Finding 1239658 (2025-001)

Material Weakness Repeat Finding
Requirement
L
Questioned Costs
-
Year
2025
Accepted
2026-09-30

AI Summary

  • Core Issue: Santee Cooper failed to report first-tier subawards on time, violating FFATA requirements.
  • Impacted Requirements: Reporting must occur by the end of the month following the issuance of subawards, and all subawards over $30,000 must be reported.
  • Recommended Follow-Up: Implement a formal FFATA reporting process to ensure timely submissions and maintain documentation for compliance.

Finding Text

Finding 2025-001 – Timeliness of Federal Funding Accountability and Transparency Act (FFATA) Subaward Reporting Award information Cluster: N/A Grantor: U.S. Department of Energy Award name: Preventing Outages and Enhancing the Resilience of the Electric Grid Formula Grants to States and Indian Tribes Award number: DE-GD0000041 Award year: 2025 Assistance listing number: 81.254 Assistance listing title: Grid Resilience Grant Program 40101 (d) Pass-through entity: N/A Criteria The Federal Funding Accountability and Transparency Act (FFATA), as implemented through 2 CFR Part 170 and Appendix A to Part 170, requires recipients of Federal awards to report applicable first-tier subawards. Unless an exemption applies, recipients must report each first-tier subaward that equals or exceeds $30,000 in Federal funds, including subsequent modifications that cause a subaward to meet or exceed the reporting threshold. Subaward information is required to be reported no later than the end of the month following the month in which the subaward was issued. Effective March 8, 2025, FFATA subaward reporting functionality transitioned from FSRS.gov to SAM.gov. Condition Through our testing of the Federal Funding Accountability and Transparency Act (FFATA) reporting compliance requirement, we selected 5 first-tier subawards for testing. We noted that the required subaward information for all selections had not been submitted by Sante Cooper for these selections along with other applicable subawards.. Following identification of the exception through our audit procedures, Santee Cooper submitted the required subaward information through the applicable Federal reporting system in Q3 2026. As such, the required reporting was completed subsequent to the applicable reporting deadlines and after the exceptions were identified during the audit. Cause Santee Cooper did not have an established process in place to identify and report applicable first-tier subawards under FFATA within the required reporting timeframe. As a result, the required subaward information was not timely reported through SAM.gov, and the subawards selected for testing were reported after the applicable reporting deadlines. Effect The lack of reporting of applicable first-tier subawards results in noncompliance with FFATA reporting requirements and delays the completeness and transparency of Federal spending information available to the public through USASpending.gov. Questioned costs None noted. Recommendation We recommend Santee Cooper establish and implement a formal FFATA reporting process to ensure applicable first-tier subawards are reported through SAM.gov within the required timeframe, including monitoring applicable reporting due dates and retaining documentation evidencing the completion and timeliness of the reporting. Repeat Finding from the Prior Year No Management’s views and corrective action plan Management’s view and corrective action plan are included at the end of this report after the summary schedule of prior audit findings and status.

Corrective Action Plan

2025-001 – Timeliness of Federal Funding Accountability and Transparency Act (FFATA) Subaward Reporting Award Information Cluster: N/A Federal Granting Agency: U.S. Department of Energy Award Name: Preventing Outages and Enhancing the Resilience of the Electric Grid Formula Grants to States and Indian Tribes Award Number: DE-GD0000041 Award Year: 2025 Assistance Listing #: 81.254 Assistance Listing Title: Grid Resilience Grant Program 40101 (d) Pass-through Entity: N/A Management acknowledges that its historical processes did not sufficiently identify first-tier subawards subject to Federal Funding Accountability and Transparency Act (FFATA) reporting requirements under 2 CFR Part 170, nor ensure that required subaward information was reported in the applicable federal reporting system within the required statutory timeframe. Upon identification of the issue, Management took immediate corrective action to identify all active and prior subawards under the Federal award subject to FFATA requirements. Management conducted a comprehensive retrospective review and has already completed and submitted reporting for the thirty-one identified applicable subawards through SAM.gov. To ensure ongoing and future compliance, Management has established and is implementing standard operating procedures to govern FFATA reporting. These procedures include: 1. Identification & Threshold Tracking: Establishing a systematic review mechanism at the time of subaward execution and subsequent modification to promptly identify first-tier subawards meeting or exceeding the $30,000 reporting threshold. 2. Timely Submission Workflow: Designating responsible personnel to compile, review, and report all required subaward data elements through SAM.gov no later than the end of the month following the month in which the subaward or qualifying modification was issued. 3. Documentation & Retention: Maintaining central repositories of reporting confirmation records, date stamps, and supporting documentation evidencing the completion, accuracy, and timeliness of each submission. Management will continue to apply these enhanced monitoring and reporting procedures across all current and future applicable federal awards. Leadership Responsible: Suzanne Ritter, Treasurer & Senior Director Treasury & Accounting and Interim Controller Completion Date: 9/29/2026 Leadership Signature(s) Suzanne Ritter Treasurer & Senior Director Treasury & Accounting and Interim Controller

Categories

Subrecipient Monitoring Reporting

Other Findings in this Audit

  • 1239659 2025-002
    Material Weakness Repeat

Programs in Audit

ALN Program Name Expenditures
81.254 GRID INFRASTRUCTURE DEPLOYMENT AND RESILIENCE $3.07M
97.036 DISASTER GRANTS - PUBLIC ASSISTANCE (PRESIDENTIALLY DECLARED DISASTERS) $1.04M
14.251 ECONOMIC DEVELOPMENT INITIATIVE, COMMUNITY PROJECT FUNDING, AND MISCELLANEOUS GRANTS $225,982