Audit 295075

FY End
2023-06-30
Total Expended
$17.93M
Findings
12
Programs
23
Year: 2023 Accepted: 2024-03-14

Organization Exclusion Status:

Checking exclusion status...

Findings

ID Ref Severity Repeat Requirement
376045 2023-002 Material Weakness - L
376046 2023-002 Material Weakness - L
376047 2023-003 Material Weakness - N
376048 2023-003 Material Weakness - N
376049 2023-004 Material Weakness - N
376050 2023-004 Material Weakness - N
952487 2023-002 Material Weakness - L
952488 2023-002 Material Weakness - L
952489 2023-003 Material Weakness - N
952490 2023-003 Material Weakness - N
952491 2023-004 Material Weakness - N
952492 2023-004 Material Weakness - N

Contacts

Name Title Type
TNKXCG3H54E9 Matt Ruess Auditee
2196132781 Beth Kelley, Cpa, Cfe Auditor
No contacts on file

Notes to SEFA

Accounting Policies: Note 1. Summary of Significant Accounting Policies A. Basis of Presentation The accompanying Schedule of Expenditures of Federal Awards (SEFA) includes the federal grant activity of the School Corporation under programs of the federal government for the years ended June 30, 2022 and 2023. The information in the SEFA is presented in accordance with the requirements of Title 2 U.S. Code of Federal Regulations Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (Uniform Guidance). Because the SEFA presents only a select portion of the operations of the School Corporation, it is not intended to and does not present the financial position of the School Corporation. The Uniform Guidance requires an annual audit of nonfederal entities expending a total amount of federal awards equal to or in excess of $750,000 in any fiscal year unless by constitution or statute a less frequent audit is required. In accordance with Indiana Code (IC 5-11-1-25), audits of school corporations shall be conducted biennially. Such audits shall include both years within the biennial period. B. Other Significant Accounting Policies Expenditures reported on the SEFA are reported on the cash basis of accounting. Such expenditures are recognized following, as applicable, either the cost principles in OMB Circular A-87, Cost Principles for State, Local, and Indian Tribal Governments, or the cost principles contained in the Uniform Guidance, wherein certain types of expenditures are not allowed or are limited as to reimbursement. When federal grants are received on a reimbursement basis, the federal awards are considered expended when the reimbursement is received. De Minimis Rate Used: N Rate Explanation: Note 2. Indirect Cost Rate The School Corporation has elected not to use the 10 percent de minimis indirect cost rate allowed under the Uniform Guidance.

Finding Details

FINDING 2023-002 Subject: Title I Grants to Local Educational Agencies - Reporting Federal Agency: Department of Education Federal Program: Title I Grants to Local Educational Agencies Assistance Listings Number: 84.010 Federal Award Numbers and Years (or Other Identifying Numbers): S010A200014, S010A210014 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness INDIANA STATE BOARD OF ACCOUNTS 18 CROWN POINT COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Condition and Context The School Corporation is required to submit final expenditure reports to the Indiana Department of Education on or before December 31, after the September 30 deadline, for encumbering prior school year funds. During the audit period, the School Corporation had final expenditure reports due for the S010A200014 and the S010A210014 grant awards. A single employee prepared and submitted the final reports without a documented review or oversight process in place to prevent, or detect and correct, errors. The lack of internal controls was isolated to the final expenditure reports for the S010A200014 and the S010A210014 grant awards. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper design or implementation of the components of a system of internal controls, including policies and procedures that provide segregation of duties and additional oversight as needed, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls over the Reporting compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-002 Subject: Title I Grants to Local Educational Agencies - Reporting Federal Agency: Department of Education Federal Program: Title I Grants to Local Educational Agencies Assistance Listings Number: 84.010 Federal Award Numbers and Years (or Other Identifying Numbers): S010A200014, S010A210014 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness INDIANA STATE BOARD OF ACCOUNTS 18 CROWN POINT COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Condition and Context The School Corporation is required to submit final expenditure reports to the Indiana Department of Education on or before December 31, after the September 30 deadline, for encumbering prior school year funds. During the audit period, the School Corporation had final expenditure reports due for the S010A200014 and the S010A210014 grant awards. A single employee prepared and submitted the final reports without a documented review or oversight process in place to prevent, or detect and correct, errors. The lack of internal controls was isolated to the final expenditure reports for the S010A200014 and the S010A210014 grant awards. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper design or implementation of the components of a system of internal controls, including policies and procedures that provide segregation of duties and additional oversight as needed, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls over the Reporting compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject: Title I Grants to Local Educational Agencies - Special Tests and Provisions - Assessment System Security Federal Agency: Department of Education Federal Program: Title I Grants to Local Educational Agencies Assistance Listings Number: 84.010 Federal Award Numbers and Years (or Other Identifying Numbers): S010A190014, S010A200014, S010A210014, S010A220014 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Assessment System Security Audit Findings: Material Weakness, Other Matters Condition and Context State educational agencies (SEA), in consultation with local educational agencies (LEA), are required to establish and maintain an assessment security system that is valid, reliable, and consistent with relevant professional and technical standards. Within their assessment system, SEAs must have policies and procedures to maintain test security measures and ensure that LEAs implement those policies and procedures. As such, the Indiana Department of Education created and published the Indiana Assessments Policy Manual. As a part of the assessment security, any individual who administers, handles, or has access to secure test materials at the school or school corporation shall complete assessment training and sign a testing security and integrity statement that remains on file in the appropriate building-level office each year. Each individual required to sign the testing integrity agreement shall sign the form by an established date. The School Corporation had a process to provide assessment system security training and to ensure each employee that attended training signed the agreement indicating training was received. However, there was no process in place to ensure that all school employees required to be trained were trained. Due to the lack of internal controls over the identification of employees requiring training, some employees that should have been trained were not. A sample of 40 employees was selected for testing from the School Corporation's roster. Of the 40 employees tested, 10 did not have a signed agreement on file indicating training was received as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." INDIANA STATE BOARD OF ACCOUNTS 20 CROWN POINT COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 511 IAC 5-5-5(b) states: "Any individual who administers, handles, or has access to secure test materials at the school or school corporation shall complete assessment training and sign a testing security and integrity agreement to remain on file in the appropriate building-level office each year." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, not all required employees were trained on Assessment System Security. Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure that all required employees complete assessment security training and sign the appropriate forms. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject: Title I Grants to Local Educational Agencies - Special Tests and Provisions - Assessment System Security Federal Agency: Department of Education Federal Program: Title I Grants to Local Educational Agencies Assistance Listings Number: 84.010 Federal Award Numbers and Years (or Other Identifying Numbers): S010A190014, S010A200014, S010A210014, S010A220014 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Assessment System Security Audit Findings: Material Weakness, Other Matters Condition and Context State educational agencies (SEA), in consultation with local educational agencies (LEA), are required to establish and maintain an assessment security system that is valid, reliable, and consistent with relevant professional and technical standards. Within their assessment system, SEAs must have policies and procedures to maintain test security measures and ensure that LEAs implement those policies and procedures. As such, the Indiana Department of Education created and published the Indiana Assessments Policy Manual. As a part of the assessment security, any individual who administers, handles, or has access to secure test materials at the school or school corporation shall complete assessment training and sign a testing security and integrity statement that remains on file in the appropriate building-level office each year. Each individual required to sign the testing integrity agreement shall sign the form by an established date. The School Corporation had a process to provide assessment system security training and to ensure each employee that attended training signed the agreement indicating training was received. However, there was no process in place to ensure that all school employees required to be trained were trained. Due to the lack of internal controls over the identification of employees requiring training, some employees that should have been trained were not. A sample of 40 employees was selected for testing from the School Corporation's roster. Of the 40 employees tested, 10 did not have a signed agreement on file indicating training was received as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." INDIANA STATE BOARD OF ACCOUNTS 20 CROWN POINT COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 511 IAC 5-5-5(b) states: "Any individual who administers, handles, or has access to secure test materials at the school or school corporation shall complete assessment training and sign a testing security and integrity agreement to remain on file in the appropriate building-level office each year." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, not all required employees were trained on Assessment System Security. Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure that all required employees complete assessment security training and sign the appropriate forms. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425D Federal Award Number and Year (or Other Identifying Number): S425D210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion INDIANA STATE BOARD OF ACCOUNTS 21 CROWN POINT COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Condition and Context Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had not designed, nor implemented a system of internal controls to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. One construction contract, totaling $35,000, was paid from the COVID-19 - Education Stabilization Fund grant funds during the audit period. The single contract was tested. The contract did not contain the required prevailing wage rate clause. In addition, certified payrolls were not obtained by the School Corporation for weeks in which work was completed at the time the week was completed. However, certified payrolls were later obtained by the School Corporation due to an ESSER Construction Monitoring Report issued in late 2023. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the following clauses . . . INDIANA STATE BOARD OF ACCOUNTS 22 CROWN POINT COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (i) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 23 CROWN POINT COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, construction contracts entered into did not contain the required wage rate requirements clauses nor were certified payrolls obtained by the School Corporation. Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and include the wage rate requirement clause in construction contracts. In addition, certified payrolls should be obtained as required in a timely manner. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report. INDIANA STATE BOARD OF ACCOUNTS 24
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425D Federal Award Number and Year (or Other Identifying Number): S425D210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion INDIANA STATE BOARD OF ACCOUNTS 21 CROWN POINT COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Condition and Context Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had not designed, nor implemented a system of internal controls to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. One construction contract, totaling $35,000, was paid from the COVID-19 - Education Stabilization Fund grant funds during the audit period. The single contract was tested. The contract did not contain the required prevailing wage rate clause. In addition, certified payrolls were not obtained by the School Corporation for weeks in which work was completed at the time the week was completed. However, certified payrolls were later obtained by the School Corporation due to an ESSER Construction Monitoring Report issued in late 2023. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the following clauses . . . INDIANA STATE BOARD OF ACCOUNTS 22 CROWN POINT COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (i) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 23 CROWN POINT COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, construction contracts entered into did not contain the required wage rate requirements clauses nor were certified payrolls obtained by the School Corporation. Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and include the wage rate requirement clause in construction contracts. In addition, certified payrolls should be obtained as required in a timely manner. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report. INDIANA STATE BOARD OF ACCOUNTS 24
FINDING 2023-002 Subject: Title I Grants to Local Educational Agencies - Reporting Federal Agency: Department of Education Federal Program: Title I Grants to Local Educational Agencies Assistance Listings Number: 84.010 Federal Award Numbers and Years (or Other Identifying Numbers): S010A200014, S010A210014 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness INDIANA STATE BOARD OF ACCOUNTS 18 CROWN POINT COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Condition and Context The School Corporation is required to submit final expenditure reports to the Indiana Department of Education on or before December 31, after the September 30 deadline, for encumbering prior school year funds. During the audit period, the School Corporation had final expenditure reports due for the S010A200014 and the S010A210014 grant awards. A single employee prepared and submitted the final reports without a documented review or oversight process in place to prevent, or detect and correct, errors. The lack of internal controls was isolated to the final expenditure reports for the S010A200014 and the S010A210014 grant awards. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper design or implementation of the components of a system of internal controls, including policies and procedures that provide segregation of duties and additional oversight as needed, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls over the Reporting compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-002 Subject: Title I Grants to Local Educational Agencies - Reporting Federal Agency: Department of Education Federal Program: Title I Grants to Local Educational Agencies Assistance Listings Number: 84.010 Federal Award Numbers and Years (or Other Identifying Numbers): S010A200014, S010A210014 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness INDIANA STATE BOARD OF ACCOUNTS 18 CROWN POINT COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Condition and Context The School Corporation is required to submit final expenditure reports to the Indiana Department of Education on or before December 31, after the September 30 deadline, for encumbering prior school year funds. During the audit period, the School Corporation had final expenditure reports due for the S010A200014 and the S010A210014 grant awards. A single employee prepared and submitted the final reports without a documented review or oversight process in place to prevent, or detect and correct, errors. The lack of internal controls was isolated to the final expenditure reports for the S010A200014 and the S010A210014 grant awards. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper design or implementation of the components of a system of internal controls, including policies and procedures that provide segregation of duties and additional oversight as needed, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls over the Reporting compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject: Title I Grants to Local Educational Agencies - Special Tests and Provisions - Assessment System Security Federal Agency: Department of Education Federal Program: Title I Grants to Local Educational Agencies Assistance Listings Number: 84.010 Federal Award Numbers and Years (or Other Identifying Numbers): S010A190014, S010A200014, S010A210014, S010A220014 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Assessment System Security Audit Findings: Material Weakness, Other Matters Condition and Context State educational agencies (SEA), in consultation with local educational agencies (LEA), are required to establish and maintain an assessment security system that is valid, reliable, and consistent with relevant professional and technical standards. Within their assessment system, SEAs must have policies and procedures to maintain test security measures and ensure that LEAs implement those policies and procedures. As such, the Indiana Department of Education created and published the Indiana Assessments Policy Manual. As a part of the assessment security, any individual who administers, handles, or has access to secure test materials at the school or school corporation shall complete assessment training and sign a testing security and integrity statement that remains on file in the appropriate building-level office each year. Each individual required to sign the testing integrity agreement shall sign the form by an established date. The School Corporation had a process to provide assessment system security training and to ensure each employee that attended training signed the agreement indicating training was received. However, there was no process in place to ensure that all school employees required to be trained were trained. Due to the lack of internal controls over the identification of employees requiring training, some employees that should have been trained were not. A sample of 40 employees was selected for testing from the School Corporation's roster. Of the 40 employees tested, 10 did not have a signed agreement on file indicating training was received as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." INDIANA STATE BOARD OF ACCOUNTS 20 CROWN POINT COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 511 IAC 5-5-5(b) states: "Any individual who administers, handles, or has access to secure test materials at the school or school corporation shall complete assessment training and sign a testing security and integrity agreement to remain on file in the appropriate building-level office each year." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, not all required employees were trained on Assessment System Security. Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure that all required employees complete assessment security training and sign the appropriate forms. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject: Title I Grants to Local Educational Agencies - Special Tests and Provisions - Assessment System Security Federal Agency: Department of Education Federal Program: Title I Grants to Local Educational Agencies Assistance Listings Number: 84.010 Federal Award Numbers and Years (or Other Identifying Numbers): S010A190014, S010A200014, S010A210014, S010A220014 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Assessment System Security Audit Findings: Material Weakness, Other Matters Condition and Context State educational agencies (SEA), in consultation with local educational agencies (LEA), are required to establish and maintain an assessment security system that is valid, reliable, and consistent with relevant professional and technical standards. Within their assessment system, SEAs must have policies and procedures to maintain test security measures and ensure that LEAs implement those policies and procedures. As such, the Indiana Department of Education created and published the Indiana Assessments Policy Manual. As a part of the assessment security, any individual who administers, handles, or has access to secure test materials at the school or school corporation shall complete assessment training and sign a testing security and integrity statement that remains on file in the appropriate building-level office each year. Each individual required to sign the testing integrity agreement shall sign the form by an established date. The School Corporation had a process to provide assessment system security training and to ensure each employee that attended training signed the agreement indicating training was received. However, there was no process in place to ensure that all school employees required to be trained were trained. Due to the lack of internal controls over the identification of employees requiring training, some employees that should have been trained were not. A sample of 40 employees was selected for testing from the School Corporation's roster. Of the 40 employees tested, 10 did not have a signed agreement on file indicating training was received as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." INDIANA STATE BOARD OF ACCOUNTS 20 CROWN POINT COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 511 IAC 5-5-5(b) states: "Any individual who administers, handles, or has access to secure test materials at the school or school corporation shall complete assessment training and sign a testing security and integrity agreement to remain on file in the appropriate building-level office each year." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, not all required employees were trained on Assessment System Security. Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure that all required employees complete assessment security training and sign the appropriate forms. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425D Federal Award Number and Year (or Other Identifying Number): S425D210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion INDIANA STATE BOARD OF ACCOUNTS 21 CROWN POINT COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Condition and Context Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had not designed, nor implemented a system of internal controls to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. One construction contract, totaling $35,000, was paid from the COVID-19 - Education Stabilization Fund grant funds during the audit period. The single contract was tested. The contract did not contain the required prevailing wage rate clause. In addition, certified payrolls were not obtained by the School Corporation for weeks in which work was completed at the time the week was completed. However, certified payrolls were later obtained by the School Corporation due to an ESSER Construction Monitoring Report issued in late 2023. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the following clauses . . . INDIANA STATE BOARD OF ACCOUNTS 22 CROWN POINT COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (i) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 23 CROWN POINT COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, construction contracts entered into did not contain the required wage rate requirements clauses nor were certified payrolls obtained by the School Corporation. Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and include the wage rate requirement clause in construction contracts. In addition, certified payrolls should be obtained as required in a timely manner. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report. INDIANA STATE BOARD OF ACCOUNTS 24
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425D Federal Award Number and Year (or Other Identifying Number): S425D210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion INDIANA STATE BOARD OF ACCOUNTS 21 CROWN POINT COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Condition and Context Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had not designed, nor implemented a system of internal controls to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. One construction contract, totaling $35,000, was paid from the COVID-19 - Education Stabilization Fund grant funds during the audit period. The single contract was tested. The contract did not contain the required prevailing wage rate clause. In addition, certified payrolls were not obtained by the School Corporation for weeks in which work was completed at the time the week was completed. However, certified payrolls were later obtained by the School Corporation due to an ESSER Construction Monitoring Report issued in late 2023. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the following clauses . . . INDIANA STATE BOARD OF ACCOUNTS 22 CROWN POINT COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (i) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 23 CROWN POINT COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, construction contracts entered into did not contain the required wage rate requirements clauses nor were certified payrolls obtained by the School Corporation. Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and include the wage rate requirement clause in construction contracts. In addition, certified payrolls should be obtained as required in a timely manner. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report. INDIANA STATE BOARD OF ACCOUNTS 24