Section 200.308 outlines the process for revising approved budgets and program plans for federal awards. Recipients or subrecipients must report any deviations from the approved budget and seek prior approval for revisions, which federal agencies must review and respond to within 30 days.
View full section details →
FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.

FY End: 2024-06-30
Grand Valley State University
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal ...

Assistance Listing, Federal Agency, and Program Name - Research and Development Cluster (R&D) Federal Award Identification Number and Year - R&D - All ALN's Pass through Entity - R&D - Various Finding Type - Significant deficiency Repeat Finding - No Criteria - A non federal entity may charge only allowable costs incurred during the approved budget period of a federal award’s period of performance and any costs incurred before the federal awarding agency or pass through entity made the federal award that were authorized by the federal awarding agency or pass through entity (2 CFR sections 200.308, 200.309, and 200.403(h)). Condition - Of the 40 samples included in our sample selected for testing in the Research and Development Cluster, the University included two invoices for a total of $2,618 that were incurred prior to the beginning of the grant period. Questioned Costs - $2,618 Identification of How Questioned Costs Were Computed - Question costs were computed using the total costs identified in our sample that were incurred prior to the grant period. Context - The University completed a transfer of costs between two grant awards that were supporting the same overall program. The samples identified were part of one cost transfer, but the invoice date and related expense was incurred one day prior to the beginning of the grant period. Cause and Effect - The University did not have proper procedures over tracking of expenditures in separate grant cost centers for a R&D program. This required a transfer between the grant programs and resulted in the University adjusting costs from a prior period and charging costs to a grant that was outside the period of performance. Recommendation - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an Award Calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented have been removed from the existing grant and replaced by other allowable costs that were included in the proper award period. Views of Responsible Officials and Planned Corrective Actions - The University has implemented a new grant financial and billing software that provides improved controls over operational transactions, including an award calendar control that recognizes the award end date in the invoice posting process. The costs described in this finding, which occurred before the new system was implemented, have been removed from the existing grant and replaced by other allowable costs that were incurred within the proper award period.