Finding 1238051 (2025-001)

Material Weakness Repeat Finding
Requirement
P
Questioned Costs
-
Year
2025
Accepted
2026-09-29

AI Summary

  • Core Issue: The District lacks a proper internal control system for preparing the schedule of federal expenditures, risking inaccuracies.
  • Impacted Requirements: Compliance with financial reporting standards for federal awards is not being met, which could lead to incomplete schedules.
  • Recommended Follow-up: The District should enhance its internal controls to ensure accurate financial reporting and be aware of the implications of this weakness.

Finding Text

Department of Energy and Passed through Nebraska Department of Environment and Energy Federal Financial Assistance Listing 81.254, 2025-150224869 Grid Infrastructure Deployment and Resilience Preparation of Schedule of Expenditures of Federal Awards Material Weakness in Internal Control Over Compliance Criteria: Proper controls over financial reporting include a system designed to prepare the schedule of expenditures of federal awards (the schedule) and the accompanying notes to the schedule. Condition: The District does not have an internal control system designed to provide for a complete and accurate schedule of federal expenditures of federal awards being audited. As auditors, we were requested to assist with the preparation of the schedule and accompanying notes to the schedule. Cause: Auditor assistance with preparation of the schedule is not unusual as the schedule has unique and specialized requirements and preparation is only required when the District meets a specified threshold of federal expenditures. Effect: There is a reasonable possibility that the District would not be able to draft a complete and accurate schedule. Questioned Costs: None reported. Context/Sampling: Sampling was not used. Repeat Finding from Prior Year: No Recommendation: While we recognize that this condition is not unusual for an organization with limited staffing, it is important that the District is aware of this condition for financial reporting requirements relating to the District’s schedule and the internal controls that impact financial reporting. Views of Responsible Officials: Management agrees with the finding.

Corrective Action Plan

Federal Agency Name: Department of Energy Pass-Through Entity: Nebraska Department of Environment and Energy Assistance Listing Number: 81.254 Program Name: Grid Infrastructure Deployment and Resilience Finding Summary: The District does not have an internal control system designed to provide for a complete and accurate schedule of federal expenditures of federal awards (the schedule) being audited. We requested our auditors to assist with the preparation of the schedule and the accompanying notes to the schedule. Corrective Action Plan: Due to the specialized nature of the SEFA, the District will continue to utilize qualified external assistance with its preparation. Management will maintain the underlying federal award and expenditure records and will review the completed SEFA and accompanying notes for completeness and accuracy prior to issuance. Responsible Individuals: Mandy Backer, Chief Financial Officer, and Josh Strafelda, Engineer Anticipated Completion Date: Ongoing

Categories

Reporting Material Weakness

Other Findings in this Audit

  • 1238052 2025-002
    Material Weakness Repeat

Programs in Audit

ALN Program Name Expenditures
81.254 GRID INFRASTRUCTURE DEPLOYMENT AND RESILIENCE $1.05M