  • Core Issue: The Authority failed to maintain proper records for equipment purchased with federal funds, including missing details like acquisition cost and condition.
  • Impacted Requirements: Noncompliance with 2 CFR 200.303 and 2 CFR 200.313(d) regarding equipment management and physical inventory checks.
  • Recommended Follow-Up: Strengthen internal controls to ensure compliance with federal equipment management requirements and conduct a complete physical inventory.

Finding Text

FINDING 2024-001 Subject: Airport Improvement Program, Infrastructure Investment and Jobs Act Programs, and COVID-19 Airports Programs - Equipment and Real Property Management Federal Agency: Department of Transportation Federal Program: Airport Improvement Program, Infrastructure Investment and Jobs Act Programs, and COVID-19 Airports Programs Assistance Listings Number: 20.106 Federal Award Number and Year (or Other Identifying Number): 3-18-0047-033-2024 Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context Detailed property records are to be maintained when equipment having a useful life of more than one year and a per-unit acquisition cost which equals or exceeds $5,000 is purchased with federal awards. The property records should contain the equipment description (including serial number or other identification number), source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property. One piece of equipment was purchased with Airport Improvement Program funds totaling $216,250. However, the equipment was not included in the Authority's property records (capital asset listing), nor did the records contain all the required information listed above. In addition, the Authority did not perform a complete physical inventory within the last two years as required. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. . . ." Cause Internal controls were not designed to ensure compliance with equipment management requirements as the Authority was unaware of the procedures needed. Effect Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of federal funding to the Authority. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the Authority's management strengthen its system of internal controls to ensure compliance with equipment management requirements. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

Categories

Equipment & Real Property Management

Other Findings in this Audit

  • 576094 2024-001
    Material Weakness

Programs in Audit

ALN Program Name Expenditures
20.106 Airport Improvement Program, Infrastructure Investment and Jobs Act Programs, and Covid-19 Airports Programs $556,266