS 18 TOWN OF PAOLI SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200.320 states in part: ". . . (b) Formal procurement methods. When the value of the procurement for property or services under a Federal financial assistance awards exceeds the SAT, or a lower threshold established by a non-Federal entity, formal procurement methods are required. Formal procurement methods require following documented procedures. Formal procurement methods also require public advertising unless a non-competitive procurement can be used in accordance with § 200.319 or paragraph (c) of this section. The following formal methods of procurement are used for procurement of property or services above the simplified acquisition threshold or a value below the simplified acquisition threshold the non-Federal entity determines to be appropriate: (1) Sealed bids. A procurement method in which bids are publicly solicited and a firm fixed-price contract (lump sum or unit price) is awarded to the responsible bidder whose bid, conforming with all the material terms and conditions of the invitation for bids, is the lowest in price. The sealed bids method is the preferred method for procuring construction, if the conditions. (i) In order for sealed bidding to be feasible, the following conditions should be present: (A) A complete, adequate, and realistic specification or purchase description is available; (B) Two or more responsible bidders are willing and able to compete effectively for the business; and (C) The procurement lends itself to a firm fixed price contract and the selection of the successful bidder can be made principally on the basis of price. (ii) If sealed bids are used, the following requirements apply: (A) Bids must be solicited from an adequate number of qualified sources, providing them sufficient response time prior to the date set for opening the bids, for local, and tribal governments, the invitation for bids must be publicly advertised; (B) The invitation for bids, which will include any specifications and pertinent attachments, must define the items or services in order for the bidder to properly respond; (C) All bids will be opened at the time and place prescribed in the invitation for bids, and for local and tribal governments, the bids must be opened publicly; (D) A firm fixed price contract award will be made in writing to the lowest responsive and responsible bidder. Where specified in bidding documents, factors such as discounts, transportation cost, and life cycle costs must be considered in determining which bid is lowest. Payment discounts will only be used to determine the low bid when prior experience indicates that such discounts are usually taken advantage of; and (E) Any or all bids may be rejected if there is a sound documented reason. INDIANA STATE BOARD OF ACCOUNTS 19 TOWN OF PAOLI SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (2) Proposals. A procurement method in which either a fixed price or cost-reimbursement type contract is awarded. Proposals are generally used when conditions are not appropriate for the use of sealed bids. They are awarded in accordance with the following requirements: (i) Requests for proposals must be publicized and identify all evaluation factors and their relative importance. Proposals must be solicited from an adequate number of qualified offerors. Any response to publicized requests for proposals must be considered to the maximum extent practical; (ii) The non-Federal entity must have a written method for conducting technical evaluations of the proposals received and making selections; (iii) Contracts must be awarded to the responsible offeror whose proposal is most advantageous to the non-Federal entity, with price and other factors considered; and (iv) The non-Federal entity may use competitive proposal procedures for qualifications based procurement of architectural/engineering (A/E) professional services whereby offeror's qualifications are evaluated and the most qualified offeror is selected, subject to negotiation of fair and reasonable compensation. The method, where price is not used as a selection factor, can only be used in procurement of A/E professional services. It cannot be used to purchase other types of services though A/E firms that are a potential source to perform the proposed effort. (c) Noncompetitive procurement. There are specific circumstances in which noncompetitive procurement can be used. Noncompetitive procurement can only be awarded if one or more of the following circumstances apply: (1) The acquisition of property or services, the aggregate dollar amount of which does not exceed the micro-purchase threshold (see paragraph (a)(1) of this section); (2) The item is available only from a single source; (3) The public exigency or emergency for the requirement will not permit a delay resulting from publicizing a competitive solicitation; (4) The Federal awarding agency or pass-through entity expressly authorizes a noncompetitive procurement in response to a written request from the non-Federal entity; or (5) After solicitation of a number of sources, competition is determined inadequate." Cause The vendor in question was an engineering firm that the Town has utilized for various projects over the course of many years. For continuity purposes, the Town chose to limit competition when awarding the contract but was unaware of the requirements necessary to do so. Since this was a multi-year award for which the Town entered into the contract in a prior year, the Town was unable to correct the noncompliance for the current audit period. INDIANA STATE BOARD OF ACCOUNTS 20 TOWN OF PAOLI SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without a proper system of internal controls in place that operated effectively, noncompliance remained undetected. As a result, proper procurement procedures were not adhered to for all vendors. Without following the required methods for procurement, the Town could be overpaying for services. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funds to the Town. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the Town's management establish a proper system of internal controls to ensure expenditures made from federal awards use the appropriate procurement method and retain the documentation to support the procurement methods used in order to ensure compliance with the terms and conditions of the federal award. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

FY End: 2024-12-31
Council of Graduate Schools
Compliance Requirement: I
Finding 2024-002: Reportable Finding Considered a Significant Deficiency – Procurement Compliance Program Name: STEM Education and NSF Technology, Innovation, and Partnerships Assistance Listing #: 47.076 and 47.084 Program Year: 2024 Federal Awarding Agency: National Science Foundation Compliance Requirement: Procurements Criteria: In accordance with 2 CFR 200.320(c), noncompetitive procurement may only be used under limited circumstances such as: the procurement does not exceed the micro-p...

Finding 2024-002: Reportable Finding Considered a Significant Deficiency – Procurement Compliance Program Name: STEM Education and NSF Technology, Innovation, and Partnerships Assistance Listing #: 47.076 and 47.084 Program Year: 2024 Federal Awarding Agency: National Science Foundation Compliance Requirement: Procurements Criteria: In accordance with 2 CFR 200.320(c), noncompetitive procurement may only be used under limited circumstances such as: the procurement does not exceed the micro-purchase threshold, the item is only available from a single source, an emergency or public exigency prevents a delay, the federal agency or pass-through entity provides prior written approval for noncompetitive procurement or after solicitation of multiple sources, competition is deemed inadequate. Unless one of these situations applies, the Organization is required to provide full and open competition in line with their established procurement policies. Condition: During our testing, we noted the procurement policies and standards were not followed for both of the two procurements selected for testing. Cause: The procurement policies were not followed due to the Organization believing they had met the criteria for noncompetitive procurement. For one selection, the Organization included the vendor in their original proposal and budget, believing this constituted prior approval. However, the regulation requires a specific written request and written approval from the federal agency, which was not obtained. For the other, the Organization believed the procurement was under the micro-purchase threshold, however the contract totaled $24,300. Although individual charges were allocated to separate grants and coded as amounts under the $10,000 micro-purchase threshold, the full contract amount exceeded that threshold and under 2 CFR 200.320, procurements must be considered in aggregate. Effect: The Organization did not obtain price quotations or bids for purchases from two vendors exceeding the micro-purchase threshold as required by 2 CFR 200.320. Questioned Costs: None. Repeat finding: This is not a repeat finding. Recommendation: We recommend that the Organization revisit its procurement policy to include these clarifications and ensure all staff involved in the acquisition of property or services charged to federal grants are aware of and re-trained on the relevant procurement requirements. Views of Responsible Officials and Planned Corrective Action (unaudited): See Corrective Action Plan.

FY End: 2024-12-31
Council of Graduate Schools
Compliance Requirement: I
Finding 2024-002: Reportable Finding Considered a Significant Deficiency – Procurement Compliance Program Name: STEM Education and NSF Technology, Innovation, and Partnerships Assistance Listing #: 47.076 and 47.084 Program Year: 2024 Federal Awarding Agency: National Science Foundation Compliance Requirement: Procurements Criteria: In accordance with 2 CFR 200.320(c), noncompetitive procurement may only be used under limited circumstances such as: the procurement does not exceed the micro-p...

Finding 2024-002: Reportable Finding Considered a Significant Deficiency – Procurement Compliance Program Name: STEM Education and NSF Technology, Innovation, and Partnerships Assistance Listing #: 47.076 and 47.084 Program Year: 2024 Federal Awarding Agency: National Science Foundation Compliance Requirement: Procurements Criteria: In accordance with 2 CFR 200.320(c), noncompetitive procurement may only be used under limited circumstances such as: the procurement does not exceed the micro-purchase threshold, the item is only available from a single source, an emergency or public exigency prevents a delay, the federal agency or pass-through entity provides prior written approval for noncompetitive procurement or after solicitation of multiple sources, competition is deemed inadequate. Unless one of these situations applies, the Organization is required to provide full and open competition in line with their established procurement policies. Condition: During our testing, we noted the procurement policies and standards were not followed for both of the two procurements selected for testing. Cause: The procurement policies were not followed due to the Organization believing they had met the criteria for noncompetitive procurement. For one selection, the Organization included the vendor in their original proposal and budget, believing this constituted prior approval. However, the regulation requires a specific written request and written approval from the federal agency, which was not obtained. For the other, the Organization believed the procurement was under the micro-purchase threshold, however the contract totaled $24,300. Although individual charges were allocated to separate grants and coded as amounts under the $10,000 micro-purchase threshold, the full contract amount exceeded that threshold and under 2 CFR 200.320, procurements must be considered in aggregate. Effect: The Organization did not obtain price quotations or bids for purchases from two vendors exceeding the micro-purchase threshold as required by 2 CFR 200.320. Questioned Costs: None. Repeat finding: This is not a repeat finding. Recommendation: We recommend that the Organization revisit its procurement policy to include these clarifications and ensure all staff involved in the acquisition of property or services charged to federal grants are aware of and re-trained on the relevant procurement requirements. Views of Responsible Officials and Planned Corrective Action (unaudited): See Corrective Action Plan.

FY End: 2024-12-31
Council of Graduate Schools
Compliance Requirement: I
Finding 2024-002: Reportable Finding Considered a Significant Deficiency – Procurement Compliance Program Name: STEM Education and NSF Technology, Innovation, and Partnerships Assistance Listing #: 47.076 and 47.084 Program Year: 2024 Federal Awarding Agency: National Science Foundation Compliance Requirement: Procurements Criteria: In accordance with 2 CFR 200.320(c), noncompetitive procurement may only be used under limited circumstances such as: the procurement does not exceed the micro-p...

Finding 2024-002: Reportable Finding Considered a Significant Deficiency – Procurement Compliance Program Name: STEM Education and NSF Technology, Innovation, and Partnerships Assistance Listing #: 47.076 and 47.084 Program Year: 2024 Federal Awarding Agency: National Science Foundation Compliance Requirement: Procurements Criteria: In accordance with 2 CFR 200.320(c), noncompetitive procurement may only be used under limited circumstances such as: the procurement does not exceed the micro-purchase threshold, the item is only available from a single source, an emergency or public exigency prevents a delay, the federal agency or pass-through entity provides prior written approval for noncompetitive procurement or after solicitation of multiple sources, competition is deemed inadequate. Unless one of these situations applies, the Organization is required to provide full and open competition in line with their established procurement policies. Condition: During our testing, we noted the procurement policies and standards were not followed for both of the two procurements selected for testing. Cause: The procurement policies were not followed due to the Organization believing they had met the criteria for noncompetitive procurement. For one selection, the Organization included the vendor in their original proposal and budget, believing this constituted prior approval. However, the regulation requires a specific written request and written approval from the federal agency, which was not obtained. For the other, the Organization believed the procurement was under the micro-purchase threshold, however the contract totaled $24,300. Although individual charges were allocated to separate grants and coded as amounts under the $10,000 micro-purchase threshold, the full contract amount exceeded that threshold and under 2 CFR 200.320, procurements must be considered in aggregate. Effect: The Organization did not obtain price quotations or bids for purchases from two vendors exceeding the micro-purchase threshold as required by 2 CFR 200.320. Questioned Costs: None. Repeat finding: This is not a repeat finding. Recommendation: We recommend that the Organization revisit its procurement policy to include these clarifications and ensure all staff involved in the acquisition of property or services charged to federal grants are aware of and re-trained on the relevant procurement requirements. Views of Responsible Officials and Planned Corrective Action (unaudited): See Corrective Action Plan.

FY End: 2024-12-31
Council of Graduate Schools
Compliance Requirement: I
Finding 2024-002: Reportable Finding Considered a Significant Deficiency – Procurement Compliance Program Name: STEM Education and NSF Technology, Innovation, and Partnerships Assistance Listing #: 47.076 and 47.084 Program Year: 2024 Federal Awarding Agency: National Science Foundation Compliance Requirement: Procurements Criteria: In accordance with 2 CFR 200.320(c), noncompetitive procurement may only be used under limited circumstances such as: the procurement does not exceed the micro-p...

Finding 2024-002: Reportable Finding Considered a Significant Deficiency – Procurement Compliance Program Name: STEM Education and NSF Technology, Innovation, and Partnerships Assistance Listing #: 47.076 and 47.084 Program Year: 2024 Federal Awarding Agency: National Science Foundation Compliance Requirement: Procurements Criteria: In accordance with 2 CFR 200.320(c), noncompetitive procurement may only be used under limited circumstances such as: the procurement does not exceed the micro-purchase threshold, the item is only available from a single source, an emergency or public exigency prevents a delay, the federal agency or pass-through entity provides prior written approval for noncompetitive procurement or after solicitation of multiple sources, competition is deemed inadequate. Unless one of these situations applies, the Organization is required to provide full and open competition in line with their established procurement policies. Condition: During our testing, we noted the procurement policies and standards were not followed for both of the two procurements selected for testing. Cause: The procurement policies were not followed due to the Organization believing they had met the criteria for noncompetitive procurement. For one selection, the Organization included the vendor in their original proposal and budget, believing this constituted prior approval. However, the regulation requires a specific written request and written approval from the federal agency, which was not obtained. For the other, the Organization believed the procurement was under the micro-purchase threshold, however the contract totaled $24,300. Although individual charges were allocated to separate grants and coded as amounts under the $10,000 micro-purchase threshold, the full contract amount exceeded that threshold and under 2 CFR 200.320, procurements must be considered in aggregate. Effect: The Organization did not obtain price quotations or bids for purchases from two vendors exceeding the micro-purchase threshold as required by 2 CFR 200.320. Questioned Costs: None. Repeat finding: This is not a repeat finding. Recommendation: We recommend that the Organization revisit its procurement policy to include these clarifications and ensure all staff involved in the acquisition of property or services charged to federal grants are aware of and re-trained on the relevant procurement requirements. Views of Responsible Officials and Planned Corrective Action (unaudited): See Corrective Action Plan.

FY End: 2024-12-31
Council of Graduate Schools
Compliance Requirement: I
Finding 2024-002: Reportable Finding Considered a Significant Deficiency – Procurement Compliance Program Name: STEM Education and NSF Technology, Innovation, and Partnerships Assistance Listing #: 47.076 and 47.084 Program Year: 2024 Federal Awarding Agency: National Science Foundation Compliance Requirement: Procurements Criteria: In accordance with 2 CFR 200.320(c), noncompetitive procurement may only be used under limited circumstances such as: the procurement does not exceed the micro-p...

Finding 2024-002: Reportable Finding Considered a Significant Deficiency – Procurement Compliance Program Name: STEM Education and NSF Technology, Innovation, and Partnerships Assistance Listing #: 47.076 and 47.084 Program Year: 2024 Federal Awarding Agency: National Science Foundation Compliance Requirement: Procurements Criteria: In accordance with 2 CFR 200.320(c), noncompetitive procurement may only be used under limited circumstances such as: the procurement does not exceed the micro-purchase threshold, the item is only available from a single source, an emergency or public exigency prevents a delay, the federal agency or pass-through entity provides prior written approval for noncompetitive procurement or after solicitation of multiple sources, competition is deemed inadequate. Unless one of these situations applies, the Organization is required to provide full and open competition in line with their established procurement policies. Condition: During our testing, we noted the procurement policies and standards were not followed for both of the two procurements selected for testing. Cause: The procurement policies were not followed due to the Organization believing they had met the criteria for noncompetitive procurement. For one selection, the Organization included the vendor in their original proposal and budget, believing this constituted prior approval. However, the regulation requires a specific written request and written approval from the federal agency, which was not obtained. For the other, the Organization believed the procurement was under the micro-purchase threshold, however the contract totaled $24,300. Although individual charges were allocated to separate grants and coded as amounts under the $10,000 micro-purchase threshold, the full contract amount exceeded that threshold and under 2 CFR 200.320, procurements must be considered in aggregate. Effect: The Organization did not obtain price quotations or bids for purchases from two vendors exceeding the micro-purchase threshold as required by 2 CFR 200.320. Questioned Costs: None. Repeat finding: This is not a repeat finding. Recommendation: We recommend that the Organization revisit its procurement policy to include these clarifications and ensure all staff involved in the acquisition of property or services charged to federal grants are aware of and re-trained on the relevant procurement requirements. Views of Responsible Officials and Planned Corrective Action (unaudited): See Corrective Action Plan.

FY End: 2024-12-31
Council of Graduate Schools
Compliance Requirement: I
Finding 2024-002: Reportable Finding Considered a Significant Deficiency – Procurement Compliance Program Name: STEM Education and NSF Technology, Innovation, and Partnerships Assistance Listing #: 47.076 and 47.084 Program Year: 2024 Federal Awarding Agency: National Science Foundation Compliance Requirement: Procurements Criteria: In accordance with 2 CFR 200.320(c), noncompetitive procurement may only be used under limited circumstances such as: the procurement does not exceed the micro-p...

Finding 2024-002: Reportable Finding Considered a Significant Deficiency – Procurement Compliance Program Name: STEM Education and NSF Technology, Innovation, and Partnerships Assistance Listing #: 47.076 and 47.084 Program Year: 2024 Federal Awarding Agency: National Science Foundation Compliance Requirement: Procurements Criteria: In accordance with 2 CFR 200.320(c), noncompetitive procurement may only be used under limited circumstances such as: the procurement does not exceed the micro-purchase threshold, the item is only available from a single source, an emergency or public exigency prevents a delay, the federal agency or pass-through entity provides prior written approval for noncompetitive procurement or after solicitation of multiple sources, competition is deemed inadequate. Unless one of these situations applies, the Organization is required to provide full and open competition in line with their established procurement policies. Condition: During our testing, we noted the procurement policies and standards were not followed for both of the two procurements selected for testing. Cause: The procurement policies were not followed due to the Organization believing they had met the criteria for noncompetitive procurement. For one selection, the Organization included the vendor in their original proposal and budget, believing this constituted prior approval. However, the regulation requires a specific written request and written approval from the federal agency, which was not obtained. For the other, the Organization believed the procurement was under the micro-purchase threshold, however the contract totaled $24,300. Although individual charges were allocated to separate grants and coded as amounts under the $10,000 micro-purchase threshold, the full contract amount exceeded that threshold and under 2 CFR 200.320, procurements must be considered in aggregate. Effect: The Organization did not obtain price quotations or bids for purchases from two vendors exceeding the micro-purchase threshold as required by 2 CFR 200.320. Questioned Costs: None. Repeat finding: This is not a repeat finding. Recommendation: We recommend that the Organization revisit its procurement policy to include these clarifications and ensure all staff involved in the acquisition of property or services charged to federal grants are aware of and re-trained on the relevant procurement requirements. Views of Responsible Officials and Planned Corrective Action (unaudited): See Corrective Action Plan.

FY End: 2024-12-31
Council of Graduate Schools
Compliance Requirement: I
Finding 2024-002: Reportable Finding Considered a Significant Deficiency – Procurement Compliance Program Name: STEM Education and NSF Technology, Innovation, and Partnerships Assistance Listing #: 47.076 and 47.084 Program Year: 2024 Federal Awarding Agency: National Science Foundation Compliance Requirement: Procurements Criteria: In accordance with 2 CFR 200.320(c), noncompetitive procurement may only be used under limited circumstances such as: the procurement does not exceed the micro-p...

Finding 2024-002: Reportable Finding Considered a Significant Deficiency – Procurement Compliance Program Name: STEM Education and NSF Technology, Innovation, and Partnerships Assistance Listing #: 47.076 and 47.084 Program Year: 2024 Federal Awarding Agency: National Science Foundation Compliance Requirement: Procurements Criteria: In accordance with 2 CFR 200.320(c), noncompetitive procurement may only be used under limited circumstances such as: the procurement does not exceed the micro-purchase threshold, the item is only available from a single source, an emergency or public exigency prevents a delay, the federal agency or pass-through entity provides prior written approval for noncompetitive procurement or after solicitation of multiple sources, competition is deemed inadequate. Unless one of these situations applies, the Organization is required to provide full and open competition in line with their established procurement policies. Condition: During our testing, we noted the procurement policies and standards were not followed for both of the two procurements selected for testing. Cause: The procurement policies were not followed due to the Organization believing they had met the criteria for noncompetitive procurement. For one selection, the Organization included the vendor in their original proposal and budget, believing this constituted prior approval. However, the regulation requires a specific written request and written approval from the federal agency, which was not obtained. For the other, the Organization believed the procurement was under the micro-purchase threshold, however the contract totaled $24,300. Although individual charges were allocated to separate grants and coded as amounts under the $10,000 micro-purchase threshold, the full contract amount exceeded that threshold and under 2 CFR 200.320, procurements must be considered in aggregate. Effect: The Organization did not obtain price quotations or bids for purchases from two vendors exceeding the micro-purchase threshold as required by 2 CFR 200.320. Questioned Costs: None. Repeat finding: This is not a repeat finding. Recommendation: We recommend that the Organization revisit its procurement policy to include these clarifications and ensure all staff involved in the acquisition of property or services charged to federal grants are aware of and re-trained on the relevant procurement requirements. Views of Responsible Officials and Planned Corrective Action (unaudited): See Corrective Action Plan.

FY End: 2024-12-31
Council of Graduate Schools
Compliance Requirement: I
Finding 2024-002: Reportable Finding Considered a Significant Deficiency – Procurement Compliance Program Name: STEM Education and NSF Technology, Innovation, and Partnerships Assistance Listing #: 47.076 and 47.084 Program Year: 2024 Federal Awarding Agency: National Science Foundation Compliance Requirement: Procurements Criteria: In accordance with 2 CFR 200.320(c), noncompetitive procurement may only be used under limited circumstances such as: the procurement does not exceed the micro-p...

Finding 2024-002: Reportable Finding Considered a Significant Deficiency – Procurement Compliance Program Name: STEM Education and NSF Technology, Innovation, and Partnerships Assistance Listing #: 47.076 and 47.084 Program Year: 2024 Federal Awarding Agency: National Science Foundation Compliance Requirement: Procurements Criteria: In accordance with 2 CFR 200.320(c), noncompetitive procurement may only be used under limited circumstances such as: the procurement does not exceed the micro-purchase threshold, the item is only available from a single source, an emergency or public exigency prevents a delay, the federal agency or pass-through entity provides prior written approval for noncompetitive procurement or after solicitation of multiple sources, competition is deemed inadequate. Unless one of these situations applies, the Organization is required to provide full and open competition in line with their established procurement policies. Condition: During our testing, we noted the procurement policies and standards were not followed for both of the two procurements selected for testing. Cause: The procurement policies were not followed due to the Organization believing they had met the criteria for noncompetitive procurement. For one selection, the Organization included the vendor in their original proposal and budget, believing this constituted prior approval. However, the regulation requires a specific written request and written approval from the federal agency, which was not obtained. For the other, the Organization believed the procurement was under the micro-purchase threshold, however the contract totaled $24,300. Although individual charges were allocated to separate grants and coded as amounts under the $10,000 micro-purchase threshold, the full contract amount exceeded that threshold and under 2 CFR 200.320, procurements must be considered in aggregate. Effect: The Organization did not obtain price quotations or bids for purchases from two vendors exceeding the micro-purchase threshold as required by 2 CFR 200.320. Questioned Costs: None. Repeat finding: This is not a repeat finding. Recommendation: We recommend that the Organization revisit its procurement policy to include these clarifications and ensure all staff involved in the acquisition of property or services charged to federal grants are aware of and re-trained on the relevant procurement requirements. Views of Responsible Officials and Planned Corrective Action (unaudited): See Corrective Action Plan.

FY End: 2024-12-31
Blachly-Lane County Cooperative Electric Association
Compliance Requirement: I
Identification of the federal program: 97.047 – Building Resilient Infrastructure and Communities (BRIC) Noncompliance with procurement, suspension, debarment, and significant deficiency in internal controls. Criteria: 2 CFR Part 200.320(a)(2)(i) indicates “If small purchase procedures are used, price or rate quotations must be obtained from an adequate number of qualified sources as determined appropriate by the non-federal entity.” Condition: The Cooperative did not retain documentation for ...

Identification of the federal program: 97.047 – Building Resilient Infrastructure and Communities (BRIC) Noncompliance with procurement, suspension, debarment, and significant deficiency in internal controls. Criteria: 2 CFR Part 200.320(a)(2)(i) indicates “If small purchase procedures are used, price or rate quotations must be obtained from an adequate number of qualified sources as determined appropriate by the non-federal entity.” Condition: The Cooperative did not retain documentation for price quotes obtained for small purchases for two of the three vendors tested. Cause: The Cooperative did not retain documentation of quote gathering as the conversations happened verbally. Effect: By not obtaining price or rate quotations, the Cooperative may pay more for goods and services than is necessary. Questioned Costs: $149,630 Recommendations: The Cooperative should establish and follow procurement policies and procedures to ensure the Cooperative adheres to requirements established by the federal government. Views of responsible officials: We did not obtain multiple price quotes for small purchases for two of the three vendors. We did, however, use the vendors we use in daily operations and the amount of the questioned costs is greater than the amount paid on the small purchases that did not follow proper procurement.

FY End: 2024-12-31
City of Seymour
Compliance Requirement: I
FINDING 2024-002 Subject: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds - Procurement and Suspension and Debarment Federal Agency: Department of the Treasury Federal Program: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds Assistance Listings Number: 21.027 Federal Award Number and Year (or Other Identifying Number): Contract #65851 Pass-Through Entity: Schneck Medical Center Compliance Requirement: Procurement and Suspension and Debarment Audit Findings: Material Wea...

FINDING 2024-002 Subject: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds - Procurement and Suspension and Debarment Federal Agency: Department of the Treasury Federal Program: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds Assistance Listings Number: 21.027 Federal Award Number and Year (or Other Identifying Number): Contract #65851 Pass-Through Entity: Schneck Medical Center Compliance Requirement: Procurement and Suspension and Debarment Audit Findings: Material Weakness, Other Matters Repeat Finding This is a repeat finding from the immediately prior audit report. The prior audit finding number was 2023-001. Condition and Context An effective internal control system was not in place at the City to ensure compliance with requirements related to the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Procurement Federal regulations allow for informal procurement methods when the value of the procurement for property or services does not exceed the simplified acquisition threshold, which is customarily set at $250,000. However, Indiana Code 5-22-8 has a more restrictive threshold of $150,000 or less for when small purchase procedures may be used. This informal process allows for methods other than the formal bid process. The informal process is divided between two methods based on thresholds. Micro-purchases, typically for those purchases $10,000 or under, and small purchase procedures for those purchases above the micro-purchase threshold, but below the simplified acquisition threshold. Micro-purchases may be awarded without soliciting competitive price rate quotations. If small purchase procedures are used, then price or rate quotations must be obtained from an adequate number of qualified sources. One vendor was identified that fell within the small purchase threshold. Purchases from the vendor totaled $148,800. As such, price or rate quotations from an adequate number of qualified sources should have been obtained. However, the City did not obtain price or rate quotations for the purchases, nor was full and open competition provided for the vendor. Additionally, there was no documentation available to support the rationale to limit competition. INDIANA STATE BOARD OF ACCOUNTS 15 CITY OF SEYMOUR SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Suspension and Debarment Prior to entering into subawards and covered transactions with the COVID-19 - Coronavirus State and Local Fiscal Recovery Funds (SLFRF) award funds, recipients are required to verify that such contractors and subrecipients are not suspended, debarred, or otherwise excluded. "Covered transactions" include, but are not limited to, contracts for goods and services awarded under a nonprocurement transaction (i.e., grant agreement) that are expected to equal or exceed $25,000. The verification is to be done by checking the Excluded Parties List System (EPLS), collecting a certification from that person, or adding a clause or condition to the covered transaction with that person. The City did not have policies or procedures in place for verifying that an entity with which it planned to enter into a covered transaction was not suspended, debarred, or otherwise excluded until November 25, 2024. One of the two vendors selected for testing, with covered transactions totaling $148,800, was not verified to ensure that the vendor was not suspended, debarred, or otherwise excluded. The lack of internal controls and noncompliance were systemic issues until the City implemented new policies and procedures in November 2024. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.320 states in part: "The non-Federal entity must have and use documented procurement procedures, consistent with the standards of this section and §§ 200.317, 200.318, and 200.319 for any of the following methods of procurement used for the acquisition of property or services required under a Federal award or sub-award. (a) Informal procurement methods. When the value of the procurement for property or services under a Federal award does not exceed the simplified acquisition threshold (SAT), as defined in § 200.1, or a lower threshold established by a non-Federal entity, formal procurement methods are not required. The non-Federal entity may use informal procurement methods to expedite the completion of its transactions and minimize the associated administrative burden and cost. The informal methods used for procurement of property or services at or below the SAT include: . . . (2) Small purchases — INDIANA STATE BOARD OF ACCOUNTS 16 CITY OF SEYMOUR SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (i) Small purchase procedures. The acquisition of property or services, the aggregate dollar amount of which is higher than the micro-purchase threshold but does not exceed the simplified acquisition threshold. If small purchase procedures are used, price or rate quotations must be obtained from an adequate number of qualified sources as determined appropriate by the non-Federal entity. . . . 31 CFR 19.300 states: "When you enter into a covered transaction with another person at the next lower tier, you must verify that the person with whom you do business is not excluded or disqualified. You do this by: (a) Checking the EPLS; or (b) Collecting a certification from that person if allowed by this rule; or (c) Adding a clause or condition to the covered transaction with that person." Cause The City did not have a procurement policy in place that contained the requirements of the procurement standards as outlined in the Code of Federal Regulations prior to entering into an agreement with the vendor. Due to the timing of the adoption of the City's Procurement and Suspension and Debarment Policy, which defines procedures to ensure they are properly procuring services and verifying suspension and debarment status for covered transactions, not all of the items selected for testing were in compliance. Effect Without the proper implementation of an effectively designed system of internal controls, the City cannot ensure that goods and services are appropriately procured and that contractors paid with federal funds are eligible to participate in federal programs. Any program funds the City used to pay contractors that have been suspended or debarred would be unallowable, and the funding agency could potentially recover them. Furthermore, noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the City. Questioned Costs There were no questioned costs identified. Recommendation We recommended adhering to the newly implemented procurement policies to ensure compliance with state and federal laws and regulations for procuring goods and services paid with federal funds. We also recommended that management of the City adhere to its newly approved policy of internal controls to ensure that all contractors that are expected to be paid $25,000 or more, all or in part with federal funds, are not suspended or debarred from participating in federal programs before entering into covered transactions. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

FY End: 2024-12-31
Town of Eagle
Compliance Requirement: I
Finding #24-001 – Significant Deficiency in Internal Control over Financial Reporting: Procurement Program Names: 3rd Street Housing Project Eagle Community Pool Replacement CFDA Titles and Numbers: 21.027 Coronavirus State and Local Fiscal Recovery Funds Federal Agency: United States Treasury Pass-through Agency: Colorado Department of Local Affairs Award Year: December 31, 2024 Condition: No formal Federal procurement policy has been adopted by the Town of Eagle, Colorado, resulting in a lack ...

Finding #24-001 – Significant Deficiency in Internal Control over Financial Reporting: Procurement Program Names: 3rd Street Housing Project Eagle Community Pool Replacement CFDA Titles and Numbers: 21.027 Coronavirus State and Local Fiscal Recovery Funds Federal Agency: United States Treasury Pass-through Agency: Colorado Department of Local Affairs Award Year: December 31, 2024 Condition: No formal Federal procurement policy has been adopted by the Town of Eagle, Colorado, resulting in a lack of internal controls over Federal procurement. Criteria or Specific Requirement: The Town of Eagle, Colorado, must comply with procurement standards set out at 2 CFR sections 200.303 and 200.318 through 200.326 within Uniform Guidance. Per 2 CFR section 200.303(a), a non-Federal entity must: Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in “Standards for Internal Control in the Federal Government” issued by the Comptroller General of the United States or the “Internal Control Integrated Framework” issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). UG §200.318 General Procurement Standards. (i) The non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include, but are not necessarily limited to, the following: Rationale for the method of procurement, section of contract type, contractor selection or rejection, and the basis for the contract price. UG §200.320 states that the non-Federal entity must use one of the prescribed methods of procurement: (a) Informal Procurement methods. When the value of the procurement for property or services under a Federal award does not exceed the simplified acquisition threshold (SAT), as defined in §200.1, or a lower threshold established by a non-Federal entity, formal procurement methods are not required. The non-Federal entity may use informal procurement methods to expedite the completion of its transactions and minimize the associated administrative burden and cost. The informal methods used for procurement or property or services at or below the SAT include: (1) Micro-purchases. Procurement by micro-purchase is the acquisition of supplies or services, the aggregate dollar amount of which does not exceed the micro-purchase threshold (see definition of micro-purchase in §200.1). To the maximum extent practicable, the non-Federal entity should distribute micro-purchases equitably among qualified suppliers. Micro-purchases may be awarded without soliciting competitive price or equitably among qualified suppliers. Micro-purchases may be awarded without soliciting competitive price or rate quotations if the non-Federal entity considers the price to be reasonable based on research, experience, purchase history or other information and documents it files accordingly. Purchase cards can be used for micro-purchases if procedures are documented and approved by the non-Federal entity. (2) Small purchase. Procurement by small purchase is the acquisition of property or services, the aggregate dollar amount of which is greater than the micro-purchase threshold but does not exceed the simplified acquisition threshold. If small purchase procedures are used, price or rate quotations must be obtained from an adequate number of qualified sources as determined appropriate by the non-Federal entity. (b) Formal procurement methods. When the value of the procurement for property or services under a Federal financial assistance award exceeds the SAT, or a lower threshold established by a non-Federal entity, formal procurement methods are required. Formal procurement methods require following documented procedures. Formal procurement methods also require public advertising unless a non-competitive procurement can be used in accordance with §200.319 or paragraph (c) of this section. The following formal methods of procurement are used for procurement of property or services above the simplified acquisition threshold or a value below the simplified acquisition threshold the non-Federal entity determines to be appropriate: (1) Sealed Bids. Bids are publicly solicited, and a firm fixed-price contract (lump sum or unit price) is awarded to the responsible bidder whose bid, conforming with all the material terms and conditions of the invitation for bids, is the lowest in price. (2) Proposals. Either a fixed price or cost-reimbursement-type contract is awarded. Proposals are generally used when conditions are not appropriate for the use of sealed bids. (c) Noncompetitive procurement. There are specific circumstances in which noncompetitive procurement can be used. Noncompetitive procurement can only be awarded if one or more of the allowed circumstances apply. Questioned Costs: N/A Context: Although the Town of Eagle, Colorado, had not adopted a formal Federal procurement policy as outlined in 2CFR sections 200.303 and 200.318 through 200.326, during the course of our federal single audit testing of transactions and contracts, we found that the Town’s general contract purchase procedures that were followed meet the requirements of the Uniform Guidance and that no contracts were awarded without proper justification in 7 or 7 procurement transactions tested. Cause: Management was not aware of the requirement of adopting a formal Federal procurement policy under the procurement standards set out at 2CFR sections 200.303 and 200.318 through 200.626 within Uniform Guidance. Effect: The Town of Eagle, Colorado, is at risk for noncompliance with Federal grants as it relates to procurement. Recommendation: We recommend that the Town of Eagle, Colorado, adopts a formal Federal procurement policy to include all elements identified in 2CFR Sections 200.303 and 200.318 through 200.626. Views of Responsible Officials and Planned Corrective Action: Management agrees with this finding and will adopt a formal Federal procurement policy which includes all elements identified in 2CFR Sections 200.303 and 200.318 through 200.626.

FY End: 2024-12-31
Town of Eagle
Compliance Requirement: I
Finding #24-003 – Procurement Program Names: 3rd Street Housing Project Eagle Community Pool Replacement CFDA Titles and Numbers: 21.027 Coronavirus State and Local Fiscal Recovery Funds Federal Agency: United States Treasury Pass-through Agency: Colorado Department of Local Affairs Award Year: December 31, 2024 Condition: No formal Federal procurement policy has been adopted by the Town of Eagle, Colorado, resulting in a lack of compliance with Federal procurement. Criteria or Specific Requirem...

Finding #24-003 – Procurement Program Names: 3rd Street Housing Project Eagle Community Pool Replacement CFDA Titles and Numbers: 21.027 Coronavirus State and Local Fiscal Recovery Funds Federal Agency: United States Treasury Pass-through Agency: Colorado Department of Local Affairs Award Year: December 31, 2024 Condition: No formal Federal procurement policy has been adopted by the Town of Eagle, Colorado, resulting in a lack of compliance with Federal procurement. Criteria or Specific Requirement: The Town of Eagle, Colorado, must comply with procurement standards set out at 2 CFR sections 200.303 and 200.318 through 200.326 within Uniform Guidance. Per 2 CFR section 200.303(a), a non-Federal entity must: Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in “Standards for Internal Control in the Federal Government” issued by the Comptroller General of the United States or the “Internal Control Integrated Framework” issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). UG §200.318 General Procurement Standards. (i) The non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include, but are not necessarily limited to, the following: Rationale for the method of procurement, section of contract type, contractor selection or rejection, and the basis for the contract price. UG §200.320 states that the non-Federal entity must use one of the prescribed methods of procurement: (a) Informal Procurement methods. When the value of the procurement for property or services under a Federal award does not exceed the simplified acquisition threshold (SAT), as defined in §200.1, or a lower threshold established by a non-Federal entity, formal procurement methods are not required. The non-Federal entity may use informal procurement methods to expedite the completion of its transactions and minimize the associated administrative burden and cost. The informal methods used for procurement or property or services at or below the SAT include: (1) Micro-purchases. Procurement by micro-purchase is the acquisition of supplies or services, the aggregate dollar amount of which does not exceed the micro-purchase threshold (see definition of micro-purchase in §200.1). To the maximum extent practicable, the non-Federal entity should distribute micro-purchases equitably among qualified suppliers. Micro-purchases may be awarded without soliciting competitive price or rate quotations if the non-Federal entity considers the price to be reasonable based on research, experience, purchase history or other information and documents it files accordingly. Purchase cards can be used for micro-purchases if procedures are documented and approved by the non-Federal entity. (2) Small purchase. Procurement by small purchase is the acquisition of property or services, the aggregate dollar amount of which is greater than the micro-purchase threshold but does not exceed the simplified acquisition threshold. If small purchase procedures are used, price or rate quotations must be obtained from an adequate number of qualified sources as determined appropriate by the non-Federal entity. (b) Formal procurement methods. When the value of the procurement for property or services under a Federal financial assistance award exceeds the SAT, or a lower threshold established by a non-Federal entity, formal procurement methods are required. Formal procurement methods require following documented procedures. Formal procurement methods also require public advertising unless a non-competitive procurement can be used in accordance with §200.319 or paragraph (c) of this section. The following formal methods of procurement are used for procurement of property or services above the simplified acquisition threshold or a value below the simplified acquisition threshold the non-Federal entity determines to be appropriate: (1) Sealed Bids. Bids are publicly solicited, and a firm fixed-price contract (lump sum or unit price) is awarded to the responsible bidder whose bid, conforming with all the material terms and conditions of the invitation for bids, is the lowest in price. (2) Proposals. Either a fixed price or cost-reimbursement-type contract is awarded. Proposals are generally used when conditions are not appropriate for the use of sealed bids. (c) Noncompetitive procurement. There are specific circumstances in which noncompetitive procurement can be used. Noncompetitive procurement can only be awarded if one or more of the allowed circumstances apply. Questioned Costs: N/A Context: Although the Town of Eagle, Colorado, had not adopted a formal Federal procurement policy as outlined in 2CFR sections 200.303 and 200.318 through 200.326, during the course of our federal single audit testing of transactions and contracts, we found that the Town’s general contract purchase procedures that were followed meet the requirements of the Uniform Guidance and that no contracts were awarded without proper justification in 7 or 7 procurement transactions tested. Cause: Management was not aware of the requirement of adopting a formal Federal procurement policy under the procurement standards set out at 2CFR sections 200.303 and 200.318 through 200.626 within Uniform Guidance. Effect: The Town of Eagle, Colorado, is at risk for noncompliance with Federal grants as it relates to procurement. Recommendation: We recommend that the Town of Eagle, Colorado, adopts a formal Federal procurement policy to include all elements identified in 2CFR Sections 200.303 and 200.318 through 200.626. Views of Responsible Officials and Planned Corrective Action: Management agrees with this finding and will adopt a formal Federal procurement policy which includes all elements identified in 2CFR Sections 200.303 and 200.318 through 200.626.

FY End: 2024-12-31
Town of Eagle
Compliance Requirement: I
Finding #24-001 – Significant Deficiency in Internal Control over Financial Reporting: Procurement Program Names: 3rd Street Housing Project Eagle Community Pool Replacement CFDA Titles and Numbers: 21.027 Coronavirus State and Local Fiscal Recovery Funds Federal Agency: United States Treasury Pass-through Agency: Colorado Department of Local Affairs Award Year: December 31, 2024 Condition: No formal Federal procurement policy has been adopted by the Town of Eagle, Colorado, resulting in a lack ...

Finding #24-001 – Significant Deficiency in Internal Control over Financial Reporting: Procurement Program Names: 3rd Street Housing Project Eagle Community Pool Replacement CFDA Titles and Numbers: 21.027 Coronavirus State and Local Fiscal Recovery Funds Federal Agency: United States Treasury Pass-through Agency: Colorado Department of Local Affairs Award Year: December 31, 2024 Condition: No formal Federal procurement policy has been adopted by the Town of Eagle, Colorado, resulting in a lack of internal controls over Federal procurement. Criteria or Specific Requirement: The Town of Eagle, Colorado, must comply with procurement standards set out at 2 CFR sections 200.303 and 200.318 through 200.326 within Uniform Guidance. Per 2 CFR section 200.303(a), a non-Federal entity must: Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in “Standards for Internal Control in the Federal Government” issued by the Comptroller General of the United States or the “Internal Control Integrated Framework” issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). UG §200.318 General Procurement Standards. (i) The non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include, but are not necessarily limited to, the following: Rationale for the method of procurement, section of contract type, contractor selection or rejection, and the basis for the contract price. UG §200.320 states that the non-Federal entity must use one of the prescribed methods of procurement: (a) Informal Procurement methods. When the value of the procurement for property or services under a Federal award does not exceed the simplified acquisition threshold (SAT), as defined in §200.1, or a lower threshold established by a non-Federal entity, formal procurement methods are not required. The non-Federal entity may use informal procurement methods to expedite the completion of its transactions and minimize the associated administrative burden and cost. The informal methods used for procurement or property or services at or below the SAT include: (1) Micro-purchases. Procurement by micro-purchase is the acquisition of supplies or services, the aggregate dollar amount of which does not exceed the micro-purchase threshold (see definition of micro-purchase in §200.1). To the maximum extent practicable, the non-Federal entity should distribute micro-purchases equitably among qualified suppliers. Micro-purchases may be awarded without soliciting competitive price or equitably among qualified suppliers. Micro-purchases may be awarded without soliciting competitive price or rate quotations if the non-Federal entity considers the price to be reasonable based on research, experience, purchase history or other information and documents it files accordingly. Purchase cards can be used for micro-purchases if procedures are documented and approved by the non-Federal entity. (2) Small purchase. Procurement by small purchase is the acquisition of property or services, the aggregate dollar amount of which is greater than the micro-purchase threshold but does not exceed the simplified acquisition threshold. If small purchase procedures are used, price or rate quotations must be obtained from an adequate number of qualified sources as determined appropriate by the non-Federal entity. (b) Formal procurement methods. When the value of the procurement for property or services under a Federal financial assistance award exceeds the SAT, or a lower threshold established by a non-Federal entity, formal procurement methods are required. Formal procurement methods require following documented procedures. Formal procurement methods also require public advertising unless a non-competitive procurement can be used in accordance with §200.319 or paragraph (c) of this section. The following formal methods of procurement are used for procurement of property or services above the simplified acquisition threshold or a value below the simplified acquisition threshold the non-Federal entity determines to be appropriate: (1) Sealed Bids. Bids are publicly solicited, and a firm fixed-price contract (lump sum or unit price) is awarded to the responsible bidder whose bid, conforming with all the material terms and conditions of the invitation for bids, is the lowest in price. (2) Proposals. Either a fixed price or cost-reimbursement-type contract is awarded. Proposals are generally used when conditions are not appropriate for the use of sealed bids. (c) Noncompetitive procurement. There are specific circumstances in which noncompetitive procurement can be used. Noncompetitive procurement can only be awarded if one or more of the allowed circumstances apply. Questioned Costs: N/A Context: Although the Town of Eagle, Colorado, had not adopted a formal Federal procurement policy as outlined in 2CFR sections 200.303 and 200.318 through 200.326, during the course of our federal single audit testing of transactions and contracts, we found that the Town’s general contract purchase procedures that were followed meet the requirements of the Uniform Guidance and that no contracts were awarded without proper justification in 7 or 7 procurement transactions tested. Cause: Management was not aware of the requirement of adopting a formal Federal procurement policy under the procurement standards set out at 2CFR sections 200.303 and 200.318 through 200.626 within Uniform Guidance. Effect: The Town of Eagle, Colorado, is at risk for noncompliance with Federal grants as it relates to procurement. Recommendation: We recommend that the Town of Eagle, Colorado, adopts a formal Federal procurement policy to include all elements identified in 2CFR Sections 200.303 and 200.318 through 200.626. Views of Responsible Officials and Planned Corrective Action: Management agrees with this finding and will adopt a formal Federal procurement policy which includes all elements identified in 2CFR Sections 200.303 and 200.318 through 200.626.

FY End: 2024-12-31
Town of Eagle
Compliance Requirement: I
Finding #24-003 – Procurement Program Names: 3rd Street Housing Project Eagle Community Pool Replacement CFDA Titles and Numbers: 21.027 Coronavirus State and Local Fiscal Recovery Funds Federal Agency: United States Treasury Pass-through Agency: Colorado Department of Local Affairs Award Year: December 31, 2024 Condition: No formal Federal procurement policy has been adopted by the Town of Eagle, Colorado, resulting in a lack of compliance with Federal procurement. Criteria or Specific Requirem...

Finding #24-003 – Procurement Program Names: 3rd Street Housing Project Eagle Community Pool Replacement CFDA Titles and Numbers: 21.027 Coronavirus State and Local Fiscal Recovery Funds Federal Agency: United States Treasury Pass-through Agency: Colorado Department of Local Affairs Award Year: December 31, 2024 Condition: No formal Federal procurement policy has been adopted by the Town of Eagle, Colorado, resulting in a lack of compliance with Federal procurement. Criteria or Specific Requirement: The Town of Eagle, Colorado, must comply with procurement standards set out at 2 CFR sections 200.303 and 200.318 through 200.326 within Uniform Guidance. Per 2 CFR section 200.303(a), a non-Federal entity must: Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in “Standards for Internal Control in the Federal Government” issued by the Comptroller General of the United States or the “Internal Control Integrated Framework” issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). UG §200.318 General Procurement Standards. (i) The non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include, but are not necessarily limited to, the following: Rationale for the method of procurement, section of contract type, contractor selection or rejection, and the basis for the contract price. UG §200.320 states that the non-Federal entity must use one of the prescribed methods of procurement: (a) Informal Procurement methods. When the value of the procurement for property or services under a Federal award does not exceed the simplified acquisition threshold (SAT), as defined in §200.1, or a lower threshold established by a non-Federal entity, formal procurement methods are not required. The non-Federal entity may use informal procurement methods to expedite the completion of its transactions and minimize the associated administrative burden and cost. The informal methods used for procurement or property or services at or below the SAT include: (1) Micro-purchases. Procurement by micro-purchase is the acquisition of supplies or services, the aggregate dollar amount of which does not exceed the micro-purchase threshold (see definition of micro-purchase in §200.1). To the maximum extent practicable, the non-Federal entity should distribute micro-purchases equitably among qualified suppliers. Micro-purchases may be awarded without soliciting competitive price or rate quotations if the non-Federal entity considers the price to be reasonable based on research, experience, purchase history or other information and documents it files accordingly. Purchase cards can be used for micro-purchases if procedures are documented and approved by the non-Federal entity. (2) Small purchase. Procurement by small purchase is the acquisition of property or services, the aggregate dollar amount of which is greater than the micro-purchase threshold but does not exceed the simplified acquisition threshold. If small purchase procedures are used, price or rate quotations must be obtained from an adequate number of qualified sources as determined appropriate by the non-Federal entity. (b) Formal procurement methods. When the value of the procurement for property or services under a Federal financial assistance award exceeds the SAT, or a lower threshold established by a non-Federal entity, formal procurement methods are required. Formal procurement methods require following documented procedures. Formal procurement methods also require public advertising unless a non-competitive procurement can be used in accordance with §200.319 or paragraph (c) of this section. The following formal methods of procurement are used for procurement of property or services above the simplified acquisition threshold or a value below the simplified acquisition threshold the non-Federal entity determines to be appropriate: (1) Sealed Bids. Bids are publicly solicited, and a firm fixed-price contract (lump sum or unit price) is awarded to the responsible bidder whose bid, conforming with all the material terms and conditions of the invitation for bids, is the lowest in price. (2) Proposals. Either a fixed price or cost-reimbursement-type contract is awarded. Proposals are generally used when conditions are not appropriate for the use of sealed bids. (c) Noncompetitive procurement. There are specific circumstances in which noncompetitive procurement can be used. Noncompetitive procurement can only be awarded if one or more of the allowed circumstances apply. Questioned Costs: N/A Context: Although the Town of Eagle, Colorado, had not adopted a formal Federal procurement policy as outlined in 2CFR sections 200.303 and 200.318 through 200.326, during the course of our federal single audit testing of transactions and contracts, we found that the Town’s general contract purchase procedures that were followed meet the requirements of the Uniform Guidance and that no contracts were awarded without proper justification in 7 or 7 procurement transactions tested. Cause: Management was not aware of the requirement of adopting a formal Federal procurement policy under the procurement standards set out at 2CFR sections 200.303 and 200.318 through 200.626 within Uniform Guidance. Effect: The Town of Eagle, Colorado, is at risk for noncompliance with Federal grants as it relates to procurement. Recommendation: We recommend that the Town of Eagle, Colorado, adopts a formal Federal procurement policy to include all elements identified in 2CFR Sections 200.303 and 200.318 through 200.626. Views of Responsible Officials and Planned Corrective Action: Management agrees with this finding and will adopt a formal Federal procurement policy which includes all elements identified in 2CFR Sections 200.303 and 200.318 through 200.626.

FY End: 2024-12-31
Housing Resources, Inc.
Compliance Requirement: I
Reference Number: 2024-001 Program Name: 21.027 COVID-19 Coronavirus State and Local Fiscal Recovery Funds Description: Procurement Criteria: 2 CFR 200.320 Methods of Procurement state that if the small purchases method is used, price or rate quotations must be obtained from an adequate number of qualified sources (at least 2). The Organization’s procurement policy also states that contracts or purchases ranging from $7,501-$20,000 require the Organization contact at least three bids from quali...

Reference Number: 2024-001 Program Name: 21.027 COVID-19 Coronavirus State and Local Fiscal Recovery Funds Description: Procurement Criteria: 2 CFR 200.320 Methods of Procurement state that if the small purchases method is used, price or rate quotations must be obtained from an adequate number of qualified sources (at least 2). The Organization’s procurement policy also states that contracts or purchases ranging from $7,501-$20,000 require the Organization contact at least three bids from qualified sources. Condition: During our testing of procurement transactions, we sampled two purchases over $7,501 and neither of them had price quotes as required by the Organization’s procurement policy. Questioned Costs: 13,863. Cause: The Organization did not follow their Procurement policy dated April 2022 related to the appropriate methods of procurement. Effect: Obtaining price quotes or proposals from an adequate number of vendors allows the Organization to use federal funds in the most fiscally responsible way. The lack of quotes and proposals may cause the Organization to overpay for supplies or services. Identification of a Repeat Finding: This is not repeat finding. Auditors’ Recommendation: We recommend the Organization review their procurement policy and either amend it to coincide with increased thresholds or adhere to current policy. Views of Responsible Officials: See attachment for the Organization’s corrective action plan.

FY End: 2024-12-31
Housing Resources, Inc.
Compliance Requirement: I
Reference Number: 2024-001 Program Name: 21.027 COVID-19 Coronavirus State and Local Fiscal Recovery Funds Description: Procurement Criteria: 2 CFR 200.320 Methods of Procurement state that if the small purchases method is used, price or rate quotations must be obtained from an adequate number of qualified sources (at least 2). The Organization’s procurement policy also states that contracts or purchases ranging from $7,501-$20,000 require the Organization contact at least three bids from quali...

Reference Number: 2024-001 Program Name: 21.027 COVID-19 Coronavirus State and Local Fiscal Recovery Funds Description: Procurement Criteria: 2 CFR 200.320 Methods of Procurement state that if the small purchases method is used, price or rate quotations must be obtained from an adequate number of qualified sources (at least 2). The Organization’s procurement policy also states that contracts or purchases ranging from $7,501-$20,000 require the Organization contact at least three bids from qualified sources. Condition: During our testing of procurement transactions, we sampled two purchases over $7,501 and neither of them had price quotes as required by the Organization’s procurement policy. Questioned Costs: 13,863. Cause: The Organization did not follow their Procurement policy dated April 2022 related to the appropriate methods of procurement. Effect: Obtaining price quotes or proposals from an adequate number of vendors allows the Organization to use federal funds in the most fiscally responsible way. The lack of quotes and proposals may cause the Organization to overpay for supplies or services. Identification of a Repeat Finding: This is not repeat finding. Auditors’ Recommendation: We recommend the Organization review their procurement policy and either amend it to coincide with increased thresholds or adhere to current policy. Views of Responsible Officials: See attachment for the Organization’s corrective action plan.

FY End: 2024-12-31
City of Johnstown
Compliance Requirement: I
INTERNAL CONTROL - MATERIAL WEAKNESS AND NONCOMPLIANCE COVID-19 - Coronavirus State and Local Fiscal Relief Funds - 21.027 ...

INTERNAL CONTROL - MATERIAL WEAKNESS AND NONCOMPLIANCE COVID-19 - Coronavirus State and Local Fiscal Relief Funds - 21.027 2024-004 - Procurement Criteria: The City is responsible for establishing and maintaining a procurement policy which is compliant with the Uniform Guidance in 2 CFR 200.320. In addition, the City is responsible for maintaining adequate records relating to procurements. Condition: The City's procurement policy lacks the specific methods of procurement to be followed and the respective thresholds for procurements using federal funds. Furthermore, there is not adequate pre-award documentation maintained relating to each of the City's procurements. Cause: The City's procurement policy was not adequately updated with necessary Uniform Guidance requirements. In addition, the City's procurement process is not centralized and there is inadequate or missing pre-award documentation pertaining to the City's various procurements. Effect: The condition above could result in material program and internal control issues relating to procurements whereby: appropriate methods of procurement may not be followed, debarred or suspended vendors or contractors could be awarded purchase orders or contracts, open and fair competition may not be achieved, etc. Context: Audit procedures noted that the procurement policy is inadequate and not in line with Uniform Guidance. Furthermore, audit procedures noted that there is not centralized process in place for tracking the City's various procurements along with the necessary pre-award documentation. There was a total of $1,194,777 of expenditures incurred during the year ended December 31, 2024 for which procurements would have been made in the current year or prior years. Questioned Costs: We questioned $1,194,777 of costs because this was the total that was expended during the year ended December 31, 2024, for goods or services for which procurement policies should have been followed. Our testing surrounding procurement in the current year noted that there was not a proper procurement policy in place that would permit the testing of procurements made during the year. Recommendation: We recommend that the City adopt a proper procurement policy that is in line with Uniform Guidance. We further recommend that the City develops a centralized procurement process whereby appropriate procurement type is documented along with the maintenance of proper pre-award documentation.

FY End: 2024-12-31
City of Johnstown
Compliance Requirement: I
INTERNAL CONTROL - MATERIAL WEAKNESS AND NONCOMPLIANCE COVID-19 - Coronavirus State and Local Fiscal Relief Funds - 21.027 ...

INTERNAL CONTROL - MATERIAL WEAKNESS AND NONCOMPLIANCE COVID-19 - Coronavirus State and Local Fiscal Relief Funds - 21.027 2024-004 - Procurement Criteria: The City is responsible for establishing and maintaining a procurement policy which is compliant with the Uniform Guidance in 2 CFR 200.320. In addition, the City is responsible for maintaining adequate records relating to procurements. Condition: The City's procurement policy lacks the specific methods of procurement to be followed and the respective thresholds for procurements using federal funds. Furthermore, there is not adequate pre-award documentation maintained relating to each of the City's procurements. Cause: The City's procurement policy was not adequately updated with necessary Uniform Guidance requirements. In addition, the City's procurement process is not centralized and there is inadequate or missing pre-award documentation pertaining to the City's various procurements. Effect: The condition above could result in material program and internal control issues relating to procurements whereby: appropriate methods of procurement may not be followed, debarred or suspended vendors or contractors could be awarded purchase orders or contracts, open and fair competition may not be achieved, etc. Context: Audit procedures noted that the procurement policy is inadequate and not in line with Uniform Guidance. Furthermore, audit procedures noted that there is not centralized process in place for tracking the City's various procurements along with the necessary pre-award documentation. There was a total of $1,194,777 of expenditures incurred during the year ended December 31, 2024 for which procurements would have been made in the current year or prior years. Questioned Costs: We questioned $1,194,777 of costs because this was the total that was expended during the year ended December 31, 2024, for goods or services for which procurement policies should have been followed. Our testing surrounding procurement in the current year noted that there was not a proper procurement policy in place that would permit the testing of procurements made during the year. Recommendation: We recommend that the City adopt a proper procurement policy that is in line with Uniform Guidance. We further recommend that the City develops a centralized procurement process whereby appropriate procurement type is documented along with the maintenance of proper pre-award documentation.

FY End: 2024-12-31
Rib Mountain Metro Sewerage District
Compliance Requirement: I
Federal Agency: U.S. Environmental Protection Agency Federal Program Name: Capitalization Grants for Clean Water State Revolving Funds Assistance Listing Number: 66.458 Federal Award Identification Number and Year: Unknown Pass-Through Agency: Wisconsin Department of Administration Pass-Through Number(s): 4021-10 Award Period: July 10, 2024 – September 30, 2026 Type of Finding: • Significant Deficiency in Internal Control over Compliance • Other Matters Criteria or specific requirement...

Federal Agency: U.S. Environmental Protection Agency Federal Program Name: Capitalization Grants for Clean Water State Revolving Funds Assistance Listing Number: 66.458 Federal Award Identification Number and Year: Unknown Pass-Through Agency: Wisconsin Department of Administration Pass-Through Number(s): 4021-10 Award Period: July 10, 2024 – September 30, 2026 Type of Finding: • Significant Deficiency in Internal Control over Compliance • Other Matters Criteria or specific requirement: 2 CFR Section 320.318(i) requires the District to maintain records sufficient to detail the history of procurement. These records will include, but are not necessarily limited to, the following: Rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. CFR 200.320(c) states that noncompetitive procurement can only be awarded if one or more of the following circumstances apply: (1) The acquisition of property or services, the aggregate dollar amount of which does not exceed the micro-purchase threshold; (2) The item is available only from a single source; (3) The public exigency or emergency for the requirement will not permit a delay resulting from publicizing a competitive solicitation; (4) The Federal awarding agency or pass-through entity expressly authorizes a noncompetitive procurement in response to a written request from the non-Federal entity; or (5) After solicitation of a number of sources, competition is determined inadequate. Condition: The District did not maintain documentation of the justification for the noncompetitive procurement and that it was done in accordance with Uniform Guidance requirements. Questioned costs: None Context: The District entered into one noncompetitive proposal during the course of the grant and did not maintain documentation of the consideration of the procurement method. Cause: The District does not receive frequent federal awards and was unfamiliar with the documentation requirements surrounding procurement procedures. Effect: Procurement practices may not be in compliance with the Uniform Guidance. Repeat Finding: No Recommendation: District personnel should familiarize themselves with the documentation requirements required by the CFR related to procurement. In addition, District policies and procedures should be modified to ensure documentation is maintained on the justification for any noncompetitive procurement transactions that are entered into and that the justification is reviewed and approved by someone other than the one making that determination. The written policies should be expanded to clearly address all five procurement methods allowed under Uniform Guidance. The District should also make sure to update its conflict of interest policy to specifically address situations with federal awards and also create written policies and procedures related to suspension and debarment. Views of responsible officials: There is no disagreement with the audit finding. The Board of Commissioners will discuss at future regularly scheduled meetings. Clerk and Director will make sure any decisions made include documentation as to why they differ from the established policy.

FY End: 2024-12-31
Barton County, Kansas
Compliance Requirement: I
SIGNIFICANT DEFICIENCY 2024-001 10.855 – Distance Learning and Telemedicine Loans and Grants – Procurement, Suspension, and Debarment Criteria or specific requirement Procurement methods should follow the requirements laid out at 2 CFR 200.320. Noncompetitive procurement methods should only be used if one of the following circumstances applies: the aggregate amount of the procurement transaction does not exceed the micro-purchase threshold; the procurement transaction can only be fulfilled by a ...

SIGNIFICANT DEFICIENCY 2024-001 10.855 – Distance Learning and Telemedicine Loans and Grants – Procurement, Suspension, and Debarment Criteria or specific requirement Procurement methods should follow the requirements laid out at 2 CFR 200.320. Noncompetitive procurement methods should only be used if one of the following circumstances applies: the aggregate amount of the procurement transaction does not exceed the micro-purchase threshold; the procurement transaction can only be fulfilled by a single source; the public exigency or emergency for the requirement will not permit a delay resulting from providing public notice of a competitive solicitation; the recipient or subrecipient requests in writing to use a noncompetitive procurement method, and the Federal agency or pass-through entity provides written approval; or, after soliciting several sources, competition is deemed inadequate. Condition The County used a noncompetitive procurement method without receiving written approval or meeting one of the other allowable circumstances for a procurement that was greater than a micro-purchase but less than the simplified acquisition threshold. Context The County’s procurement policy allows for noncompetitive procurements in specified circumstances, including when the procurement is for services from a provider with unique knowledge, skill, or ability not available from other sources; when the procurement is for goods and services where standardization is beneficial for reasons including maintenance, repair, training, and inoperability; and when the procurement is for goods and services where continuity of providers’ efficiency or critical knowledge is preferable and other providers of the goods and services cannot provide similar efficiency or critical knowledge. County staff felt that they had sufficiently met these three circumstances, and they used that justification to proceed with a noncompetitive procurement. Cause The County was following its procurement policy and did not note that there were some key differences between it and when noncompetitive procurements are allowable when using federal funding. Effect The County did not allow for full and open competition. Recommendation Whenever possible, we recommend that the County request written permission from the awarding agency if it seeks to use noncompetitive procurement methods for grants. We also recommend that the County consider updating its procurement policy to make it clear that the circumstances in which noncompetitive procurements can be used with federal assistance differ from normal circumstances. Views of responsible officials See corrective action plan.

FY End: 2024-12-31
East Phillips CO Hospital Dist Dba Melissa Memorial Hospital
Compliance Requirement: I
2024-002 Procurement Federal Agency U.S. Department of the Treasury Federal Assistance Listing Numbers 21.027 – Coronavirus State and Local Fiscal Recovery Funds Criteria [ X ] Compliance Finding [ ] Significant Deficiency [ X ] Material Weakness Entities receiving federal awards must have and follow documented procurement policies. Title 2 CFR 200.320 outlines acceptable methods of procurement and establishes applicable threshold requirements. Condition During our review of federally f...

2024-002 Procurement Federal Agency U.S. Department of the Treasury Federal Assistance Listing Numbers 21.027 – Coronavirus State and Local Fiscal Recovery Funds Criteria [ X ] Compliance Finding [ ] Significant Deficiency [ X ] Material Weakness Entities receiving federal awards must have and follow documented procurement policies. Title 2 CFR 200.320 outlines acceptable methods of procurement and establishes applicable threshold requirements. Condition During our review of federally funded purchases, we noted several instances where procurement transactions were not conducted in accordance with these federal guidelines. For purchases falling between the micro-purchase threshold and the simplified acquisition threshold, the District did not retain documentation to demonstrate that price quotations were obtained from an adequate number of qualified sources. Additionally, for purchases exceeding the simplified acquisition threshold, the District was unable to provide documentation showing that the required number of bids were solicited. In one instance, a sole source acquisition was made without sufficient written justification, as required by 2 CFR 200.320(c), which permits noncompetitive procurement only under specific and well-documented circumstances. Furthermore, the District could not provide documentation verifying that vendors were screened against the federal System for Award Management (SAM.gov) to confirm that they were not suspended or debarred from participating in federal programs. Lastly, the District could not demonstrate that it performed conflict of interest checks to ensure that employees or officers participated in the selection, award or administration of a contract where conflicts of interest exist. This finding appears to be a systemic problem. Cause The District’s procurement policy was not compared with the federal regulations when it was developed. Management did not follow its established procurement policy and documentation was not maintained evidencing its compliance with the policy. Effect Noncompliance with federal procurement requirements increases the risk of unallowable costs, noncompetitive vendor selection, and potential questioned costs. This could result in financial penalties or the need to return federal funds. The absence of conflict of interest checks also exposes the District to the risk of biased procurement decisions and compromised integrity. Recommendation The District should update and enforce procurement policies and procedures to fully comply with 2 CFR 200.318–200.327. These procedures must include documented competitive procurement processes, appropriate documentation retention, sole source justification protocols, and mandatory screening of vendors through SAM.gov. Written standards of conduct should be maintained and enforced to prevent conflicts of interest. Additionally, all staff involved in procurement should receive comprehensive training on federal procurement requirements and internal control responsibilities. The District should also implement a monitoring process to ensure ongoing compliance with these requirements. Views of responsible officials and planned corrective actions Two new policies will be implemented; a board policy to cover board approvals for the bidding of large projects and an internal policy and procedure which spells out additional requirements, like requiring three written bids for large purchases. In addition, all members of the Board of Directors and senior leadership team will sign Conflict of Interest statements on an annual basis to confirm that they do not have any potential conflicts that could impact purchasing decisions.

FY End: 2024-12-31
East Phillips CO Hospital Dist Dba Melissa Memorial Hospital
Compliance Requirement: I
2024-002 Procurement Federal Agency U.S. Department of the Treasury Federal Assistance Listing Numbers 21.027 – Coronavirus State and Local Fiscal Recovery Funds Criteria [ X ] Compliance Finding [ ] Significant Deficiency [ X ] Material Weakness Entities receiving federal awards must have and follow documented procurement policies. Title 2 CFR 200.320 outlines acceptable methods of procurement and establishes applicable threshold requirements. Condition During our review of federally f...

2024-002 Procurement Federal Agency U.S. Department of the Treasury Federal Assistance Listing Numbers 21.027 – Coronavirus State and Local Fiscal Recovery Funds Criteria [ X ] Compliance Finding [ ] Significant Deficiency [ X ] Material Weakness Entities receiving federal awards must have and follow documented procurement policies. Title 2 CFR 200.320 outlines acceptable methods of procurement and establishes applicable threshold requirements. Condition During our review of federally funded purchases, we noted several instances where procurement transactions were not conducted in accordance with these federal guidelines. For purchases falling between the micro-purchase threshold and the simplified acquisition threshold, the District did not retain documentation to demonstrate that price quotations were obtained from an adequate number of qualified sources. Additionally, for purchases exceeding the simplified acquisition threshold, the District was unable to provide documentation showing that the required number of bids were solicited. In one instance, a sole source acquisition was made without sufficient written justification, as required by 2 CFR 200.320(c), which permits noncompetitive procurement only under specific and well-documented circumstances. Furthermore, the District could not provide documentation verifying that vendors were screened against the federal System for Award Management (SAM.gov) to confirm that they were not suspended or debarred from participating in federal programs. Lastly, the District could not demonstrate that it performed conflict of interest checks to ensure that employees or officers participated in the selection, award or administration of a contract where conflicts of interest exist. This finding appears to be a systemic problem. Cause The District’s procurement policy was not compared with the federal regulations when it was developed. Management did not follow its established procurement policy and documentation was not maintained evidencing its compliance with the policy. Effect Noncompliance with federal procurement requirements increases the risk of unallowable costs, noncompetitive vendor selection, and potential questioned costs. This could result in financial penalties or the need to return federal funds. The absence of conflict of interest checks also exposes the District to the risk of biased procurement decisions and compromised integrity. Recommendation The District should update and enforce procurement policies and procedures to fully comply with 2 CFR 200.318–200.327. These procedures must include documented competitive procurement processes, appropriate documentation retention, sole source justification protocols, and mandatory screening of vendors through SAM.gov. Written standards of conduct should be maintained and enforced to prevent conflicts of interest. Additionally, all staff involved in procurement should receive comprehensive training on federal procurement requirements and internal control responsibilities. The District should also implement a monitoring process to ensure ongoing compliance with these requirements. Views of responsible officials and planned corrective actions Two new policies will be implemented; a board policy to cover board approvals for the bidding of large projects and an internal policy and procedure which spells out additional requirements, like requiring three written bids for large purchases. In addition, all members of the Board of Directors and senior leadership team will sign Conflict of Interest statements on an annual basis to confirm that they do not have any potential conflicts that could impact purchasing decisions.

FY End: 2024-12-31
East Phillips CO Hospital Dist Dba Melissa Memorial Hospital
Compliance Requirement: I
2024-002 Procurement Federal Agency U.S. Department of the Treasury Federal Assistance Listing Numbers 21.027 – Coronavirus State and Local Fiscal Recovery Funds Criteria [ X ] Compliance Finding [ ] Significant Deficiency [ X ] Material Weakness Entities receiving federal awards must have and follow documented procurement policies. Title 2 CFR 200.320 outlines acceptable methods of procurement and establishes applicable threshold requirements. Condition During our review of federally f...

2024-002 Procurement Federal Agency U.S. Department of the Treasury Federal Assistance Listing Numbers 21.027 – Coronavirus State and Local Fiscal Recovery Funds Criteria [ X ] Compliance Finding [ ] Significant Deficiency [ X ] Material Weakness Entities receiving federal awards must have and follow documented procurement policies. Title 2 CFR 200.320 outlines acceptable methods of procurement and establishes applicable threshold requirements. Condition During our review of federally funded purchases, we noted several instances where procurement transactions were not conducted in accordance with these federal guidelines. For purchases falling between the micro-purchase threshold and the simplified acquisition threshold, the District did not retain documentation to demonstrate that price quotations were obtained from an adequate number of qualified sources. Additionally, for purchases exceeding the simplified acquisition threshold, the District was unable to provide documentation showing that the required number of bids were solicited. In one instance, a sole source acquisition was made without sufficient written justification, as required by 2 CFR 200.320(c), which permits noncompetitive procurement only under specific and well-documented circumstances. Furthermore, the District could not provide documentation verifying that vendors were screened against the federal System for Award Management (SAM.gov) to confirm that they were not suspended or debarred from participating in federal programs. Lastly, the District could not demonstrate that it performed conflict of interest checks to ensure that employees or officers participated in the selection, award or administration of a contract where conflicts of interest exist. This finding appears to be a systemic problem. Cause The District’s procurement policy was not compared with the federal regulations when it was developed. Management did not follow its established procurement policy and documentation was not maintained evidencing its compliance with the policy. Effect Noncompliance with federal procurement requirements increases the risk of unallowable costs, noncompetitive vendor selection, and potential questioned costs. This could result in financial penalties or the need to return federal funds. The absence of conflict of interest checks also exposes the District to the risk of biased procurement decisions and compromised integrity. Recommendation The District should update and enforce procurement policies and procedures to fully comply with 2 CFR 200.318–200.327. These procedures must include documented competitive procurement processes, appropriate documentation retention, sole source justification protocols, and mandatory screening of vendors through SAM.gov. Written standards of conduct should be maintained and enforced to prevent conflicts of interest. Additionally, all staff involved in procurement should receive comprehensive training on federal procurement requirements and internal control responsibilities. The District should also implement a monitoring process to ensure ongoing compliance with these requirements. Views of responsible officials and planned corrective actions Two new policies will be implemented; a board policy to cover board approvals for the bidding of large projects and an internal policy and procedure which spells out additional requirements, like requiring three written bids for large purchases. In addition, all members of the Board of Directors and senior leadership team will sign Conflict of Interest statements on an annual basis to confirm that they do not have any potential conflicts that could impact purchasing decisions.

FY End: 2024-12-31
City of Huntingburg
Compliance Requirement: I
FINDING 2024-002 Subject: Water and Waste Disposal Systems for Rural Communities - Procurement and Suspension and Debarment Federal Agency: Department of Agriculture Federal Program: Water and Waste Disposal Systems for Rural Communities Assistance Listings Number: 10.760 Federal Award Number and Year (or Other Identifying Number): BAN-2 Compliance Requirement: Procurement and Suspension and Debarment Audit Findings: Material Weakness, Other Matters Condition and Context As part of sound managem...

FINDING 2024-002 Subject: Water and Waste Disposal Systems for Rural Communities - Procurement and Suspension and Debarment Federal Agency: Department of Agriculture Federal Program: Water and Waste Disposal Systems for Rural Communities Assistance Listings Number: 10.760 Federal Award Number and Year (or Other Identifying Number): BAN-2 Compliance Requirement: Procurement and Suspension and Debarment Audit Findings: Material Weakness, Other Matters Condition and Context As part of sound management of the federal award, the City was responsible for implementing a system of internal controls that would ensure compliance with the applicable requirements. The City had not properly designed or implemented such a system, which would include appropriate segregation of duties, that would likely be effective in preventing, or detecting and correcting, noncompliance. INDIANA STATE BOARD OF ACCOUNTS 16 CITY OF HUNTINGBURG SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Federal regulations allow for informal procurement methods when the value of the procurement for property or services does not exceed the simplified acquisition threshold, which is set at $250,000 unless a lower, more restrictive threshold is set by a nonfederal entity. As Indiana Code has set a more restrictive threshold of $150,000, informal procurement methods are permitted when the value of the procurement does not exceed $150,000. This informal process allows for methods other than the formal bid process. The informal process is divided between two methods based on thresholds, micro-purchases, typically for those purchases $10,000 or under, and small purchase procedures for those purchases above the micropurchase threshold but below the simplified acquisition threshold. Micro-purchases may be awarded without soliciting competitive price rate quotations. If small purchase procedures are used, then price or rate quotations must be obtained from an adequate number of qualified sources. Procurement - Simplified Acquisition During the audit period, the City had two vendors with purchases over the $150,000 threshold that were considered simplified acquisition procurements. Both vendors were tested. For one vendor, the City could not provide the procurement history or the rationale for the method of procurement, the selection of vendor, or the basis for price. The total amount spent with this vendor was $2,391,895. Procurement - Policy The City provided its purchasing policy for review, but it did not include the applicable federal regulations, such as procedures to avoid the acquisition of unnecessary or duplicative items and procedures to ensure that all solicitations incorporate a clear and accurate description of the technical requirements for the material, product, or service to be procured. Additionally, the City did not maintain written standards of conduct covering conflicts of interest and governing actions of its employees engaged in the selection, award, and administration of contracts. Suspension and Debarment Prior to entering into subawards and covered transactions with, recipients are required to verify that such contracts and subrecipients are not suspended, debarred, or otherwise excluded. "Covered transactions" include, but are not limited to, contracts for goods and services awarded under a nonprocurement transaction (i.e., grant agreement) that are expected to equal or exceed $25,000. The verification is to be done by checking the Excluded Parties List System (EPLS), collecting a certification from that person, or adding a clause or condition to the covered transaction with that person. A population of four covered transactions for goods or services were paid from USDA award funds during the audit period. A sample of two vendors were selected for testing. Of the two vendors tested, one vendor was not verified to not be suspended nor debarred or otherwise excluded or disqualified from participating in federal assistance programs or activities. The lack of internal controls and noncompliance were isolated to the same single vendor for both the simplified acquisition and the suspension and debarment issues as noted above. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: INDIANA STATE BOARD OF ACCOUNTS 17 CITY OF HUNTINGBURG SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.318 states in part: "(a) The non-Federal entity must have and use documented procurement procedures, consistent with State, local, and tribal laws and regulations and the standards of this section, for the acquisition of property or services required under a Federal award or subaward. The non-Federal entity's documented procurement procedures must conform to the procurement standards identified in §§ 200.317 through 200.327. . . . (i) The non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include, but are not necessarily limited to, the following: Rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. . . ." 2 CFR 200.320(b) states in part: "Formal procurement methods. When the value of the procurement for property or services under a Federal financial assistance awards exceeds the SAT, or a lower threshold established by a non-Federal entity, formal procurement methods are required. Formal procurement methods require following documented procedures. Formal procurement methods also require public advertising unless a non-competitive procurement can be used in accordance with § 200.319 or paragraph (c) of this section. The following formal methods of procurement are used for procurement of property or services above the simplified acquisition threshold or a value below the simplified acquisition threshold the non-Federal entity determines to be appropriate: (1) Sealed bids. A procurement method in which bids are publicly solicited and a firm fixed-price contract (lump sum or unit price) is awarded to the responsible bidder whose bid, conforming with all the material terms and conditions of the invitation for bids, is the lowest in price. . . . (2) Proposals. A procurement method in which either a fixed price or cost-reimbursement type contract is awarded. Proposals are generally used when conditions are not appropriate for the use of sealed bids. . . ." 2 CFR 180.300 states: "When you enter into a covered transaction with another person at the next lower tier, you must verify that the person with whom you intend to do business is not excluded or disqualified. You do this by: (a) Checking SAM Exclusions; or (b) Collecting a certification from that person; or (c) Adding a clause or condition to the covered transaction with that person." INDIANA STATE BOARD OF ACCOUNTS 18 CITY OF HUNTINGBURG SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Cause The vendor in question was an engineering firm that the City originally hired to do a study at $40,000 in 2018 related to the wastewater treatment plant project. Through the years, the City did amendments to the contract to include more engineering services and did not advertise for bids or verify that the engineering firm was not suspended or debarred from receiving federal funds. Effect Without the proper implementation of an effectively designed system of internal controls, the City cannot ensure that the services obtained provided full and open competition or the basis of the price. In addition, the City cannot ensure the vendors paid were eligible to participate in federal programs. Any program funds the City used to pay vendors that have been suspended or debarred would be unallowable, and the funding agency could potentially recover them. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the City. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the City's management establish a proper system of internal controls to ensure expenditures made from federal awards use the appropriate procurement method and retain the documentation to support the procurement methods used in order to ensure compliance with the terms and conditions of the federal award. We recommended that management of the City establish a proper system of internal controls and develop policies and procedures to ensure contractors and subrecipients, as appropriate, are not suspended, debarred, or otherwise excluded prior to entering into contracts or subawards. We also recommended strengthening its policies and procedures to ensure appropriate supporting documentation for federal programs is retained to be presented for audit. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

FY End: 2024-12-31
Franciscan Alliance, Inc.
Compliance Requirement: I
Cluster: Not applicable Federal Granting Agency: Department of Treasury Pass Through Entity: Indiana Department of Health Award Name: COVID-19 – Coronavirus State and Local Fiscal Recovery Funds Award Year: 2024 Assistance Listing #: 21.027 Federal Award Identification Number: Contract#0000000000000000000065435 Criteria In accordance with 2 CFR 200.320(c) and Franciscan's policy, vendors above a micro-purchase threshold ($10,000 based on Franciscan’s policy) require a competitive process that i...

Cluster: Not applicable Federal Granting Agency: Department of Treasury Pass Through Entity: Indiana Department of Health Award Name: COVID-19 – Coronavirus State and Local Fiscal Recovery Funds Award Year: 2024 Assistance Listing #: 21.027 Federal Award Identification Number: Contract#0000000000000000000065435 Criteria In accordance with 2 CFR 200.320(c) and Franciscan's policy, vendors above a micro-purchase threshold ($10,000 based on Franciscan’s policy) require a competitive process that includes soliciting multiple bids/quotes to justify best value, unless a sole sourcing method is justified. The Uniform Guidance requires purchasing decisions to be documented, including sole source justification, as applicable. Condition We identified one vendor with sole source transactions totaling $60,192 for which a purchase order was dated in March 2024. Sole source justification documentation was not prepared at the time of procurement in March 2024, but rather was prepared in April 2025. Cause Management did not timely prepare sole source justification related to one vendor prior to procurement of services. Effect The lack of a competitive procurement process, or a sole sourcing justification, could lead to Franciscan experiencing management bias in vendor selection or to miss out on better prospective vendors to do business with. Questioned Costs None noted. Recommendation We recommend that Franciscan enhance its internal control around the adherence to procurement methods established within the Uniform Guidance, and within Franciscan’s procurement policies, including the performance, and documentation of, the required justification for performing a sole sourcing procurement ensuring timeliness of procurement procedures and documentation. Management’s Views and Corrective Action Plan Management’s views and corrective action plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2024-12-31
City of Michigan City
Compliance Requirement: I
FINDING 2024-001 Subject: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds - Procurement and Suspension and Debarment Federal Agency: Department of the Treasury Federal Program: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds Assistance Listings Number: 21.027 Federal Award Number and Year (or Other Identifying Number): 2021 Compliance Requirement: Procurement and Suspension and Debarment Audit Findings: Material Weakness, Modified Opinion Repeat Finding This is a repeat...

FINDING 2024-001 Subject: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds - Procurement and Suspension and Debarment Federal Agency: Department of the Treasury Federal Program: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds Assistance Listings Number: 21.027 Federal Award Number and Year (or Other Identifying Number): 2021 Compliance Requirement: Procurement and Suspension and Debarment Audit Findings: Material Weakness, Modified Opinion Repeat Finding This is a repeat finding from the immediate prior audit report. The prior audit finding number was 2023-001. Condition and Context An effective internal control system was not designed or implemented at the City to ensure compliance with requirements related to the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Procurement Federal regulations allow for informal procurement methods when the value of the procurement for property or services does not exceed the simplified acquisition threshold, which is customarily set at $250,000. However, Indiana Code 5-22-8 has a more restrictive threshold of $150,000 or less for when small purchase procedures may be used. This informal process allows for methods other than the formal bid process. Micro-purchases are typically for those purchases $10,000 or under, and small purchase procedures are for those purchases above the micro-purchase threshold, but below the simplified acquisition threshold. Micro-purchases may be awarded without soliciting competitive price rate quotations. If small purchase procedures are used, then price or rate quotations must be obtained from an adequate number of qualified sources. One vendor was identified that fell within the small purchase threshold. Purchases from the vendor totaled $40,458. As such, price or rate quotations from an adequate number of qualified sources should have been obtained. However, the City did not obtain price or rate quotations for the purchases, nor was full and open competition provided for the vendor. Additionally, there was no documentation available to support the rationale to limit competition. Suspension and Debarment The City elected to receive the standard revenue loss allowance, allowing the City to claim $10,000,000 of its total COVID-19 - State and Local Fiscal Recovery Funds (SLFRF) allocation of $16,549,045 as revenue loss to use for government services. The U.S. Department of the Treasury (Treasury) determined that there are no subawards under this eligible use category, and that recipients' use of revenue loss funds would not give rise to subrecipient relationships given that there is no federal program or purpose to carry out in the case of the revenue loss portion of the award. Prior to entering into subawards and covered transactions with SLFRF award funds, recipients are required to verify that such contractors and subrecipients are not suspended, debarred, or otherwise excluded. "Covered transactions" include, but are not limited to, contracts for goods and services awarded under a nonprocurement transaction (i.e., grant agreement) that are expected to equal or exceed $25,000. The verification is to be done by checking the Excluded Parties List System (EPLS), collecting a certification from that person, or adding a clause or condition to the covered transaction with that person or entity. Due to the Treasury's determination that the revenue loss eligible use category does not give rise to subawards, the City was only required to comply with suspension and debarment requirements related to contracts. The City's policies related to SLFRF suspension and debarment requirements include the Board of Public Works completing a review of each bid packet to ensure the bidder submitted a statement indicating if they were not suspended or debarred or an employee from the City Controller's office checking the Sam.gov website. There were 13 covered transactions identified that equaled or exceeded $25,000, and 2 covered transactions, totaling $251,334, were selected for testing. For both of the transactions tested, the City did not verify the suspension or debarment status prior to payment. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 31 CFR 19.300 states: "When you enter into a covered transaction with another person at the next lower tier, you must verify that the person with whom you do business is not excluded or disqualified. You do this by: (a) Checking the EPLS; or (b) Collecting a certification from that person if allowed by this rule; or (c) Adding a clause or condition to the covered transaction with that person." 2 CFR 200.318(a) states: "The non-Federal entity must have and use documented procurement procedures, consistent with State, local, and tribal laws and regulations and the standards of this section, for the acquisition of property or services required under a Federal award or subaward. The nonfederal entity's documented procurement procedures must conform to the procurement standards identified in §§ 200.317 through 200.327." 2 CFR 200.320 states in part: "The non-Federal entity must have and use documented procurement procedures, consistent with the standards of this section and §§ 200.317, 200.318, and 200.319 for any of the following methods of procurement used for the acquisition of property or services required under a Federal award or sub-award. (a) Informal procurement methods. When the value of the procurement for property or services under a Federal award does not exceed the simplified acquisition threshold (SAT), as defined in § 200.1, or a lower threshold established by a non-Federal entity, formal procurement methods are not required. The non-Federal entity may use informal procurement methods to expedite the completion of its transactions and minimize the associated administrative burden and cost. The informal methods used for procurement of property or services at or below the SAT include: . . . (2) Small purchases– (i) Small purchase procedures. The acquisition of property or services, the aggregate dollar amount of which is higher than the micro-purchase threshold but does not exceed the simplified acquisition threshold. If small purchase procedures are used, price or rate quotations must be obtained from an adequate number of qualified sources as determined appropriate by the non-Federal entity. . . ." Cause The City did not follow the City's established policy to ensure the proper procurement of services and supplies and to verify suspension and debarment status for covered transactions. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. The City did not use the proper method of procurement to choose a vendor. In addition, the City did not ensure the contractors paid with federal funds are eligible to participate in federal programs. Any program funds the City used to pay contractors that have been suspended or debarred would be unallowable, and the funding agency could potentially recover them. Furthermore, noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the City. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the City follow the City's established policies to ensure compliance with requirements related to procurement and suspension and debarment. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

FY End: 2024-12-31
City of Michigan City
Compliance Requirement: I
FINDING 2024-002 Subject: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds - Procurement and Suspension and Debarment Federal Agency: Department of the Treasury Federal Program: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds Assistance Listings Number: 21.027 Federal Award Number and Year (or Other Identifying Number): TRSW222046 Pass-Through Entity: Indiana Finance Authority Compliance Requirement: Procurement and Suspension and Debarment Audit Findings: Material Weakn...

FINDING 2024-002 Subject: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds - Procurement and Suspension and Debarment Federal Agency: Department of the Treasury Federal Program: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds Assistance Listings Number: 21.027 Federal Award Number and Year (or Other Identifying Number): TRSW222046 Pass-Through Entity: Indiana Finance Authority Compliance Requirement: Procurement and Suspension and Debarment Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not designed or implemented at the City to ensure compliance with requirements related to the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Procurement Federal regulations allow for informal procurement methods when the value of the procurement for property or services does not exceed the simplified acquisition threshold, which is customarily set at $250,000. However, Indiana Code 5-22-8 has a more restrictive threshold of $150,000 or less for when small purchase procedures may be used. This informal process allows for methods other than the formal bid process. Micro-purchases are typically for those purchases $10,000 or under, and small purchase procedures are for those purchases above the micro-purchase threshold, but below the simplified acquisition threshold. Micro-purchases may be awarded without soliciting competitive price rate quotations. If small purchase procedures are used, then price or rate quotations must be obtained from an adequate number of qualified sources. The grant covered one project with one vendor that fell within the simplified acquisition threshold. Payments to the vendor for the project totaled $189,741 with $120,452 of that amount was grant funds. As such, the formal bid process should have been followed. The City did not perform bid procedures or provide the rationale for the method of procurement, the selection of vendor, or the basis for price. Additionally, the City did not obtain a written contract for the services. Suspension and Debarment Prior to entering into subawards and covered transactions with federal award funds, recipients are required to verify that such contractors and subrecipients are not suspended, debarred, or otherwise excluded. "Covered transactions" include, but are not limited to, contracts for goods and services awarded under a nonprocurement transaction (i.e., grant agreement) that are expected to equal or exceed $25,000. The verification is to be done by checking the SAM exclusions, collecting a certification from that person, or adding a clause or condition to the covered transaction with that person or entity. The City's policies related to COVID-19 - Coronavirus State and Local Fiscal Recovery Funds suspension and debarment requirements include the Board of Public Works completing a review of each bid packet to ensure the bidder submitted a statement indicating if they were not suspended or debarred or an employee from the City Controller's office checking the Sam.gov website. As noted above, the grant covered one project with one vendor utilized and the City did not verify the suspension or debarment status prior to payment for this vendor. The lack of internal controls and noncompliance was isolated to the instance noted above. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.318(a) states: "The non-Federal entity must have and use documented procurement procedures, consistent with State, local, and tribal laws and regulations and the standards of this section, for the acquisition of property or services required under a Federal award or subaward. The nonfederal entity's documented procurement procedures must conform to the procurement standards identified in §§ 200.317 through 200.327." 2 CFR 200.320 states in part: "The non-Federal entity must have and use documented procurement procedures, consistent with the standards of this section and §§ 200.317, 200.318, and 200.319 for any of the following methods of procurement used for the acquisition of property or services required under a Federal award or sub-award. (a) Informal procurement methods. When the value of the procurement for property or services under a Federal award does not exceed the simplified acquisition threshold (SAT), as defined in § 200.1, or a lower threshold established by a non-Federal entity, formal procurement methods are not required. The non-Federal entity may use informal procurement methods to expedite the completion of its transactions and minimize the associated administrative burden and cost. The informal methods used for procurement of property or services at or below the SAT include: . . . (b) Formal Procurement Methods. When the value of the procurement for property or services under a Federal financial assistance award exceeds the SAT, or a lower threshold established by a non-Federal entity, formal procurement methods are required. Formal procurement methods require following documented procedures. Formal procurement methods also require public advertising unless a non-competitive procurement can be used in accordance with § 200.319 or paragraph (c) of this section. The following formal methods of procurement are used for procurement of property or services above the simplified acquisition threshold or a value below the simplified acquisition threshold the non-Federal entity determines to be appropriate: (1) Sealed bids. A procurement method in which bids are publicly solicited and a firm fixed-price contract (lump sum or unit price) is awarded to the responsible bidder whose bid, conforming with all the material terms and conditions of the invitation for bids, is the lowest in price. The sealed bids method is the preferred method for procuring construction, if the conditions. . . . (2) Proposals. A procurement method in which either a fixed price or cost-reimbursement type contract is awarded. Proposals are generally used when conditions are not appropriate for the use of sealed bids. . . ." 31 CFR 19.300 states: "When you enter into a covered transaction with another person at the next lower tier, you must verify that the person with whom you do business is not excluded or disqualified. You do this by: (a) Checking the EPLS; or (b) Collecting a certification from that person if allowed by this rule; or (c) Adding a clause or condition to the covered transaction with that person." Cause The City did not follow the City's established policy to ensure the proper procurement of services and supplies and to verify suspension and debarment status for covered transactions. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. The City did not use the proper method of procurement to choose a vendor. In addition, the City did not ensure the contractors paid with federal funds are eligible to participate in federal programs. Any program funds the City used to pay contractors that have been suspended or debarred would be unallowable, and the funding agency could potentially recover them. Furthermore, noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the City. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the City follow its established policies to ensure compliance with requirements related to procurement and suspension and debarment. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.