Criteria: 2 CFR 200.510 (b) requires an entity to prepare a Schedule of Expenditures of Federal Awards (SEFA) for the period covered by the auditee’s financial statements. The schedule must include the total Federal awards expended as determined in accordance with 2 CFR 200.502 (a), which states that determination of when a Federal award is expended must be based on when the activity related to the Federal award occurs. Condition: During the FY2024 Uniform Guidance audit, we noted that there were $1.2 million of funds from this program that had underlying transaction dates from FY2023. These expenditures were not reported on the FY2023 SEFA but rather were included in the FY2024 SEFA. The omission in the prior year did not result in a change to the major program determination for the 2023 or 2024 audits. Cause: In April 2023, Drexel received a subaward for the SNAP Cluster and a new active fund account was created in the accounting system to track expenses after the subaward was signed. This was set up as a new active award in the system, however there was already an existing advance fund account set up in pre-award status prior to the subaward being executed. The FY2023 expenditures were recorded in pre-award fund account and not the new active fund account. Management included the new active fund account in the population for FY2023 SEFA reporting which had no expenditures and excluded the pre-award fund account with the $1.2 million of charges. This accounting for the FY2023 expenditures was corrected in July 2023 (FY2024) but not in time for SEFA reporting purposes. Effect: FY2023 SEFA expenditures for the SNAP cluster were understated by $1.2 million. This amount has been reported in the FY2024 SEFA. Questioned Costs: None; Recommendation: Management should enhance the control in place to perform a more precise review of award status and other reconciling items when preparing and reviewing the SEFA reconciliation to the financial statements. Management's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.510 (b) requires an entity to prepare a Schedule of Expenditures of Federal Awards (SEFA) for the period covered by the auditee’s financial statements. The schedule must include the total Federal awards expended as determined in accordance with 2 CFR 200.502 (a), which states that determination of when a Federal award is expended must be based on when the activity related to the Federal award occurs. Condition: During the FY2024 Uniform Guidance audit, we noted that there were $1.2 million of funds from this program that had underlying transaction dates from FY2023. These expenditures were not reported on the FY2023 SEFA but rather were included in the FY2024 SEFA. The omission in the prior year did not result in a change to the major program determination for the 2023 or 2024 audits. Cause: In April 2023, Drexel received a subaward for the SNAP Cluster and a new active fund account was created in the accounting system to track expenses after the subaward was signed. This was set up as a new active award in the system, however there was already an existing advance fund account set up in pre-award status prior to the subaward being executed. The FY2023 expenditures were recorded in pre-award fund account and not the new active fund account. Management included the new active fund account in the population for FY2023 SEFA reporting which had no expenditures and excluded the pre-award fund account with the $1.2 million of charges. This accounting for the FY2023 expenditures was corrected in July 2023 (FY2024) but not in time for SEFA reporting purposes. Effect: FY2023 SEFA expenditures for the SNAP cluster were understated by $1.2 million. This amount has been reported in the FY2024 SEFA. Questioned Costs: None; Recommendation: Management should enhance the control in place to perform a more precise review of award status and other reconciling items when preparing and reviewing the SEFA reconciliation to the financial statements. Management's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.510 (b) requires an entity to prepare a Schedule of Expenditures of Federal Awards (SEFA) for the period covered by the auditee’s financial statements. The schedule must include the total Federal awards expended as determined in accordance with 2 CFR 200.502 (a), which states that determination of when a Federal award is expended must be based on when the activity related to the Federal award occurs. Condition: During the FY2024 Uniform Guidance audit, we noted that there were $1.2 million of funds from this program that had underlying transaction dates from FY2023. These expenditures were not reported on the FY2023 SEFA but rather were included in the FY2024 SEFA. The omission in the prior year did not result in a change to the major program determination for the 2023 or 2024 audits. Cause: In April 2023, Drexel received a subaward for the SNAP Cluster and a new active fund account was created in the accounting system to track expenses after the subaward was signed. This was set up as a new active award in the system, however there was already an existing advance fund account set up in pre-award status prior to the subaward being executed. The FY2023 expenditures were recorded in pre-award fund account and not the new active fund account. Management included the new active fund account in the population for FY2023 SEFA reporting which had no expenditures and excluded the pre-award fund account with the $1.2 million of charges. This accounting for the FY2023 expenditures was corrected in July 2023 (FY2024) but not in time for SEFA reporting purposes. Effect: FY2023 SEFA expenditures for the SNAP cluster were understated by $1.2 million. This amount has been reported in the FY2024 SEFA. Questioned Costs: None; Recommendation: Management should enhance the control in place to perform a more precise review of award status and other reconciling items when preparing and reviewing the SEFA reconciliation to the financial statements. Management's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.510 (b) requires an entity to prepare a Schedule of Expenditures of Federal Awards (SEFA) for the period covered by the auditee’s financial statements. The schedule must include the total Federal awards expended as determined in accordance with 2 CFR 200.502 (a), which states that determination of when a Federal award is expended must be based on when the activity related to the Federal award occurs. Condition: During the FY2024 Uniform Guidance audit, we noted that there were $1.2 million of funds from this program that had underlying transaction dates from FY2023. These expenditures were not reported on the FY2023 SEFA but rather were included in the FY2024 SEFA. The omission in the prior year did not result in a change to the major program determination for the 2023 or 2024 audits. Cause: In April 2023, Drexel received a subaward for the SNAP Cluster and a new active fund account was created in the accounting system to track expenses after the subaward was signed. This was set up as a new active award in the system, however there was already an existing advance fund account set up in pre-award status prior to the subaward being executed. The FY2023 expenditures were recorded in pre-award fund account and not the new active fund account. Management included the new active fund account in the population for FY2023 SEFA reporting which had no expenditures and excluded the pre-award fund account with the $1.2 million of charges. This accounting for the FY2023 expenditures was corrected in July 2023 (FY2024) but not in time for SEFA reporting purposes. Effect: FY2023 SEFA expenditures for the SNAP cluster were understated by $1.2 million. This amount has been reported in the FY2024 SEFA. Questioned Costs: None; Recommendation: Management should enhance the control in place to perform a more precise review of award status and other reconciling items when preparing and reviewing the SEFA reconciliation to the financial statements. Management's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.510 (b) requires an entity to prepare a Schedule of Expenditures of Federal Awards (SEFA) for the period covered by the auditee’s financial statements. The schedule must include the total Federal awards expended as determined in accordance with 2 CFR 200.502 (a), which states that determination of when a Federal award is expended must be based on when the activity related to the Federal award occurs. Condition: During the FY2024 Uniform Guidance audit, we noted that there were $1.2 million of funds from this program that had underlying transaction dates from FY2023. These expenditures were not reported on the FY2023 SEFA but rather were included in the FY2024 SEFA. The omission in the prior year did not result in a change to the major program determination for the 2023 or 2024 audits. Cause: In April 2023, Drexel received a subaward for the SNAP Cluster and a new active fund account was created in the accounting system to track expenses after the subaward was signed. This was set up as a new active award in the system, however there was already an existing advance fund account set up in pre-award status prior to the subaward being executed. The FY2023 expenditures were recorded in pre-award fund account and not the new active fund account. Management included the new active fund account in the population for FY2023 SEFA reporting which had no expenditures and excluded the pre-award fund account with the $1.2 million of charges. This accounting for the FY2023 expenditures was corrected in July 2023 (FY2024) but not in time for SEFA reporting purposes. Effect: FY2023 SEFA expenditures for the SNAP cluster were understated by $1.2 million. This amount has been reported in the FY2024 SEFA. Questioned Costs: None; Recommendation: Management should enhance the control in place to perform a more precise review of award status and other reconciling items when preparing and reviewing the SEFA reconciliation to the financial statements. Management's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.510 (b) requires an entity to prepare a Schedule of Expenditures of Federal Awards (SEFA) for the period covered by the auditee’s financial statements. The schedule must include the total Federal awards expended as determined in accordance with 2 CFR 200.502 (a), which states that determination of when a Federal award is expended must be based on when the activity related to the Federal award occurs. Condition: During the FY2024 Uniform Guidance audit, we noted that there were $1.2 million of funds from this program that had underlying transaction dates from FY2023. These expenditures were not reported on the FY2023 SEFA but rather were included in the FY2024 SEFA. The omission in the prior year did not result in a change to the major program determination for the 2023 or 2024 audits. Cause: In April 2023, Drexel received a subaward for the SNAP Cluster and a new active fund account was created in the accounting system to track expenses after the subaward was signed. This was set up as a new active award in the system, however there was already an existing advance fund account set up in pre-award status prior to the subaward being executed. The FY2023 expenditures were recorded in pre-award fund account and not the new active fund account. Management included the new active fund account in the population for FY2023 SEFA reporting which had no expenditures and excluded the pre-award fund account with the $1.2 million of charges. This accounting for the FY2023 expenditures was corrected in July 2023 (FY2024) but not in time for SEFA reporting purposes. Effect: FY2023 SEFA expenditures for the SNAP cluster were understated by $1.2 million. This amount has been reported in the FY2024 SEFA. Questioned Costs: None; Recommendation: Management should enhance the control in place to perform a more precise review of award status and other reconciling items when preparing and reviewing the SEFA reconciliation to the financial statements. Management's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.