Finding 1123995 (2023-005)

Material Weakness Repeat Finding
Requirement
N
Questioned Costs
$1
Year
2023
Accepted
2025-03-31

AI Summary

  • Core Issue: The Authority failed to conduct required biennial HQS inspections for 27 out of 54 sampled units, leading to material non-compliance.
  • Impacted Requirements: Compliance with HQS inspection standards as outlined in the Authority's HCV Admin Plan and federal regulations.
  • Recommended Follow-Up: Implement robust internal control procedures to ensure ongoing compliance with inspection requirements and federal guidelines.

Finding Text

Finding 2023-005: Federal Agency: U.S. Department of Housing and Urban Development Federal Program Titles: Section 8 Housing Choice Vouchers Program and Mainstream Vouchers Program Federal Assistance Listing Numbers: 14.871 and 14.879 Material Noncompliance – N. Special Tests and Provisions – HQS Inspections Non Compliance Material to the Financial Statements: Yes Material Weakness in Internal Control over Compliance for Special Tests and Provisions Criteria: HQS Inspections. Per the Authority's HCV Admin Plan, the PHA must inspect the unit leased to a family at least biennially to determine if the unit meets HQS standards and the PHA must conduct quality control re-inspections. The PHA must prepare a unit inspection report (24 CFR sections 982.158(d) and 982.405(b)). These inspection reports are required to be maintained and available for examination at the time of audit. Condition: Based upon inspection of the Authority’s files and on discussion with management there were inspection reports that were unavailable for examination at the time of audit. Context: Of a sample size of fifty-four (54) units, twenty-seven (27) units did not have a biennial HQS inspection performed. Our sample size is statistically valid. Known Questioned Costs: $239,802. Cause: There is a material weakness in internal controls over the compliance for the special tests and provisions type of compliance related to HQS inspections. The Authority has not properly considered, designed, implemented, maintained and monitored a system of internal controls that assures the program is in compliance. Effect: The Section 8 Housing Choice Vouchers and Mainstream Vouchers Programs are in material non-compliance with the with the special tests and provisions type of compliance related to HQS inspections. Recommendation: We recommend the Authority design and implement internal control procedures that will reasonably assure compliance with the Uniform Guidance and the compliance supplement. Authority Response: The Authority has recognized the material weakness in the Section 8 Housing Choice Vouchers and Mainstream Vouchers Programs and will implement internal control procedures that will ensure compliance with federal regulations.

Categories

Questioned Costs HUD Housing Programs Material Weakness Special Tests & Provisions Internal Control / Segregation of Duties

Other Findings in this Audit

  • 547550 2023-003
    Material Weakness Repeat
  • 547551 2023-004
    Material Weakness Repeat
  • 547552 2023-005
    Material Weakness Repeat
  • 547553 2023-005
    Material Weakness Repeat
  • 1123992 2023-003
    Material Weakness Repeat
  • 1123993 2023-004
    Material Weakness Repeat
  • 1123994 2023-005
    Material Weakness Repeat

Programs in Audit

ALN Program Name Expenditures
14.871 Section 8 Housing Choice Vouchers $53.61M
14.879 Mainstream Vouchers $2.48M
14.856 Lower Income Housing Assistance Program_section 8 Moderate Rehabilitation $1.17M
14.235 Supportive Housing Program $329,786
14.896 Family Self-Sufficiency Program $222,904