Audit 293984

FY End
2023-06-30
Total Expended
$30.61M
Findings
20
Programs
33
Year: 2023 Accepted: 2024-03-07

Organization Exclusion Status:

Checking exclusion status...

Findings

ID Ref Severity Repeat Requirement
374372 2023-002 Material Weakness Yes G
374373 2023-002 Material Weakness Yes G
374374 2023-003 Material Weakness - N
374375 2023-004 Material Weakness - F
374376 2023-003 Material Weakness - N
374377 2023-004 Material Weakness - F
374378 2023-003 Material Weakness - N
374379 2023-004 Material Weakness - F
374380 2023-003 Material Weakness - N
374381 2023-004 Material Weakness - F
950814 2023-002 Material Weakness Yes G
950815 2023-002 Material Weakness Yes G
950816 2023-003 Material Weakness - N
950817 2023-004 Material Weakness - F
950818 2023-003 Material Weakness - N
950819 2023-004 Material Weakness - F
950820 2023-003 Material Weakness - N
950821 2023-004 Material Weakness - F
950822 2023-003 Material Weakness - N
950823 2023-004 Material Weakness - F

Programs

ALN Program Spent Major Findings
84.425 Education Stabilization Fund 2023 $4.08M Yes 2
10.555 National School Lunch Program 2023 $3.43M - 0
84.010 Title I Grants to Local Educational Agencies 2022 $1.99M - 0
84.010 Title I Grants to Local Educational Agencies 2023 $1.73M - 0
10.553 School Breakfast Program 2023 $1.12M - 0
10.553 School Breakfast Program 2022 $1.02M - 0
93.600 Head Start 2023 $982,949 - 0
93.600 Head Start 2022 $898,696 - 0
84.367 Improving Teacher Quality State Grants 2022 $348,272 - 0
84.367 Improving Teacher Quality State Grants 2023 $322,844 - 0
97.036 Disaster Grants - Public Assistance (presidentially Declared Disasters) 2023 $259,993 - 0
84.027 Special Education_grants to States 2023 $188,935 Yes 0
84.048 Career and Technical Education -- Basic Grants to States 2022 $176,811 - 0
84.424 Student Support and Academic Enrichment Program 2022 $164,047 - 0
84.048 Career and Technical Education -- Basic Grants to States 2023 $157,106 - 0
84.027 Special Education_grants to States 2022 $141,673 Yes 0
10.559 Summer Food Service Program for Children 2023 $122,031 - 0
84.425 Education Stabilization Fund 2022 $115,731 Yes 2
84.424 Student Support and Academic Enrichment Program 2023 $113,421 - 0
93.778 Medical Assistance Program 2022 $112,195 - 0
93.778 Medical Assistance Program 2023 $95,885 - 0
10.555 National School Lunch Program 2022 $91,549 - 0
97.036 Disaster Grants - Public Assistance (presidentially Declared Disasters) 2022 $58,635 - 0
84.365 English Language Acquisition State Grants 2022 $41,001 - 0
10.559 Summer Food Service Program for Children 2022 $34,652 - 0
10.579 Child Nutrition Discretionary Grants Limited Availability 2023 $28,309 - 0
84.365 English Language Acquisition State Grants 2023 $18,045 - 0
84.173 Special Education_preschool Grants 2023 $17,825 Yes 0
84.173 Special Education_preschool Grants 2022 $10,253 Yes 0
10.558 Child and Adult Care Food Program 2023 $9,960 - 0
10.558 Child and Adult Care Food Program 2022 $9,074 - 0
10.649 Pandemic Ebt Administrative Costs 2023 $3,135 - 0
10.649 Pandemic Ebt Administrative Costs 2022 $3,063 - 0

Contacts

Name Title Type
W5K8MYC8RJD9 Meghan Damron Auditee
2196505300 Beth Kelley, Cpa, Cfe Auditor
No contacts on file

Notes to SEFA

Title: Note 3. Special Education Cooperative Accounting Policies: Note 1. Summary of Significant Accounting Policies A. Basis of Presentation The accompanying Schedule of Expenditures of Federal Awards (SEFA) includes the federal grant activity of the School Corporation under programs of the federal government for the years ended June 30, 2022 and 2023. The information in the SEFA is presented in accordance with the requirements of Title 2 U.S. Code of Federal Regulations Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (Uniform Guidance). Because the SEFA presents only a select portion of the operations of the School Corporation, it is not intended to and does not present the financial position of the School Corporation. The Uniform Guidance requires an annual audit of nonfederal entities expending a total amount of federal awards equal to or in excess of $750,000 in any fiscal year unless by constitution or statute a less frequent audit is required. In accordance with Indiana Code (IC 5-11-1-25), audits of school corporations shall be conducted biennially. Such audits shall include both years within the biennial period. B. Other Significant Accounting Policies Expenditures reported on the SEFA are reported on the cash basis of accounting. Such expenditures are recognized following, as applicable, either the cost principles in OMB Circular A-87, Cost Principles for State, Local, and Indian Tribal Governments, or the cost principles contained in the Uniform Guidance, wherein certain types of expenditures are not allowed or are limited as to reimbursement. When federal grants are received on a reimbursement basis, the federal awards are considered expended when the reimbursement is received. De Minimis Rate Used: N Rate Explanation: Note 2. Indirect Cost Rate The School Corporation has elected not to use the 10 percent de minimis indirect cost rate allowed under the Uniform Guidance. Note 3. Special Education Cooperative The School Corporation is a member of a special education cooperative (Cooperative). As a result, some of the activity for the Special Education Cluster (IDEA) that is presented on the SEFA is not presented as receipts and disbursements in the financial statement for the School Corporation. This activity is presented in the financial statement of the Cooperative's fiscal agent.

Finding Details

FINDING 2023-002 Subject: Special Education Cluster - Earmarking Federal Agency: Department of Education Federal Program: Special Education Grants to States, Special Education Preschool Grants Assistance Listings Numbers: 84.027, 84.173 Federal Award Numbers and Years: 20611-043-PN01, 21611-043-PN01, 21619-43-PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirements: Matching, Level of Effort, Earmarking Audit Findings: Material Weakness, Modified Opinion Repeat Finding This is a repeat finding from the prior audit report. The prior audit finding number was 2021-001. Condition and Context The School Corporation is a member of the Northwest Indiana Special Education Cooperative (Cooperative). During fiscal year 2021-2022, the Cooperative operated the special education programs and spent the federal money on behalf of all its members. As the grant agreements were between the Indiana Department of Education (IDOE) and each member school, the School Corporation was responsible for ensuring and providing oversight of the Cooperative. However, there was inadequate oversight performed by the School Corporation in order to ensure compliance with the Matching, Level of Effort, Earmarking compliance requirement. The School Corporation did not have internal controls in place to ensure that the Cooperative complied with the earmarking requirements. The Cooperative did not have adequate procedures in place to ensure that the required level of expenditures for non-public school students with disabilities was met for each member school. The Cooperative did not have effective internal controls to ensure non-public school expenditures were appropriately identified and reported. The Non-Public Proportionate Share expenditures for the 20611-043-PN01, 21611-043-PN01, and 21619-43-PN01 grant awards could not be verified for the individual member schools. The non-public school share funds for all member schools were comingled and the aggregate amount of expenditures was then allocated to the member schools on a percentage basis. These allocations were the amounts reported to the IDOE. As such, we were unable to identify which expenditures were for each school in order to verify the minimum amount per the grant award was expended and properly reported to the IDOE as required. The lack of internal controls and noncompliance were isolated to the 20611-043-PN01, 21611-043-PN01, and 21619-43-PN01 grant awards. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: . . . (g) Be adequately documented. . . ." 2 CFR 200.208(b) states in part: "The Federal awarding agency or pass-through entity may adjust specific Federal award conditions as needed . . ." 511 IAC 7-34-7(b) states: "The public agency, in providing special education and related services to students in nonpublic schools must expend at least an amount that is the same proportion of the public agency total subgrant under 20 U.S.C. 1411(f) as the number of nonpublic school students with disabilities, who are enrolled by their parents in nonpublic schools within its boundaries, is to the total number of students with disabilities of the same age range." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal control, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, it could not be determined if the School Corporation expended their required non-public proportionate share. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure that the required non-public proportionate share amounts are spent as required. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-002 Subject: Special Education Cluster - Earmarking Federal Agency: Department of Education Federal Program: Special Education Grants to States, Special Education Preschool Grants Assistance Listings Numbers: 84.027, 84.173 Federal Award Numbers and Years: 20611-043-PN01, 21611-043-PN01, 21619-43-PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirements: Matching, Level of Effort, Earmarking Audit Findings: Material Weakness, Modified Opinion Repeat Finding This is a repeat finding from the prior audit report. The prior audit finding number was 2021-001. Condition and Context The School Corporation is a member of the Northwest Indiana Special Education Cooperative (Cooperative). During fiscal year 2021-2022, the Cooperative operated the special education programs and spent the federal money on behalf of all its members. As the grant agreements were between the Indiana Department of Education (IDOE) and each member school, the School Corporation was responsible for ensuring and providing oversight of the Cooperative. However, there was inadequate oversight performed by the School Corporation in order to ensure compliance with the Matching, Level of Effort, Earmarking compliance requirement. The School Corporation did not have internal controls in place to ensure that the Cooperative complied with the earmarking requirements. The Cooperative did not have adequate procedures in place to ensure that the required level of expenditures for non-public school students with disabilities was met for each member school. The Cooperative did not have effective internal controls to ensure non-public school expenditures were appropriately identified and reported. The Non-Public Proportionate Share expenditures for the 20611-043-PN01, 21611-043-PN01, and 21619-43-PN01 grant awards could not be verified for the individual member schools. The non-public school share funds for all member schools were comingled and the aggregate amount of expenditures was then allocated to the member schools on a percentage basis. These allocations were the amounts reported to the IDOE. As such, we were unable to identify which expenditures were for each school in order to verify the minimum amount per the grant award was expended and properly reported to the IDOE as required. The lack of internal controls and noncompliance were isolated to the 20611-043-PN01, 21611-043-PN01, and 21619-43-PN01 grant awards. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: . . . (g) Be adequately documented. . . ." 2 CFR 200.208(b) states in part: "The Federal awarding agency or pass-through entity may adjust specific Federal award conditions as needed . . ." 511 IAC 7-34-7(b) states: "The public agency, in providing special education and related services to students in nonpublic schools must expend at least an amount that is the same proportion of the public agency total subgrant under 20 U.S.C. 1411(f) as the number of nonpublic school students with disabilities, who are enrolled by their parents in nonpublic schools within its boundaries, is to the total number of students with disabilities of the same age range." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal control, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, it could not be determined if the School Corporation expended their required non-public proportionate share. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure that the required non-public proportionate share amounts are spent as required. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had not designed, nor implemented a system of internal controls to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. Two construction contracts, totaling $1,543,551 were paid from the COVID-19 - Education Stabilization Fund grant funds during the audit period. Both contracts were tested; however, neither contract contained the required prevailing wage rate clause. Certified payrolls were submitted by the contractor for one of the contracts after the construction was completed for the contract which totaled $1,424,051; however, certified payrolls could not be obtained for the contract which totaled $119,500. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (ii) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, construction contracts entered into did not contain the required wage rate requirements clauses nor were certified payrolls timely obtained by the School Corporation. Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and include the wage rate requirement clause in construction contracts. In addition, certified payrolls should be obtained as required. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation paid $1,467,550 from the COVID-19 - Education Stabilization Fund program for two improvement projects which exceeded the School Corporation's capitalization threshold. The improvements were not added to the School Corporation's capital asset listing. Additionally, the School Corporation completed a capital asset inventory as required; however, because material improvements were not included in the capital asset listing, it was determined that the School Corporation did not reconcile differences in the property records as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, improvements purchased were not properly added to the capital asset listing. In addition, a reconcilement between the inventory records and the property records were not completed. Noncompliance with the grant agreement and the compliance requirement could result in the loss of federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records include all assets. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had not designed, nor implemented a system of internal controls to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. Two construction contracts, totaling $1,543,551 were paid from the COVID-19 - Education Stabilization Fund grant funds during the audit period. Both contracts were tested; however, neither contract contained the required prevailing wage rate clause. Certified payrolls were submitted by the contractor for one of the contracts after the construction was completed for the contract which totaled $1,424,051; however, certified payrolls could not be obtained for the contract which totaled $119,500. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (ii) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, construction contracts entered into did not contain the required wage rate requirements clauses nor were certified payrolls timely obtained by the School Corporation. Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and include the wage rate requirement clause in construction contracts. In addition, certified payrolls should be obtained as required. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation paid $1,467,550 from the COVID-19 - Education Stabilization Fund program for two improvement projects which exceeded the School Corporation's capitalization threshold. The improvements were not added to the School Corporation's capital asset listing. Additionally, the School Corporation completed a capital asset inventory as required; however, because material improvements were not included in the capital asset listing, it was determined that the School Corporation did not reconcile differences in the property records as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, improvements purchased were not properly added to the capital asset listing. In addition, a reconcilement between the inventory records and the property records were not completed. Noncompliance with the grant agreement and the compliance requirement could result in the loss of federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records include all assets. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had not designed, nor implemented a system of internal controls to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. Two construction contracts, totaling $1,543,551 were paid from the COVID-19 - Education Stabilization Fund grant funds during the audit period. Both contracts were tested; however, neither contract contained the required prevailing wage rate clause. Certified payrolls were submitted by the contractor for one of the contracts after the construction was completed for the contract which totaled $1,424,051; however, certified payrolls could not be obtained for the contract which totaled $119,500. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (ii) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, construction contracts entered into did not contain the required wage rate requirements clauses nor were certified payrolls timely obtained by the School Corporation. Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and include the wage rate requirement clause in construction contracts. In addition, certified payrolls should be obtained as required. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation paid $1,467,550 from the COVID-19 - Education Stabilization Fund program for two improvement projects which exceeded the School Corporation's capitalization threshold. The improvements were not added to the School Corporation's capital asset listing. Additionally, the School Corporation completed a capital asset inventory as required; however, because material improvements were not included in the capital asset listing, it was determined that the School Corporation did not reconcile differences in the property records as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, improvements purchased were not properly added to the capital asset listing. In addition, a reconcilement between the inventory records and the property records were not completed. Noncompliance with the grant agreement and the compliance requirement could result in the loss of federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records include all assets. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had not designed, nor implemented a system of internal controls to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. Two construction contracts, totaling $1,543,551 were paid from the COVID-19 - Education Stabilization Fund grant funds during the audit period. Both contracts were tested; however, neither contract contained the required prevailing wage rate clause. Certified payrolls were submitted by the contractor for one of the contracts after the construction was completed for the contract which totaled $1,424,051; however, certified payrolls could not be obtained for the contract which totaled $119,500. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (ii) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, construction contracts entered into did not contain the required wage rate requirements clauses nor were certified payrolls timely obtained by the School Corporation. Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and include the wage rate requirement clause in construction contracts. In addition, certified payrolls should be obtained as required. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation paid $1,467,550 from the COVID-19 - Education Stabilization Fund program for two improvement projects which exceeded the School Corporation's capitalization threshold. The improvements were not added to the School Corporation's capital asset listing. Additionally, the School Corporation completed a capital asset inventory as required; however, because material improvements were not included in the capital asset listing, it was determined that the School Corporation did not reconcile differences in the property records as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, improvements purchased were not properly added to the capital asset listing. In addition, a reconcilement between the inventory records and the property records were not completed. Noncompliance with the grant agreement and the compliance requirement could result in the loss of federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records include all assets. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-002 Subject: Special Education Cluster - Earmarking Federal Agency: Department of Education Federal Program: Special Education Grants to States, Special Education Preschool Grants Assistance Listings Numbers: 84.027, 84.173 Federal Award Numbers and Years: 20611-043-PN01, 21611-043-PN01, 21619-43-PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirements: Matching, Level of Effort, Earmarking Audit Findings: Material Weakness, Modified Opinion Repeat Finding This is a repeat finding from the prior audit report. The prior audit finding number was 2021-001. Condition and Context The School Corporation is a member of the Northwest Indiana Special Education Cooperative (Cooperative). During fiscal year 2021-2022, the Cooperative operated the special education programs and spent the federal money on behalf of all its members. As the grant agreements were between the Indiana Department of Education (IDOE) and each member school, the School Corporation was responsible for ensuring and providing oversight of the Cooperative. However, there was inadequate oversight performed by the School Corporation in order to ensure compliance with the Matching, Level of Effort, Earmarking compliance requirement. The School Corporation did not have internal controls in place to ensure that the Cooperative complied with the earmarking requirements. The Cooperative did not have adequate procedures in place to ensure that the required level of expenditures for non-public school students with disabilities was met for each member school. The Cooperative did not have effective internal controls to ensure non-public school expenditures were appropriately identified and reported. The Non-Public Proportionate Share expenditures for the 20611-043-PN01, 21611-043-PN01, and 21619-43-PN01 grant awards could not be verified for the individual member schools. The non-public school share funds for all member schools were comingled and the aggregate amount of expenditures was then allocated to the member schools on a percentage basis. These allocations were the amounts reported to the IDOE. As such, we were unable to identify which expenditures were for each school in order to verify the minimum amount per the grant award was expended and properly reported to the IDOE as required. The lack of internal controls and noncompliance were isolated to the 20611-043-PN01, 21611-043-PN01, and 21619-43-PN01 grant awards. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: . . . (g) Be adequately documented. . . ." 2 CFR 200.208(b) states in part: "The Federal awarding agency or pass-through entity may adjust specific Federal award conditions as needed . . ." 511 IAC 7-34-7(b) states: "The public agency, in providing special education and related services to students in nonpublic schools must expend at least an amount that is the same proportion of the public agency total subgrant under 20 U.S.C. 1411(f) as the number of nonpublic school students with disabilities, who are enrolled by their parents in nonpublic schools within its boundaries, is to the total number of students with disabilities of the same age range." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal control, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, it could not be determined if the School Corporation expended their required non-public proportionate share. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure that the required non-public proportionate share amounts are spent as required. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-002 Subject: Special Education Cluster - Earmarking Federal Agency: Department of Education Federal Program: Special Education Grants to States, Special Education Preschool Grants Assistance Listings Numbers: 84.027, 84.173 Federal Award Numbers and Years: 20611-043-PN01, 21611-043-PN01, 21619-43-PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirements: Matching, Level of Effort, Earmarking Audit Findings: Material Weakness, Modified Opinion Repeat Finding This is a repeat finding from the prior audit report. The prior audit finding number was 2021-001. Condition and Context The School Corporation is a member of the Northwest Indiana Special Education Cooperative (Cooperative). During fiscal year 2021-2022, the Cooperative operated the special education programs and spent the federal money on behalf of all its members. As the grant agreements were between the Indiana Department of Education (IDOE) and each member school, the School Corporation was responsible for ensuring and providing oversight of the Cooperative. However, there was inadequate oversight performed by the School Corporation in order to ensure compliance with the Matching, Level of Effort, Earmarking compliance requirement. The School Corporation did not have internal controls in place to ensure that the Cooperative complied with the earmarking requirements. The Cooperative did not have adequate procedures in place to ensure that the required level of expenditures for non-public school students with disabilities was met for each member school. The Cooperative did not have effective internal controls to ensure non-public school expenditures were appropriately identified and reported. The Non-Public Proportionate Share expenditures for the 20611-043-PN01, 21611-043-PN01, and 21619-43-PN01 grant awards could not be verified for the individual member schools. The non-public school share funds for all member schools were comingled and the aggregate amount of expenditures was then allocated to the member schools on a percentage basis. These allocations were the amounts reported to the IDOE. As such, we were unable to identify which expenditures were for each school in order to verify the minimum amount per the grant award was expended and properly reported to the IDOE as required. The lack of internal controls and noncompliance were isolated to the 20611-043-PN01, 21611-043-PN01, and 21619-43-PN01 grant awards. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: . . . (g) Be adequately documented. . . ." 2 CFR 200.208(b) states in part: "The Federal awarding agency or pass-through entity may adjust specific Federal award conditions as needed . . ." 511 IAC 7-34-7(b) states: "The public agency, in providing special education and related services to students in nonpublic schools must expend at least an amount that is the same proportion of the public agency total subgrant under 20 U.S.C. 1411(f) as the number of nonpublic school students with disabilities, who are enrolled by their parents in nonpublic schools within its boundaries, is to the total number of students with disabilities of the same age range." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal control, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, it could not be determined if the School Corporation expended their required non-public proportionate share. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure that the required non-public proportionate share amounts are spent as required. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had not designed, nor implemented a system of internal controls to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. Two construction contracts, totaling $1,543,551 were paid from the COVID-19 - Education Stabilization Fund grant funds during the audit period. Both contracts were tested; however, neither contract contained the required prevailing wage rate clause. Certified payrolls were submitted by the contractor for one of the contracts after the construction was completed for the contract which totaled $1,424,051; however, certified payrolls could not be obtained for the contract which totaled $119,500. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (ii) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, construction contracts entered into did not contain the required wage rate requirements clauses nor were certified payrolls timely obtained by the School Corporation. Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and include the wage rate requirement clause in construction contracts. In addition, certified payrolls should be obtained as required. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation paid $1,467,550 from the COVID-19 - Education Stabilization Fund program for two improvement projects which exceeded the School Corporation's capitalization threshold. The improvements were not added to the School Corporation's capital asset listing. Additionally, the School Corporation completed a capital asset inventory as required; however, because material improvements were not included in the capital asset listing, it was determined that the School Corporation did not reconcile differences in the property records as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, improvements purchased were not properly added to the capital asset listing. In addition, a reconcilement between the inventory records and the property records were not completed. Noncompliance with the grant agreement and the compliance requirement could result in the loss of federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records include all assets. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had not designed, nor implemented a system of internal controls to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. Two construction contracts, totaling $1,543,551 were paid from the COVID-19 - Education Stabilization Fund grant funds during the audit period. Both contracts were tested; however, neither contract contained the required prevailing wage rate clause. Certified payrolls were submitted by the contractor for one of the contracts after the construction was completed for the contract which totaled $1,424,051; however, certified payrolls could not be obtained for the contract which totaled $119,500. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (ii) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, construction contracts entered into did not contain the required wage rate requirements clauses nor were certified payrolls timely obtained by the School Corporation. Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and include the wage rate requirement clause in construction contracts. In addition, certified payrolls should be obtained as required. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation paid $1,467,550 from the COVID-19 - Education Stabilization Fund program for two improvement projects which exceeded the School Corporation's capitalization threshold. The improvements were not added to the School Corporation's capital asset listing. Additionally, the School Corporation completed a capital asset inventory as required; however, because material improvements were not included in the capital asset listing, it was determined that the School Corporation did not reconcile differences in the property records as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, improvements purchased were not properly added to the capital asset listing. In addition, a reconcilement between the inventory records and the property records were not completed. Noncompliance with the grant agreement and the compliance requirement could result in the loss of federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records include all assets. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had not designed, nor implemented a system of internal controls to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. Two construction contracts, totaling $1,543,551 were paid from the COVID-19 - Education Stabilization Fund grant funds during the audit period. Both contracts were tested; however, neither contract contained the required prevailing wage rate clause. Certified payrolls were submitted by the contractor for one of the contracts after the construction was completed for the contract which totaled $1,424,051; however, certified payrolls could not be obtained for the contract which totaled $119,500. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (ii) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, construction contracts entered into did not contain the required wage rate requirements clauses nor were certified payrolls timely obtained by the School Corporation. Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and include the wage rate requirement clause in construction contracts. In addition, certified payrolls should be obtained as required. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation paid $1,467,550 from the COVID-19 - Education Stabilization Fund program for two improvement projects which exceeded the School Corporation's capitalization threshold. The improvements were not added to the School Corporation's capital asset listing. Additionally, the School Corporation completed a capital asset inventory as required; however, because material improvements were not included in the capital asset listing, it was determined that the School Corporation did not reconcile differences in the property records as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, improvements purchased were not properly added to the capital asset listing. In addition, a reconcilement between the inventory records and the property records were not completed. Noncompliance with the grant agreement and the compliance requirement could result in the loss of federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records include all assets. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had not designed, nor implemented a system of internal controls to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. Two construction contracts, totaling $1,543,551 were paid from the COVID-19 - Education Stabilization Fund grant funds during the audit period. Both contracts were tested; however, neither contract contained the required prevailing wage rate clause. Certified payrolls were submitted by the contractor for one of the contracts after the construction was completed for the contract which totaled $1,424,051; however, certified payrolls could not be obtained for the contract which totaled $119,500. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (ii) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, construction contracts entered into did not contain the required wage rate requirements clauses nor were certified payrolls timely obtained by the School Corporation. Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and include the wage rate requirement clause in construction contracts. In addition, certified payrolls should be obtained as required. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation paid $1,467,550 from the COVID-19 - Education Stabilization Fund program for two improvement projects which exceeded the School Corporation's capitalization threshold. The improvements were not added to the School Corporation's capital asset listing. Additionally, the School Corporation completed a capital asset inventory as required; however, because material improvements were not included in the capital asset listing, it was determined that the School Corporation did not reconcile differences in the property records as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, improvements purchased were not properly added to the capital asset listing. In addition, a reconcilement between the inventory records and the property records were not completed. Noncompliance with the grant agreement and the compliance requirement could result in the loss of federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records include all assets. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.