Audit 55733

FY End
2022-06-30
Total Expended
$7.70M
Findings
44
Programs
23
Year: 2022 Accepted: 2023-03-21

Organization Exclusion Status:

Checking exclusion status...

Findings

ID Ref Severity Repeat Requirement
57924 2022-002 Material Weakness Yes I
57925 2022-003 Material Weakness - G
60695 2022-002 Material Weakness Yes I
60696 2022-003 Material Weakness - G
60697 2022-003 Material Weakness - G
60698 2022-002 Material Weakness Yes I
60699 2022-003 Material Weakness - G
60700 2022-004 Material Weakness - F
60701 2022-005 Material Weakness - L
60702 2022-006 Material Weakness - N
60703 2022-004 Material Weakness - F
60704 2022-005 Material Weakness - L
60705 2022-006 Material Weakness - N
60706 2022-004 Material Weakness - F
60707 2022-005 Material Weakness - L
60708 2022-006 Material Weakness - N
60709 2022-004 Material Weakness - F
60710 2022-005 Material Weakness - L
60711 2022-006 Material Weakness - N
60712 2022-004 Material Weakness - F
60713 2022-005 Material Weakness - L
60714 2022-006 Material Weakness - N
634366 2022-002 Material Weakness Yes I
634367 2022-003 Material Weakness - G
637137 2022-002 Material Weakness Yes I
637138 2022-003 Material Weakness - G
637139 2022-003 Material Weakness - G
637140 2022-002 Material Weakness Yes I
637141 2022-003 Material Weakness - G
637142 2022-004 Material Weakness - F
637143 2022-005 Material Weakness - L
637144 2022-006 Material Weakness - N
637145 2022-004 Material Weakness - F
637146 2022-005 Material Weakness - L
637147 2022-006 Material Weakness - N
637148 2022-004 Material Weakness - F
637149 2022-005 Material Weakness - L
637150 2022-006 Material Weakness - N
637151 2022-004 Material Weakness - F
637152 2022-005 Material Weakness - L
637153 2022-006 Material Weakness - N
637154 2022-004 Material Weakness - F
637155 2022-005 Material Weakness - L
637156 2022-006 Material Weakness - N

Contacts

Name Title Type
MCDHMTMHGP27 Chris Richie Auditee
2199874789 Beth Kelley, CPA Auditor
No contacts on file

Notes to SEFA

Title: Note 3. Special Education Cooperative Accounting Policies: Note 1. Summary of Significant Accounting PoliciesA. Basis of PresentationThe accompanying Schedule of Expenditures of Federal Awards (SEFA) includes the federalgrant activity of the School Corporation under programs of the federal government for theyears ended June 30, 2021 and 2022. The information in the SEFA is presented in accordancewith the requirements of Title 2 U.S. Code of Federal Regulations Part 200, UniformAdministrative Requirements, Cost Principles, and Audit Requirements for Federal Awards(Uniform Guidance). Because the SEFA presents only a select portion of the operations ofthe School Corporation, it is not intended to and does not present the financial position of theSchool Corporation.The Uniform Guidance requires an annual audit of nonfederal entities expending a totalamount of federal awards equal to or in excess of $750,000 in any fiscal year unless byconstitution or statute a less frequent audit is required. In accordance with Indiana Code(IC 5-11-1-25), audits of school corporations shall be conducted biennially. Such audits shallinclude both years within the biennial period.B. Other Significant Accounting PoliciesExpenditures reported on the SEFA are reported on the cash basis of accounting. Suchexpenditures are recognized following, as applicable, either the cost principles in OMBCircular A-87, Cost Principles for State, Local, and Indian Tribal Governments, or the costprinciples contained in Uniform Guidance, wherein certain types of expenditures are notallowed or are limited as to reimbursement. When federal grants are received on a reimbursementbasis, the federal awards are considered expended when the reimbursement isreceived. Negative amounts shown on the SEFA represent adjustments or credits made inthe normal course of business to amounts reported as expenditures in prior years. De Minimis Rate Used: N Rate Explanation: The auditee did not use the de minimis cost rate. Note 3. Special Education CooperativeThe School Corporation is a member of the Cooperative School Services (Cooperative), which operates the special education program for the School Corporation. As aresult, the activity for the Special Education Cluster (IDEA) that is presented on the SEFA is notpresented as receipts and disbursements in the financial statement for the School Corporation.This activity is presented in the financial statement of the Cooperative's fiscal agent.
Title: Note 4. Medicaid Reimbursement by the School Corporation Accounting Policies: Note 1. Summary of Significant Accounting PoliciesA. Basis of PresentationThe accompanying Schedule of Expenditures of Federal Awards (SEFA) includes the federalgrant activity of the School Corporation under programs of the federal government for theyears ended June 30, 2021 and 2022. The information in the SEFA is presented in accordancewith the requirements of Title 2 U.S. Code of Federal Regulations Part 200, UniformAdministrative Requirements, Cost Principles, and Audit Requirements for Federal Awards(Uniform Guidance). Because the SEFA presents only a select portion of the operations ofthe School Corporation, it is not intended to and does not present the financial position of theSchool Corporation.The Uniform Guidance requires an annual audit of nonfederal entities expending a totalamount of federal awards equal to or in excess of $750,000 in any fiscal year unless byconstitution or statute a less frequent audit is required. In accordance with Indiana Code(IC 5-11-1-25), audits of school corporations shall be conducted biennially. Such audits shallinclude both years within the biennial period.B. Other Significant Accounting PoliciesExpenditures reported on the SEFA are reported on the cash basis of accounting. Suchexpenditures are recognized following, as applicable, either the cost principles in OMBCircular A-87, Cost Principles for State, Local, and Indian Tribal Governments, or the costprinciples contained in Uniform Guidance, wherein certain types of expenditures are notallowed or are limited as to reimbursement. When federal grants are received on a reimbursementbasis, the federal awards are considered expended when the reimbursement isreceived. Negative amounts shown on the SEFA represent adjustments or credits made inthe normal course of business to amounts reported as expenditures in prior years. De Minimis Rate Used: N Rate Explanation: The auditee did not use the de minimis cost rate. Note 4. Medicaid Reimbursement by the School CorporationIn May of 2022, the School Corporation returned $1,026,770 in Medicaid reimbursement moniesas a result of a possible overpayment for services rendered over a seven-year period. TheSchool Corporation had contracted with an outside vendor as its Medicaid reimbursementprovider. The vendor did not require providers to acknowledge receipt of doctors' referrals forspeech and occupational therapy services received. Upon advice of counsel, the SchoolCorporation voluntarily reimbursed all federal and state Medicaid payments received over theseven-year period. The State of Indiana is currently working on determining the amount offunding that will be returned to the School Corporation for the state portion, which was returnedin an abundance of caution.Since the June 30, 2021 school year was included in the amount returned, the SEFA shows thefederal amount of Medical Assistance Program funds received as of June 30, 2021. The MedicalAssistance Program amount recorded for the June 30, 2022 SEFA amounts was the amountreceived in that year less the amount received in the prior year, resulting in a negative amount.

Finding Details

FINDING 2022-002 Subject: Special Education Cluster (IDEA) - Suspension and Debarment Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listings Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 21611-047-PN01, 21619-047-PN01, 22611-047-PN01, 22619-047- PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Procurement and Suspension and Debarment Audit Finding: Material Weakness INDIANA STATE BOARD OF ACCOUNTS 15 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Repeat Finding This is a repeat finding from the immediately prior audit report. The prior audit finding number was 2020-003. Condition and Context The School Corporation is a member of the Cooperative School Services (Cooperative). The Cooperative operated the special education programs on behalf of the School Corporation and managed the Special Education grant funds. As the grant agreement was between the Indiana Department of Education and the School Corporation, the School Corporation was responsible for compliance with the grant agreement and the suspension and debarment requirements of the Procurement and Suspension and Debarment compliance requirement. The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the suspension and debarment requirements. The Special Education Director obtained suspension and debarment certifications for contracted vendors over $25,000 without an oversight or review process. The lack of internal controls was a systemic issue throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed a system of internal controls that would have ensured compliance with the grant agreement and the suspension and debarment requirements of the Procurement and Suspension and Debarment compliance requirement. Effect The failure to establish an effective internal control system placed the School Corporation at risk of noncompliance with the grant agreement and the suspension and debarment requirements of the Procurement and Suspension and Debarment compliance requirement. Questioned Costs There were no questioned costs identified. INDIANA STATE BOARD OF ACCOUNTS 16 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-003 Subject: Special Education Cluster (IDEA) - Earmarking Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listings Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 20611-047-PN01, 20619-047-PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Matching, Level of Effort, Earmarking Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not in place at the School Corporation in order to ensure compliance with the grant agreement and the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement. The School Corporation did not have effective internal controls in place to ensure that the required level of expenditures for non-public students for private school and homeschooled students were met. The School Corporation did not spend all of the required proportionate share for grant 20611-047-PN01. Additionally, the School Corporation did not spend any of the required proportionate share amount for grant 20619-047-PN01. For grant 20611-047-PN01, the amounts spent for one of the four teachers was not supported by timesheets. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." INDIANA STATE BOARD OF ACCOUNTS 17 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200.400 states in part: ". . . (a) The non-Federal entity is responsible for the efficient and effective administration of the Federal award through the application of sound management practices. (b) The non-Federal entity assumes responsibility for administering Federal funds in a manner consistent with underlying agreements, program objectives, and the terms and conditions of the Federal award. . . ." 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: . . . (g) Be adequately documented . . ." 2 CFR 200.208(b) states in part: "The Federal awarding agency or pass-through entity may adjust specific Federal award conditions as needed . . ." 511 IAC 7-34-7(b) states: "The public agency, in providing special education and related services to students in nonpublic schools must expend at least an amount that is the same proportion of the public agency total subgrant under 20 U.S.C. 1411(f) as the number of nonpublic school students with disabilities, who are enrolled by their parents in nonpublic schools within its boundaries, is to the total number of students with disabilities of the same age range." Cause Management had not developed a system of internal controls that would have ensured compliance with the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Matching, Level of Effort, Earmarking compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-002 Subject: Special Education Cluster (IDEA) - Suspension and Debarment Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listings Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 21611-047-PN01, 21619-047-PN01, 22611-047-PN01, 22619-047- PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Procurement and Suspension and Debarment Audit Finding: Material Weakness INDIANA STATE BOARD OF ACCOUNTS 15 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Repeat Finding This is a repeat finding from the immediately prior audit report. The prior audit finding number was 2020-003. Condition and Context The School Corporation is a member of the Cooperative School Services (Cooperative). The Cooperative operated the special education programs on behalf of the School Corporation and managed the Special Education grant funds. As the grant agreement was between the Indiana Department of Education and the School Corporation, the School Corporation was responsible for compliance with the grant agreement and the suspension and debarment requirements of the Procurement and Suspension and Debarment compliance requirement. The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the suspension and debarment requirements. The Special Education Director obtained suspension and debarment certifications for contracted vendors over $25,000 without an oversight or review process. The lack of internal controls was a systemic issue throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed a system of internal controls that would have ensured compliance with the grant agreement and the suspension and debarment requirements of the Procurement and Suspension and Debarment compliance requirement. Effect The failure to establish an effective internal control system placed the School Corporation at risk of noncompliance with the grant agreement and the suspension and debarment requirements of the Procurement and Suspension and Debarment compliance requirement. Questioned Costs There were no questioned costs identified. INDIANA STATE BOARD OF ACCOUNTS 16 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-003 Subject: Special Education Cluster (IDEA) - Earmarking Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listings Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 20611-047-PN01, 20619-047-PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Matching, Level of Effort, Earmarking Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not in place at the School Corporation in order to ensure compliance with the grant agreement and the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement. The School Corporation did not have effective internal controls in place to ensure that the required level of expenditures for non-public students for private school and homeschooled students were met. The School Corporation did not spend all of the required proportionate share for grant 20611-047-PN01. Additionally, the School Corporation did not spend any of the required proportionate share amount for grant 20619-047-PN01. For grant 20611-047-PN01, the amounts spent for one of the four teachers was not supported by timesheets. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." INDIANA STATE BOARD OF ACCOUNTS 17 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200.400 states in part: ". . . (a) The non-Federal entity is responsible for the efficient and effective administration of the Federal award through the application of sound management practices. (b) The non-Federal entity assumes responsibility for administering Federal funds in a manner consistent with underlying agreements, program objectives, and the terms and conditions of the Federal award. . . ." 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: . . . (g) Be adequately documented . . ." 2 CFR 200.208(b) states in part: "The Federal awarding agency or pass-through entity may adjust specific Federal award conditions as needed . . ." 511 IAC 7-34-7(b) states: "The public agency, in providing special education and related services to students in nonpublic schools must expend at least an amount that is the same proportion of the public agency total subgrant under 20 U.S.C. 1411(f) as the number of nonpublic school students with disabilities, who are enrolled by their parents in nonpublic schools within its boundaries, is to the total number of students with disabilities of the same age range." Cause Management had not developed a system of internal controls that would have ensured compliance with the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Matching, Level of Effort, Earmarking compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-003 Subject: Special Education Cluster (IDEA) - Earmarking Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listings Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 20611-047-PN01, 20619-047-PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Matching, Level of Effort, Earmarking Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not in place at the School Corporation in order to ensure compliance with the grant agreement and the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement. The School Corporation did not have effective internal controls in place to ensure that the required level of expenditures for non-public students for private school and homeschooled students were met. The School Corporation did not spend all of the required proportionate share for grant 20611-047-PN01. Additionally, the School Corporation did not spend any of the required proportionate share amount for grant 20619-047-PN01. For grant 20611-047-PN01, the amounts spent for one of the four teachers was not supported by timesheets. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." INDIANA STATE BOARD OF ACCOUNTS 17 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200.400 states in part: ". . . (a) The non-Federal entity is responsible for the efficient and effective administration of the Federal award through the application of sound management practices. (b) The non-Federal entity assumes responsibility for administering Federal funds in a manner consistent with underlying agreements, program objectives, and the terms and conditions of the Federal award. . . ." 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: . . . (g) Be adequately documented . . ." 2 CFR 200.208(b) states in part: "The Federal awarding agency or pass-through entity may adjust specific Federal award conditions as needed . . ." 511 IAC 7-34-7(b) states: "The public agency, in providing special education and related services to students in nonpublic schools must expend at least an amount that is the same proportion of the public agency total subgrant under 20 U.S.C. 1411(f) as the number of nonpublic school students with disabilities, who are enrolled by their parents in nonpublic schools within its boundaries, is to the total number of students with disabilities of the same age range." Cause Management had not developed a system of internal controls that would have ensured compliance with the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Matching, Level of Effort, Earmarking compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-002 Subject: Special Education Cluster (IDEA) - Suspension and Debarment Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listings Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 21611-047-PN01, 21619-047-PN01, 22611-047-PN01, 22619-047- PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Procurement and Suspension and Debarment Audit Finding: Material Weakness INDIANA STATE BOARD OF ACCOUNTS 15 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Repeat Finding This is a repeat finding from the immediately prior audit report. The prior audit finding number was 2020-003. Condition and Context The School Corporation is a member of the Cooperative School Services (Cooperative). The Cooperative operated the special education programs on behalf of the School Corporation and managed the Special Education grant funds. As the grant agreement was between the Indiana Department of Education and the School Corporation, the School Corporation was responsible for compliance with the grant agreement and the suspension and debarment requirements of the Procurement and Suspension and Debarment compliance requirement. The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the suspension and debarment requirements. The Special Education Director obtained suspension and debarment certifications for contracted vendors over $25,000 without an oversight or review process. The lack of internal controls was a systemic issue throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed a system of internal controls that would have ensured compliance with the grant agreement and the suspension and debarment requirements of the Procurement and Suspension and Debarment compliance requirement. Effect The failure to establish an effective internal control system placed the School Corporation at risk of noncompliance with the grant agreement and the suspension and debarment requirements of the Procurement and Suspension and Debarment compliance requirement. Questioned Costs There were no questioned costs identified. INDIANA STATE BOARD OF ACCOUNTS 16 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-003 Subject: Special Education Cluster (IDEA) - Earmarking Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listings Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 20611-047-PN01, 20619-047-PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Matching, Level of Effort, Earmarking Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not in place at the School Corporation in order to ensure compliance with the grant agreement and the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement. The School Corporation did not have effective internal controls in place to ensure that the required level of expenditures for non-public students for private school and homeschooled students were met. The School Corporation did not spend all of the required proportionate share for grant 20611-047-PN01. Additionally, the School Corporation did not spend any of the required proportionate share amount for grant 20619-047-PN01. For grant 20611-047-PN01, the amounts spent for one of the four teachers was not supported by timesheets. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." INDIANA STATE BOARD OF ACCOUNTS 17 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200.400 states in part: ". . . (a) The non-Federal entity is responsible for the efficient and effective administration of the Federal award through the application of sound management practices. (b) The non-Federal entity assumes responsibility for administering Federal funds in a manner consistent with underlying agreements, program objectives, and the terms and conditions of the Federal award. . . ." 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: . . . (g) Be adequately documented . . ." 2 CFR 200.208(b) states in part: "The Federal awarding agency or pass-through entity may adjust specific Federal award conditions as needed . . ." 511 IAC 7-34-7(b) states: "The public agency, in providing special education and related services to students in nonpublic schools must expend at least an amount that is the same proportion of the public agency total subgrant under 20 U.S.C. 1411(f) as the number of nonpublic school students with disabilities, who are enrolled by their parents in nonpublic schools within its boundaries, is to the total number of students with disabilities of the same age range." Cause Management had not developed a system of internal controls that would have ensured compliance with the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Matching, Level of Effort, Earmarking compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-004 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Other Matters Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Equipment and Real Property Management compliance requirement. The School Corporation paid for various pieces of equipment with Education Stabilization Funds. Although these assets were added to a detailed listing of capital assets, this listing did not include a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and the use and condition of the property. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d)(1) states: "Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property." Cause Management had not developed a system of internal controls that would have ensured compliance with the Equipment and Real Property Management compliance requirement. INDIANA STATE BOARD OF ACCOUNTS 19 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Equipment and Real Property Management compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Equipment and Real Property Management compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-005 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. The School Corporation had not designed or implemented a system of internal controls to ensure that the annual Elementary and Secondary School Emergency Relief (ESSER) and the Governor's Emergency Education Relief (GEER) annual Data Collection reports (Reports) were complete and accurately submitted. The Reports were prepared by one employee without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was a systemic issue throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: INDIANA STATE BOARD OF ACCOUNTS 20 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed or implemented a system of internal controls that would have ensured compliance with the grant agreement and the Reporting compliance requirement. Effect The failure to establish an effective internal control system could have enabled material noncompliance to go undetected. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance with the grant agreements and the Reporting compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-006 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. INDIANA STATE BOARD OF ACCOUNTS 21 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation did not have adequate policies or procedures to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. For one of two contracts tested, the required prevailing wage rate clause was not included in the contract. Additionally, none of the required certified payrolls were presented for audit. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in ? 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . INDIANA STATE BOARD OF ACCOUNTS 22 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (3) . . . (ii) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity, all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause Management had not designed or implemented a system of internal controls that would have ensured compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Special Tests and Provisions - Wage Rate Requirement compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-004 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Other Matters Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Equipment and Real Property Management compliance requirement. The School Corporation paid for various pieces of equipment with Education Stabilization Funds. Although these assets were added to a detailed listing of capital assets, this listing did not include a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and the use and condition of the property. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d)(1) states: "Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property." Cause Management had not developed a system of internal controls that would have ensured compliance with the Equipment and Real Property Management compliance requirement. INDIANA STATE BOARD OF ACCOUNTS 19 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Equipment and Real Property Management compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Equipment and Real Property Management compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-005 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. The School Corporation had not designed or implemented a system of internal controls to ensure that the annual Elementary and Secondary School Emergency Relief (ESSER) and the Governor's Emergency Education Relief (GEER) annual Data Collection reports (Reports) were complete and accurately submitted. The Reports were prepared by one employee without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was a systemic issue throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: INDIANA STATE BOARD OF ACCOUNTS 20 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed or implemented a system of internal controls that would have ensured compliance with the grant agreement and the Reporting compliance requirement. Effect The failure to establish an effective internal control system could have enabled material noncompliance to go undetected. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance with the grant agreements and the Reporting compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-006 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. INDIANA STATE BOARD OF ACCOUNTS 21 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation did not have adequate policies or procedures to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. For one of two contracts tested, the required prevailing wage rate clause was not included in the contract. Additionally, none of the required certified payrolls were presented for audit. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in ? 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . INDIANA STATE BOARD OF ACCOUNTS 22 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (3) . . . (ii) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity, all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause Management had not designed or implemented a system of internal controls that would have ensured compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Special Tests and Provisions - Wage Rate Requirement compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-004 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Other Matters Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Equipment and Real Property Management compliance requirement. The School Corporation paid for various pieces of equipment with Education Stabilization Funds. Although these assets were added to a detailed listing of capital assets, this listing did not include a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and the use and condition of the property. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d)(1) states: "Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property." Cause Management had not developed a system of internal controls that would have ensured compliance with the Equipment and Real Property Management compliance requirement. INDIANA STATE BOARD OF ACCOUNTS 19 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Equipment and Real Property Management compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Equipment and Real Property Management compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-005 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. The School Corporation had not designed or implemented a system of internal controls to ensure that the annual Elementary and Secondary School Emergency Relief (ESSER) and the Governor's Emergency Education Relief (GEER) annual Data Collection reports (Reports) were complete and accurately submitted. The Reports were prepared by one employee without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was a systemic issue throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: INDIANA STATE BOARD OF ACCOUNTS 20 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed or implemented a system of internal controls that would have ensured compliance with the grant agreement and the Reporting compliance requirement. Effect The failure to establish an effective internal control system could have enabled material noncompliance to go undetected. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance with the grant agreements and the Reporting compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-006 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. INDIANA STATE BOARD OF ACCOUNTS 21 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation did not have adequate policies or procedures to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. For one of two contracts tested, the required prevailing wage rate clause was not included in the contract. Additionally, none of the required certified payrolls were presented for audit. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in ? 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . INDIANA STATE BOARD OF ACCOUNTS 22 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (3) . . . (ii) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity, all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause Management had not designed or implemented a system of internal controls that would have ensured compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Special Tests and Provisions - Wage Rate Requirement compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-004 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Other Matters Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Equipment and Real Property Management compliance requirement. The School Corporation paid for various pieces of equipment with Education Stabilization Funds. Although these assets were added to a detailed listing of capital assets, this listing did not include a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and the use and condition of the property. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d)(1) states: "Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property." Cause Management had not developed a system of internal controls that would have ensured compliance with the Equipment and Real Property Management compliance requirement. INDIANA STATE BOARD OF ACCOUNTS 19 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Equipment and Real Property Management compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Equipment and Real Property Management compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-005 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. The School Corporation had not designed or implemented a system of internal controls to ensure that the annual Elementary and Secondary School Emergency Relief (ESSER) and the Governor's Emergency Education Relief (GEER) annual Data Collection reports (Reports) were complete and accurately submitted. The Reports were prepared by one employee without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was a systemic issue throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: INDIANA STATE BOARD OF ACCOUNTS 20 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed or implemented a system of internal controls that would have ensured compliance with the grant agreement and the Reporting compliance requirement. Effect The failure to establish an effective internal control system could have enabled material noncompliance to go undetected. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance with the grant agreements and the Reporting compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-006 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. INDIANA STATE BOARD OF ACCOUNTS 21 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation did not have adequate policies or procedures to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. For one of two contracts tested, the required prevailing wage rate clause was not included in the contract. Additionally, none of the required certified payrolls were presented for audit. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in ? 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . INDIANA STATE BOARD OF ACCOUNTS 22 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (3) . . . (ii) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity, all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause Management had not designed or implemented a system of internal controls that would have ensured compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Special Tests and Provisions - Wage Rate Requirement compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-004 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Other Matters Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Equipment and Real Property Management compliance requirement. The School Corporation paid for various pieces of equipment with Education Stabilization Funds. Although these assets were added to a detailed listing of capital assets, this listing did not include a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and the use and condition of the property. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d)(1) states: "Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property." Cause Management had not developed a system of internal controls that would have ensured compliance with the Equipment and Real Property Management compliance requirement. INDIANA STATE BOARD OF ACCOUNTS 19 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Equipment and Real Property Management compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Equipment and Real Property Management compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-005 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. The School Corporation had not designed or implemented a system of internal controls to ensure that the annual Elementary and Secondary School Emergency Relief (ESSER) and the Governor's Emergency Education Relief (GEER) annual Data Collection reports (Reports) were complete and accurately submitted. The Reports were prepared by one employee without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was a systemic issue throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: INDIANA STATE BOARD OF ACCOUNTS 20 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed or implemented a system of internal controls that would have ensured compliance with the grant agreement and the Reporting compliance requirement. Effect The failure to establish an effective internal control system could have enabled material noncompliance to go undetected. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance with the grant agreements and the Reporting compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-006 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. INDIANA STATE BOARD OF ACCOUNTS 21 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation did not have adequate policies or procedures to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. For one of two contracts tested, the required prevailing wage rate clause was not included in the contract. Additionally, none of the required certified payrolls were presented for audit. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in ? 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . INDIANA STATE BOARD OF ACCOUNTS 22 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (3) . . . (ii) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity, all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause Management had not designed or implemented a system of internal controls that would have ensured compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Special Tests and Provisions - Wage Rate Requirement compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-002 Subject: Special Education Cluster (IDEA) - Suspension and Debarment Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listings Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 21611-047-PN01, 21619-047-PN01, 22611-047-PN01, 22619-047- PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Procurement and Suspension and Debarment Audit Finding: Material Weakness INDIANA STATE BOARD OF ACCOUNTS 15 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Repeat Finding This is a repeat finding from the immediately prior audit report. The prior audit finding number was 2020-003. Condition and Context The School Corporation is a member of the Cooperative School Services (Cooperative). The Cooperative operated the special education programs on behalf of the School Corporation and managed the Special Education grant funds. As the grant agreement was between the Indiana Department of Education and the School Corporation, the School Corporation was responsible for compliance with the grant agreement and the suspension and debarment requirements of the Procurement and Suspension and Debarment compliance requirement. The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the suspension and debarment requirements. The Special Education Director obtained suspension and debarment certifications for contracted vendors over $25,000 without an oversight or review process. The lack of internal controls was a systemic issue throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed a system of internal controls that would have ensured compliance with the grant agreement and the suspension and debarment requirements of the Procurement and Suspension and Debarment compliance requirement. Effect The failure to establish an effective internal control system placed the School Corporation at risk of noncompliance with the grant agreement and the suspension and debarment requirements of the Procurement and Suspension and Debarment compliance requirement. Questioned Costs There were no questioned costs identified. INDIANA STATE BOARD OF ACCOUNTS 16 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-003 Subject: Special Education Cluster (IDEA) - Earmarking Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listings Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 20611-047-PN01, 20619-047-PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Matching, Level of Effort, Earmarking Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not in place at the School Corporation in order to ensure compliance with the grant agreement and the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement. The School Corporation did not have effective internal controls in place to ensure that the required level of expenditures for non-public students for private school and homeschooled students were met. The School Corporation did not spend all of the required proportionate share for grant 20611-047-PN01. Additionally, the School Corporation did not spend any of the required proportionate share amount for grant 20619-047-PN01. For grant 20611-047-PN01, the amounts spent for one of the four teachers was not supported by timesheets. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." INDIANA STATE BOARD OF ACCOUNTS 17 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200.400 states in part: ". . . (a) The non-Federal entity is responsible for the efficient and effective administration of the Federal award through the application of sound management practices. (b) The non-Federal entity assumes responsibility for administering Federal funds in a manner consistent with underlying agreements, program objectives, and the terms and conditions of the Federal award. . . ." 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: . . . (g) Be adequately documented . . ." 2 CFR 200.208(b) states in part: "The Federal awarding agency or pass-through entity may adjust specific Federal award conditions as needed . . ." 511 IAC 7-34-7(b) states: "The public agency, in providing special education and related services to students in nonpublic schools must expend at least an amount that is the same proportion of the public agency total subgrant under 20 U.S.C. 1411(f) as the number of nonpublic school students with disabilities, who are enrolled by their parents in nonpublic schools within its boundaries, is to the total number of students with disabilities of the same age range." Cause Management had not developed a system of internal controls that would have ensured compliance with the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Matching, Level of Effort, Earmarking compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-002 Subject: Special Education Cluster (IDEA) - Suspension and Debarment Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listings Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 21611-047-PN01, 21619-047-PN01, 22611-047-PN01, 22619-047- PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Procurement and Suspension and Debarment Audit Finding: Material Weakness INDIANA STATE BOARD OF ACCOUNTS 15 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Repeat Finding This is a repeat finding from the immediately prior audit report. The prior audit finding number was 2020-003. Condition and Context The School Corporation is a member of the Cooperative School Services (Cooperative). The Cooperative operated the special education programs on behalf of the School Corporation and managed the Special Education grant funds. As the grant agreement was between the Indiana Department of Education and the School Corporation, the School Corporation was responsible for compliance with the grant agreement and the suspension and debarment requirements of the Procurement and Suspension and Debarment compliance requirement. The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the suspension and debarment requirements. The Special Education Director obtained suspension and debarment certifications for contracted vendors over $25,000 without an oversight or review process. The lack of internal controls was a systemic issue throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed a system of internal controls that would have ensured compliance with the grant agreement and the suspension and debarment requirements of the Procurement and Suspension and Debarment compliance requirement. Effect The failure to establish an effective internal control system placed the School Corporation at risk of noncompliance with the grant agreement and the suspension and debarment requirements of the Procurement and Suspension and Debarment compliance requirement. Questioned Costs There were no questioned costs identified. INDIANA STATE BOARD OF ACCOUNTS 16 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-003 Subject: Special Education Cluster (IDEA) - Earmarking Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listings Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 20611-047-PN01, 20619-047-PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Matching, Level of Effort, Earmarking Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not in place at the School Corporation in order to ensure compliance with the grant agreement and the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement. The School Corporation did not have effective internal controls in place to ensure that the required level of expenditures for non-public students for private school and homeschooled students were met. The School Corporation did not spend all of the required proportionate share for grant 20611-047-PN01. Additionally, the School Corporation did not spend any of the required proportionate share amount for grant 20619-047-PN01. For grant 20611-047-PN01, the amounts spent for one of the four teachers was not supported by timesheets. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." INDIANA STATE BOARD OF ACCOUNTS 17 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200.400 states in part: ". . . (a) The non-Federal entity is responsible for the efficient and effective administration of the Federal award through the application of sound management practices. (b) The non-Federal entity assumes responsibility for administering Federal funds in a manner consistent with underlying agreements, program objectives, and the terms and conditions of the Federal award. . . ." 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: . . . (g) Be adequately documented . . ." 2 CFR 200.208(b) states in part: "The Federal awarding agency or pass-through entity may adjust specific Federal award conditions as needed . . ." 511 IAC 7-34-7(b) states: "The public agency, in providing special education and related services to students in nonpublic schools must expend at least an amount that is the same proportion of the public agency total subgrant under 20 U.S.C. 1411(f) as the number of nonpublic school students with disabilities, who are enrolled by their parents in nonpublic schools within its boundaries, is to the total number of students with disabilities of the same age range." Cause Management had not developed a system of internal controls that would have ensured compliance with the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Matching, Level of Effort, Earmarking compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-003 Subject: Special Education Cluster (IDEA) - Earmarking Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listings Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 20611-047-PN01, 20619-047-PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Matching, Level of Effort, Earmarking Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not in place at the School Corporation in order to ensure compliance with the grant agreement and the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement. The School Corporation did not have effective internal controls in place to ensure that the required level of expenditures for non-public students for private school and homeschooled students were met. The School Corporation did not spend all of the required proportionate share for grant 20611-047-PN01. Additionally, the School Corporation did not spend any of the required proportionate share amount for grant 20619-047-PN01. For grant 20611-047-PN01, the amounts spent for one of the four teachers was not supported by timesheets. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." INDIANA STATE BOARD OF ACCOUNTS 17 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200.400 states in part: ". . . (a) The non-Federal entity is responsible for the efficient and effective administration of the Federal award through the application of sound management practices. (b) The non-Federal entity assumes responsibility for administering Federal funds in a manner consistent with underlying agreements, program objectives, and the terms and conditions of the Federal award. . . ." 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: . . . (g) Be adequately documented . . ." 2 CFR 200.208(b) states in part: "The Federal awarding agency or pass-through entity may adjust specific Federal award conditions as needed . . ." 511 IAC 7-34-7(b) states: "The public agency, in providing special education and related services to students in nonpublic schools must expend at least an amount that is the same proportion of the public agency total subgrant under 20 U.S.C. 1411(f) as the number of nonpublic school students with disabilities, who are enrolled by their parents in nonpublic schools within its boundaries, is to the total number of students with disabilities of the same age range." Cause Management had not developed a system of internal controls that would have ensured compliance with the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Matching, Level of Effort, Earmarking compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-002 Subject: Special Education Cluster (IDEA) - Suspension and Debarment Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listings Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 21611-047-PN01, 21619-047-PN01, 22611-047-PN01, 22619-047- PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Procurement and Suspension and Debarment Audit Finding: Material Weakness INDIANA STATE BOARD OF ACCOUNTS 15 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Repeat Finding This is a repeat finding from the immediately prior audit report. The prior audit finding number was 2020-003. Condition and Context The School Corporation is a member of the Cooperative School Services (Cooperative). The Cooperative operated the special education programs on behalf of the School Corporation and managed the Special Education grant funds. As the grant agreement was between the Indiana Department of Education and the School Corporation, the School Corporation was responsible for compliance with the grant agreement and the suspension and debarment requirements of the Procurement and Suspension and Debarment compliance requirement. The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the suspension and debarment requirements. The Special Education Director obtained suspension and debarment certifications for contracted vendors over $25,000 without an oversight or review process. The lack of internal controls was a systemic issue throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed a system of internal controls that would have ensured compliance with the grant agreement and the suspension and debarment requirements of the Procurement and Suspension and Debarment compliance requirement. Effect The failure to establish an effective internal control system placed the School Corporation at risk of noncompliance with the grant agreement and the suspension and debarment requirements of the Procurement and Suspension and Debarment compliance requirement. Questioned Costs There were no questioned costs identified. INDIANA STATE BOARD OF ACCOUNTS 16 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-003 Subject: Special Education Cluster (IDEA) - Earmarking Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listings Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 20611-047-PN01, 20619-047-PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Matching, Level of Effort, Earmarking Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not in place at the School Corporation in order to ensure compliance with the grant agreement and the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement. The School Corporation did not have effective internal controls in place to ensure that the required level of expenditures for non-public students for private school and homeschooled students were met. The School Corporation did not spend all of the required proportionate share for grant 20611-047-PN01. Additionally, the School Corporation did not spend any of the required proportionate share amount for grant 20619-047-PN01. For grant 20611-047-PN01, the amounts spent for one of the four teachers was not supported by timesheets. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." INDIANA STATE BOARD OF ACCOUNTS 17 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200.400 states in part: ". . . (a) The non-Federal entity is responsible for the efficient and effective administration of the Federal award through the application of sound management practices. (b) The non-Federal entity assumes responsibility for administering Federal funds in a manner consistent with underlying agreements, program objectives, and the terms and conditions of the Federal award. . . ." 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: . . . (g) Be adequately documented . . ." 2 CFR 200.208(b) states in part: "The Federal awarding agency or pass-through entity may adjust specific Federal award conditions as needed . . ." 511 IAC 7-34-7(b) states: "The public agency, in providing special education and related services to students in nonpublic schools must expend at least an amount that is the same proportion of the public agency total subgrant under 20 U.S.C. 1411(f) as the number of nonpublic school students with disabilities, who are enrolled by their parents in nonpublic schools within its boundaries, is to the total number of students with disabilities of the same age range." Cause Management had not developed a system of internal controls that would have ensured compliance with the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Matching, Level of Effort, Earmarking compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-004 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Other Matters Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Equipment and Real Property Management compliance requirement. The School Corporation paid for various pieces of equipment with Education Stabilization Funds. Although these assets were added to a detailed listing of capital assets, this listing did not include a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and the use and condition of the property. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d)(1) states: "Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property." Cause Management had not developed a system of internal controls that would have ensured compliance with the Equipment and Real Property Management compliance requirement. INDIANA STATE BOARD OF ACCOUNTS 19 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Equipment and Real Property Management compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Equipment and Real Property Management compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-005 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. The School Corporation had not designed or implemented a system of internal controls to ensure that the annual Elementary and Secondary School Emergency Relief (ESSER) and the Governor's Emergency Education Relief (GEER) annual Data Collection reports (Reports) were complete and accurately submitted. The Reports were prepared by one employee without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was a systemic issue throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: INDIANA STATE BOARD OF ACCOUNTS 20 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed or implemented a system of internal controls that would have ensured compliance with the grant agreement and the Reporting compliance requirement. Effect The failure to establish an effective internal control system could have enabled material noncompliance to go undetected. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance with the grant agreements and the Reporting compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-006 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. INDIANA STATE BOARD OF ACCOUNTS 21 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation did not have adequate policies or procedures to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. For one of two contracts tested, the required prevailing wage rate clause was not included in the contract. Additionally, none of the required certified payrolls were presented for audit. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in ? 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . INDIANA STATE BOARD OF ACCOUNTS 22 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (3) . . . (ii) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity, all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause Management had not designed or implemented a system of internal controls that would have ensured compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Special Tests and Provisions - Wage Rate Requirement compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-004 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Other Matters Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Equipment and Real Property Management compliance requirement. The School Corporation paid for various pieces of equipment with Education Stabilization Funds. Although these assets were added to a detailed listing of capital assets, this listing did not include a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and the use and condition of the property. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d)(1) states: "Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property." Cause Management had not developed a system of internal controls that would have ensured compliance with the Equipment and Real Property Management compliance requirement. INDIANA STATE BOARD OF ACCOUNTS 19 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Equipment and Real Property Management compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Equipment and Real Property Management compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-005 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. The School Corporation had not designed or implemented a system of internal controls to ensure that the annual Elementary and Secondary School Emergency Relief (ESSER) and the Governor's Emergency Education Relief (GEER) annual Data Collection reports (Reports) were complete and accurately submitted. The Reports were prepared by one employee without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was a systemic issue throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: INDIANA STATE BOARD OF ACCOUNTS 20 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed or implemented a system of internal controls that would have ensured compliance with the grant agreement and the Reporting compliance requirement. Effect The failure to establish an effective internal control system could have enabled material noncompliance to go undetected. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance with the grant agreements and the Reporting compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-006 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. INDIANA STATE BOARD OF ACCOUNTS 21 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation did not have adequate policies or procedures to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. For one of two contracts tested, the required prevailing wage rate clause was not included in the contract. Additionally, none of the required certified payrolls were presented for audit. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in ? 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . INDIANA STATE BOARD OF ACCOUNTS 22 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (3) . . . (ii) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity, all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause Management had not designed or implemented a system of internal controls that would have ensured compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Special Tests and Provisions - Wage Rate Requirement compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-004 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Other Matters Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Equipment and Real Property Management compliance requirement. The School Corporation paid for various pieces of equipment with Education Stabilization Funds. Although these assets were added to a detailed listing of capital assets, this listing did not include a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and the use and condition of the property. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d)(1) states: "Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property." Cause Management had not developed a system of internal controls that would have ensured compliance with the Equipment and Real Property Management compliance requirement. INDIANA STATE BOARD OF ACCOUNTS 19 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Equipment and Real Property Management compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Equipment and Real Property Management compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-005 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. The School Corporation had not designed or implemented a system of internal controls to ensure that the annual Elementary and Secondary School Emergency Relief (ESSER) and the Governor's Emergency Education Relief (GEER) annual Data Collection reports (Reports) were complete and accurately submitted. The Reports were prepared by one employee without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was a systemic issue throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: INDIANA STATE BOARD OF ACCOUNTS 20 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed or implemented a system of internal controls that would have ensured compliance with the grant agreement and the Reporting compliance requirement. Effect The failure to establish an effective internal control system could have enabled material noncompliance to go undetected. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance with the grant agreements and the Reporting compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-006 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. INDIANA STATE BOARD OF ACCOUNTS 21 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation did not have adequate policies or procedures to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. For one of two contracts tested, the required prevailing wage rate clause was not included in the contract. Additionally, none of the required certified payrolls were presented for audit. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in ? 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . INDIANA STATE BOARD OF ACCOUNTS 22 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (3) . . . (ii) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity, all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause Management had not designed or implemented a system of internal controls that would have ensured compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Special Tests and Provisions - Wage Rate Requirement compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-004 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Other Matters Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Equipment and Real Property Management compliance requirement. The School Corporation paid for various pieces of equipment with Education Stabilization Funds. Although these assets were added to a detailed listing of capital assets, this listing did not include a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and the use and condition of the property. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d)(1) states: "Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property." Cause Management had not developed a system of internal controls that would have ensured compliance with the Equipment and Real Property Management compliance requirement. INDIANA STATE BOARD OF ACCOUNTS 19 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Equipment and Real Property Management compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Equipment and Real Property Management compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-005 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. The School Corporation had not designed or implemented a system of internal controls to ensure that the annual Elementary and Secondary School Emergency Relief (ESSER) and the Governor's Emergency Education Relief (GEER) annual Data Collection reports (Reports) were complete and accurately submitted. The Reports were prepared by one employee without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was a systemic issue throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: INDIANA STATE BOARD OF ACCOUNTS 20 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed or implemented a system of internal controls that would have ensured compliance with the grant agreement and the Reporting compliance requirement. Effect The failure to establish an effective internal control system could have enabled material noncompliance to go undetected. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance with the grant agreements and the Reporting compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-006 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. INDIANA STATE BOARD OF ACCOUNTS 21 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation did not have adequate policies or procedures to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. For one of two contracts tested, the required prevailing wage rate clause was not included in the contract. Additionally, none of the required certified payrolls were presented for audit. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in ? 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . INDIANA STATE BOARD OF ACCOUNTS 22 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (3) . . . (ii) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity, all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause Management had not designed or implemented a system of internal controls that would have ensured compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Special Tests and Provisions - Wage Rate Requirement compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-004 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Other Matters Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Equipment and Real Property Management compliance requirement. The School Corporation paid for various pieces of equipment with Education Stabilization Funds. Although these assets were added to a detailed listing of capital assets, this listing did not include a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and the use and condition of the property. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d)(1) states: "Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property." Cause Management had not developed a system of internal controls that would have ensured compliance with the Equipment and Real Property Management compliance requirement. INDIANA STATE BOARD OF ACCOUNTS 19 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Equipment and Real Property Management compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Equipment and Real Property Management compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-005 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. The School Corporation had not designed or implemented a system of internal controls to ensure that the annual Elementary and Secondary School Emergency Relief (ESSER) and the Governor's Emergency Education Relief (GEER) annual Data Collection reports (Reports) were complete and accurately submitted. The Reports were prepared by one employee without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was a systemic issue throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: INDIANA STATE BOARD OF ACCOUNTS 20 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed or implemented a system of internal controls that would have ensured compliance with the grant agreement and the Reporting compliance requirement. Effect The failure to establish an effective internal control system could have enabled material noncompliance to go undetected. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance with the grant agreements and the Reporting compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-006 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. INDIANA STATE BOARD OF ACCOUNTS 21 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation did not have adequate policies or procedures to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. For one of two contracts tested, the required prevailing wage rate clause was not included in the contract. Additionally, none of the required certified payrolls were presented for audit. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in ? 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . INDIANA STATE BOARD OF ACCOUNTS 22 KANKAKEE VALLEY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (3) . . . (ii) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity, all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause Management had not designed or implemented a system of internal controls that would have ensured compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Special Tests and Provisions - Wage Rate Requirement compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.