Finding 384301 (2023-004)

Material Weakness
Requirement
N
Questioned Costs
$1
Year
2023
Accepted
2024-03-25

AI Summary

  • Core Issue: The Authority is not complying with Housing Quality Standards (HQS) enforcement, leading to material weaknesses in internal controls and noncompliance.
  • Impacted Requirements: Failed inspections were not followed up within required time frames, and abatements were not processed for units that failed subsequent inspections.
  • Recommended Follow-Up: The Authority should review and improve their processes for timely follow-up on failed inspections and ensure proper abatement of Housing Assistance Payments (HAP) until issues are resolved.

Finding Text

Federal Agency: U.S. Department of Housing and Urban Development Federal Program Name: Housing Choice Voucher Cluster Assistance Listing Number: 14.871/14.879/14.EHV Federal Award Identification Number and Year: VA901; 2022-2023 Award Period: July 1, 2022 through June 30, 2023 Type of Finding: Material Weakness in Internal Control over Compliance, Material Noncompliance (Modified Opinion) Criteria or specific requirement: HQS Enforcement: The PHA must inspect the unit leased to a family at least biennially to determine if the unit meets Housing Quality Standards (HQS) and the PHA must conduct quality control reinspections. The PHA must prepare a unit inspection report (24 CFR sections 982.158(d) and 982.405(b)). Per the Housing Choice Voucher Program Guidebook and the Authority's administrative plan, QC inspections must be performed on a HQS inspection that is no older than 3 months at the time of reinspection. For units under HAP contract that fail to meet HQS, the PHA must require the owner to correct any life threatening HQS deficiencies within 24 hours after the inspections and all other HQS deficiencies within 30 calendar days or within a specified PHA-approved extension. If the owner does not correct the cited HQS deficiencies within the specified correction period, the PHA must stop (abate) HAPs beginning no later than the first of the month following the specified correction period or must terminate the HAP contract. The owner is not responsible for a breach of HQS as a result of the family’s failure to pay for utilities for which the family is responsible under the lease or for tenant damage. For family-caused defects, if the family does not correct the cited HQS deficiencies within the specified correction period, the PHA must take prompt and vigorous action to enforce the family obligations (24 CFR sections 982.158(d) and 982.404). Condition/Context: During our testing of 25 files for HQS enforcement requirements, we noted the following in 6 files: - 5 of 25 files tested had a failed inspection that was not followed up on within the required time frame (either 24 hours or 30 days depending on the severity of the failures). - 6 out of 25 files tested where the Authority failed to process abatements for units that failed on the second inspection. - 5 out of 25 files tested where the Authority failed to enforce the family obligations for units that failed on the second inspection. The samples were statistically valid samples. Questioned costs: $13,701 Cause: As a balance of state PHA, the Authority is responsible for ensuring the Housing Choice Voucher (HCV) program is administered in compliance with Federal regulations across Virginia. The Authority has partnered with 29 local housing agencies (LHAs) throughout the state to administer the program. Due to the number of LHAs there are inconsistencies among agencies on quality control practices. LHA’s differ in size, staffing patterns, geographic service area, and overall capacity to operate the program. In addition to these differences, the Authority and its partner agencies are still recovering from the lingering impacts of COVID-19VHDA S. Staff turnover and retention have contributed to challenges in quality control practices. The Authority has actively worked to improve the HCV Program by taking a methodical approach, making intentional decisions about program improvements while balancing the need to make changes quickly to ensure compliance with federal regulations. Effect: The Authority is not in compliance with their Administrative Plan or HUD’s requirements over HQS enforcement. Repeat Finding: No Recommendation: We recommend the Authority review their process over HQS failed inspections to ensure they are following up timely on correction or properly abating HAP for the unit until correction. Views of responsible officials: There is no disagreement with the audit finding.

Categories

Questioned Costs HUD Housing Programs Material Weakness Internal Control / Segregation of Duties

Other Findings in this Audit

  • 384290 2023-001
    Significant Deficiency
  • 384291 2023-001
    Significant Deficiency
  • 384292 2023-001
    Significant Deficiency
  • 384293 2023-002
    Material Weakness
  • 384294 2023-002
    Material Weakness
  • 384295 2023-002
    Material Weakness
  • 384296 2023-003
    Significant Deficiency
  • 384297 2023-003
    Significant Deficiency
  • 384298 2023-003
    Significant Deficiency
  • 384299 2023-004
    Material Weakness
  • 384300 2023-004
    Material Weakness
  • 960732 2023-001
    Significant Deficiency
  • 960733 2023-001
    Significant Deficiency
  • 960734 2023-001
    Significant Deficiency
  • 960735 2023-002
    Material Weakness
  • 960736 2023-002
    Material Weakness
  • 960737 2023-002
    Material Weakness
  • 960738 2023-003
    Significant Deficiency
  • 960739 2023-003
    Significant Deficiency
  • 960740 2023-003
    Significant Deficiency
  • 960741 2023-004
    Material Weakness
  • 960742 2023-004
    Material Weakness
  • 960743 2023-004
    Material Weakness

Programs in Audit

ALN Program Name Expenditures
14.U01 Government National Mortgage Association Mortgage Backed Securities Program (note 4) $667.08M
14.117 Mortgage Insurance_homes $516.47M
21.026 Homeowner Assistance Fund $143.86M
64.114 Veterans Housing_guaranteed and Insured Loans $95.36M
14.871 Section 8 Housing Choice Vouchers $3.22M
14.879 Mainstream Vouchers $2.84M
14.169 Housing Counseling Assistance Program $1.23M
14.182 Section 8 New Construction and Substantial Rehabilitation $247,485
14.856 Lower Income Housing Assistance Program_section 8 Moderate Rehabilitation $168,745