Finding 1152465 (2023-001)

Material Weakness
Requirement
C
Questioned Costs
-
Year
2023
Accepted
2025-09-09
Audit: 365912
Organization: City of Hartwell, Georgia (GA)

AI Summary

  • Core Issue: The City lacks formal procedures for cash management, leading to a material weakness in internal controls.
  • Impacted Requirements: Non-compliance with 2 CFR §200.305(b) and §200.303 regarding timely disbursement of federal funds.
  • Recommended Follow-up: Develop and implement documented procedures to ensure federal funds are drawn and disbursed promptly.

Finding Text

Material Weakness in Cash Management Controls Federal Agency and Pass-through Entity: U.S. Environmental Protection Agency – Georgia Environmental Finance Authority Program Title/Cluster: Clean Water State Revolving Fund Cluster (CWSRF) Criteria: In accordance with 2 CFR §200.305(b), when advance payments are made, the non-federal entity must maintain written procedures to minimize the time elapsing between the transfer of funds from the U.S. Treasury (or pass-through entity) and disbursement. Effective internal control over compliance with the cash management requirement includes documented procedures to ensure federal funds are drawn down only when needed and promptly disbursed. Per 2 CFR §200.303, the non-federal entity must establish and maintain effective internal controls over federal awards that provide reasonable assurance that the non-federal entity is managing the federal award in compliance with federal statutes, regulations, and the terms and conditions of the federal award. Condition: During our testing of compliance with cash management requirements for the CWSRF program, we inquired about the City’s procedures to minimize the time elapsed between draw requests, deposit of funds, and disbursement to contractors. We noted that the City did not have formal or documented internal controls in place specifically related to this process. No control activities were identified to monitor or ensure timely disbursement following drawdowns. Effect: The absence of identifiable internal controls over cash management increases the risk of noncompliance with federal requirements, including the potential for drawing federal funds in advance of immediate cash needs. While our audit testing did not identify any instances of noncompliance (contractor payments were made within a reasonable timeframe) this control deficiency represents a material weakness in internal control over compliance. Questioned Costs: None reported. Recommendation: We recommend that the City develop and implement formal, documented procedures and internal controls to ensure that federal funds are drawn only when needed and disbursed in a timely manner in accordance with federal cash management requirements. This should include documented monitoring of the timing of drawdowns and corresponding disbursements. Status: New finding in the current year.

Categories

Cash Management Subrecipient Monitoring Internal Control / Segregation of Duties

Other Findings in this Audit

Programs in Audit

ALN Program Name Expenditures
66.458 Clean Water State Revolving Fund $7.73M