Management gave instructions to the Finance Department staff to submit, in a timely manner, all the required financial information, to our external consultants and to our external auditors, in order to comply with the datelines for the submission of the Single Audit Report.
Management gave instructions to the Finance Department staff to submit, in a timely manner, all the required financial information, to our external consultants and to our external auditors, in order to comply with the datelines for the submission of the Single Audit Report.
Corrective Action Plan: The College has implemented a report that will show differences in the date Direct Student Loan funds are disbursed in Powerfaids versus the date the funds are disbursed in COD. All differences will be investigated and rectified on a monthly basis. The College implemented thi...
Corrective Action Plan: The College has implemented a report that will show differences in the date Direct Student Loan funds are disbursed in Powerfaids versus the date the funds are disbursed in COD. All differences will be investigated and rectified on a monthly basis. The College implemented this reporting function in January of 2023. Timeline for Implementation of Corrective Action Plan: Implemented in January 2023 Contact Person Richard O?Connor Director of Financial Aid
Corrective Action Plan: The College has implemented a report that will show differences in the date Pell funds are disbursed in Powerfaids versus the date the funds are disbursed in COD. All differences will be investigated and rectified on a monthly basis. The College implemented this reporting fun...
Corrective Action Plan: The College has implemented a report that will show differences in the date Pell funds are disbursed in Powerfaids versus the date the funds are disbursed in COD. All differences will be investigated and rectified on a monthly basis. The College implemented this reporting function in January of 2023. Timeline for Implementation of Corrective Action Plan: Implemented in January 2023 Contact Person Richard O?Connor Director of Financial Aid
Corrective Action Plan: The College has implemented a disbursement schedule of disbursing federal funds including the Pell Grant and Direct Student Loans on Monday and Wednesday each week. Files are sent to COD to update them of these disbursement dates by Tuesday and Thursday of the week the funds ...
Corrective Action Plan: The College has implemented a disbursement schedule of disbursing federal funds including the Pell Grant and Direct Student Loans on Monday and Wednesday each week. Files are sent to COD to update them of these disbursement dates by Tuesday and Thursday of the week the funds are disbursed. The College implemented this revised schedule in October of 2021. Timeline for Implementation of Corrective Action Plan: Implemented in October 2021 Contact Person Richard O?Connor Director of Financial Aid
2022-004 Compliance Requirements: Reporting Finding: Material Weakness in Internal Control Over Compliance Effective January 2023, business office personnel responsible for grant accounting will meet with grant managers to discuss grant activity and obtain approval for reimbursements. The assistant ...
2022-004 Compliance Requirements: Reporting Finding: Material Weakness in Internal Control Over Compliance Effective January 2023, business office personnel responsible for grant accounting will meet with grant managers to discuss grant activity and obtain approval for reimbursements. The assistant superintendent of business and operations, Margaret Lee, will be responsible for scheduling the monthly meetings between business office staff and grant managers. Margaret Lee will establish a master calendar of grant reporting deadlines that will be reviewed at each monthly meeting between business office staff and grant managers. As a part of the monthly balance sheet reconciliation and review, accounting staff will review grant reimbursement requests from the prior month and ensure that funds were received and recorded to the appropriate account. Evidence of communications with the granting agency will be required to document any revenues that were not received and/or recorded. If communications from the granting agency are not provided, the assistant superintendent for business and operations will be responsible for contacting the granting agency directly to follow up on the reporting requirements and reimbursement status. Estimated Completion Date: August 2023 Management Contact: Margaret Lee
2022-003 Allowable Costs/Cost Principles Type of Finding: Material Weakness in Internal Control Over Compliance and Noncompliance Federal programs purchases go through multiple approvals prior to issuing a purchase order. Approvals include the grant program administrator, director of purchasing, dir...
2022-003 Allowable Costs/Cost Principles Type of Finding: Material Weakness in Internal Control Over Compliance and Noncompliance Federal programs purchases go through multiple approvals prior to issuing a purchase order. Approvals include the grant program administrator, director of purchasing, director of finance, and assistant superintendent of business and operations, and superintendent at a minimum. All approving staff have attended federal programs training including ESSER training. Since the questioned costs went through the established approval procedures, all staff with responsibility of approving grant purchases will attend additional training on allowable costs including a refresher training each semester beginning with the Spring 2023 semester. Training should be continuous and ongoing since question-and-answer documents are constantly updated and changed. To address the specific finding in the audit, the director of finance will establish pre-paid accounts in the general fund that will be used to record subscriptions and contracts that extend beyond the current fiscal year. At the end of the fiscal year, the director of finance will move expenditures associated with the fiscal year to the grant through a journal entry. In addition, the pre-paid account will be reconciled with the balance of each subscription identified in the reconciliation. The list of pre-paid subscriptions and the journal entry will both be reviewed and approved by the assistant superintendent of business and operations as a part of newly established operating procedures. Estimated Completion Date: January 2023 Management Contact: Margaret Lee
View Audit 18283 Questioned Costs: $1
Incorrect Pell Calculations Planned Corrective Action: The Organization awarded $1186 to the student in question on February 10, 2023. The Financial Aid Department will perform midterm audits to ensure that students are receiving the correct amount of Pell Grant. Person Responsible for Correctiv...
Incorrect Pell Calculations Planned Corrective Action: The Organization awarded $1186 to the student in question on February 10, 2023. The Financial Aid Department will perform midterm audits to ensure that students are receiving the correct amount of Pell Grant. Person Responsible for Corrective Action Plan: Cathy Lucas, Vice President of Administration Anticipated Date of Completion: February 10, 2023
Incorrect Return of Title IV Funds Calculation Planned Corrective Action: The Vice President of Administration had a meeting with the new supervisor over the department at Campus Ivy that processes R2T4s. The supervisor stated that there have been changes made to ensure that these mistakes will n...
Incorrect Return of Title IV Funds Calculation Planned Corrective Action: The Vice President of Administration had a meeting with the new supervisor over the department at Campus Ivy that processes R2T4s. The supervisor stated that there have been changes made to ensure that these mistakes will never happen again. The Vice President of Administration will review the R2T4s after Campus Ivy has completed the calculations to be sure that the representative used the correct amount of funds disbursed. The R2T4 that was incorrect has been corrected and the funds have been returned to the Department of Education. Person Responsible for Corrective Action Plan: Cathy Lucas, Vice President of Administration Anticipated Date of Completion: March 7, 2023
Finding 23049 (2022-003)
Significant Deficiency 2022
Monthly Reconciliations of Pell Grant and Federal Direct Loans Planned Corrective Action: The Organization is now fully aware of the requirement to process student-by-student monthly reconciliations for both Pell Grant and Direct Loans disbursements. Procedures have been put into place to ensure ...
Monthly Reconciliations of Pell Grant and Federal Direct Loans Planned Corrective Action: The Organization is now fully aware of the requirement to process student-by-student monthly reconciliations for both Pell Grant and Direct Loans disbursements. Procedures have been put into place to ensure that the reconciliations are completed each month for each fiscal year. Person Responsible for Corrective Action Plan: Cathy Lucas, Vice President of Administration Anticipated Date of Completion: June 30, 2023
FINDING 2022?003 Contact Person Responsible for Corrective Action: Maria Conwell Contact Phone Number: 260-868-2125 Views of Responsible Official: We agree with the finding. Description of Corrective Action Plan: DeKalb County Eastern Community School District will work with the Northeast Indiana Sp...
FINDING 2022?003 Contact Person Responsible for Corrective Action: Maria Conwell Contact Phone Number: 260-868-2125 Views of Responsible Official: We agree with the finding. Description of Corrective Action Plan: DeKalb County Eastern Community School District will work with the Northeast Indiana Special Education Cooperative to implement the procedures detailed below. The Northeast Indiana Special Education Cooperative (NEISEC) Treasurer will reach out to DeKalb Eastern during the writing process of the IDEA 611 and 619 grants in order for DeKalb Eastern to submit their plans for their allocation of proportionate share money. NEISEC will provide the allocation amounts to DeKalb Eastern. These submissions will include a proportionate share budget and include proportionate share staff names and any necessary information for the budget categories. The NEISEC Treasurer will then compile the proportionate share information and include on the grant submission. The LEA Treasurer will be given a copy of the grant application and budget upon approval of the grant. Any NEISEC employee being paid out of proportionate share grant funds for salary and benefits will be paid from the LEA's financial software. The LEA Treasurer will keep a spreadsheet of employee proportionate share expenses and this spreadsheet will be updated monthly based on time and effort logs that are submitted by DeKalb Eastern to the LEA and NEISEC. Any employee utilizing proportionate share funds that is not an employee of NEISEC, but rather a direct employee of DeKalb Eastern, will be paid directly by DeKalb Eastern. Time and effort logs will still be submitted to the LEA and NEISEC Treasurers for these employees in order to generate a direct reimbursement from the grant fund to DeKalb Eastern. For any expenses for a category outside of salary and benefits, DeKalb Eastern will need to submit an invoice and proof of purchase for equipment, supplies, etc. to NEISEC and the LEA in order to be directly reimbursed for those proportionate share expenses. If the request was not in the initial grant budget, DeKalb Eastern must submit all relevant information to NEISEC in order for a grant modification to be completed. Per IDOE the grant modification must be approved first prior to purchasing the items. Time and effort logs as well as invoice and proof of payment must be sent to the LEA Treasurer in order to completed the grant reimbursement requests. At the end of the grant period, any remaining proportionate share money will require that a waiver be completed. As of this date (2/10/2023) the LEA (DeKalb County Eastern CSD) and NEISEC are still in communication with SBOA and IDOE to review the proportionate share plan and ensure all necessary requirements will be satisfied. Anticipated Completion Date: Changes discussed above will be implemented for the remainder of the FY23 grant period starting 07/01/2023.
FINDING 2022-002 Contact Person Responsible for Corrective Action: Dawn Mason and Dana Hedges Contact Phone Number: 260-868-2125 Views of Responsible Official. We agree with the finding. Description of Corrective Action Plan: The Food Service Director with prepare the monthly sponsor claims for reim...
FINDING 2022-002 Contact Person Responsible for Corrective Action: Dawn Mason and Dana Hedges Contact Phone Number: 260-868-2125 Views of Responsible Official. We agree with the finding. Description of Corrective Action Plan: The Food Service Director with prepare the monthly sponsor claims for reimbursement. The Eastside Manager will review and sign off on the claims. The Food Service Director will submit the claims to the Indiana Department of Education after review by the Eastside Manager. Anticipated Completion Date: Ongoing - The Food Service Director and Eastside Manager will review and initial the monthly sponsor claims for reimbursement starting with the most recent month that requires submission.
FINDING 2022-001 Contact Person Responsible for Corrective Action: Dawn Mason and Dana Hedges Contact Phone Number: 260-868-2125 Views of Responsible Official: We agree with the finding. Description of Corrective Action Plan: The Food Service Director will obtain price or rate quotes for vendors exc...
FINDING 2022-001 Contact Person Responsible for Corrective Action: Dawn Mason and Dana Hedges Contact Phone Number: 260-868-2125 Views of Responsible Official: We agree with the finding. Description of Corrective Action Plan: The Food Service Director will obtain price or rate quotes for vendors exceeding $10,000 from three sources. These will be reviewed and initialed by the Business Manager. For vendors with total disbursements expected to be between $50,000 and $150,000, the Food Service Director will obtain contracts from the vendors and these contracts will be stored at our Central Office. DeKalb Eastern will confirm with the Education Service Center via email or letter that the Service Center is correctly certified with the state for procurement requirements. 1f the Education Service Center remains uncertified, the Food Service Director will obtain price or rate quotes for milk from three sources. These quotes will be reviewed and initialed by the Business Manager. The Food Service Director will request a certification from vendors with contracts over $25,000 to show they are not excluded from participation in federal award programs. In the event the vendor is unable to provide a certification, DeKalb Eastern will utilize the SAM website to view the exclusions list of vendors . Anticipated Completion Date: Ongoing - The Food Service Director will obtain the necessary price and rate quotes, as well as contracts and certifications and the Business Manager will review and initial the quotes.
Management?s Response/Corrective Action Plan: The School Department has had turnover in positions that have had oversight and direct involvement in this process. In some cases, the established process was followed as constructed; however, in others, gaps in coverage are clearly exposed. The School D...
Management?s Response/Corrective Action Plan: The School Department has had turnover in positions that have had oversight and direct involvement in this process. In some cases, the established process was followed as constructed; however, in others, gaps in coverage are clearly exposed. The School Department agrees that the management of important documents has been inconsistent. In the future, the School Department will be assigning the management of these documents to positions where turnover is less likely to occur and a more consistent process is maintained.
Management?s Response/Corrective Action Plan: The School Department has had turnover in positions that have had oversight and direct involvement in this process. In some cases, the established process was followed as constructed; however, in others, gaps in coverage are clearly exposed. The School D...
Management?s Response/Corrective Action Plan: The School Department has had turnover in positions that have had oversight and direct involvement in this process. In some cases, the established process was followed as constructed; however, in others, gaps in coverage are clearly exposed. The School Department agrees that the management of important documents has been inconsistent. In the future, the School Department will be assigning the management of these documents to positions where turnover is less likely to occur and a more consistent process is maintained.
Planned Corrective Action: ? CTFB is transitioning to a centralized purchasing model, which will require purchase requests to go through the finance department for final approval whereas previously, purchase request approval could be obtained before reaching finance. Purchase requests will require ...
Planned Corrective Action: ? CTFB is transitioning to a centralized purchasing model, which will require purchase requests to go through the finance department for final approval whereas previously, purchase request approval could be obtained before reaching finance. Purchase requests will require approval from the appropriate level of management and will adhere to CTFB?s revised procurement policy, including competitive bidding, prior to final approval and submission. Through a centralized process, the acquisition of items will follow the competitive process, requiring approval from the Chief Financial Officer and/or Chief Executive Officer. All staff with appropriate authority will be trained on CTFB?s centralized purchasing process and procurement policy. o Due Date: Current transition in progress as of March 2023. ? CTFB has hired and is in the process of hiring new management over finance, logistics, and executive administration; management overseeing the questioned cost are no longer involved in the operations of the business. o Due Date: Current transition in progress as of March 2023. Name of Contact Person: Thomas Foster, Controller tfoster@centraltexasfoodbank.org 512-684-2102
View Audit 23141 Questioned Costs: $1
Corrective Action Plan Finding No.: 2022-_ 006__ Condition: The District's property records did not include all equipment purchased with federal funds and the records did not include serial numbers for all the equipment. Plan: The District should assign an employee in...
Corrective Action Plan Finding No.: 2022-_ 006__ Condition: The District's property records did not include all equipment purchased with federal funds and the records did not include serial numbers for all the equipment. Plan: The District should assign an employee independent of the preparer, preferably with knowledge of applicable federal grant expenditures, to review the District's property records on a periodic basis to ensure completeness and adequacy. Anticipated Date of Completion: 06/30/2023 Name of Contact Person: Kevin Haarman Management Response: Management will implement the auditor's recommendation for the year ended June 30, 2023.
Finding 22994 (2022-005)
Significant Deficiency 2022
Corrective Action Plan Finding No.: 2022-_ 005__ Condition: The District's expenditure reports were not reviewed by someone independent of the preparer and the District's June 30, 2022 expenditure reports included expenditures paid subsequent to June 30, 2022. ...
Corrective Action Plan Finding No.: 2022-_ 005__ Condition: The District's expenditure reports were not reviewed by someone independent of the preparer and the District's June 30, 2022 expenditure reports included expenditures paid subsequent to June 30, 2022. Plan: The District should assign an employee independent of the preparer to review the District's expenditure reports prior to submission to ensure that expenditures are only claimed for reimbursement subsequent to their payment. Anticipated Date of Completion: 06/30/2023 Name of Contact Person: Kevin Haarman Management Response: Management will implement the auditor's recommendation for the year ended June 30, 2023.
View Audit 22831 Questioned Costs: $1
Child Nutrition Cluster Suspension and Debarment Recommendation: We recommend that the District review its policies over suspension and debarment review to ensure they are maintaining compliance and controls over verifying or contracting with vendors that are allowable Explanation of disagreement wi...
Child Nutrition Cluster Suspension and Debarment Recommendation: We recommend that the District review its policies over suspension and debarment review to ensure they are maintaining compliance and controls over verifying or contracting with vendors that are allowable Explanation of disagreement with audit finding: There is no disagreement with the audit finding. Action planned/taken in response to finding: The new business manager is aware of these federal funding requirements; additionally, he is aware of the need to continually (once per year during multi-year contract cycles) verify that contractors being paid with federal money in excess of the allowable thresholds are not on the list of debarred contractors in the S.A.M. portal. Name(s) of the contact person(s) responsible for corrective action: Edward Then, Business Manager Planned completion date for corrective action plan: 6/30/2023
Child Nutrition Cluster Reporting Recommendation: We recommend that the District review its internal controls and designate an individual other than the preparer to review and approve any grant claims. Explanation of disagreement with audit finding: There is no disagreement with the audit finding. A...
Child Nutrition Cluster Reporting Recommendation: We recommend that the District review its internal controls and designate an individual other than the preparer to review and approve any grant claims. Explanation of disagreement with audit finding: There is no disagreement with the audit finding. Action planned/taken in response to finding: The business manager will sign off on claim submissions to very accuracy for monthly claims so there are two sets of eyes on the claims to maintain accuracy. Name(s) of the contact person(s) responsible for corrective action: Edward Then, Business Manager Planned completion date for corrective action plan: 6/30/2023
Federally funded employees will have their timecards regularly evaluated to ensure amounts charged to federal programs are substantiated.
Federally funded employees will have their timecards regularly evaluated to ensure amounts charged to federal programs are substantiated.
Due to personnel changes, we do not access to the requested report. The finance team searched all files in their shared drive, and in any personal computer files to no avail. Moving forward, digital copies of reports will be kept in a shared drive accessible by multiple staff in the finance depart...
Due to personnel changes, we do not access to the requested report. The finance team searched all files in their shared drive, and in any personal computer files to no avail. Moving forward, digital copies of reports will be kept in a shared drive accessible by multiple staff in the finance department.
2022-001 Audit Adjustments Recommendation: We recommend the board and management work with their bookkeeping company to develop a process to review and identify such items in a timely manner. Explanation of disagreement with audit finding: There is no disagreement with the audit finding. Action take...
2022-001 Audit Adjustments Recommendation: We recommend the board and management work with their bookkeeping company to develop a process to review and identify such items in a timely manner. Explanation of disagreement with audit finding: There is no disagreement with the audit finding. Action taken in response to finding: The Business Office will establish a month end close checklist to ensure transactions are identified and properly recorded in the general ledger in a timely manner and conduct monthly financial statement reviews to ensure financial statements are complete and accurate. Name of the contact person responsible for corrective action: Carlo Hershberger, Director of Finance and Accounting Planned completion date for corrective action plan: September 30, 2023
Finding 22980 (2022-001)
Significant Deficiency 2022
CP-1011 CORRECTIVE ACTION PLAN Project Legal Name: Winter Grove, Inc. HUD Project No.: 017-EE118 Audit Firm: Cohn Reznick Period covered by the audit: 12/31/2022 Corrective Action Plan prepared by: Name: Arlene Lawrence Position: Chief Financial Officer Telephone Number: 203-562-4514 Signature:_____...
CP-1011 CORRECTIVE ACTION PLAN Project Legal Name: Winter Grove, Inc. HUD Project No.: 017-EE118 Audit Firm: Cohn Reznick Period covered by the audit: 12/31/2022 Corrective Action Plan prepared by: Name: Arlene Lawrence Position: Chief Financial Officer Telephone Number: 203-562-4514 Signature:___________________________________ The following is a recommended format to be followed by the auditee for preparing a corrective action plan: A. Current Findings on the Schedule of Findings, Questioned Costs and Recommendations 1. Finding 2022-001 a. Comments on the Finding and Each Recommendation The bank erroneously refunded dormant account balances Winter Grove was holding as security deposits for tenants. This resulted in the security deposit account to be underfunded as of December 31, 2022. b. Action(s) Taken or Planned on the Finding We are working with the bank and are in the process of closing out all individual sub-accounts to hold all the funds under Winter Grove?s name. We have identified the tenants that received refunds and are working with them to replenish those funds. The account will be funded appropriately in 2023.
Finding 22979 (2022-004)
Material Weakness 2022
FINDING 2022-004 Contact Person Responsible for Corrective Action: Cheryl Alcorn, County Auditor Contact Phone Number: 574-753-7700 Views of Responsible Official: We concur with the finding. Description of Corrective Action Plan: Auditor and Commissioner will work together to ensure Project and Expe...
FINDING 2022-004 Contact Person Responsible for Corrective Action: Cheryl Alcorn, County Auditor Contact Phone Number: 574-753-7700 Views of Responsible Official: We concur with the finding. Description of Corrective Action Plan: Auditor and Commissioner will work together to ensure Project and Expenditure Amounts are properly reported to the Department of Treasury. The corrective plan of action will include the guidance of financial advisors to ensure reporting to be complete and accurate. Anticipated Completion Date: Corrective action plan will start immediately.
Finding 22978 (2022-003)
Material Weakness 2022
FINDING 2022-003 Contact Person Responsible for Corrective Action: Cheryl Alcorn, County Auditor Contact Phone Number: 574-753-7700 Views of Responsible Official: We concur with the finding. Description of Corrective Action Plan: Plan of action has been implemented to include procedures and controls...
FINDING 2022-003 Contact Person Responsible for Corrective Action: Cheryl Alcorn, County Auditor Contact Phone Number: 574-753-7700 Views of Responsible Official: We concur with the finding. Description of Corrective Action Plan: Plan of action has been implemented to include procedures and controls to ensure vendor contracts include suspension and debarment compliance clause. If suspension and debarment clause is not included the Auditor will research suspension debarment findings through the SAM Exclusions website. Research results will be reviewed and documented by Commissioner President. Plan of action includes recording of Procurement process, history of obtaining sales/services contracts. Anticipated Completion Date: Corrective action plan will start immediately.