2024-004 Program: Highway Planning and Construction
Financial Assistance Listing Number: 20.205
Federal Agency: U.S. Department of Transportation
Pass-through: California Department of Transportation
Award Year: Multiple
Grant Award Number: Multiple
Compliance Requirements: Special Tests and Provisions – Wage Rate Requirements
Type of Finding: Material Weakness in Internal Control over Compliance and Instance of
Noncompliance
Criteria:
All laborers and mechanics employed by contractors or subcontractors to work on construction
contracts in excess of $2,000 financed by federal assistance funds must be paid wages not less
than those established for the locality of the project (prevailing wage rates) by the Department
of Labor (DOL) (40 USC 3141–3144, 3146, and 3147.
Nonfederal entities shall include in their construction contracts subject to the Wage Rate
Requirements a provision that the contractor or subcontractor comply with those requirements
and the DOL regulations (29 CFR Part 5, Labor Standards Provisions Applicable to Contacts
Governing Federally Financed and Assisted Construction). This includes a requirement for the
contractor or subcontractor to submit to the nonfederal entity weekly, for each week in which
any contract work is performed, a copy of the payroll and a statement of compliance (certified
payrolls) (29 CFR sections 5.5 and 5.6; the A-102 Common Rule (section 36(i)(5)); OMB Circular
A-110 (2 CFR Part 215, Appendix A, Contract Provisions); 2 CFR Part 176, Subpart C; and 2 CFR
section 200.326).
2 CFR 200.303, the non-Federal entity must establish and maintain effective internal control
over the Federal award that provides reasonable assurance that the non-Federal entity is
managing the Federal award in compliance with Federal statutes, regulations, and the terms and
conditions of the Federal award. This includes internal controls over maintaining records of the
receipt and review of certified payrolls.
Condition:
We noted for eight (8) out of eight (8) certified payrolls selected for testing, the City did not
document their review and approval of certified payroll submission. In addition, for two (2) out
of eight (8) weeks of certified payroll selected for testing, we noted the contractor or
subcontractor did not submit the certified payroll in a timely manner.
Cause:
The City’s procedures did not include documenting the review of the certified payroll received.
In addition, the City did not have the necessary internal controls in place to ensure the
contractor’s and subcontractor’s timely submittal of certified payroll.
Effect:
Ineffective procedures over this area of compliance could result in noncompliance with the
wage rate compliance requirements.
Questioned Costs:
No questioned costs were identified as a result of our procedures.
Context/Sampling:
Sampling was used. We selected eight (8) of twenty-one (21) certified payrolls for testing.
Repeat Finding from the Prior Year(s):
No.
Recommendation:
We recommend that the City strengthen its internal controls to ensure that timely reviews of
certified payroll submissions are being performed by the City. This could include performing
procedures to ensure that information being provided to the City by its consultant project
managers is accurate and that the required certified payroll is being submitted by contractors
and subcontractors in a timely manner.
View of Responsible Official and Planned Corrective Actions
The City concurs with the finding. See separate corrective action plan.