2 CFR 200 § 200.521

Findings Citing § 200.521

Management decisions.

Total Findings
4,261
Across all audits in database
Showing Page
3 of 86
50 findings per page
About this section
Section 200.521 outlines the requirements for management decisions regarding audit findings, specifying that they must clarify whether findings are upheld, provide reasons, and detail expected actions from the auditee, including timelines for corrective measures. This section affects federal agencies, pass-through entities, and auditees by establishing responsibilities and timelines for addressing audit findings and ensuring accountability in federal funding.
View full section details →
FY End: 2024-06-30
Commonwealth of Pennsylvania
Compliance Requirement: M
Various Agencies Finding 2024 ¬– 015: ALN 10.565, 10.568, 10.569 – Food Distribution Cluster ALN 15.252 – Abandoned Mine Land Reclamation (AMLR) ALN 21.027 – COVID 19 – Coronavirus State and Local Fiscal Recovery Funds ALN 84.425C – COVID 19 – Education Stabilization Fund – GEER Fund ALN 84.425D – COVID 19 – Education Stabilization Fund – ESSER Fund ALN 84.425R – COVID 19 – Education Stabilization Fund – CRRSA EANS Program ALN 84.425U – COVID 19 – Education Stabilization Fund – ARP ESSER ALN ...

Various Agencies Finding 2024 ¬– 015: ALN 10.565, 10.568, 10.569 – Food Distribution Cluster ALN 15.252 – Abandoned Mine Land Reclamation (AMLR) ALN 21.027 – COVID 19 – Coronavirus State and Local Fiscal Recovery Funds ALN 84.425C – COVID 19 – Education Stabilization Fund – GEER Fund ALN 84.425D – COVID 19 – Education Stabilization Fund – ESSER Fund ALN 84.425R – COVID 19 – Education Stabilization Fund – CRRSA EANS Program ALN 84.425U – COVID 19 – Education Stabilization Fund – ARP ESSER ALN 84.425V – COVID 19 – Education Stabilization Fund – ARP EANS Program ALN 84.425W – COVID 19 – Education Stabilization Fund – ARP ESSER HCY ALN 93.044, 93.045, 93.053 – Aging Cluster (including COVID-19) ALN 93.558 – Temporary Assistance for Needy Families ALN 93.667 – Social Services Block Grant A Material Weakness and Material Noncompliance Exist in the Commonwealth’s Subrecipient Audit Resolution Process (A Similar Condition Was Noted in Prior Year Finding 2023-024) Federal Grant Number(s) and Year(s): 228PA100I1003 (6/13/2022 – 6/30/2025), 231PA445Q2204 (10/01/2022 – 9/30/2023), 231PA825Y8005 (10/01/2022 – 9/30/2023), 231PA825Y8105 (10/01/2022 – 9/30/2023), 241PA825Y8005 (10/01/2023 – 9/30/2024), 241PA825Y8105 (10/01/2023 – 9/30/2024), S18AF20004 (11/01/2017 – 10/31/2025), S19AF20004 (12/01/2018 – 11/30/2025), S21AF10015 (1/01/2021 – 12/31/2023), S22AF00017 (1/01/2022 – 12/31/2024), S23AF00002 (11/01/2022 – 10/31/2027), TN75GJE1S7G3 (3/03/2021 – 12/31/2024), S425W210039 (4/23/2021 – 9/30/2024), S425U210028 (3/24/2021– 9/30/2024), S425D210028 (1/05/2021 – 9/30/2024), S425C200013 (5/18/2020 – 4/01/2024), S425R210037 (3/13/2020 – 9/30/2024), S425V210037 (11/16/2021 – 9/30/2024), S425C210013 (3/13/2020 – 9/30/2024), 2101PACMC6 (4/01/2021 – 9/30/2024), 2101PAHDC6 (4/01/2021 – 9/30/2024), 2101PAPHC6 (4/01/2021 – 9/30/2024), 2101PASSC6 (4/01/2021 – 9/30/2024), 2201PAOASS (10/01/2021 – 9/30/2023), 2201PASTPH (1/01/2022 – 9/30/2024), 2301PAOACM (10/01/2022 – 9/30/2024), 2301PAOAHD (10/01/2022 – 9/30/2024), 2301PAOANS (10/01/2022 – 9/30/2024), 2301PAOASS (10/01/2022 – 9/30/2024), 2401PAOACM (10/01/2023 – 9/30/2025), 2401PAOAHD (10/01/2023 – 9/30/2025), 2401PAOANS (10/01/2023 – 9/30/2025), 2401PAOASS (10/01/2023 – 9/30/2025), 2101PATANF (10/01/2020 – 9/30/2021), 2201PATANF (10/01/2021 – 9/30/2022), 2301PATANF (10/01/2022 – 9/30/2023), 2401PATANF (10/01/2023 – 9/30/2024), 2301PASOSR (10/01/2022 – 9/30/2024), 2401PASOSR (10/01/2023 – 9/30/2025), 2301PATANF (10/01/2022 – 9/30/2024), 2401PATANF (10/01/2023 – 9/30/2025) Type of Finding: Significant Deficiency in Internal Control over Compliance, Other Matters for Abandoned Mine Land Reclamation (AMLR), Temporary Assistance for Needy Families, Coronavirus State and Local Fiscal Recovery Funds, and Social Services Block Grant Material Weakness in Internal Control over Compliance, Material Noncompliance for Food Distribution Cluster, Education Stabilization Fund, and Aging Cluster Compliance Requirement: Subrecipient Monitoring Condition: Under the Commonwealth of Pennsylvania's (Commonwealth) implementation of the Single Audit Act, review and resolution of subrecipient Single Audit reports is split into two stages. The Office of the Budget’s Bureau of Accounting and Financial Management (OB-BAFM) ensures the reports meet technical standards through a centralized desk review process. The various funding agencies in the Commonwealth are responsible for making a management decision on each finding within six months of the Federal Audit Clearinghouse’s (FAC) Acceptance date for audits subject to Uniform Guidance and to ensure appropriate corrective action is taken by the subrecipient (except for Uniform Guidance Finding 2024 ¬– 015: (continued) audits under U.S. Department of Labor programs which are permitted 12 months for management decisions in accordance with 2 CFR Section 2900.21). Each Commonwealth agency is also responsible for reviewing financial information in each audit report to determine whether the audit included all pass-through funding provided by the agency to ensure pass-through funds were subject to audit. Most agencies meet this requirement by performing Schedule of Expenditures of Federal Awards (SEFA) reconciliations. The agency is also required to adjust Commonwealth records, if necessary. Our fiscal year ended June 30, 2024 audit of the Commonwealth’s process for review and resolution of subrecipient Single Audits included an evaluation of the Commonwealth’s fiscal year ended June 30, 2023 subrecipient audit universe for audits due for submission to the FAC during the fiscal year ended June 30, 2024. We also evaluated the Commonwealth’s review of 45 subrecipient audit reports with findings in major programs/clusters which were identified on the Commonwealth agencies’ tracking lists during the fiscal year ended June 30, 2024 and required management decisions by Commonwealth agencies. Our testing disclosed the following audit exceptions regarding the Commonwealth agencies’ review of subrecipient audit reports: • Pennsylvania Department of Aging (PDOA): Our testing disclosed that PDOA did not have procedures in place to track audit reports including having an audit tracking list. The time period for making a management decision on findings was approximately 17.6 months to over 18 months after the FAC Acceptance date for two out of two audit reports with findings. There was also a delay in PDOA’s procedures to ensure the subrecipient SEFAs were accurate so that major programs were properly determined and subjected to audit. • Department of Agriculture (PDA): Our testing disclosed that PDA did not have procedures in place to track audit reports including having an audit tracking list. The time period for making a management decision on findings was approximately 8.7 months to over 16 months after the FAC Acceptance date for four out of four audit reports with findings. • Department of Education (PDE): The time period for making a management decision on findings was approximately 7.8 months to over 12 months after the FAC Acceptance date for seven out of 22 audit reports with findings. There were additional audit reports with findings listed on PDE’s audit tracking list where management decisions were not made timely. • Department of Environmental Protection (DEP): The time period for making a management decision on findings was approximately 11.6 months to over 12 months after the FAC Acceptance date for two out of two audit reports with findings. Our testing disclosed for the two late audit reports, DEP made management decisions timely. However, DEP did not notify the subrecipients of the management decisions within the required six month time period after the audit reports FAC Acceptance date. • Department of Human Services (DHS): The time period for making a management decision on findings was approximately 7.2 months after the FAC Acceptance date for one out of two audit reports with findings. Our testing disclosed for the one late audit report DHS made a management decision timely. However, DHS did not notify the subrecipient of the management decision within the required six month time period after the audit reports FAC Acceptance date. Criteria: 2 CFR §200.332, Requirements for pass-through entities, states in part: All pass-through entities must: (d) Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, in compliance with Federal statutes, regulations, and the terms and conditions of the subaward, and that subaward performance goals are achieved. Pass-through entity monitoring of the subrecipient must include: Finding 2024 ¬– 015: (continued) (2) Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity detected through audits, on-site reviews, and written confirmation from the subrecipient, highlighting the status of actions planned or taken to address Single Audit findings related to the particular subaward. (3) Issuing a management decision for applicable audit findings pertaining only to the Federal award provided to the subrecipient from the pass-through entity as required by §200.521 [Management decision]. (f) Verify that every subrecipient is audited as required by Subpart F [Audit Requirements] of this part when it is expected that the subrecipient’s Federal awards expended during the respective fiscal year equaled or exceeded the threshold set forth in §200.501 [Audit requirements]. (g) Consider whether the results of the subrecipient’s audit, on-site review, or other monitoring indicate conditions that necessitate adjustments to the pass-through entity’s own records. (h) Consider taking enforcement action against noncompliant subrecipients as described in §200.339 [Remedies for noncompliance] of this part and in program regulations. In order to carry out these responsibilities properly, good internal control dictates that state pass-through agencies ensure subrecipient Single Audit SEFAs are representative of state payment records each year, and that the related federal programs have been properly subjected to Single Audit procedures. 2 CFR §200.512, Report submission, states in part: (a) General. (1) The audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor’s report(s), or nine months after the end of the audit period. If the due date falls on a Saturday, Sunday, or Federal holiday, the reporting package is due the next business day. 2 CFR §200.521, Management decision, states in part: (a) General. The management decision must clearly state whether or not the finding is sustained, the reasons for the decision, and the expected auditee action to repay disallowed costs, make financial adjustments, or take other action. (d) Time requirements. The Federal awarding agency or pass-through entity responsible for issuing a management decision must do so within six months of acceptance of the audit report by the FAC. The auditee must initiate and proceed with corrective action as rapidly as possible and corrective action should begin no later than upon receipt of the audit report. 2 CFR §200.505, Sanctions, states: In cases of continued inability or unwillingness to have an audit conducted in accordance with this part, Federal agencies and pass-through entities must take appropriate action as provided in §200.339 [Remedies for noncompliance]. 2 CFR §200.339, Remedies for noncompliance, states in part: If a non-Federal entity fails to comply with the U.S. Constitution, Federal statutes, regulations or the terms and conditions of a Federal award, the Federal awarding agency or pass-through entity may impose additional conditions, as described in §200.208 [Specific conditions]. If the Federal awarding agency or pass-through entity determines that noncompliance cannot be remedied by imposing additional conditions, the federal awarding agency or pass-through entity may take one or more of the following actions, as appropriate in the circumstances. Finding 2024 ¬– 015: (continued) (a) Temporarily withhold cash payments pending correction of the deficiency by the non-Federal entity or more severe enforcement action by the Federal awarding agency or pass-through entity. (b) Disallow (that is, deny both use of funds and any applicable matching credit for) all or part of the cost of the activity or action not in compliance. (c) Wholly or partly suspend or terminate the Federal award. (d) Initiate suspension or debarment proceedings as authorized under 2 CFR Part 180 and Federal awarding agency regulations (or in the case of a pass-through entity, recommend such a proceeding be initiated by a Federal awarding agency). (e) Withhold further Federal awards for the project or program. (f) Take other remedies that may be legally available. To ensure Commonwealth enforcement of federal regulations for subrecipient noncompliance with audit requirements, Commonwealth Management Directive 325.08, Amended – Remedies for Recipient Noncompliance with Audit Requirements, Section 5 related to policy, states in part: (a) Agencies must develop and implement remedial action that reflects the unique requirements of each program… (b) The remedial action should be implemented within six months from the date the first remedial action is initiated. At the end of the six-month period, the recipient should take the appropriate corrective action or the final stage of remedial action should be imposed on the recipient. Examples of remedial action include, but are not limited to: (1) Meeting or calling the recipient to explain the importance and benefits of the audit and audit resolution processes, emphasizing the value of the audit as an administrative tool and the Commonwealth’s reliance on an acceptable audit and prompt resolution as evidence of the recipient’s ability to properly administer the program. (2) Encouraging the entity to establish an audit committee or designate an individual as the single point of contact to: (a) Communicate regarding the audit. (b) Arrange for and oversee the audit. (c) Direct and monitor audit resolution. (3) Providing technical assistance to the recipient in devising and implementing an appropriate plan to remedy the noncompliance. (4) Withholding a portion of assistance payments until the noncompliance is resolved. (5) Withholding or disallowing overhead costs until the noncompliance is resolved. (6) Suspending the assistance agreement until the noncompliance is resolved. (7) Terminating the assistance agreement with the recipient and, if necessary, seeking alternative entities to administer the program. Finding 2024 ¬– 015: (continued) Management Directive 325.09, Amended – Processing Subrecipient Single Audits of Federal Pass-Through Funds, Section 7 related to procedures, states in part: c. Agencies. (2) Evaluate single audit report submissions received from BAFM to determine program purpose acceptability by verifying, at a minimum, that all agency-funded programs are properly included on the applicable financial schedules; that findings affecting the agency contain sufficient information to facilitate a management decision; and that the subrecipient has submitted an adequate corrective action plan. (5) Issue management decisions relative to audit findings and crosscutting findings assigned to the agency for resolution, as required by 2 CFR §200.521. If responsible for the resolution of crosscutting findings, notify the affected agency or agencies upon resolution of such findings. (6) Impose or coordinate the imposition of remedial action in accordance with 2 CFR Part 200.339 and Management Directive 325.08 Amended, Remedies for Recipient Noncompliance with Audit Requirements, when subrecipients fail to comply with the provisions of Subpart F. Management Directive 325.12, Amended – Standards for Enterprise Risk Management in Commonwealth Agencies, adopted the internal control framework outlined in the United States Government Accountability Office’s, Standards for Internal Control in the Federal Government (Green Book). The Green Book states in part: Management should establish and operate monitoring activities to monitor the internal control system and evaluate the results. Management should remediate identified internal control deficiencies on a timely basis. Cause: One reason provided by Commonwealth management for untimely audit resolution in the various agencies, including making management decisions, approving corrective action, and performing procedures to ensure the accuracy of subrecipient SEFAs, was either a change in staff or a lack of staff to follow up and process subrecipient audit reports more timely. Effect: Since required management decisions were not made within six months to ensure appropriate corrective action was taken on audits received from subrecipients, the Commonwealth did not comply with federal regulations, and subrecipients were not made aware of acceptance or rejection of corrective action plans in a timely manner. Further, noncompliance may recur in future periods if control deficiencies are not corrected on a timely basis, and there is an increased risk of unallowable charges being made to federal programs if corrective action and recovery of questioned costs is not timely. Regarding the SEFA reviews or alternate procedures which are not being performed timely, there is an increased risk that subrecipients could be misspending and/or inappropriately tracking and reporting federal funds over multiple year periods, and these discrepancies may not be properly monitored, detected, and corrected by agency personnel on a timely basis as required. Recommendation: We recommend that the above weaknesses that cause untimely subrecipient Single Audit resolution, including untimely management decisions on findings, and untimely review of the SEFA or alternate procedures be corrected to ensure compliance with federal requirements and Commonwealth Management Directives, and to better ensure timelier subrecipient compliance with program requirements. PDOA Response: PDOA agrees with the finding. PDA Response: PDA agrees with the finding. PDE Response: PDE agrees with the finding. DEP Response: DEP agrees with the finding. Finding 2024 ¬– 015: (continued) DHS Response: DHS agrees that there was an exception where human error caused a management decision on one single audit report to be issued untimely; in this instance, the decision itself was made timely but was not communicated in a timely manner. DHS disagrees that an isolated incident due to human error signifies a weakness in internal controls. This was not a systemic issue and therefore should not have been considered a significant deficiency in internal controls, and DHS should not have been included in this finding. Auditors’ Conclusion: The agency responses from PDOA, PDA, PDE, and DEP indicate agreement with the finding. DHS agrees that an error occurred resulting in untimely submission of one management decision, DHS disagrees that the error represents a significant deficiency. We acknowledge the error occurred due to an oversight and is not a systemic error, however, the error resulted in noncompliance with one of two audit reports that required timely management decisions. We will evaluate corrective action in the subsequent audit. The finding remains as stated. Questioned Costs: The amount of questioned costs cannot be determined.

FY End: 2024-06-30
Commonwealth of Pennsylvania
Compliance Requirement: M
Various Agencies Finding 2024 ¬– 015: ALN 10.565, 10.568, 10.569 – Food Distribution Cluster ALN 15.252 – Abandoned Mine Land Reclamation (AMLR) ALN 21.027 – COVID 19 – Coronavirus State and Local Fiscal Recovery Funds ALN 84.425C – COVID 19 – Education Stabilization Fund – GEER Fund ALN 84.425D – COVID 19 – Education Stabilization Fund – ESSER Fund ALN 84.425R – COVID 19 – Education Stabilization Fund – CRRSA EANS Program ALN 84.425U – COVID 19 – Education Stabilization Fund – ARP ESSER ALN ...

Various Agencies Finding 2024 ¬– 015: ALN 10.565, 10.568, 10.569 – Food Distribution Cluster ALN 15.252 – Abandoned Mine Land Reclamation (AMLR) ALN 21.027 – COVID 19 – Coronavirus State and Local Fiscal Recovery Funds ALN 84.425C – COVID 19 – Education Stabilization Fund – GEER Fund ALN 84.425D – COVID 19 – Education Stabilization Fund – ESSER Fund ALN 84.425R – COVID 19 – Education Stabilization Fund – CRRSA EANS Program ALN 84.425U – COVID 19 – Education Stabilization Fund – ARP ESSER ALN 84.425V – COVID 19 – Education Stabilization Fund – ARP EANS Program ALN 84.425W – COVID 19 – Education Stabilization Fund – ARP ESSER HCY ALN 93.044, 93.045, 93.053 – Aging Cluster (including COVID-19) ALN 93.558 – Temporary Assistance for Needy Families ALN 93.667 – Social Services Block Grant A Material Weakness and Material Noncompliance Exist in the Commonwealth’s Subrecipient Audit Resolution Process (A Similar Condition Was Noted in Prior Year Finding 2023-024) Federal Grant Number(s) and Year(s): 228PA100I1003 (6/13/2022 – 6/30/2025), 231PA445Q2204 (10/01/2022 – 9/30/2023), 231PA825Y8005 (10/01/2022 – 9/30/2023), 231PA825Y8105 (10/01/2022 – 9/30/2023), 241PA825Y8005 (10/01/2023 – 9/30/2024), 241PA825Y8105 (10/01/2023 – 9/30/2024), S18AF20004 (11/01/2017 – 10/31/2025), S19AF20004 (12/01/2018 – 11/30/2025), S21AF10015 (1/01/2021 – 12/31/2023), S22AF00017 (1/01/2022 – 12/31/2024), S23AF00002 (11/01/2022 – 10/31/2027), TN75GJE1S7G3 (3/03/2021 – 12/31/2024), S425W210039 (4/23/2021 – 9/30/2024), S425U210028 (3/24/2021– 9/30/2024), S425D210028 (1/05/2021 – 9/30/2024), S425C200013 (5/18/2020 – 4/01/2024), S425R210037 (3/13/2020 – 9/30/2024), S425V210037 (11/16/2021 – 9/30/2024), S425C210013 (3/13/2020 – 9/30/2024), 2101PACMC6 (4/01/2021 – 9/30/2024), 2101PAHDC6 (4/01/2021 – 9/30/2024), 2101PAPHC6 (4/01/2021 – 9/30/2024), 2101PASSC6 (4/01/2021 – 9/30/2024), 2201PAOASS (10/01/2021 – 9/30/2023), 2201PASTPH (1/01/2022 – 9/30/2024), 2301PAOACM (10/01/2022 – 9/30/2024), 2301PAOAHD (10/01/2022 – 9/30/2024), 2301PAOANS (10/01/2022 – 9/30/2024), 2301PAOASS (10/01/2022 – 9/30/2024), 2401PAOACM (10/01/2023 – 9/30/2025), 2401PAOAHD (10/01/2023 – 9/30/2025), 2401PAOANS (10/01/2023 – 9/30/2025), 2401PAOASS (10/01/2023 – 9/30/2025), 2101PATANF (10/01/2020 – 9/30/2021), 2201PATANF (10/01/2021 – 9/30/2022), 2301PATANF (10/01/2022 – 9/30/2023), 2401PATANF (10/01/2023 – 9/30/2024), 2301PASOSR (10/01/2022 – 9/30/2024), 2401PASOSR (10/01/2023 – 9/30/2025), 2301PATANF (10/01/2022 – 9/30/2024), 2401PATANF (10/01/2023 – 9/30/2025) Type of Finding: Significant Deficiency in Internal Control over Compliance, Other Matters for Abandoned Mine Land Reclamation (AMLR), Temporary Assistance for Needy Families, Coronavirus State and Local Fiscal Recovery Funds, and Social Services Block Grant Material Weakness in Internal Control over Compliance, Material Noncompliance for Food Distribution Cluster, Education Stabilization Fund, and Aging Cluster Compliance Requirement: Subrecipient Monitoring Condition: Under the Commonwealth of Pennsylvania's (Commonwealth) implementation of the Single Audit Act, review and resolution of subrecipient Single Audit reports is split into two stages. The Office of the Budget’s Bureau of Accounting and Financial Management (OB-BAFM) ensures the reports meet technical standards through a centralized desk review process. The various funding agencies in the Commonwealth are responsible for making a management decision on each finding within six months of the Federal Audit Clearinghouse’s (FAC) Acceptance date for audits subject to Uniform Guidance and to ensure appropriate corrective action is taken by the subrecipient (except for Uniform Guidance Finding 2024 ¬– 015: (continued) audits under U.S. Department of Labor programs which are permitted 12 months for management decisions in accordance with 2 CFR Section 2900.21). Each Commonwealth agency is also responsible for reviewing financial information in each audit report to determine whether the audit included all pass-through funding provided by the agency to ensure pass-through funds were subject to audit. Most agencies meet this requirement by performing Schedule of Expenditures of Federal Awards (SEFA) reconciliations. The agency is also required to adjust Commonwealth records, if necessary. Our fiscal year ended June 30, 2024 audit of the Commonwealth’s process for review and resolution of subrecipient Single Audits included an evaluation of the Commonwealth’s fiscal year ended June 30, 2023 subrecipient audit universe for audits due for submission to the FAC during the fiscal year ended June 30, 2024. We also evaluated the Commonwealth’s review of 45 subrecipient audit reports with findings in major programs/clusters which were identified on the Commonwealth agencies’ tracking lists during the fiscal year ended June 30, 2024 and required management decisions by Commonwealth agencies. Our testing disclosed the following audit exceptions regarding the Commonwealth agencies’ review of subrecipient audit reports: • Pennsylvania Department of Aging (PDOA): Our testing disclosed that PDOA did not have procedures in place to track audit reports including having an audit tracking list. The time period for making a management decision on findings was approximately 17.6 months to over 18 months after the FAC Acceptance date for two out of two audit reports with findings. There was also a delay in PDOA’s procedures to ensure the subrecipient SEFAs were accurate so that major programs were properly determined and subjected to audit. • Department of Agriculture (PDA): Our testing disclosed that PDA did not have procedures in place to track audit reports including having an audit tracking list. The time period for making a management decision on findings was approximately 8.7 months to over 16 months after the FAC Acceptance date for four out of four audit reports with findings. • Department of Education (PDE): The time period for making a management decision on findings was approximately 7.8 months to over 12 months after the FAC Acceptance date for seven out of 22 audit reports with findings. There were additional audit reports with findings listed on PDE’s audit tracking list where management decisions were not made timely. • Department of Environmental Protection (DEP): The time period for making a management decision on findings was approximately 11.6 months to over 12 months after the FAC Acceptance date for two out of two audit reports with findings. Our testing disclosed for the two late audit reports, DEP made management decisions timely. However, DEP did not notify the subrecipients of the management decisions within the required six month time period after the audit reports FAC Acceptance date. • Department of Human Services (DHS): The time period for making a management decision on findings was approximately 7.2 months after the FAC Acceptance date for one out of two audit reports with findings. Our testing disclosed for the one late audit report DHS made a management decision timely. However, DHS did not notify the subrecipient of the management decision within the required six month time period after the audit reports FAC Acceptance date. Criteria: 2 CFR §200.332, Requirements for pass-through entities, states in part: All pass-through entities must: (d) Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, in compliance with Federal statutes, regulations, and the terms and conditions of the subaward, and that subaward performance goals are achieved. Pass-through entity monitoring of the subrecipient must include: Finding 2024 ¬– 015: (continued) (2) Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity detected through audits, on-site reviews, and written confirmation from the subrecipient, highlighting the status of actions planned or taken to address Single Audit findings related to the particular subaward. (3) Issuing a management decision for applicable audit findings pertaining only to the Federal award provided to the subrecipient from the pass-through entity as required by §200.521 [Management decision]. (f) Verify that every subrecipient is audited as required by Subpart F [Audit Requirements] of this part when it is expected that the subrecipient’s Federal awards expended during the respective fiscal year equaled or exceeded the threshold set forth in §200.501 [Audit requirements]. (g) Consider whether the results of the subrecipient’s audit, on-site review, or other monitoring indicate conditions that necessitate adjustments to the pass-through entity’s own records. (h) Consider taking enforcement action against noncompliant subrecipients as described in §200.339 [Remedies for noncompliance] of this part and in program regulations. In order to carry out these responsibilities properly, good internal control dictates that state pass-through agencies ensure subrecipient Single Audit SEFAs are representative of state payment records each year, and that the related federal programs have been properly subjected to Single Audit procedures. 2 CFR §200.512, Report submission, states in part: (a) General. (1) The audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor’s report(s), or nine months after the end of the audit period. If the due date falls on a Saturday, Sunday, or Federal holiday, the reporting package is due the next business day. 2 CFR §200.521, Management decision, states in part: (a) General. The management decision must clearly state whether or not the finding is sustained, the reasons for the decision, and the expected auditee action to repay disallowed costs, make financial adjustments, or take other action. (d) Time requirements. The Federal awarding agency or pass-through entity responsible for issuing a management decision must do so within six months of acceptance of the audit report by the FAC. The auditee must initiate and proceed with corrective action as rapidly as possible and corrective action should begin no later than upon receipt of the audit report. 2 CFR §200.505, Sanctions, states: In cases of continued inability or unwillingness to have an audit conducted in accordance with this part, Federal agencies and pass-through entities must take appropriate action as provided in §200.339 [Remedies for noncompliance]. 2 CFR §200.339, Remedies for noncompliance, states in part: If a non-Federal entity fails to comply with the U.S. Constitution, Federal statutes, regulations or the terms and conditions of a Federal award, the Federal awarding agency or pass-through entity may impose additional conditions, as described in §200.208 [Specific conditions]. If the Federal awarding agency or pass-through entity determines that noncompliance cannot be remedied by imposing additional conditions, the federal awarding agency or pass-through entity may take one or more of the following actions, as appropriate in the circumstances. Finding 2024 ¬– 015: (continued) (a) Temporarily withhold cash payments pending correction of the deficiency by the non-Federal entity or more severe enforcement action by the Federal awarding agency or pass-through entity. (b) Disallow (that is, deny both use of funds and any applicable matching credit for) all or part of the cost of the activity or action not in compliance. (c) Wholly or partly suspend or terminate the Federal award. (d) Initiate suspension or debarment proceedings as authorized under 2 CFR Part 180 and Federal awarding agency regulations (or in the case of a pass-through entity, recommend such a proceeding be initiated by a Federal awarding agency). (e) Withhold further Federal awards for the project or program. (f) Take other remedies that may be legally available. To ensure Commonwealth enforcement of federal regulations for subrecipient noncompliance with audit requirements, Commonwealth Management Directive 325.08, Amended – Remedies for Recipient Noncompliance with Audit Requirements, Section 5 related to policy, states in part: (a) Agencies must develop and implement remedial action that reflects the unique requirements of each program… (b) The remedial action should be implemented within six months from the date the first remedial action is initiated. At the end of the six-month period, the recipient should take the appropriate corrective action or the final stage of remedial action should be imposed on the recipient. Examples of remedial action include, but are not limited to: (1) Meeting or calling the recipient to explain the importance and benefits of the audit and audit resolution processes, emphasizing the value of the audit as an administrative tool and the Commonwealth’s reliance on an acceptable audit and prompt resolution as evidence of the recipient’s ability to properly administer the program. (2) Encouraging the entity to establish an audit committee or designate an individual as the single point of contact to: (a) Communicate regarding the audit. (b) Arrange for and oversee the audit. (c) Direct and monitor audit resolution. (3) Providing technical assistance to the recipient in devising and implementing an appropriate plan to remedy the noncompliance. (4) Withholding a portion of assistance payments until the noncompliance is resolved. (5) Withholding or disallowing overhead costs until the noncompliance is resolved. (6) Suspending the assistance agreement until the noncompliance is resolved. (7) Terminating the assistance agreement with the recipient and, if necessary, seeking alternative entities to administer the program. Finding 2024 ¬– 015: (continued) Management Directive 325.09, Amended – Processing Subrecipient Single Audits of Federal Pass-Through Funds, Section 7 related to procedures, states in part: c. Agencies. (2) Evaluate single audit report submissions received from BAFM to determine program purpose acceptability by verifying, at a minimum, that all agency-funded programs are properly included on the applicable financial schedules; that findings affecting the agency contain sufficient information to facilitate a management decision; and that the subrecipient has submitted an adequate corrective action plan. (5) Issue management decisions relative to audit findings and crosscutting findings assigned to the agency for resolution, as required by 2 CFR §200.521. If responsible for the resolution of crosscutting findings, notify the affected agency or agencies upon resolution of such findings. (6) Impose or coordinate the imposition of remedial action in accordance with 2 CFR Part 200.339 and Management Directive 325.08 Amended, Remedies for Recipient Noncompliance with Audit Requirements, when subrecipients fail to comply with the provisions of Subpart F. Management Directive 325.12, Amended – Standards for Enterprise Risk Management in Commonwealth Agencies, adopted the internal control framework outlined in the United States Government Accountability Office’s, Standards for Internal Control in the Federal Government (Green Book). The Green Book states in part: Management should establish and operate monitoring activities to monitor the internal control system and evaluate the results. Management should remediate identified internal control deficiencies on a timely basis. Cause: One reason provided by Commonwealth management for untimely audit resolution in the various agencies, including making management decisions, approving corrective action, and performing procedures to ensure the accuracy of subrecipient SEFAs, was either a change in staff or a lack of staff to follow up and process subrecipient audit reports more timely. Effect: Since required management decisions were not made within six months to ensure appropriate corrective action was taken on audits received from subrecipients, the Commonwealth did not comply with federal regulations, and subrecipients were not made aware of acceptance or rejection of corrective action plans in a timely manner. Further, noncompliance may recur in future periods if control deficiencies are not corrected on a timely basis, and there is an increased risk of unallowable charges being made to federal programs if corrective action and recovery of questioned costs is not timely. Regarding the SEFA reviews or alternate procedures which are not being performed timely, there is an increased risk that subrecipients could be misspending and/or inappropriately tracking and reporting federal funds over multiple year periods, and these discrepancies may not be properly monitored, detected, and corrected by agency personnel on a timely basis as required. Recommendation: We recommend that the above weaknesses that cause untimely subrecipient Single Audit resolution, including untimely management decisions on findings, and untimely review of the SEFA or alternate procedures be corrected to ensure compliance with federal requirements and Commonwealth Management Directives, and to better ensure timelier subrecipient compliance with program requirements. PDOA Response: PDOA agrees with the finding. PDA Response: PDA agrees with the finding. PDE Response: PDE agrees with the finding. DEP Response: DEP agrees with the finding. Finding 2024 ¬– 015: (continued) DHS Response: DHS agrees that there was an exception where human error caused a management decision on one single audit report to be issued untimely; in this instance, the decision itself was made timely but was not communicated in a timely manner. DHS disagrees that an isolated incident due to human error signifies a weakness in internal controls. This was not a systemic issue and therefore should not have been considered a significant deficiency in internal controls, and DHS should not have been included in this finding. Auditors’ Conclusion: The agency responses from PDOA, PDA, PDE, and DEP indicate agreement with the finding. DHS agrees that an error occurred resulting in untimely submission of one management decision, DHS disagrees that the error represents a significant deficiency. We acknowledge the error occurred due to an oversight and is not a systemic error, however, the error resulted in noncompliance with one of two audit reports that required timely management decisions. We will evaluate corrective action in the subsequent audit. The finding remains as stated. Questioned Costs: The amount of questioned costs cannot be determined.

FY End: 2024-06-30
Commonwealth of Pennsylvania
Compliance Requirement: M
Various Agencies Finding 2024 ¬– 015: ALN 10.565, 10.568, 10.569 – Food Distribution Cluster ALN 15.252 – Abandoned Mine Land Reclamation (AMLR) ALN 21.027 – COVID 19 – Coronavirus State and Local Fiscal Recovery Funds ALN 84.425C – COVID 19 – Education Stabilization Fund – GEER Fund ALN 84.425D – COVID 19 – Education Stabilization Fund – ESSER Fund ALN 84.425R – COVID 19 – Education Stabilization Fund – CRRSA EANS Program ALN 84.425U – COVID 19 – Education Stabilization Fund – ARP ESSER ALN ...

Various Agencies Finding 2024 ¬– 015: ALN 10.565, 10.568, 10.569 – Food Distribution Cluster ALN 15.252 – Abandoned Mine Land Reclamation (AMLR) ALN 21.027 – COVID 19 – Coronavirus State and Local Fiscal Recovery Funds ALN 84.425C – COVID 19 – Education Stabilization Fund – GEER Fund ALN 84.425D – COVID 19 – Education Stabilization Fund – ESSER Fund ALN 84.425R – COVID 19 – Education Stabilization Fund – CRRSA EANS Program ALN 84.425U – COVID 19 – Education Stabilization Fund – ARP ESSER ALN 84.425V – COVID 19 – Education Stabilization Fund – ARP EANS Program ALN 84.425W – COVID 19 – Education Stabilization Fund – ARP ESSER HCY ALN 93.044, 93.045, 93.053 – Aging Cluster (including COVID-19) ALN 93.558 – Temporary Assistance for Needy Families ALN 93.667 – Social Services Block Grant A Material Weakness and Material Noncompliance Exist in the Commonwealth’s Subrecipient Audit Resolution Process (A Similar Condition Was Noted in Prior Year Finding 2023-024) Federal Grant Number(s) and Year(s): 228PA100I1003 (6/13/2022 – 6/30/2025), 231PA445Q2204 (10/01/2022 – 9/30/2023), 231PA825Y8005 (10/01/2022 – 9/30/2023), 231PA825Y8105 (10/01/2022 – 9/30/2023), 241PA825Y8005 (10/01/2023 – 9/30/2024), 241PA825Y8105 (10/01/2023 – 9/30/2024), S18AF20004 (11/01/2017 – 10/31/2025), S19AF20004 (12/01/2018 – 11/30/2025), S21AF10015 (1/01/2021 – 12/31/2023), S22AF00017 (1/01/2022 – 12/31/2024), S23AF00002 (11/01/2022 – 10/31/2027), TN75GJE1S7G3 (3/03/2021 – 12/31/2024), S425W210039 (4/23/2021 – 9/30/2024), S425U210028 (3/24/2021– 9/30/2024), S425D210028 (1/05/2021 – 9/30/2024), S425C200013 (5/18/2020 – 4/01/2024), S425R210037 (3/13/2020 – 9/30/2024), S425V210037 (11/16/2021 – 9/30/2024), S425C210013 (3/13/2020 – 9/30/2024), 2101PACMC6 (4/01/2021 – 9/30/2024), 2101PAHDC6 (4/01/2021 – 9/30/2024), 2101PAPHC6 (4/01/2021 – 9/30/2024), 2101PASSC6 (4/01/2021 – 9/30/2024), 2201PAOASS (10/01/2021 – 9/30/2023), 2201PASTPH (1/01/2022 – 9/30/2024), 2301PAOACM (10/01/2022 – 9/30/2024), 2301PAOAHD (10/01/2022 – 9/30/2024), 2301PAOANS (10/01/2022 – 9/30/2024), 2301PAOASS (10/01/2022 – 9/30/2024), 2401PAOACM (10/01/2023 – 9/30/2025), 2401PAOAHD (10/01/2023 – 9/30/2025), 2401PAOANS (10/01/2023 – 9/30/2025), 2401PAOASS (10/01/2023 – 9/30/2025), 2101PATANF (10/01/2020 – 9/30/2021), 2201PATANF (10/01/2021 – 9/30/2022), 2301PATANF (10/01/2022 – 9/30/2023), 2401PATANF (10/01/2023 – 9/30/2024), 2301PASOSR (10/01/2022 – 9/30/2024), 2401PASOSR (10/01/2023 – 9/30/2025), 2301PATANF (10/01/2022 – 9/30/2024), 2401PATANF (10/01/2023 – 9/30/2025) Type of Finding: Significant Deficiency in Internal Control over Compliance, Other Matters for Abandoned Mine Land Reclamation (AMLR), Temporary Assistance for Needy Families, Coronavirus State and Local Fiscal Recovery Funds, and Social Services Block Grant Material Weakness in Internal Control over Compliance, Material Noncompliance for Food Distribution Cluster, Education Stabilization Fund, and Aging Cluster Compliance Requirement: Subrecipient Monitoring Condition: Under the Commonwealth of Pennsylvania's (Commonwealth) implementation of the Single Audit Act, review and resolution of subrecipient Single Audit reports is split into two stages. The Office of the Budget’s Bureau of Accounting and Financial Management (OB-BAFM) ensures the reports meet technical standards through a centralized desk review process. The various funding agencies in the Commonwealth are responsible for making a management decision on each finding within six months of the Federal Audit Clearinghouse’s (FAC) Acceptance date for audits subject to Uniform Guidance and to ensure appropriate corrective action is taken by the subrecipient (except for Uniform Guidance Finding 2024 ¬– 015: (continued) audits under U.S. Department of Labor programs which are permitted 12 months for management decisions in accordance with 2 CFR Section 2900.21). Each Commonwealth agency is also responsible for reviewing financial information in each audit report to determine whether the audit included all pass-through funding provided by the agency to ensure pass-through funds were subject to audit. Most agencies meet this requirement by performing Schedule of Expenditures of Federal Awards (SEFA) reconciliations. The agency is also required to adjust Commonwealth records, if necessary. Our fiscal year ended June 30, 2024 audit of the Commonwealth’s process for review and resolution of subrecipient Single Audits included an evaluation of the Commonwealth’s fiscal year ended June 30, 2023 subrecipient audit universe for audits due for submission to the FAC during the fiscal year ended June 30, 2024. We also evaluated the Commonwealth’s review of 45 subrecipient audit reports with findings in major programs/clusters which were identified on the Commonwealth agencies’ tracking lists during the fiscal year ended June 30, 2024 and required management decisions by Commonwealth agencies. Our testing disclosed the following audit exceptions regarding the Commonwealth agencies’ review of subrecipient audit reports: • Pennsylvania Department of Aging (PDOA): Our testing disclosed that PDOA did not have procedures in place to track audit reports including having an audit tracking list. The time period for making a management decision on findings was approximately 17.6 months to over 18 months after the FAC Acceptance date for two out of two audit reports with findings. There was also a delay in PDOA’s procedures to ensure the subrecipient SEFAs were accurate so that major programs were properly determined and subjected to audit. • Department of Agriculture (PDA): Our testing disclosed that PDA did not have procedures in place to track audit reports including having an audit tracking list. The time period for making a management decision on findings was approximately 8.7 months to over 16 months after the FAC Acceptance date for four out of four audit reports with findings. • Department of Education (PDE): The time period for making a management decision on findings was approximately 7.8 months to over 12 months after the FAC Acceptance date for seven out of 22 audit reports with findings. There were additional audit reports with findings listed on PDE’s audit tracking list where management decisions were not made timely. • Department of Environmental Protection (DEP): The time period for making a management decision on findings was approximately 11.6 months to over 12 months after the FAC Acceptance date for two out of two audit reports with findings. Our testing disclosed for the two late audit reports, DEP made management decisions timely. However, DEP did not notify the subrecipients of the management decisions within the required six month time period after the audit reports FAC Acceptance date. • Department of Human Services (DHS): The time period for making a management decision on findings was approximately 7.2 months after the FAC Acceptance date for one out of two audit reports with findings. Our testing disclosed for the one late audit report DHS made a management decision timely. However, DHS did not notify the subrecipient of the management decision within the required six month time period after the audit reports FAC Acceptance date. Criteria: 2 CFR §200.332, Requirements for pass-through entities, states in part: All pass-through entities must: (d) Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, in compliance with Federal statutes, regulations, and the terms and conditions of the subaward, and that subaward performance goals are achieved. Pass-through entity monitoring of the subrecipient must include: Finding 2024 ¬– 015: (continued) (2) Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity detected through audits, on-site reviews, and written confirmation from the subrecipient, highlighting the status of actions planned or taken to address Single Audit findings related to the particular subaward. (3) Issuing a management decision for applicable audit findings pertaining only to the Federal award provided to the subrecipient from the pass-through entity as required by §200.521 [Management decision]. (f) Verify that every subrecipient is audited as required by Subpart F [Audit Requirements] of this part when it is expected that the subrecipient’s Federal awards expended during the respective fiscal year equaled or exceeded the threshold set forth in §200.501 [Audit requirements]. (g) Consider whether the results of the subrecipient’s audit, on-site review, or other monitoring indicate conditions that necessitate adjustments to the pass-through entity’s own records. (h) Consider taking enforcement action against noncompliant subrecipients as described in §200.339 [Remedies for noncompliance] of this part and in program regulations. In order to carry out these responsibilities properly, good internal control dictates that state pass-through agencies ensure subrecipient Single Audit SEFAs are representative of state payment records each year, and that the related federal programs have been properly subjected to Single Audit procedures. 2 CFR §200.512, Report submission, states in part: (a) General. (1) The audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor’s report(s), or nine months after the end of the audit period. If the due date falls on a Saturday, Sunday, or Federal holiday, the reporting package is due the next business day. 2 CFR §200.521, Management decision, states in part: (a) General. The management decision must clearly state whether or not the finding is sustained, the reasons for the decision, and the expected auditee action to repay disallowed costs, make financial adjustments, or take other action. (d) Time requirements. The Federal awarding agency or pass-through entity responsible for issuing a management decision must do so within six months of acceptance of the audit report by the FAC. The auditee must initiate and proceed with corrective action as rapidly as possible and corrective action should begin no later than upon receipt of the audit report. 2 CFR §200.505, Sanctions, states: In cases of continued inability or unwillingness to have an audit conducted in accordance with this part, Federal agencies and pass-through entities must take appropriate action as provided in §200.339 [Remedies for noncompliance]. 2 CFR §200.339, Remedies for noncompliance, states in part: If a non-Federal entity fails to comply with the U.S. Constitution, Federal statutes, regulations or the terms and conditions of a Federal award, the Federal awarding agency or pass-through entity may impose additional conditions, as described in §200.208 [Specific conditions]. If the Federal awarding agency or pass-through entity determines that noncompliance cannot be remedied by imposing additional conditions, the federal awarding agency or pass-through entity may take one or more of the following actions, as appropriate in the circumstances. Finding 2024 ¬– 015: (continued) (a) Temporarily withhold cash payments pending correction of the deficiency by the non-Federal entity or more severe enforcement action by the Federal awarding agency or pass-through entity. (b) Disallow (that is, deny both use of funds and any applicable matching credit for) all or part of the cost of the activity or action not in compliance. (c) Wholly or partly suspend or terminate the Federal award. (d) Initiate suspension or debarment proceedings as authorized under 2 CFR Part 180 and Federal awarding agency regulations (or in the case of a pass-through entity, recommend such a proceeding be initiated by a Federal awarding agency). (e) Withhold further Federal awards for the project or program. (f) Take other remedies that may be legally available. To ensure Commonwealth enforcement of federal regulations for subrecipient noncompliance with audit requirements, Commonwealth Management Directive 325.08, Amended – Remedies for Recipient Noncompliance with Audit Requirements, Section 5 related to policy, states in part: (a) Agencies must develop and implement remedial action that reflects the unique requirements of each program… (b) The remedial action should be implemented within six months from the date the first remedial action is initiated. At the end of the six-month period, the recipient should take the appropriate corrective action or the final stage of remedial action should be imposed on the recipient. Examples of remedial action include, but are not limited to: (1) Meeting or calling the recipient to explain the importance and benefits of the audit and audit resolution processes, emphasizing the value of the audit as an administrative tool and the Commonwealth’s reliance on an acceptable audit and prompt resolution as evidence of the recipient’s ability to properly administer the program. (2) Encouraging the entity to establish an audit committee or designate an individual as the single point of contact to: (a) Communicate regarding the audit. (b) Arrange for and oversee the audit. (c) Direct and monitor audit resolution. (3) Providing technical assistance to the recipient in devising and implementing an appropriate plan to remedy the noncompliance. (4) Withholding a portion of assistance payments until the noncompliance is resolved. (5) Withholding or disallowing overhead costs until the noncompliance is resolved. (6) Suspending the assistance agreement until the noncompliance is resolved. (7) Terminating the assistance agreement with the recipient and, if necessary, seeking alternative entities to administer the program. Finding 2024 ¬– 015: (continued) Management Directive 325.09, Amended – Processing Subrecipient Single Audits of Federal Pass-Through Funds, Section 7 related to procedures, states in part: c. Agencies. (2) Evaluate single audit report submissions received from BAFM to determine program purpose acceptability by verifying, at a minimum, that all agency-funded programs are properly included on the applicable financial schedules; that findings affecting the agency contain sufficient information to facilitate a management decision; and that the subrecipient has submitted an adequate corrective action plan. (5) Issue management decisions relative to audit findings and crosscutting findings assigned to the agency for resolution, as required by 2 CFR §200.521. If responsible for the resolution of crosscutting findings, notify the affected agency or agencies upon resolution of such findings. (6) Impose or coordinate the imposition of remedial action in accordance with 2 CFR Part 200.339 and Management Directive 325.08 Amended, Remedies for Recipient Noncompliance with Audit Requirements, when subrecipients fail to comply with the provisions of Subpart F. Management Directive 325.12, Amended – Standards for Enterprise Risk Management in Commonwealth Agencies, adopted the internal control framework outlined in the United States Government Accountability Office’s, Standards for Internal Control in the Federal Government (Green Book). The Green Book states in part: Management should establish and operate monitoring activities to monitor the internal control system and evaluate the results. Management should remediate identified internal control deficiencies on a timely basis. Cause: One reason provided by Commonwealth management for untimely audit resolution in the various agencies, including making management decisions, approving corrective action, and performing procedures to ensure the accuracy of subrecipient SEFAs, was either a change in staff or a lack of staff to follow up and process subrecipient audit reports more timely. Effect: Since required management decisions were not made within six months to ensure appropriate corrective action was taken on audits received from subrecipients, the Commonwealth did not comply with federal regulations, and subrecipients were not made aware of acceptance or rejection of corrective action plans in a timely manner. Further, noncompliance may recur in future periods if control deficiencies are not corrected on a timely basis, and there is an increased risk of unallowable charges being made to federal programs if corrective action and recovery of questioned costs is not timely. Regarding the SEFA reviews or alternate procedures which are not being performed timely, there is an increased risk that subrecipients could be misspending and/or inappropriately tracking and reporting federal funds over multiple year periods, and these discrepancies may not be properly monitored, detected, and corrected by agency personnel on a timely basis as required. Recommendation: We recommend that the above weaknesses that cause untimely subrecipient Single Audit resolution, including untimely management decisions on findings, and untimely review of the SEFA or alternate procedures be corrected to ensure compliance with federal requirements and Commonwealth Management Directives, and to better ensure timelier subrecipient compliance with program requirements. PDOA Response: PDOA agrees with the finding. PDA Response: PDA agrees with the finding. PDE Response: PDE agrees with the finding. DEP Response: DEP agrees with the finding. Finding 2024 ¬– 015: (continued) DHS Response: DHS agrees that there was an exception where human error caused a management decision on one single audit report to be issued untimely; in this instance, the decision itself was made timely but was not communicated in a timely manner. DHS disagrees that an isolated incident due to human error signifies a weakness in internal controls. This was not a systemic issue and therefore should not have been considered a significant deficiency in internal controls, and DHS should not have been included in this finding. Auditors’ Conclusion: The agency responses from PDOA, PDA, PDE, and DEP indicate agreement with the finding. DHS agrees that an error occurred resulting in untimely submission of one management decision, DHS disagrees that the error represents a significant deficiency. We acknowledge the error occurred due to an oversight and is not a systemic error, however, the error resulted in noncompliance with one of two audit reports that required timely management decisions. We will evaluate corrective action in the subsequent audit. The finding remains as stated. Questioned Costs: The amount of questioned costs cannot be determined.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as require...

CONDITION The Department of Public Instruction did not ensure all subrecipients submitted a Single Audit Report or a form identifying a Single Audit is not required. In addition, The Department of Public Instruction did not issue management decisions on audit findings within 6 months or ensure that timely and appropriate corrective action was taken in all applicable instances. CRITERIA 2 CFR 200.331(f) states that a pass-through entity must verify that every subrecipient is audited as required by 2 CFS 200 Subpart F. 2 CFR 200.311(d)(2) states that a pass-through entity must ensure subrecipients take timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity through audits, on-site reviews, and other means. 2 CFR 200.521(d) states that a pass-through entity must issue a management decision within six months of acceptance of the audit report by the Federal Audit Clearinghouse (FAC). 2 CFR 200.303(a) states that non-federal entities must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with statutes, regulations, and the terms and condition of the federal award. CAUSE The Department of Public Instruction maintains a spreadsheet to track all subrecipient audit report monitoring, however, they did not ensure that everyone on the spreadsheet provided a Single Audit report, or review the filed report within 6 months, or provided a certification of total federal expenditures. EFFECT Subrecipients spending more than $750,000 from all federal sources may not be obtaining audits as required or may not be implementing a corrective action plan in a timely manner if findings are noted in audits that were completed. The Department of Public instruction is not meeting the requirements of 2 CFR 200 Subpart F. CONTEXT The total number of subrecipients was 536 and the total amount received from the Department of Public Instruction was $667,731,290. Where sampling was performed, the audit used a non-statistical sampling method. Of all the subrecipients that had errors, the total amount they received from the Department of Public Instruction was $53,403,270. Sixty subrecipients that received funds from the Department of Public Instruction were included in our sampling. One subrecipient was not included on the Departments tracking spreadsheet, two subrecipients did not received the required audit as required by 2 CFR Subpart F. 10 Subrecipients had reports filed, but the Department did not review the report within the required 6 month window. IDENTIFICATION AS A REPEAT FINDING Finding 2022-033 was reported in the immediate prior year. Findings 2020-021 and 2018-041 were reported in previous years. The prior audit finding was reported as implemented on the summary schedule of prior audit findings. This materially misrepresents the status of the finding. RECOMMENDATION We recommend the Department of Public Instruction: • Ensure all subrecipients obtain audits in accordance with 2 CFR 200 Subpart F if they meet the requirements; • Issue management decisions within a timely manner; • Ensure subrecipients took timely corrective action on deficiencies identified in the audits. DEPARTMENT OF PUBLIC INSTRUCTION RESPONSE The Department of Public Instruction agrees with the finding. See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of North Dakota
Compliance Requirement: M
CONDITION Career and Technical Education is not verifying every subrecipient is audited and reviewing audit findings as required by 2 CFR 200, Subpart F. Subsequently, by not verifying every subrecipient is audited, Career and Technical Education is not ensuring their responsibilities for issuing management decisions are performed, if any findings are identified in the audits. CRITERIA All pass-through entities must: • Monitor the activities of the subrecipient as necessary to ensure that the ...

CONDITION Career and Technical Education is not verifying every subrecipient is audited and reviewing audit findings as required by 2 CFR 200, Subpart F. Subsequently, by not verifying every subrecipient is audited, Career and Technical Education is not ensuring their responsibilities for issuing management decisions are performed, if any findings are identified in the audits. CRITERIA All pass-through entities must: • Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, in compliance with Federal statutes, regulations, and terms and conditions of the subaward, and that the subaward performance goals are achieved. Pass-through entity monitoring of the subrecipient must include, in part, following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity detected through audits, on-site reviews, and written confirmation from the subrecipient, highlighting the status of actions planned or taken to address Single Audit findings related to the particular subaward; issuing a management decision for applicable audit findings pertaining only to the federal award provided to the subrecipient from the pass-through entity as required by 2 CFR 200.521; and ensuring audit findings specifically related to the subaward are resolved (2 CFR 200.332(d)). • Verify that every subrecipient is audited as required by 2 CFR 200, Subpart F, when it is expected that the subrecipient's Federal award expended during the respective fiscal year equaled or exceeded the $750,000 threshold set forth in 2 CFR 200.501 (2 CFR 200.332(f). Federal regulation, 2 CFR 200.303, requires non-Federal entities, in part, to establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. CAUSE Career and Technical Education has not established processes to identify which subrecipients are subject to required audits or to obtain and review Uniform Guidance Single Audit reports. In addition, Career and Technical Education has not developed a tracking system to ensure timely submission of required audit reports and to ensure timely and appropriate corrective action is taken on all deficiencies. EFFECT Subrecipient noncompliance with Federal statutes, regulations, and the terms and conditions of the subaward, including audit findings pertaining to the Federal award, may go undetected and unresolved. CONTEXT Career and Technical Education awarded subawards, individually up to $10 million, to 13 subrecipients totaling $74.6 million for 19 different multi-purpose community facility projects. Career and Technical Education has had prior experience with these subrecipients. Projects were included in the state’s program plan that was reviewed and approved by U.S. Treasury. Career and Technical Education imposed specific subaward conditions upon each subrecipient requiring payments as reimbursements rather than advance payments. Career and Technical Education performs ongoing monitoring procedures through review and approval of subrecipient requests for reimbursements, which includes reviewing invoices and contractor progress billings for unallowable expenses, prior to disbursing Capital Project Funds. Lastly, Career and Technical Education conducts annual on-site visits of started projects until completed to visually inspect projects are being completed as planned. Where sampling was performed, the audit used a non-statistical sampling method. This finding, in combination with the finding regarding required communication of award information to the subrecipients (Finding 2024-04), results in a modified opinion for the subrecipient monitoring compliance requirement. IDENTIFICATION AS A REPEAT FINDING Not a repeat finding. RECOMMENDATION We recommend Career and Technical Education establish processes to identify which subrecipients are subject to required audits and to obtain and review Uniform Guidance Single Audit reports, including developing a tracking system to ensure timely submission of required audit reports and timely and appropriate corrective action is taken on all deficiencies. We also recommend Career and Technical Education verify every subrecipient is audited as required by 2 CFR 200, Subpart F; follow-up and ensure that subrecipients take timely and appropriate action on all deficiencies of the Federal award; and issue management decisions and ensure audit findings have been resolved. CAREER AND TECHNICAL EDUCATION RESPONSE The Department agrees with this recommendation See “Management’s Response and Corrective Action” section of this report.

FY End: 2024-06-30
State of Vermont
Compliance Requirement: M
Reference Number: 2024-011 Prior Year Finding: No Federal Agency: U.S. Department of Transportation State Agency: Agency of Transportation Federal Program: Highway Planning and Construction Assistance Listing Number: 20.205 Award Number and Year: FFY2023 – FFY2024 Compliance Requirement: Subrecipient Monitoring Type of Finding: Significant Deficiency in Internal Control over Compliance, Other Matters Criteria or specific requirement: Compliance – Per 2 CFR section 200.332, the following require...

Reference Number: 2024-011 Prior Year Finding: No Federal Agency: U.S. Department of Transportation State Agency: Agency of Transportation Federal Program: Highway Planning and Construction Assistance Listing Number: 20.205 Award Number and Year: FFY2023 – FFY2024 Compliance Requirement: Subrecipient Monitoring Type of Finding: Significant Deficiency in Internal Control over Compliance, Other Matters Criteria or specific requirement: Compliance – Per 2 CFR section 200.332, the following requirements are imposed on pass-through entities: (a) Ensure that every subaward is clearly identified to the subrecipient as a subaward and includes information at the time of the subaward and if any of these data elements change, include the changes in subsequent subaward modification. When some of this information is not available, the pass-through entity must provide the best information available to describe the Federal award and subaward. Required information includes: (1) (iii) Federal Award Identification Number (FAIN); (iv) Federal Award Date; (b) Evaluate each subrecipient's risk of noncompliance with Federal statutes, regulations, and the terms and conditions of the subaward for purposes of determining the appropriate subrecipient monitoring described in paragraphs (d) and (e) of this section, which may include consideration of such factors as: (1) The subrecipient's prior experience with the same or similar subawards; (2) The results of previous audits including whether or not the subrecipient receives a Single Audit in accordance with Subpart F of this part, and the extent to which the same or similar subaward has been audited as a major program; (3) Whether the subrecipient has new personnel or new or substantially changed systems; and (4) The extent and results of Federal awarding agency monitoring (e.g., if the subrecipient also receives Federal awards directly from a Federal awarding agency). (c) Consider imposing specific subaward conditions upon a subrecipient if appropriate as described in § 200.208. (d) Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, in compliance with Federal statutes, regulations, and the terms and conditions of the subaward; and that subaward performance goals are achieved. Pass-through entity monitoring of the subrecipient must include: (1) Reviewing financial and performance reports required by the pass-through entity. (2) Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the Federal award provided to the subrecipient from the pass-through entity detected through audits, on-site reviews, and written confirmation from the subrecipient, highlighting the status of actions planned or taken to address Single Audit findings related to the particular subaward. (3) Issuing a management decision for applicable audit findings pertaining only to the Federal award provided to the subrecipient from the pass-through entity as required by § 200.521. (4) The pass-through entity is responsible for resolving audit findings specifically related to the subaward and not responsible for resolving crosscutting findings. If a subrecipient has a current Single Audit report posted in the Federal Audit Clearinghouse and has not otherwise been excluded from receipt of Federal funding (e.g., has been debarred or suspended), the pass-through entity may rely on the subrecipient's cognizant audit agency or cognizant oversight agency to perform audit follow-up and make management decisions related to cross-cutting findings in accordance with section § 200.513(a)(3)(vii). Such reliance does not eliminate the responsibility of the pass-through entity to issue subawards that conform to agency and award-specific requirements, to manage risk through ongoing subaward monitoring, and to monitor the status of the findings that are specifically related to the subaward. (e) Depending upon the pass-through entity's assessment of risk posed by the subrecipient (as described in paragraph (b) of this section), the following monitoring tools may be useful for the pass-through entity to ensure proper accountability and compliance with program requirements and achievement of performance goals: (1) Providing subrecipients with training and technical assistance on program-related matters; and (2) Performing on-site reviews of the subrecipient's program operations; (3) Arranging for agreed-upon-procedures engagements as described in § 200.425. Control – Per 2 CFR section 200.303(a), a non-Federal entity must: Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in “Standards for Internal Control in the Federal Government” issued by the Comptroller General of the United States or the “Internal Control Integrated Framework”, issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). Condition: The Vermont Agency of Transportation (VTrans) omitted required federal award information from subawards it issued in the program and did not adequately monitor subrecipients. Context: Nineteen subawards were selected for testing and the following exceptions were noted: • For 16 of 19 subawards selected for testing, the federal award date was not included on the subaward agreement. • For 1 of 19 subawards selected for testing, the last on-site subrecipient monitoring visit was performed in FY 2019 and the next on-site monitoring did not take place until FY 2024. Per the VTrans subrecipient monitoring plan, on-site monitoring must be performed no less than every three years. Cause: Procedures and internal controls were not sufficient to ensure that subawards included all required federal information. Although VTrans subsequently modified its subaward issuance process, controls in effect during the audit period were not sufficient to ensure that subawards included all required information. Procedures and internal controls were also not sufficient to ensure that timely on-site monitoring visits were performed in accordance with its monitoring plan. Effect: Excluding the required federal grant award information at the time of subaward issuance may cause subrecipients and their auditors to be uninformed about specific program and other regulations that apply to the funds they receive. There is also the potential for subrecipients to have incomplete Schedules of Expenditures of Federal Awards (SEFA) in their Single Audit reports. Failure to conduct adequate subrecipient monitoring may result in a failure of VTrans to detect that subawards are used for unauthorized purposes, are managed in violation of the terms and conditions of the subawards, or that subaward performance goals are not achieved. There is an increased risk that subrecipients could be inappropriately spending and/or inaccurately tracking and reporting federal funds over multiple year periods, and these discrepancies may not be properly monitored, detected, and corrected by VTrans personnel on a timely basis. Questioned costs: Undetermined. Recommendation: VTrans should review and enhance internal controls and procedures to ensure that all required federal award information is included in subawards and that on-site subrecipient monitoring is conducted timely per the terms of its subrecipient monitoring plan. Views of responsible officials: Management agrees with the finding.

FY End: 2024-06-30
Stevens Institute of Technology
Compliance Requirement: M
Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether o...

Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether or not the subrecipient receives single audit in accordance with 2 CFR Part 200, Subpart F, and the extent to which the same or similar subaward has been audited as a major program; 3. Whether the subrecipient has new personnel or new or substantially changed systems; and 4. The extent and results of federal awarding agency monitoring (e.g., if the subrecipient also receives federal awards directly from a federal awarding agency). Monitor – Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, complies with the terms and conditions of the subaward, and achieves performance goals (2 CFR sections 200.332(d) through (f)). In addition to procedures identified as necessary based upon the evaluation of subrecipient risk or specifically required by the terms and conditions of the award, subaward monitoring must include the following: 1. Reviewing financial and programmatic (performance and special reports) required by the PTE. 2. Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the federal award provided to the subrecipient from the PTE detected through audits, on-site reviews, and other means. 3. Issuing a management decision for audit findings pertaining to the federal award provided to the subrecipient from the PTE as required by 2 CFR section 200.521. Additionally, in accordance with federal requirements, the University shall maintain internal controls over federal programs designed to provide reasonable assurance that transactions are executed in compliance with federal statutes, regulations, and the terms and conditions of the federal award that could have a direct and material effect on a federal program. Condition and Context We selected thirteen subrecipients for testwork out of 82 in total and we noted that the University did not properly receive and review the single audit reports for seven of those subrecipients to ensure they had no material findings that would impact the University. The University then identified an additional six subrecipients outside of our sample where the same deficiency occurred. Cause The University had turnover in staff in the Office of Sponsored Projects during the fiscal year 2024 and this led to miscommunication which resulted in this monitoring step not being performed timely. Effect Subrecipient monitoring that is not performed timely could result in federal dollars being passed down to subrecipients with significant control or compliance issues that could impact the University. Questioned Costs There were no questioned costs related to this finding. Recommendation We recommend that the University strengthen its policies and procedures to ensure that subrecipient monitoring is being performed timely. The University should provide training to the departments responsible for these reviews.

FY End: 2024-06-30
Stevens Institute of Technology
Compliance Requirement: M
Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether o...

Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether or not the subrecipient receives single audit in accordance with 2 CFR Part 200, Subpart F, and the extent to which the same or similar subaward has been audited as a major program; 3. Whether the subrecipient has new personnel or new or substantially changed systems; and 4. The extent and results of federal awarding agency monitoring (e.g., if the subrecipient also receives federal awards directly from a federal awarding agency). Monitor – Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, complies with the terms and conditions of the subaward, and achieves performance goals (2 CFR sections 200.332(d) through (f)). In addition to procedures identified as necessary based upon the evaluation of subrecipient risk or specifically required by the terms and conditions of the award, subaward monitoring must include the following: 1. Reviewing financial and programmatic (performance and special reports) required by the PTE. 2. Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the federal award provided to the subrecipient from the PTE detected through audits, on-site reviews, and other means. 3. Issuing a management decision for audit findings pertaining to the federal award provided to the subrecipient from the PTE as required by 2 CFR section 200.521. Additionally, in accordance with federal requirements, the University shall maintain internal controls over federal programs designed to provide reasonable assurance that transactions are executed in compliance with federal statutes, regulations, and the terms and conditions of the federal award that could have a direct and material effect on a federal program. Condition and Context We selected thirteen subrecipients for testwork out of 82 in total and we noted that the University did not properly receive and review the single audit reports for seven of those subrecipients to ensure they had no material findings that would impact the University. The University then identified an additional six subrecipients outside of our sample where the same deficiency occurred. Cause The University had turnover in staff in the Office of Sponsored Projects during the fiscal year 2024 and this led to miscommunication which resulted in this monitoring step not being performed timely. Effect Subrecipient monitoring that is not performed timely could result in federal dollars being passed down to subrecipients with significant control or compliance issues that could impact the University. Questioned Costs There were no questioned costs related to this finding. Recommendation We recommend that the University strengthen its policies and procedures to ensure that subrecipient monitoring is being performed timely. The University should provide training to the departments responsible for these reviews.

FY End: 2024-06-30
Stevens Institute of Technology
Compliance Requirement: M
Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether o...

Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether or not the subrecipient receives single audit in accordance with 2 CFR Part 200, Subpart F, and the extent to which the same or similar subaward has been audited as a major program; 3. Whether the subrecipient has new personnel or new or substantially changed systems; and 4. The extent and results of federal awarding agency monitoring (e.g., if the subrecipient also receives federal awards directly from a federal awarding agency). Monitor – Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, complies with the terms and conditions of the subaward, and achieves performance goals (2 CFR sections 200.332(d) through (f)). In addition to procedures identified as necessary based upon the evaluation of subrecipient risk or specifically required by the terms and conditions of the award, subaward monitoring must include the following: 1. Reviewing financial and programmatic (performance and special reports) required by the PTE. 2. Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the federal award provided to the subrecipient from the PTE detected through audits, on-site reviews, and other means. 3. Issuing a management decision for audit findings pertaining to the federal award provided to the subrecipient from the PTE as required by 2 CFR section 200.521. Additionally, in accordance with federal requirements, the University shall maintain internal controls over federal programs designed to provide reasonable assurance that transactions are executed in compliance with federal statutes, regulations, and the terms and conditions of the federal award that could have a direct and material effect on a federal program. Condition and Context We selected thirteen subrecipients for testwork out of 82 in total and we noted that the University did not properly receive and review the single audit reports for seven of those subrecipients to ensure they had no material findings that would impact the University. The University then identified an additional six subrecipients outside of our sample where the same deficiency occurred. Cause The University had turnover in staff in the Office of Sponsored Projects during the fiscal year 2024 and this led to miscommunication which resulted in this monitoring step not being performed timely. Effect Subrecipient monitoring that is not performed timely could result in federal dollars being passed down to subrecipients with significant control or compliance issues that could impact the University. Questioned Costs There were no questioned costs related to this finding. Recommendation We recommend that the University strengthen its policies and procedures to ensure that subrecipient monitoring is being performed timely. The University should provide training to the departments responsible for these reviews.

FY End: 2024-06-30
Stevens Institute of Technology
Compliance Requirement: M
Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether o...

Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether or not the subrecipient receives single audit in accordance with 2 CFR Part 200, Subpart F, and the extent to which the same or similar subaward has been audited as a major program; 3. Whether the subrecipient has new personnel or new or substantially changed systems; and 4. The extent and results of federal awarding agency monitoring (e.g., if the subrecipient also receives federal awards directly from a federal awarding agency). Monitor – Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, complies with the terms and conditions of the subaward, and achieves performance goals (2 CFR sections 200.332(d) through (f)). In addition to procedures identified as necessary based upon the evaluation of subrecipient risk or specifically required by the terms and conditions of the award, subaward monitoring must include the following: 1. Reviewing financial and programmatic (performance and special reports) required by the PTE. 2. Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the federal award provided to the subrecipient from the PTE detected through audits, on-site reviews, and other means. 3. Issuing a management decision for audit findings pertaining to the federal award provided to the subrecipient from the PTE as required by 2 CFR section 200.521. Additionally, in accordance with federal requirements, the University shall maintain internal controls over federal programs designed to provide reasonable assurance that transactions are executed in compliance with federal statutes, regulations, and the terms and conditions of the federal award that could have a direct and material effect on a federal program. Condition and Context We selected thirteen subrecipients for testwork out of 82 in total and we noted that the University did not properly receive and review the single audit reports for seven of those subrecipients to ensure they had no material findings that would impact the University. The University then identified an additional six subrecipients outside of our sample where the same deficiency occurred. Cause The University had turnover in staff in the Office of Sponsored Projects during the fiscal year 2024 and this led to miscommunication which resulted in this monitoring step not being performed timely. Effect Subrecipient monitoring that is not performed timely could result in federal dollars being passed down to subrecipients with significant control or compliance issues that could impact the University. Questioned Costs There were no questioned costs related to this finding. Recommendation We recommend that the University strengthen its policies and procedures to ensure that subrecipient monitoring is being performed timely. The University should provide training to the departments responsible for these reviews.

FY End: 2024-06-30
Stevens Institute of Technology
Compliance Requirement: M
Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether o...

Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether or not the subrecipient receives single audit in accordance with 2 CFR Part 200, Subpart F, and the extent to which the same or similar subaward has been audited as a major program; 3. Whether the subrecipient has new personnel or new or substantially changed systems; and 4. The extent and results of federal awarding agency monitoring (e.g., if the subrecipient also receives federal awards directly from a federal awarding agency). Monitor – Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, complies with the terms and conditions of the subaward, and achieves performance goals (2 CFR sections 200.332(d) through (f)). In addition to procedures identified as necessary based upon the evaluation of subrecipient risk or specifically required by the terms and conditions of the award, subaward monitoring must include the following: 1. Reviewing financial and programmatic (performance and special reports) required by the PTE. 2. Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the federal award provided to the subrecipient from the PTE detected through audits, on-site reviews, and other means. 3. Issuing a management decision for audit findings pertaining to the federal award provided to the subrecipient from the PTE as required by 2 CFR section 200.521. Additionally, in accordance with federal requirements, the University shall maintain internal controls over federal programs designed to provide reasonable assurance that transactions are executed in compliance with federal statutes, regulations, and the terms and conditions of the federal award that could have a direct and material effect on a federal program. Condition and Context We selected thirteen subrecipients for testwork out of 82 in total and we noted that the University did not properly receive and review the single audit reports for seven of those subrecipients to ensure they had no material findings that would impact the University. The University then identified an additional six subrecipients outside of our sample where the same deficiency occurred. Cause The University had turnover in staff in the Office of Sponsored Projects during the fiscal year 2024 and this led to miscommunication which resulted in this monitoring step not being performed timely. Effect Subrecipient monitoring that is not performed timely could result in federal dollars being passed down to subrecipients with significant control or compliance issues that could impact the University. Questioned Costs There were no questioned costs related to this finding. Recommendation We recommend that the University strengthen its policies and procedures to ensure that subrecipient monitoring is being performed timely. The University should provide training to the departments responsible for these reviews.

FY End: 2024-06-30
Stevens Institute of Technology
Compliance Requirement: M
Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether o...

Compliance Requirement – Subrecipient Monitoring – Significant Deficiency and Noncompliance Criteria Evaluate Risk – Evaluate each subrecipient’s risk of noncompliance for purposes of determining the appropriate subrecipient monitoring related to the subaward (2 CFR section 200.332(b)). This evaluation of risk may include consideration of such factors as the following: 1. The subrecipient’s prior experience with the same or similar subawards; 2. The results of previous audits including whether or not the subrecipient receives single audit in accordance with 2 CFR Part 200, Subpart F, and the extent to which the same or similar subaward has been audited as a major program; 3. Whether the subrecipient has new personnel or new or substantially changed systems; and 4. The extent and results of federal awarding agency monitoring (e.g., if the subrecipient also receives federal awards directly from a federal awarding agency). Monitor – Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, complies with the terms and conditions of the subaward, and achieves performance goals (2 CFR sections 200.332(d) through (f)). In addition to procedures identified as necessary based upon the evaluation of subrecipient risk or specifically required by the terms and conditions of the award, subaward monitoring must include the following: 1. Reviewing financial and programmatic (performance and special reports) required by the PTE. 2. Following-up and ensuring that the subrecipient takes timely and appropriate action on all deficiencies pertaining to the federal award provided to the subrecipient from the PTE detected through audits, on-site reviews, and other means. 3. Issuing a management decision for audit findings pertaining to the federal award provided to the subrecipient from the PTE as required by 2 CFR section 200.521. Additionally, in accordance with federal requirements, the University shall maintain internal controls over federal programs designed to provide reasonable assurance that transactions are executed in compliance with federal statutes, regulations, and the terms and conditions of the federal award that could have a direct and material effect on a federal program. Condition and Context We selected thirteen subrecipients for testwork out of 82 in total and we noted that the University did not properly receive and review the single audit reports for seven of those subrecipients to ensure they had no material findings that would impact the University. The University then identified an additional six subrecipients outside of our sample where the same deficiency occurred. Cause The University had turnover in staff in the Office of Sponsored Projects during the fiscal year 2024 and this led to miscommunication which resulted in this monitoring step not being performed timely. Effect Subrecipient monitoring that is not performed timely could result in federal dollars being passed down to subrecipients with significant control or compliance issues that could impact the University. Questioned Costs There were no questioned costs related to this finding. Recommendation We recommend that the University strengthen its policies and procedures to ensure that subrecipient monitoring is being performed timely. The University should provide training to the departments responsible for these reviews.

« 1 2 4 5 86 »