Finding 403972 (2023-005)

Material Weakness
Requirement
N
Questioned Costs
-
Year
2023
Accepted
2024-06-28

AI Summary

  • Core Issue: The Authority failed to conduct required annual housing unit inspections, risking health and safety hazards.
  • Impacted Requirements: Compliance with HUD regulations for routine self-inspections to ensure safe and habitable living conditions.
  • Recommended Follow-Up: Implement a tracking system for annual inspections and address any identified health and safety issues promptly.

Finding Text

2023-005 Authority did not perform annual housing unit inspections (Special Tests and Provisions) Criteria: HUD requires Public Housing Authorities to perform routine self-inspections of public housing properties. These self-inspections include an annual visual assessment of the property to look for all deficiencies and to determine the maintenance and modernization needs of the properties. In accordance with 24 CFR 5.703, the Authority must complete the annual inspections to ensure that all residents live in safe, habitable dwellings, the items and components located inside the building, outside the building, and within the units of HUD housing must be functionally adequate, operable, and free of health and safety hazards. Condition: The Authority did not perform the required annual inspection during its fiscal year. Questioned Costs: None. Effect: The Authority could have health and safety hazards present in its housing units that are not being adequately addressed. Cause: The Authority did not have procedures in place to track and monitor the annual inspection process. Recommendation: The Authority should establish a process whereby the inspection dates of units are monitored to ensure all units are inspected annually. The Authority should also establish procedures to ensure all health and safety hazards are addressed appropriately. Management Response: The Authority did not perform the annual inspection of units until after September 30, 2023. This issue has been corrected for the fiscal year ending September 30, 2024.

Corrective Action Plan

Finding 2023-005 Authority did not perform annual housing unit inspections The Authority has already implemented a control to ensure that this is not repeated in the future. The inspections were performed after the fiscal year end. Date of Completion: September 30, 2024

Categories

HUD Housing Programs Special Tests & Provisions

Other Findings in this Audit

  • 403969 2023-002
    Material Weakness Repeat
  • 403970 2023-003
    Material Weakness
  • 403971 2023-004
    Material Weakness Repeat
  • 980411 2023-002
    Material Weakness Repeat
  • 980412 2023-003
    Material Weakness
  • 980413 2023-004
    Material Weakness Repeat
  • 980414 2023-005
    Material Weakness

Programs in Audit

ALN Program Name Expenditures
14.850 Public and Indian Housing $749,003
14.872 Public Housing Capital Fund $533,179