Finding Text
FINDING 2024-003 Subject: Highway Planning and Construction - Procurement Federal Agency: Department of Transportation Federal Program: Highway Planning and Construction Assistance Listings Number: 20.205 Federal Award Number and Year (or Other Identifying Number): DES 2300096 Pass-Through Entity: Indiana Department of Transportation Compliance Requirement: Procurement and Suspension and Debarment Audit Findings: Material Weakness, Modified Opinion Condition and Context The County had not properly designed or implemented a system of internal controls that would be effective in preventing, or detecting and correcting, noncompliance to ensure that the Local Public Agency (LPA) followed all federal requirements related to engineering and design services. In addition, the County did not have documented procurement procedures or policies used to procure engineering and design services. For consultant contracting (engineering and design related services), the LPA was to create and send a Request for Proposal (RFP) to the Indiana Department of Transportation (INDOT), who would review and advertise them. Consultants could then respond to those RFPs by completing and submitting a Letter of Interest (LOI). After all LOIs were received and ranked, the County was to report the number of LOIs received on the LPA Selection Review Checklist. The County did not maintain the LOIs as reported to the INDOT on the LPA Selection Review Checklist. As a result, the number of LOIs documented on the checklist provided to the INDOT could not be verified or audited. In addition, we were unable to ensure the minimum number of LOIs were received to meet the procurement competition standards. The lack of internal controls and noncompliance was isolated to DES 2300096. The lack of written procedures or policies was a systemic issue throughout the audit period. INDIANA STATE BOARD OF ACCOUNTS 18 CRAWFORD COUNTY SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.318 states in part: "(a) The non-Federal entity must have and use documented procurement procedures, consistent with State, local, and tribal laws and regulations and the standards of this section, for the acquisition of property or services required under a Federal award or subaward. The non-Federal entity's documented procurement procedures must conform to the procurement standards identified in §§ 200.317 through 200.327. . . . (i) The non-Federal entity must maintain records sufficient to detail the history of procurement. These records will include, but are not necessarily limited to, the following: Rationale for the method of procurement, selection of contract type, contractor selection or rejection, and the basis for the contract price. . . ." 2 CFR 200.320(b) states in part: "Formal procurement methods. When the value of the procurement for property or services under a Federal financial assistance awards exceeds the SAT, or a lower threshold established by a non-Federal entity, formal procurement methods are required. Formal procurement methods require following documented procedures. Formal procurement methods also require public advertising unless a non-competitive procurement can be used in accordance with § 200.319 or paragraph (c) of this section. The following formal methods of procurement are used for procurement of property or services above the simplified acquisition threshold or a value below the simplified acquisition threshold the non-Federal entity determines to be appropriate: . . . (2) Proposals. A procurement method in which either a fixed price or cost-reimbursement type contract is awarded. Proposals are generally used when conditions are not appropriate for the use of sealed bids. They are awarded in accordance with the following requirements: (i) Requests for proposals must be publicized and identify all evaluation factors and their relative importance. Proposals must be solicited from an adequate number of qualified offerors. Any response to publicized requests for proposals must be considered to the maximum extent practical; (ii) The non-Federal entity must have a written method for conducting technical evaluations of the proposals received and making selections; INDIANA STATE BOARD OF ACCOUNTS 19 CRAWFORD COUNTY SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (iii) Contracts must be awarded to the responsible offeror whose proposal is most advantageous to the non-Federal entity, with price and other factors considered; and (iv) The non-Federal entity may use competitive proposal procedures for qualifications based procurement of architectural/engineering (A/E) professional services whereby offeror's qualifications are evaluated and the most qualified offeror is selected, subject to negotiation of fair and reasonable compensation. The method, where price is not used as a selection factor, can only be used in procurement of A/E professional services. It cannot be used to purchase other types of services though A/E firms that are a potential source to perform the proposed effort. Cause Management did not develop effective internal controls to maintain records sufficient to detail the history of a procurement as required by retaining the LOIs. The County was unaware that it needed to maintain documented procurement procedures or policies. Effect The failure to establish and maintain an effective internal control system for procurement placed the County at risk of noncompliance with the federal requirements. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the County. Due to the lack of retention of the LOIs, compliance with the procurement process could not be determined. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the County establish and implement written policies and procedures for the procurement of engineering and design services. We further recommended that the County ensure it retains all LOIs and other procurement documentation to ensure compliance with federal regulations. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.