Finding 1140943 (2023-008)

Significant Deficiency
Requirement
I
Questioned Costs
-
Year
2023
Accepted
2025-06-11

AI Summary

  • Core Issue: NAIHC failed to verify the suspension and debarment status of a vendor before contracting, which is a significant internal control deficiency.
  • Impacted Requirements: Compliance with 2 CFR section 180.995, which mandates verification of vendor eligibility through the SAM Exclusions.
  • Recommended Follow-Up: NAIHC should enhance its policies to ensure proper documentation of vendor verification processes is maintained.

Finding Text

2023-08 Federal Agency: U.S. Department of Housing and Urban Development Federal Program Name: Community Compass Technical Assistance and Capacity Building Assistance Listing Number: 14.259 Federal Award Identification Number and Year: N-15-IT-TA-0001, Year 2016 Award Period: 03/17/16-09/12/23 Type of Finding: Significant Deficiency in Internal Control Over Compliance Criteria: When a non-Federal entity enters into a covered transaction with an entity at a lower tier, the non-Federal entity must verify that the entity, as defined in 2 CFR section 180.995 and agency adopting regulations, is not suspended or debarred or otherwise excluded from participating in the transaction. This verification may be accomplished by (1) checking the System for Award Management (SAM) Exclusions maintained by the General Services Administration (GSA) and available at https://www.sam.gov/portal/public/SAM/ (Note: The OMB guidance at 2 CFR part 180 and agency implementing regulations still refer to the SAM Exclusions as the Excluded Parties List System (EPLS)), (2) collecting a certification from the entity, or (3) adding a clause or condition to the covered transaction with that entity (2 CFR section 180.300). Condition: For one of the six procured vendors selected for testing, NAIHC did not verify suspension and debarment status of one vendor prior to contracting the vendor. Context: A nonstatistical sample of six out of twenty procured vendors were selected for testing for the Community Compass Technical Assistance and Capacity Building program. The condition noted above was identified during our procedures over the Procurement compliance requirements. Effect: NAIHC contracted with a vendor without verifying suspension and debarment status. Cause: NAIHC did not verify suspension and debarment status. Recommendation: We recommend that NAIHC strengthen its current policies and procedures to ensure that evidence of verifying suspension and debarment status is retained. Management’s View: See Separate Corrective Action Plan.

Categories

Procurement, Suspension & Debarment

Other Findings in this Audit

  • 564500 2023-007
    Significant Deficiency
  • 564501 2023-008
    Significant Deficiency
  • 1140942 2023-007
    Significant Deficiency

Programs in Audit

ALN Program Name Expenditures
14.259 Community Compass Technical Assistance and Capacity Building $57,120