Finding 583337 (2023-001)

Material Weakness
Requirement
N
Questioned Costs
$1
Year
2023
Accepted
2023-12-29
Audit: 8875
Organization: Gainesville Housing Authority (FL)

AI Summary

  • Core Issue: The Housing Authority failed to conduct timely inspections and properly manage Housing Quality Standards (HQS) compliance, leading to material weaknesses in internal controls.
  • Impacted Requirements: The Authority did not meet the 30-day correction period for HQS deficiencies and failed to abate Housing Assistance Payments (HAP) after second failed inspections.
  • Recommended Follow-Up: Assign a dedicated individual to oversee the inspection process and ensure HAP payments are only made for units that pass HQS inspections.

Finding Text

Federal Agency: Housing and Urban Development Federal Program Title: Housing Choice Voucher Cluster Assistance Listing Number: 14.871 and 14.879 Federal Award Identification Number and Year: FL063, 2023 Award Period: April 1, 2022 to March 31, 2023 Type of Finding: Material Weakness in Internal Control over Compliance, Material Noncompliance (Modified Opinion) Criteria or specific requirement: For units under HAP contract that fail to meet HQS, the PHA must require the owner to correct any life threatening HQS deficiencies within 24 hours after the inspections and all other HQS deficiencies within 30 calendar days or within a specified PHA-approved extension. If the owner does not correct the cited HQS deficiencies within the specified correction period, the PHA must abate HAP payments beginning no later than the first of the month following the specified correction period or must terminate the HAP contract. The owner is not responsible for a breach of HQS as a result of the family’s failure to pay for utilities for which the family is responsible under the lease or for tenant damage. For family-caused defects, if the family does not correct the cited HQS deficiencies within the specified correction period, the PHA must take prompt and vigorous action to enforce the family obligations (24 CFR sections 982.158(d) and 982.404). In addition, all HCV units are required to be inspected annually. The PHA must inspect the unit leased to a family at least annually to determine if the unit meets Housing Quality Standards (HQS) and the PHA must conduct quality control re-inspections. The PHA must prepare a unit inspection report (24 CFR sections 982.158(d) and 982.405(b)). Condition: During the testing of the Housing Choice Voucher Program tenant files, certain special provision compliance deficiencies were noted as summarized below: Failed HQS Inspections Number of Instances Finding 5 The second inspection was not performed in a timely manner and didn’t follow the correction period of 30 days (range 32-78 days) 4 The Authority did not properly abate HAP after the second failed inspection Annual HQS Inspections Number of Instances Finding 5 The annual inspection was performed late. Questioned Costs: $890 Context: Of the 50 tenant files tested, 13 tenant files contained the errors as noted above. Cause: The Authority failed to provide adequate monitoring and oversight to ensure compliance with HUD rules and regulations, as well as their administrative policy. Effect: The Authority does not have adequate procedures in place to ensure units are re-inspected timely and to ensure that units with housing quality standard deficiencies are not paid housing assistance payments. Repeat Finding: No Recommendation: We recommend management should designate one person to oversee the inspection process to ensure that all inspections are being performed in a timely manner. Furthermore, management should ensure no HAP payments are issued for units that have not passed HQS housing inspections. Views of responsible officials: There is no disagreement.

Categories

Questioned Costs HUD Housing Programs Subrecipient Monitoring Material Weakness Internal Control / Segregation of Duties

Other Findings in this Audit

  • 6893 2023-001
    Material Weakness
  • 6894 2023-001
    Material Weakness
  • 6895 2023-001
    Material Weakness
  • 6896 2023-002
    Material Weakness
  • 6897 2023-002
    Material Weakness
  • 6898 2023-002
    Material Weakness
  • 6899 2023-003
    Material Weakness
  • 6900 2023-003
    Material Weakness
  • 6901 2023-003
    Material Weakness
  • 583335 2023-001
    Material Weakness
  • 583336 2023-001
    Material Weakness
  • 583338 2023-002
    Material Weakness
  • 583339 2023-002
    Material Weakness
  • 583340 2023-002
    Material Weakness
  • 583341 2023-003
    Material Weakness
  • 583342 2023-003
    Material Weakness
  • 583343 2023-003
    Material Weakness

Programs in Audit

ALN Program Name Expenditures
14.850 Public and Indian Housing $3.16M
14.872 Public Housing Capital Fund $779,048
14.879 Mainstream Vouchers $738,711
14.895 Jobs-Plus Pilot Initiative $350,073
14.871 Section 8 Housing Choice Vouchers $221,344