Finding 573464 (2024-001)

Material Weakness
Requirement
P
Questioned Costs
-
Year
2024
Accepted
2025-08-13

AI Summary

  • Core Issue: The Cooperative lacks a proper internal control system for preparing the schedule of federal expenditures, leading to potential inaccuracies.
  • Impacted Requirements: Compliance with financial reporting standards for the schedule of expenditures of federal awards is at risk.
  • Recommended Follow-Up: Management should enhance internal controls to ensure accurate and complete reporting of federal expenditures.

Finding Text

Department of Treasury, State of Iowa Department of Management, Federal Financial Assistance Listing 21.029, 526659 Coronavirus Capital Projects Fund Preparation of Schedule of Expenditures of Federal Awards Material Weakness in Internal Control over Compliance Criteria: Proper controls over financial reporting include a system designed to prepare the schedule of expenditures of federal awards (the schedule) and the accompanying notes to the schedule. Condition: The Cooperative does not have an internal control system designed to provide for a complete and accurate schedule of federal expenditures of federal awards being audited. As auditors, we were requested to assist with the preparation of the schedule and accompanying notes to the schedule. Cause: Auditor assistance with preparation of the schedule is not unusual as the schedule has unique and specialized requirements and preparation is only required when the Cooperative meets a specified threshold of federal expenditures. Effect: There is a reasonable possibility that the Cooperative would not be able to draft a complete and accurate schedule. Questioned Costs: None reported. Context/Sampling: Sampling was not used. Repeat Finding form Prior Year: No Recommendation: While we recognize that this condition is not unusual for an organization with limited staffing, it is important that the Cooperative is aware of this condition for financial reporting requirements relating to the Cooperative’s schedule of expenditures of federal awards and the internal controls that impact financial reporting. Views of Responsible Officials: Management agrees with the finding.

Corrective Action Plan

Federal Agency Name: Department of Treasury Pass-Through Entity: State of Iowa Department of Management Federal Financial Assistance Listing #21.029 Program Name: Coronavirus Capital Projects Fund Finding Summary: The Cooperative does not have an internal control system designed to provide for a complete and accurate schedule of federal expenditures of federal awards (the schedule) being audited. We requested our auditors to assist with the preparation of the schedule and the accompanying notes to the schedule. Corrective Action Plan: It is not cost effective to have an internal control system designed to provide for the preparation of the schedule of federal expenditures of federal awards and the accompanying notes to the schedule. We requested that our auditors, Eide Bailly, LLP, prepare the schedule and accompanying notes. We have designated a member of management to review the drafted schedule and accompanying notes to the schedule. Responsible Individuals: Jeremy Richert, CEO and Kelly Gibbs, CFO Anticipated Completion Date: Ongoing

Categories

Reporting Material Weakness

Other Findings in this Audit

  • 573465 2024-002
    Material Weakness
  • 1149906 2024-001
    Material Weakness
  • 1149907 2024-002
    Material Weakness

Programs in Audit

ALN Program Name Expenditures
21.029 Coronavirus Capital Projects Fund $1.27M