Finding 1081805 (2024-001)

Significant Deficiency Repeat Finding
Requirement
N
Questioned Costs
-
Year
2024
Accepted
2024-11-12

AI Summary

  • Core Issue: The PHA is not properly documenting follow-ups on failed inspections, leading to non-compliance with federal Housing Quality Standards (HQS).
  • Impacted Requirements: The PHA must conduct bi-annual inspections and ensure timely corrections of deficiencies, or face penalties.
  • Recommended Follow-Up: Implement a robust system for tracking compliance and improve documentation practices to meet regulatory standards.

Finding Text

Criteria: The PHA must inspect the unit leased to a family at least bi-annually to determine if the unit meets Housing Quality Standards (HQS) and the PHA must conduct quality control re‐inspections. The PHA must prepare a unit inspection report (24 CFR §§982.405, 983.103). Condition: Units under HAP contract that fail to meet HQS, the PHA must require the owner to correct any life threatening HQS deficiencies within 24 hours after the inspections and all other HQS deficiencies within 30 calendar days or within a specified PHA‐approved extension. If the owner does not correct the cited HQS deficiencies within the specified correction period, the PHA must stop (abate) HAPs beginning no later than the first of the month following the specified correction period or must terminate the HAP contract. The owner is not responsible for a breach of HQS as a result of the family’s failure to pay for utilities for which the family is responsible under the lease or for tenant damage. For family‐caused defects, if the family does not correct the cited HQS deficiencies within the specified correction period, the PHA must take prompt and vigorous action to enforce the family obligations (24 CFR sections 982.158(d) and 982.404). Context: We selected a sample of 8 failed inspections that occurred during the fiscal year from a population of 16 total for the year. Out of the 8 samples selected, 6 of those lacked the proper documentation of a follow up for the failed inspection within the prescibed time frame above. Cause: Controls over compliance associated with the Authority’s HQS Enforcement are inadequate to detect these errors. Effect: The Authority is non‐compliant with the federal regulations over this federal program, this could potentially result in significant operating and financial penalties. Recommendations: We suggest the Authority structure a system capable of properly overseeing compliance with regulations relative to these grants as well as maintaining more accurate and complete documentation of adherence to compliance. Management Views: Management agrees with the audit finding.

Categories

HUD Housing Programs

Other Findings in this Audit

  • 505363 2024-001
    Significant Deficiency Repeat

Programs in Audit

ALN Program Name Expenditures
14.871 Section 8 Housing Choice Vouchers $6.62M
14.850 Public and Indian Housing $1.67M
14.872 Public Housing Capital Fund $1.56M