CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.
CONDITION Career and Technical Education is not verifying every subrecipient is audited and reviewing audit findings as required by 2 CFR 200, Subpart F. Subsequently, by not verifying every subrecipient is audited, Career and Technical Education is not ensuring their responsibilities for issuing management decisions are performed, if any findings are identified in the audits. CRITERIA All pass-through entities must: • Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, in compliance with Federal statutes, regulations, and terms and conditions of the subaward, and that the subaward performance goals are achieved. Pass-through entity monitoring of the subrecipient must include, in part, following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity detected through audits, on-site reviews, and written confirmation from the subrecipient, highlighting the status of actions planned or taken to address Single Audit findings related to the particular subaward; issuing a management decision for applicable audit findings pertaining only to the federal award provided to the subrecipient from the pass-through entity as required by 2 CFR 200.521; and ensuring audit findings specifically related to the subaward are resolved (2 CFR 200.332(d)). • Verify that every subrecipient is audited as required by 2 CFR 200, Subpart F, when it is expected that the subrecipient's Federal award expended during the respective fiscal year equaled or exceeded the $750,000 threshold set forth in 2 CFR 200.501 (2 CFR 200.332(f). Federal regulation, 2 CFR 200.303, requires non-Federal entities, in part, to establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. CAUSE Career and Technical Education has not established processes to identify which subrecipients are subject to required audits or to obtain and review Uniform Guidance Single Audit reports. In addition, Career and Technical Education has not developed a tracking system to ensure timely submission of required audit reports and to ensure timely and appropriate corrective action is taken on all deficiencies. EFFECT Subrecipient noncompliance with Federal statutes, regulations, and the terms and conditions of the subaward, including audit findings pertaining to the Federal award, may go undetected and unresolved. CONTEXT Career and Technical Education awarded subawards, individually up to $10 million, to 13 subrecipients totaling $74.6 million for 19 different multi-purpose community facility projects. Career and Technical Education has had prior experience with these subrecipients. Projects were included in the state’s program plan that was reviewed and approved by U.S. Treasury. Career and Technical Education imposed specific subaward conditions upon each subrecipient requiring payments as reimbursements rather than advance payments. Career and Technical Education performs ongoing monitoring procedures through review and approval of subrecipient requests for reimbursements, which includes reviewing invoices and contractor progress billings for unallowable expenses, prior to disbursing Capital Project Funds. Lastly, Career and Technical Education conducts annual on-site visits of started projects until completed to visually inspect projects are being completed as planned. Where sampling was performed, the audit used a non-statistical sampling method. This finding, in combination with the finding regarding required communication of award information to the subrecipients (Finding 2024-04), results in a modified opinion for the subrecipient monitoring compliance requirement. IDENTIFICATION AS A REPEAT FINDING Not a repeat finding. RECOMMENDATION We recommend Career and Technical Education establish processes to identify which subrecipients are subject to required audits and to obtain and review Uniform Guidance Single Audit reports, including developing a tracking system to ensure timely submission of required audit reports and timely and appropriate corrective action is taken on all deficiencies. We also recommend Career and Technical Education verify every subrecipient is audited as required by 2 CFR 200, Subpart F; follow-up and ensure that subrecipients take timely and appropriate action on all deficiencies of the Federal award; and issue management decisions and ensure audit findings have been resolved. CAREER AND TECHNICAL EDUCATION RESPONSE The Department agrees with this recommendation See “Management’s Response and Corrective Action” section of this report.
Reference Number: 2024-011 Prior Year Finding: No Federal Agency: U.S. Department of Transportation State Agency: Agency of Transportation Federal Program: Highway Planning and Construction Assistance Listing Number: 20.205 Award Number and Year: FFY2023 – FFY2024 Compliance Requirement: Subrecipient Monitoring Type of Finding: Significant Deficiency in Internal Control over Compliance, Other Matters Criteria or specific requirement: Compliance – Per 2 CFR section 200.332, the following requirements are imposed on pass-through entities: (a) Ensure that every subaward is clearly identified to the subrecipient as a subaward and includes information at the time of the subaward and if any of these data elements change, include the changes in subsequent subaward modification. When some of this information is not available, the pass-through entity must provide the best information available to describe the Federal award and subaward. Required information includes: (1) (iii) Federal Award Identification Number (FAIN); (iv) Federal Award Date; (b) Evaluate each subrecipient's risk of noncompliance with Federal statutes, regulations, and the terms and conditions of the subaward for purposes of determining the appropriate subrecipient monitoring described in paragraphs (d) and (e) of this section, which may include consideration of such factors as: (1) The subrecipient's prior experience with the same or similar subawards; (2) The results of previous audits including whether or not the subrecipient receives a Single Audit in accordance with Subpart F of this part, and the extent to which the same or similar subaward has been audited as a major program; (3) Whether the subrecipient has new personnel or new or substantially changed systems; and (4) The extent and results of Federal awarding agency monitoring (e.g., if the subrecipient also receives Federal awards directly from a Federal awarding agency). (c) Consider imposing specific subaward conditions upon a subrecipient if appropriate as described in § 200.208. (d) Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, in compliance with Federal statutes, regulations, and the terms and conditions of the subaward; and that subaward performance goals are achieved. Pass-through entity monitoring of the subrecipient must include: (1) Reviewing financial and performance reports required by the pass-through entity. (2) Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity detected through audits, on-site reviews, and written confirmation from the subrecipient, highlighting the status of actions planned or taken to address Single Audit findings related to the particular subaward. (3) Issuing a management decision for applicable audit findings pertaining only to the Federal award provided to the subrecipient from the pass-through entity as required by § 200.521. (4) The pass-through entity is responsible for resolving audit findings specifically related to the subaward and not responsible for resolving crosscutting findings. If a subrecipient has a current Single Audit report posted in the Federal Audit Clearinghouse and has not otherwise been excluded from receipt of Federal funding (e.g., has been debarred or suspended), the pass-through entity may rely on the subrecipient's cognizant audit agency or cognizant oversight agency to perform audit follow-up and make management decisions related to cross-cutting findings in accordance with section § 200.513(a)(3)(vii). Such reliance does not eliminate the responsibility of the pass-through entity to issue subawards that conform to agency and award-specific requirements, to manage risk through ongoing subaward monitoring, and to monitor the status of the findings that are specifically related to the subaward. (e) Depending upon the pass-through entity's assessment of risk posed by the subrecipient (as described in paragraph (b) of this section), the following monitoring tools may be useful for the pass-through entity to ensure proper accountability and compliance with program requirements and achievement of performance goals: (1) Providing subrecipients with training and technical assistance on program-related matters; and (2) Performing on-site reviews of the subrecipient's program operations; (3) Arranging for agreed-upon-procedures engagements as described in § 200.425. Control – Per 2 CFR section 200.303(a), a non-Federal entity must: Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in “Standards for Internal Control in the Federal Government” issued by the Comptroller General of the United States or the “Internal Control Integrated Framework”, issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). Condition: The Vermont Agency of Transportation (VTrans) omitted required federal award information from subawards it issued in the program and did not adequately monitor subrecipients. Context: Nineteen subawards were selected for testing and the following exceptions were noted: • For 16 of 19 subawards selected for testing, the federal award date was not included on the subaward agreement. • For 1 of 19 subawards selected for testing, the last on-site subrecipient monitoring visit was performed in FY 2019 and the next on-site monitoring did not take place until FY 2024. Per the VTrans subrecipient monitoring plan, on-site monitoring must be performed no less than every three years. Cause: Procedures and internal controls were not sufficient to ensure that subawards included all required federal information. Although VTrans subsequently modified its subaward issuance process, controls in effect during the audit period were not sufficient to ensure that subawards included all required information. Procedures and internal controls were also not sufficient to ensure that timely on-site monitoring visits were performed in accordance with its monitoring plan. Effect: Excluding the required federal grant award information at the time of subaward issuance may cause subrecipients and their auditors to be uninformed about specific program and other regulations that apply to the funds they receive. There is also the potential for subrecipients to have incomplete Schedules of Expenditures of Federal Awards (SEFA) in their Single Audit reports. Failure to conduct adequate subrecipient monitoring may result in a failure of VTrans to detect that subawards are used for unauthorized purposes, are managed in violation of the terms and conditions of the subawards, or that subaward performance goals are not achieved. There is an increased risk that subrecipients could be inappropriately spending and/or inaccurately tracking and reporting federal funds over multiple year periods, and these discrepancies may not be properly monitored, detected, and corrected by VTrans personnel on a timely basis. Questioned costs: Undetermined. Recommendation: VTrans should review and enhance internal controls and procedures to ensure that all required federal award information is included in subawards and that on-site subrecipient monitoring is conducted timely per the terms of its subrecipient monitoring plan. Views of responsible officials: Management agrees with the finding.
Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether or not the subrecipient receives single audit in accordance with 2 CFR Part 200, Subpart F, and the extent to which the same or similar subaward has been audited as a major program; 3. Whether the subrecipient has new personnel or new or substantially changed systems; and 4. The extent and results of federal awarding agency monitoring (e.g., if the subrecipient also receives federal awards directly from a federal awarding agency). Monitor – Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, complies with the terms and conditions of the subaward, and achieves performance goals (2 CFR sections 200.332(d) through (f)). In addition to procedures identified as necessary based upon the evaluation of subrecipient risk or specifically required by the terms and conditions of the award, subaward monitoring must include the following: 1. Reviewing financial and programmatic (performance and special reports) required by the PTE. 2. Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the federal award provided to the subrecipient from the PTE detected through audits, on-site reviews, and other means. 3. Issuing a management decision for audit findings pertaining to the federal award provided to the subrecipient from the PTE as required by 2 CFR section 200.521. Additionally, in accordance with federal requirements, the University shall maintain internal controls over federal programs designed to provide reasonable assurance that transactions are executed in compliance with federal statutes, regulations, and the terms and conditions of the federal award that could have a direct and material effect on a federal program. Condition and Context We selected thirteen subrecipients for testwork out of 82 in total and we noted that the University did not properly receive and review the single audit reports for seven of those subrecipients to ensure they had no material findings that would impact the University. The University then identified an additional six subrecipients outside of our sample where the same deficiency occurred. Cause The University had turnover in staff in the Office of Sponsored Projects during the fiscal year 2024 and this led to miscommunication which resulted in this monitoring step not being performed timely. Effect Subrecipient monitoring that is not performed timely could result in federal dollars being passed down to subrecipients with significant control or compliance issues that could impact the University. Questioned Costs There were no questioned costs related to this finding. Recommendation We recommend that the University strengthen its policies and procedures to ensure that subrecipient monitoring is being performed timely. The University should provide training to the departments responsible for these reviews.
Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether or not the subrecipient receives single audit in accordance with 2 CFR Part 200, Subpart F, and the extent to which the same or similar subaward has been audited as a major program; 3. Whether the subrecipient has new personnel or new or substantially changed systems; and 4. The extent and results of federal awarding agency monitoring (e.g., if the subrecipient also receives federal awards directly from a federal awarding agency). Monitor – Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, complies with the terms and conditions of the subaward, and achieves performance goals (2 CFR sections 200.332(d) through (f)). In addition to procedures identified as necessary based upon the evaluation of subrecipient risk or specifically required by the terms and conditions of the award, subaward monitoring must include the following: 1. Reviewing financial and programmatic (performance and special reports) required by the PTE. 2. Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the federal award provided to the subrecipient from the PTE detected through audits, on-site reviews, and other means. 3. Issuing a management decision for audit findings pertaining to the federal award provided to the subrecipient from the PTE as required by 2 CFR section 200.521. Additionally, in accordance with federal requirements, the University shall maintain internal controls over federal programs designed to provide reasonable assurance that transactions are executed in compliance with federal statutes, regulations, and the terms and conditions of the federal award that could have a direct and material effect on a federal program. Condition and Context We selected thirteen subrecipients for testwork out of 82 in total and we noted that the University did not properly receive and review the single audit reports for seven of those subrecipients to ensure they had no material findings that would impact the University. The University then identified an additional six subrecipients outside of our sample where the same deficiency occurred. Cause The University had turnover in staff in the Office of Sponsored Projects during the fiscal year 2024 and this led to miscommunication which resulted in this monitoring step not being performed timely. Effect Subrecipient monitoring that is not performed timely could result in federal dollars being passed down to subrecipients with significant control or compliance issues that could impact the University. Questioned Costs There were no questioned costs related to this finding. Recommendation We recommend that the University strengthen its policies and procedures to ensure that subrecipient monitoring is being performed timely. The University should provide training to the departments responsible for these reviews.
Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether or not the subrecipient receives single audit in accordance with 2 CFR Part 200, Subpart F, and the extent to which the same or similar subaward has been audited as a major program; 3. Whether the subrecipient has new personnel or new or substantially changed systems; and 4. The extent and results of federal awarding agency monitoring (e.g., if the subrecipient also receives federal awards directly from a federal awarding agency). Monitor – Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, complies with the terms and conditions of the subaward, and achieves performance goals (2 CFR sections 200.332(d) through (f)). In addition to procedures identified as necessary based upon the evaluation of subrecipient risk or specifically required by the terms and conditions of the award, subaward monitoring must include the following: 1. Reviewing financial and programmatic (performance and special reports) required by the PTE. 2. Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the federal award provided to the subrecipient from the PTE detected through audits, on-site reviews, and other means. 3. Issuing a management decision for audit findings pertaining to the federal award provided to the subrecipient from the PTE as required by 2 CFR section 200.521. Additionally, in accordance with federal requirements, the University shall maintain internal controls over federal programs designed to provide reasonable assurance that transactions are executed in compliance with federal statutes, regulations, and the terms and conditions of the federal award that could have a direct and material effect on a federal program. Condition and Context We selected thirteen subrecipients for testwork out of 82 in total and we noted that the University did not properly receive and review the single audit reports for seven of those subrecipients to ensure they had no material findings that would impact the University. The University then identified an additional six subrecipients outside of our sample where the same deficiency occurred. Cause The University had turnover in staff in the Office of Sponsored Projects during the fiscal year 2024 and this led to miscommunication which resulted in this monitoring step not being performed timely. Effect Subrecipient monitoring that is not performed timely could result in federal dollars being passed down to subrecipients with significant control or compliance issues that could impact the University. Questioned Costs There were no questioned costs related to this finding. Recommendation We recommend that the University strengthen its policies and procedures to ensure that subrecipient monitoring is being performed timely. The University should provide training to the departments responsible for these reviews.
Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether or not the subrecipient receives single audit in accordance with 2 CFR Part 200, Subpart F, and the extent to which the same or similar subaward has been audited as a major program; 3. Whether the subrecipient has new personnel or new or substantially changed systems; and 4. The extent and results of federal awarding agency monitoring (e.g., if the subrecipient also receives federal awards directly from a federal awarding agency). Monitor – Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, complies with the terms and conditions of the subaward, and achieves performance goals (2 CFR sections 200.332(d) through (f)). In addition to procedures identified as necessary based upon the evaluation of subrecipient risk or specifically required by the terms and conditions of the award, subaward monitoring must include the following: 1. Reviewing financial and programmatic (performance and special reports) required by the PTE. 2. Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the federal award provided to the subrecipient from the PTE detected through audits, on-site reviews, and other means. 3. Issuing a management decision for audit findings pertaining to the federal award provided to the subrecipient from the PTE as required by 2 CFR section 200.521. Additionally, in accordance with federal requirements, the University shall maintain internal controls over federal programs designed to provide reasonable assurance that transactions are executed in compliance with federal statutes, regulations, and the terms and conditions of the federal award that could have a direct and material effect on a federal program. Condition and Context We selected thirteen subrecipients for testwork out of 82 in total and we noted that the University did not properly receive and review the single audit reports for seven of those subrecipients to ensure they had no material findings that would impact the University. The University then identified an additional six subrecipients outside of our sample where the same deficiency occurred. Cause The University had turnover in staff in the Office of Sponsored Projects during the fiscal year 2024 and this led to miscommunication which resulted in this monitoring step not being performed timely. Effect Subrecipient monitoring that is not performed timely could result in federal dollars being passed down to subrecipients with significant control or compliance issues that could impact the University. Questioned Costs There were no questioned costs related to this finding. Recommendation We recommend that the University strengthen its policies and procedures to ensure that subrecipient monitoring is being performed timely. The University should provide training to the departments responsible for these reviews.
Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether or not the subrecipient receives single audit in accordance with 2 CFR Part 200, Subpart F, and the extent to which the same or similar subaward has been audited as a major program; 3. Whether the subrecipient has new personnel or new or substantially changed systems; and 4. The extent and results of federal awarding agency monitoring (e.g., if the subrecipient also receives federal awards directly from a federal awarding agency). Monitor – Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, complies with the terms and conditions of the subaward, and achieves performance goals (2 CFR sections 200.332(d) through (f)). In addition to procedures identified as necessary based upon the evaluation of subrecipient risk or specifically required by the terms and conditions of the award, subaward monitoring must include the following: 1. Reviewing financial and programmatic (performance and special reports) required by the PTE. 2. Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the federal award provided to the subrecipient from the PTE detected through audits, on-site reviews, and other means. 3. Issuing a management decision for audit findings pertaining to the federal award provided to the subrecipient from the PTE as required by 2 CFR section 200.521. Additionally, in accordance with federal requirements, the University shall maintain internal controls over federal programs designed to provide reasonable assurance that transactions are executed in compliance with federal statutes, regulations, and the terms and conditions of the federal award that could have a direct and material effect on a federal program. Condition and Context We selected thirteen subrecipients for testwork out of 82 in total and we noted that the University did not properly receive and review the single audit reports for seven of those subrecipients to ensure they had no material findings that would impact the University. The University then identified an additional six subrecipients outside of our sample where the same deficiency occurred. Cause The University had turnover in staff in the Office of Sponsored Projects during the fiscal year 2024 and this led to miscommunication which resulted in this monitoring step not being performed timely. Effect Subrecipient monitoring that is not performed timely could result in federal dollars being passed down to subrecipients with significant control or compliance issues that could impact the University. Questioned Costs There were no questioned costs related to this finding. Recommendation We recommend that the University strengthen its policies and procedures to ensure that subrecipient monitoring is being performed timely. The University should provide training to the departments responsible for these reviews.
Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether or not the subrecipient receives single audit in accordance with 2 CFR Part 200, Subpart F, and the extent to which the same or similar subaward has been audited as a major program; 3. Whether the subrecipient has new personnel or new or substantially changed systems; and 4. The extent and results of federal awarding agency monitoring (e.g., if the subrecipient also receives federal awards directly from a federal awarding agency). Monitor – Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, complies with the terms and conditions of the subaward, and achieves performance goals (2 CFR sections 200.332(d) through (f)). In addition to procedures identified as necessary based upon the evaluation of subrecipient risk or specifically required by the terms and conditions of the award, subaward monitoring must include the following: 1. Reviewing financial and programmatic (performance and special reports) required by the PTE. 2. Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the federal award provided to the subrecipient from the PTE detected through audits, on-site reviews, and other means. 3. Issuing a management decision for audit findings pertaining to the federal award provided to the subrecipient from the PTE as required by 2 CFR section 200.521. Additionally, in accordance with federal requirements, the University shall maintain internal controls over federal programs designed to provide reasonable assurance that transactions are executed in compliance with federal statutes, regulations, and the terms and conditions of the federal award that could have a direct and material effect on a federal program. Condition and Context We selected thirteen subrecipients for testwork out of 82 in total and we noted that the University did not properly receive and review the single audit reports for seven of those subrecipients to ensure they had no material findings that would impact the University. The University then identified an additional six subrecipients outside of our sample where the same deficiency occurred. Cause The University had turnover in staff in the Office of Sponsored Projects during the fiscal year 2024 and this led to miscommunication which resulted in this monitoring step not being performed timely. Effect Subrecipient monitoring that is not performed timely could result in federal dollars being passed down to subrecipients with significant control or compliance issues that could impact the University. Questioned Costs There were no questioned costs related to this finding. Recommendation We recommend that the University strengthen its policies and procedures to ensure that subrecipient monitoring is being performed timely. The University should provide training to the departments responsible for these reviews.
Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether or not the subrecipient receives single audit in accordance with 2 CFR Part 200, Subpart F, and the extent to which the same or similar subaward has been audited as a major program; 3. Whether the subrecipient has new personnel or new or substantially changed systems; and 4. The extent and results of federal awarding agency monitoring (e.g., if the subrecipient also receives federal awards directly from a federal awarding agency). Monitor – Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, complies with the terms and conditions of the subaward, and achieves performance goals (2 CFR sections 200.332(d) through (f)). In addition to procedures identified as necessary based upon the evaluation of subrecipient risk or specifically required by the terms and conditions of the award, subaward monitoring must include the following: 1. Reviewing financial and programmatic (performance and special reports) required by the PTE. 2. Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the federal award provided to the subrecipient from the PTE detected through audits, on-site reviews, and other means. 3. Issuing a management decision for audit findings pertaining to the federal award provided to the subrecipient from the PTE as required by 2 CFR section 200.521. Additionally, in accordance with federal requirements, the University shall maintain internal controls over federal programs designed to provide reasonable assurance that transactions are executed in compliance with federal statutes, regulations, and the terms and conditions of the federal award that could have a direct and material effect on a federal program. Condition and Context We selected thirteen subrecipients for testwork out of 82 in total and we noted that the University did not properly receive and review the single audit reports for seven of those subrecipients to ensure they had no material findings that would impact the University. The University then identified an additional six subrecipients outside of our sample where the same deficiency occurred. Cause The University had turnover in staff in the Office of Sponsored Projects during the fiscal year 2024 and this led to miscommunication which resulted in this monitoring step not being performed timely. Effect Subrecipient monitoring that is not performed timely could result in federal dollars being passed down to subrecipients with significant control or compliance issues that could impact the University. Questioned Costs There were no questioned costs related to this finding. Recommendation We recommend that the University strengthen its policies and procedures to ensure that subrecipient monitoring is being performed timely. The University should provide training to the departments responsible for these reviews.
Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether or not the subrecipient receives single audit in accordance with 2 CFR Part 200, Subpart F, and the extent to which the same or similar subaward has been audited as a major program; 3. Whether the subrecipient has new personnel or new or substantially changed systems; and 4. The extent and results of federal awarding agency monitoring (e.g., if the subrecipient also receives federal awards directly from a federal awarding agency). Monitor – Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, complies with the terms and conditions of the subaward, and achieves performance goals (2 CFR sections 200.332(d) through (f)). In addition to procedures identified as necessary based upon the evaluation of subrecipient risk or specifically required by the terms and conditions of the award, subaward monitoring must include the following: 1. Reviewing financial and programmatic (performance and special reports) required by the PTE. 2. Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the federal award provided to the subrecipient from the PTE detected through audits, on-site reviews, and other means. 3. Issuing a management decision for audit findings pertaining to the federal award provided to the subrecipient from the PTE as required by 2 CFR section 200.521. Additionally, in accordance with federal requirements, the University shall maintain internal controls over federal programs designed to provide reasonable assurance that transactions are executed in compliance with federal statutes, regulations, and the terms and conditions of the federal award that could have a direct and material effect on a federal program. Condition and Context We selected thirteen subrecipients for testwork out of 82 in total and we noted that the University did not properly receive and review the single audit reports for seven of those subrecipients to ensure they had no material findings that would impact the University. The University then identified an additional six subrecipients outside of our sample where the same deficiency occurred. Cause The University had turnover in staff in the Office of Sponsored Projects during the fiscal year 2024 and this led to miscommunication which resulted in this monitoring step not being performed timely. Effect Subrecipient monitoring that is not performed timely could result in federal dollars being passed down to subrecipients with significant control or compliance issues that could impact the University. Questioned Costs There were no questioned costs related to this finding. Recommendation We recommend that the University strengthen its policies and procedures to ensure that subrecipient monitoring is being performed timely. The University should provide training to the departments responsible for these reviews.
Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether or not the subrecipient receives single audit in accordance with 2 CFR Part 200, Subpart F, and the extent to which the same or similar subaward has been audited as a major program; 3. Whether the subrecipient has new personnel or new or substantially changed systems; and 4. The extent and results of federal awarding agency monitoring (e.g., if the subrecipient also receives federal awards directly from a federal awarding agency). Monitor – Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, complies with the terms and conditions of the subaward, and achieves performance goals (2 CFR sections 200.332(d) through (f)). In addition to procedures identified as necessary based upon the evaluation of subrecipient risk or specifically required by the terms and conditions of the award, subaward monitoring must include the following: 1. Reviewing financial and programmatic (performance and special reports) required by the PTE. 2. Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the federal award provided to the subrecipient from the PTE detected through audits, on-site reviews, and other means. 3. Issuing a management decision for audit findings pertaining to the federal award provided to the subrecipient from the PTE as required by 2 CFR section 200.521. Additionally, in accordance with federal requirements, the University shall maintain internal controls over federal programs designed to provide reasonable assurance that transactions are executed in compliance with federal statutes, regulations, and the terms and conditions of the federal award that could have a direct and material effect on a federal program. Condition and Context We selected thirteen subrecipients for testwork out of 82 in total and we noted that the University did not properly receive and review the single audit reports for seven of those subrecipients to ensure they had no material findings that would impact the University. The University then identified an additional six subrecipients outside of our sample where the same deficiency occurred. Cause The University had turnover in staff in the Office of Sponsored Projects during the fiscal year 2024 and this led to miscommunication which resulted in this monitoring step not being performed timely. Effect Subrecipient monitoring that is not performed timely could result in federal dollars being passed down to subrecipients with significant control or compliance issues that could impact the University. Questioned Costs There were no questioned costs related to this finding. Recommendation We recommend that the University strengthen its policies and procedures to ensure that subrecipient monitoring is being performed timely. The University should provide training to the departments responsible for these reviews.
Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether or not the subrecipient receives single audit in accordance with 2 CFR Part 200, Subpart F, and the extent to which the same or similar subaward has been audited as a major program; 3. Whether the subrecipient has new personnel or new or substantially changed systems; and 4. The extent and results of federal awarding agency monitoring (e.g., if the subrecipient also receives federal awards directly from a federal awarding agency). Monitor – Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, complies with the terms and conditions of the subaward, and achieves performance goals (2 CFR sections 200.332(d) through (f)). In addition to procedures identified as necessary based upon the evaluation of subrecipient risk or specifically required by the terms and conditions of the award, subaward monitoring must include the following: 1. Reviewing financial and programmatic (performance and special reports) required by the PTE. 2. Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the federal award provided to the subrecipient from the PTE detected through audits, on-site reviews, and other means. 3. Issuing a management decision for audit findings pertaining to the federal award provided to the subrecipient from the PTE as required by 2 CFR section 200.521. Additionally, in accordance with federal requirements, the University shall maintain internal controls over federal programs designed to provide reasonable assurance that transactions are executed in compliance with federal statutes, regulations, and the terms and conditions of the federal award that could have a direct and material effect on a federal program. Condition and Context We selected thirteen subrecipients for testwork out of 82 in total and we noted that the University did not properly receive and review the single audit reports for seven of those subrecipients to ensure they had no material findings that would impact the University. The University then identified an additional six subrecipients outside of our sample where the same deficiency occurred. Cause The University had turnover in staff in the Office of Sponsored Projects during the fiscal year 2024 and this led to miscommunication which resulted in this monitoring step not being performed timely. Effect Subrecipient monitoring that is not performed timely could result in federal dollars being passed down to subrecipients with significant control or compliance issues that could impact the University. Questioned Costs There were no questioned costs related to this finding. Recommendation We recommend that the University strengthen its policies and procedures to ensure that subrecipient monitoring is being performed timely. The University should provide training to the departments responsible for these reviews.
Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether or not the subrecipient receives single audit in accordance with 2 CFR Part 200, Subpart F, and the extent to which the same or similar subaward has been audited as a major program; 3. Whether the subrecipient has new personnel or new or substantially changed systems; and 4. The extent and results of federal awarding agency monitoring (e.g., if the subrecipient also receives federal awards directly from a federal awarding agency). Monitor – Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, complies with the terms and conditions of the subaward, and achieves performance goals (2 CFR sections 200.332(d) through (f)). In addition to procedures identified as necessary based upon the evaluation of subrecipient risk or specifically required by the terms and conditions of the award, subaward monitoring must include the following: 1. Reviewing financial and programmatic (performance and special reports) required by the PTE. 2. Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the federal award provided to the subrecipient from the PTE detected through audits, on-site reviews, and other means. 3. Issuing a management decision for audit findings pertaining to the federal award provided to the subrecipient from the PTE as required by 2 CFR section 200.521. Additionally, in accordance with federal requirements, the University shall maintain internal controls over federal programs designed to provide reasonable assurance that transactions are executed in compliance with federal statutes, regulations, and the terms and conditions of the federal award that could have a direct and material effect on a federal program. Condition and Context We selected thirteen subrecipients for testwork out of 82 in total and we noted that the University did not properly receive and review the single audit reports for seven of those subrecipients to ensure they had no material findings that would impact the University. The University then identified an additional six subrecipients outside of our sample where the same deficiency occurred. Cause The University had turnover in staff in the Office of Sponsored Projects during the fiscal year 2024 and this led to miscommunication which resulted in this monitoring step not being performed timely. Effect Subrecipient monitoring that is not performed timely could result in federal dollars being passed down to subrecipients with significant control or compliance issues that could impact the University. Questioned Costs There were no questioned costs related to this finding. Recommendation We recommend that the University strengthen its policies and procedures to ensure that subrecipient monitoring is being performed timely. The University should provide training to the departments responsible for these reviews.
Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether or not the subrecipient receives single audit in accordance with 2 CFR Part 200, Subpart F, and the extent to which the same or similar subaward has been audited as a major program; 3. Whether the subrecipient has new personnel or new or substantially changed systems; and 4. The extent and results of federal awarding agency monitoring (e.g., if the subrecipient also receives federal awards directly from a federal awarding agency). Monitor – Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, complies with the terms and conditions of the subaward, and achieves performance goals (2 CFR sections 200.332(d) through (f)). In addition to procedures identified as necessary based upon the evaluation of subrecipient risk or specifically required by the terms and conditions of the award, subaward monitoring must include the following: 1. Reviewing financial and programmatic (performance and special reports) required by the PTE. 2. Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the federal award provided to the subrecipient from the PTE detected through audits, on-site reviews, and other means. 3. Issuing a management decision for audit findings pertaining to the federal award provided to the subrecipient from the PTE as required by 2 CFR section 200.521. Additionally, in accordance with federal requirements, the University shall maintain internal controls over federal programs designed to provide reasonable assurance that transactions are executed in compliance with federal statutes, regulations, and the terms and conditions of the federal award that could have a direct and material effect on a federal program. Condition and Context We selected thirteen subrecipients for testwork out of 82 in total and we noted that the University did not properly receive and review the single audit reports for seven of those subrecipients to ensure they had no material findings that would impact the University. The University then identified an additional six subrecipients outside of our sample where the same deficiency occurred. Cause The University had turnover in staff in the Office of Sponsored Projects during the fiscal year 2024 and this led to miscommunication which resulted in this monitoring step not being performed timely. Effect Subrecipient monitoring that is not performed timely could result in federal dollars being passed down to subrecipients with significant control or compliance issues that could impact the University. Questioned Costs There were no questioned costs related to this finding. Recommendation We recommend that the University strengthen its policies and procedures to ensure that subrecipient monitoring is being performed timely. The University should provide training to the departments responsible for these reviews.
Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether or not the subrecipient receives single audit in accordance with 2 CFR Part 200, Subpart F, and the extent to which the same or similar subaward has been audited as a major program; 3. Whether the subrecipient has new personnel or new or substantially changed systems; and 4. The extent and results of federal awarding agency monitoring (e.g., if the subrecipient also receives federal awards directly from a federal awarding agency). Monitor – Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, complies with the terms and conditions of the subaward, and achieves performance goals (2 CFR sections 200.332(d) through (f)). In addition to procedures identified as necessary based upon the evaluation of subrecipient risk or specifically required by the terms and conditions of the award, subaward monitoring must include the following: 1. Reviewing financial and programmatic (performance and special reports) required by the PTE. 2. Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the federal award provided to the subrecipient from the PTE detected through audits, on-site reviews, and other means. 3. Issuing a management decision for audit findings pertaining to the federal award provided to the subrecipient from the PTE as required by 2 CFR section 200.521. Additionally, in accordance with federal requirements, the University shall maintain internal controls over federal programs designed to provide reasonable assurance that transactions are executed in compliance with federal statutes, regulations, and the terms and conditions of the federal award that could have a direct and material effect on a federal program. Condition and Context We selected thirteen subrecipients for testwork out of 82 in total and we noted that the University did not properly receive and review the single audit reports for seven of those subrecipients to ensure they had no material findings that would impact the University. The University then identified an additional six subrecipients outside of our sample where the same deficiency occurred. Cause The University had turnover in staff in the Office of Sponsored Projects during the fiscal year 2024 and this led to miscommunication which resulted in this monitoring step not being performed timely. Effect Subrecipient monitoring that is not performed timely could result in federal dollars being passed down to subrecipients with significant control or compliance issues that could impact the University. Questioned Costs There were no questioned costs related to this finding. Recommendation We recommend that the University strengthen its policies and procedures to ensure that subrecipient monitoring is being performed timely. The University should provide training to the departments responsible for these reviews.
Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether or not the subrecipient receives single audit in accordance with 2 CFR Part 200, Subpart F, and the extent to which the same or similar subaward has been audited as a major program; 3. Whether the subrecipient has new personnel or new or substantially changed systems; and 4. The extent and results of federal awarding agency monitoring (e.g., if the subrecipient also receives federal awards directly from a federal awarding agency). Monitor – Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, complies with the terms and conditions of the subaward, and achieves performance goals (2 CFR sections 200.332(d) through (f)). In addition to procedures identified as necessary based upon the evaluation of subrecipient risk or specifically required by the terms and conditions of the award, subaward monitoring must include the following: 1. Reviewing financial and programmatic (performance and special reports) required by the PTE. 2. Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the federal award provided to the subrecipient from the PTE detected through audits, on-site reviews, and other means. 3. Issuing a management decision for audit findings pertaining to the federal award provided to the subrecipient from the PTE as required by 2 CFR section 200.521. Additionally, in accordance with federal requirements, the University shall maintain internal controls over federal programs designed to provide reasonable assurance that transactions are executed in compliance with federal statutes, regulations, and the terms and conditions of the federal award that could have a direct and material effect on a federal program. Condition and Context We selected thirteen subrecipients for testwork out of 82 in total and we noted that the University did not properly receive and review the single audit reports for seven of those subrecipients to ensure they had no material findings that would impact the University. The University then identified an additional six subrecipients outside of our sample where the same deficiency occurred. Cause The University had turnover in staff in the Office of Sponsored Projects during the fiscal year 2024 and this led to miscommunication which resulted in this monitoring step not being performed timely. Effect Subrecipient monitoring that is not performed timely could result in federal dollars being passed down to subrecipients with significant control or compliance issues that could impact the University. Questioned Costs There were no questioned costs related to this finding. Recommendation We recommend that the University strengthen its policies and procedures to ensure that subrecipient monitoring is being performed timely. The University should provide training to the departments responsible for these reviews.
Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether or not the subrecipient receives single audit in accordance with 2 CFR Part 200, Subpart F, and the extent to which the same or similar subaward has been audited as a major program; 3. Whether the subrecipient has new personnel or new or substantially changed systems; and 4. The extent and results of federal awarding agency monitoring (e.g., if the subrecipient also receives federal awards directly from a federal awarding agency). Monitor – Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, complies with the terms and conditions of the subaward, and achieves performance goals (2 CFR sections 200.332(d) through (f)). In addition to procedures identified as necessary based upon the evaluation of subrecipient risk or specifically required by the terms and conditions of the award, subaward monitoring must include the following: 1. Reviewing financial and programmatic (performance and special reports) required by the PTE. 2. Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the federal award provided to the subrecipient from the PTE detected through audits, on-site reviews, and other means. 3. Issuing a management decision for audit findings pertaining to the federal award provided to the subrecipient from the PTE as required by 2 CFR section 200.521. Additionally, in accordance with federal requirements, the University shall maintain internal controls over federal programs designed to provide reasonable assurance that transactions are executed in compliance with federal statutes, regulations, and the terms and conditions of the federal award that could have a direct and material effect on a federal program. Condition and Context We selected thirteen subrecipients for testwork out of 82 in total and we noted that the University did not properly receive and review the single audit reports for seven of those subrecipients to ensure they had no material findings that would impact the University. The University then identified an additional six subrecipients outside of our sample where the same deficiency occurred. Cause The University had turnover in staff in the Office of Sponsored Projects during the fiscal year 2024 and this led to miscommunication which resulted in this monitoring step not being performed timely. Effect Subrecipient monitoring that is not performed timely could result in federal dollars being passed down to subrecipients with significant control or compliance issues that could impact the University. Questioned Costs There were no questioned costs related to this finding. Recommendation We recommend that the University strengthen its policies and procedures to ensure that subrecipient monitoring is being performed timely. The University should provide training to the departments responsible for these reviews.
2024-003 – Subrecipient Monitoring – Internal Control and Compliance over Subrecipient Monitoring (Significant Deficiency) Identification of the Federal Program: Assistance Listing Number: 21.027 Assistance Listing Title: Coronavirus State and Local Fiscal Recovery Funds Federal Agency: Department of Treasury Pass-Through Entity: N/A Federal Award Number and Award Year: N/A Criteria or Specific Requirement (Including Statutory, Regulatory, or Other Citation): C.F.R. § 200.332 prescribes that the pass-through entity must conduct monitoring activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, in compliance with Federal statutes, regulations, and the terms and conditions of the subaward; and that subaward performance goals are achieved. Pass-through entity monitoring of the subrecipient must include: 1. Reviewing financial and performance reports required by the pass-through entity. 2. Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity detected through audits, on-site reviews, and written confirmation from the subrecipient, highlighting the status of actions planned or taken to address Single Audit findings related to the particular subaward. 3. Issuing a management decision for applicable audit findings pertaining only to the Federal award provided to the subrecipient from the pass-through entity as required by § 200.521. 4. The pass-through entity is responsible for resolving audit findings specifically related to the subaward and not responsible for resolving crosscutting findings. Condition: During the review of subrecipient monitoring records, several areas were noted for improvement: • For two (2) out of three (3) subrecipients, the official agreement was not formally documented. One subrecipient agreement was executed via internal resolution and email approval; another subrecipient’s agreement lacked sufficient identification and award details, omitting key funding terminology. • The City’s Subrecipient Monitoring Policy, which became effective on April 17, 2024, does not cover the period before the policy took effect. For all three (3) subrecipients, the City is unable to provide any documentation of the review of Financial and Performance Reports. • The required Pre-Award Risk Assessments have not been provided for at least one subrecipient because the City’s Subrecipient Monitoring Policy, which became effective on April 17, 2024, does not cover the period before the policy took effect. Cause: These conditions appear to stem from transitional challenges as the City implemented the new Monitoring Policy on April 17, 2024. In addition, there is an opportunity to enhance the documentation processes by moving from informal approvals to more formal subrecipient agreements, and by ensuring that Pre-Award Risk Assessments are consistently documented and maintained. Effect or Potential Effect: The City was not able to do the necessary subrecipient monitoring activities resulted to internal control and compliance requirement finding. Questioned Costs: None. Context: See condition above for context of the finding. Identification as a Repeat Finding, If Applicable: Yes. See prior year finding 2023-006. Recommendation: We recommended the City to fully implement its Monitoring Policy by formalizing subrecipient agreements, strengthening internal controls, and establishing consistent processes for documenting Pre-Award Risk Assessments and Financial and Performance Reports. Views of Responsible Officials: Management concurs.
Reference Number: 2024-002 Federal Program Title: Coronavirus State and Local Fiscal Recovery Funds Federal Assistance Listing Number: 21.027 Federal Agency: U.S. Department of Treasury Pass-Through Entity: N/A Federal Award Number and Year: Fiscal Year 2023-24 Name of Department: County Executive Office Department of Aging Department of Arts and Culture Department of Economic Opportunity Category of Finding: Subrecipient Monitoring Type of Finding: Material Weakness in Internal Control Over Compliance; Material Noncompliance Criteria In accordance with Title 2 U.S. Code of Federal Regulations (CFR) § 200.332(e), all pass-through entities (PTE) must: Monitor the activities of the subrecipient as necessary to ensure that the subrecipient complies with Federal statutes, regulations, and the terms and conditions of the subaward. The pass-through entity is responsible for monitoring the overall performance of a subrecipient to ensure that the goals and objectives of the subaward are achieved. In monitoring a subrecipient, a pass-through entity must: (1) Review financial and performance reports. (2) Ensure that the subrecipient takes corrective action on all significant developments that negatively affect the subaward. Significant developments include Single Audit findings related to the subaward, other audit findings, site visits, and written notification from a subrecipient of adverse conditions which will impact their ability to meet the milestones or the objectives of a subaward. When significant developments negatively impact the subaward, a subrecipient must provide the pass-through entity with information on their plan for corrective action and any assistance needed to resolve the situation. (3) Issue management decision for audit findings pertaining to only to the Federal award provided to the subrecipient from the pass-through entity as required by § 200.521. (4) Resolve audit findings specifically related to the subaward. However, the pass-through entity is not responsible for resolving cross-cutting audit findings that apply to the subaward and other Federal awards or subawards. If a subrecipient has a current Single Audit report and has not been excluded from receiving Federal funding (meaning, has not been debarred or suspended), the pass-through entity may rely on the subrecipient’s cognizant agency for audit or oversight agency for audit to perform audit follow-up and make management decisions related to cross-cutting audit findings in accordance with section § 200.513(a)(4)(viii). Such reliance does not eliminate the responsibility of the pass-through entity to issue subawards that conform to agency and award-specific requirements, to manage risk through ongoing subaward monitoring, and to monitor the status of the findings that are specifically related to the subaward. Condition During our audit of the Coronavirus State and Local Fiscal Recovery Funds (CSLFRF) program, we selected fifteen (15) subrecipients with active contracts with the County during FY 2023-24. We noted for seven (7) contracts administered by the Departments of Aging, Arts and Culture, and Economic Opportunity, the departments did not perform subrecipient monitoring related to the CSLFRF program during FY 2023-24. This is a repeat finding of 2023-009. Cause Due to the urgency to implement the CSLFRF program, the departments needed more time to enter into contracts with independent CPA firms to monitor the CSLFRF subrecipients and document the reviews in accordance with subrecipient monitoring requirements. Effect Failure to document monitoring results in noncompliance with the subrecipient monitoring requirements 2 CFR § 200.332(e). Questioned Costs Questioned costs were not determinable. Context Of the fifteen (15) subrecipients selected for testing, which totaled $20,981,306, from a population of 76 subrecipients with expenditures totaling $101,950,949, the departments did not perform subrecipient monitoring for seven (7) subrecipients with expenditures totaling $19,118,116. The sample was not a statistically valid sample. Recommendation We recommend the County monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes and maintain sufficient records of monitoring subrecipients in accordance with subrecipient monitoring requirements.
Reference Number: 2024-002 Federal Program Title: Coronavirus State and Local Fiscal Recovery Funds Federal Assistance Listing Number: 21.027 Federal Agency: U.S. Department of Treasury Pass-Through Entity: N/A Federal Award Number and Year: Fiscal Year 2023-24 Name of Department: County Executive Office Department of Aging Department of Arts and Culture Department of Economic Opportunity Category of Finding: Subrecipient Monitoring Type of Finding: Material Weakness in Internal Control Over Compliance; Material Noncompliance Criteria In accordance with Title 2 U.S. Code of Federal Regulations (CFR) § 200.332(e), all pass-through entities (PTE) must: Monitor the activities of the subrecipient as necessary to ensure that the subrecipient complies with Federal statutes, regulations, and the terms and conditions of the subaward. The pass-through entity is responsible for monitoring the overall performance of a subrecipient to ensure that the goals and objectives of the subaward are achieved. In monitoring a subrecipient, a pass-through entity must: (1) Review financial and performance reports. (2) Ensure that the subrecipient takes corrective action on all significant developments that negatively affect the subaward. Significant developments include Single Audit findings related to the subaward, other audit findings, site visits, and written notification from a subrecipient of adverse conditions which will impact their ability to meet the milestones or the objectives of a subaward. When significant developments negatively impact the subaward, a subrecipient must provide the pass-through entity with information on their plan for corrective action and any assistance needed to resolve the situation. (3) Issue management decision for audit findings pertaining to only to the Federal award provided to the subrecipient from the pass-through entity as required by § 200.521. (4) Resolve audit findings specifically related to the subaward. However, the pass-through entity is not responsible for resolving cross-cutting audit findings that apply to the subaward and other Federal awards or subawards. If a subrecipient has a current Single Audit report and has not been excluded from receiving Federal funding (meaning, has not been debarred or suspended), the pass-through entity may rely on the subrecipient’s cognizant agency for audit or oversight agency for audit to perform audit follow-up and make management decisions related to cross-cutting audit findings in accordance with section § 200.513(a)(4)(viii). Such reliance does not eliminate the responsibility of the pass-through entity to issue subawards that conform to agency and award-specific requirements, to manage risk through ongoing subaward monitoring, and to monitor the status of the findings that are specifically related to the subaward. Condition During our audit of the Coronavirus State and Local Fiscal Recovery Funds (CSLFRF) program, we selected fifteen (15) subrecipients with active contracts with the County during FY 2023-24. We noted for seven (7) contracts administered by the Departments of Aging, Arts and Culture, and Economic Opportunity, the departments did not perform subrecipient monitoring related to the CSLFRF program during FY 2023-24. This is a repeat finding of 2023-009. Cause Due to the urgency to implement the CSLFRF program, the departments needed more time to enter into contracts with independent CPA firms to monitor the CSLFRF subrecipients and document the reviews in accordance with subrecipient monitoring requirements. Effect Failure to document monitoring results in noncompliance with the subrecipient monitoring requirements 2 CFR § 200.332(e). Questioned Costs Questioned costs were not determinable. Context Of the fifteen (15) subrecipients selected for testing, which totaled $20,981,306, from a population of 76 subrecipients with expenditures totaling $101,950,949, the departments did not perform subrecipient monitoring for seven (7) subrecipients with expenditures totaling $19,118,116. The sample was not a statistically valid sample. Recommendation We recommend the County monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes and maintain sufficient records of monitoring subrecipients in accordance with subrecipient monitoring requirements.
2024-005 SUBRECIPIENT MONITORING Federal Agency: U.S. Department of Homeland Security/FEMA Federal Program Title & Assistance Listing Number: Disaster Grants – Public Assistance (Presidentially Declared Disasters) - 97.036 Emergency Management Performance Grants – 97.042 Homeland Security Grant Program – 97.067 Award Period: Various Type of Finding:Significant Deficiency in Internal Control over Compliance Other Non-compliance Condition: During our testing, we noted the Department did not have adequate internal controls in place to ensure compliance with subrecipient monitoring. . ALN 97.036, ALN 97.042, ALN 97.067 The Department lacked an effective process to timely provide documentation to the auditors which would evidence compliance with the Subrecipient Monitoring compliance requirement. This makes it difficult for management to monitor for compliance or for a third party to test compliance. All requested documentation was ultimate provided. ALN 97.036 o We reviewed files for 5 subrecipients, from which there were 16 ongoing projects during fiscal year 2024. Of these, 1 of 5 subrecipients did not have evidence that a risk assessment was performed. 2 of 5 subrecipients did not have adequate documentation of monitoring activities performed, including the Department's monitoring checklist. Management's Progress for Repeated Finding: Management made some progress in the performing of risk assessments and reviews of audits for non-disaster grants, but still has opportunity to improve controls in the areas described above. Criteria: According to §200.332 Requirements for pass-through entities of 2 CFR Part 200, all pass-through entities must evaluate each subrecipient's risk of noncompliance with Federal statutes, regulations, and the terms and conditions of the subaward for purposes of determining the appropriate subrecipient monitoring. In addition, the pass-through entity must monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, in compliance with Federal statutes, regulations, and the terms and conditions of the subaward; and that subaward performance goals are achieved. Pass-through entity monitoring of the subrecipient must include: (1) Reviewing financial and performance reports required by the pass-through entity. (2) Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass- through entity detected through audits, on-site reviews, and written confirmation from the subrecipient, highlighting the status of actions planned or taken to address Single Audit findings related to the particular subaward. (3) Issuing a management decision for applicable audit findings pertaining only to the Federal award provided to the subrecipient from the pass-through entity as required by §200.521 Management Decision. Department Policy No. GRA 418 Sub-Grant Recipient Monitoring effective June 30, 2017 establishes and implements policy and procedures for the Department staff engaged in the Department's sub- grant recipient monitoring process. For Mitigation Sub-Grant Monitoring, the Mitigation Specialist shall review the local progress quarterly reports due to the Department. For Non-Disaster Sub-Grant Recipient Monitoring, the Program Manager shall review the local progress quarterly reports due to the Department. Specific to Pre-Monitoring Requirements and Considerations, Department Program Staff shall perform risk-based assessments and apply the assessment to all of the Department's approved sub-recipients for monitoring purposes and risk designation.
2024-005 SUBRECIPIENT MONITORING Federal Agency: U.S. Department of Homeland Security/FEMA Federal Program Title & Assistance Listing Number: Disaster Grants – Public Assistance (Presidentially Declared Disasters) - 97.036 Emergency Management Performance Grants – 97.042 Homeland Security Grant Program – 97.067 Award Period: Various Type of Finding:Significant Deficiency in Internal Control over Compliance Other Non-compliance Condition: During our testing, we noted the Department did not have adequate internal controls in place to ensure compliance with subrecipient monitoring. . ALN 97.036, ALN 97.042, ALN 97.067 The Department lacked an effective process to timely provide documentation to the auditors which would evidence compliance with the Subrecipient Monitoring compliance requirement. This makes it difficult for management to monitor for compliance or for a third party to test compliance. All requested documentation was ultimate provided. ALN 97.036 o We reviewed files for 5 subrecipients, from which there were 16 ongoing projects during fiscal year 2024. Of these, 1 of 5 subrecipients did not have evidence that a risk assessment was performed. 2 of 5 subrecipients did not have adequate documentation of monitoring activities performed, including the Department's monitoring checklist. Management's Progress for Repeated Finding: Management made some progress in the performing of risk assessments and reviews of audits for non-disaster grants, but still has opportunity to improve controls in the areas described above. Criteria: According to §200.332 Requirements for pass-through entities of 2 CFR Part 200, all pass-through entities must evaluate each subrecipient's risk of noncompliance with Federal statutes, regulations, and the terms and conditions of the subaward for purposes of determining the appropriate subrecipient monitoring. In addition, the pass-through entity must monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, in compliance with Federal statutes, regulations, and the terms and conditions of the subaward; and that subaward performance goals are achieved. Pass-through entity monitoring of the subrecipient must include: (1) Reviewing financial and performance reports required by the pass-through entity. (2) Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass- through entity detected through audits, on-site reviews, and written confirmation from the subrecipient, highlighting the status of actions planned or taken to address Single Audit findings related to the particular subaward. (3) Issuing a management decision for applicable audit findings pertaining only to the Federal award provided to the subrecipient from the pass-through entity as required by §200.521 Management Decision. Department Policy No. GRA 418 Sub-Grant Recipient Monitoring effective June 30, 2017 establishes and implements policy and procedures for the Department staff engaged in the Department's sub- grant recipient monitoring process. For Mitigation Sub-Grant Monitoring, the Mitigation Specialist shall review the local progress quarterly reports due to the Department. For Non-Disaster Sub-Grant Recipient Monitoring, the Program Manager shall review the local progress quarterly reports due to the Department. Specific to Pre-Monitoring Requirements and Considerations, Department Program Staff shall perform risk-based assessments and apply the assessment to all of the Department's approved sub-recipients for monitoring purposes and risk designation.