Finding 1223014 (2025-002)

Material Weakness Repeat Finding
Requirement
I
Questioned Costs
-
Year
2025
Accepted
2026-07-07
Audit: 406557
Organization: City of Fort Lupton (CO)

AI Summary

  • Core Issue: The City failed to verify a vendor's suspension or debarment status before procurement, despite having policies in place.
  • Impacted Requirements: Compliance with suspension and debarment regulations for covered transactions, as outlined in 2 CFR section 180.
  • Recommended Follow-Up: Implement a tracking system to ensure all vendors are verified against the Excluded Parties List prior to contract execution.

Finding Text

Federal Program Name(s): Drinking Water State Revolving Fund and Water and Waste Disposal Systems for Rural Communities Assistance Listing Number(s): 66.468 and 10.760 Pass-Through Agency: Colorado Water Resource and Power Development Authority (66.468) Pass-Through Number(s): None Award Period: 1/1/2025 – 12/31/2025 Compliance Requirement: Suspension and Debarment Type of Finding: Significant Deficiency in Internal Control over Compliance, Other Matters Criteria or Specific Requirement: Non-federal entities are prohibited from contracting with or making subawards under covered transactions to parties that are suspended or debarred. "Covered transactions" include contracts for goods and services awarded under a non-procurement transaction (e.g., grant or cooperative agreement) that are expected to equal or exceed $25,000 or meet certain other criteria as specified in 2 CFR section 180.220. All non-procurement transactions entered into by a passthrough entity (i.e., subawards to subrecipients), irrespective of award amount, are considered covered transactions, unless they are exempt as provided in 2 CFR section 180.215. When a nonfederal entity enters into a covered transaction with an entity at a lower tier, the non-Federal entity must verify that the entity, as defined in 2 CFR section 180.995 and agency adopting regulations, is not suspended or debarred or otherwise excluded from participating in the transaction. This verification may be accomplished by (1) checking the Excluded Parties List System (EPLS) maintained available at SAM.gov, (2) collecting a certification from the entity, or (3) adding a clause or condition to the covered transaction with that entity (2 CFR section 180.300). Condition: We noted that the City does have policies and procedures in place for compliance with suspension and debarment requirements; however, we noted that the vendor selected for testing had not been checked to verify they were not suspended or debarred prior to the services provided. Questioned Costs: None. Context: The City does have a policy and procedure to check a vendor’s suspension and debarment status either by checking the active record on SAM.gov, collecting a certification from the proposed entity, and/or adding a clause or condition to the covered transaction with that entity. The City was not able to provide verification, prior to procurement, of the suspension and debarment status through review of SAM.gov, providing a certification from the vendor, or through a clause or condition within the signed contract. We did verify this vendor was not currently suspended or debarred through review of SAM.gov. Cause: The City did not maintain a system to adequately track and document vendors needing to be verified through SAM.gov. Effect: The City could make a payment to a vendor or subrecipient who is suspended and/or debarred from participating in federal programs. Repeat Finding: Yes

Corrective Action Plan

Suspension and Debarment – Assistance Listing No. 66.458 and 10.760 Recommendation: The City should update all contracts to include a suspension and debarment paragraph to verify status with every renewal, request certification from the proposed entity, or verify vendors through SAM.gov prior to utilizing vendor services. Explanation of Disagreement with Audit Finding: There is no disagreement with the audit finding. (102) Action Taken in Response to Finding: The finance director and the public works director have already implemented a process to verify the SAM status of all contractors on all projects regardless of funding. However, this did not capture contractors working on existing projects. Name of the Contact Person Responsible for Corrective Action: Leann Perino, Finance Director Planned Completion Date for Corrective Action Plan: December 31, 2026

Categories

Procurement, Suspension & Debarment Subrecipient Monitoring Matching / Level of Effort / Earmarking

Other Findings in this Audit

  • 1223013 2025-002
    Material Weakness Repeat

Programs in Audit

ALN Program Name Expenditures
10.760 WATER AND WASTE DISPOSAL SYSTEMS FOR RURAL COMMUNITIES $15.72M
66.468 DRINKING WATER STATE REVOLVING FUND $3.36M
15.437 MINERALS LEASING ACT $603,475