Section 200.512 requires auditees to submit their audit reports and data collection forms within 30 days of receiving the auditor's report or within nine months after the audit period, whichever is sooner. This affects organizations that receive federal funds, as they must ensure compliance and make their reports available for public inspection, while safeguarding personal information.
View full section details →
FY End: 2023-12-31
Oakland Livingston Human Service Agency
Compliance Requirement: P
Assistance Listing Number, Federal Agency, and Program Name: Across all major programs Federal Award Identification Number and Year: Across all major programs Pass-through Entity – Various Finding Type – Material weakness in internal control over compliance Repeat Finding – No Criteria – Per 2 CFR 200.512 (a) (1), the audit must be completed, and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must ...

Assistance Listing Number, Federal Agency, and Program Name: Across all major programs Federal Award Identification Number and Year: Across all major programs Pass-through Entity – Various Finding Type – Material weakness in internal control over compliance Repeat Finding – No Criteria – Per 2 CFR 200.512 (a) (1), the audit must be completed, and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Per 2 CFR 200.501 (b), a non-Federal entity that expends $750,000 or more during the non-Federal entity's fiscal year in Federal awards must have a single audit conducted in accordance with § 200.514. Condition – The data collection form was not submitted within the required time as required by 2 CFR 200.512 for the year ended December 31, 2023. Identification of How Questioned Costs Were Computed – N/A Questioned Costs – None Cause/Effect – The Organization’s books and records for the 2023 fiscal year were not reconciled or closed in a timely manner. The data collection form was not submitted within the required time. Data collection form was not submitted on time. Recommendation – We recommend that the Organization maintain a system of policies, procedures, and controls to ensure that the financial records closed in a timely manner in order to facilitate the timely submission of the data collection form. View of Responsible Officials and Corrective Action Plan – We agree with this finding. The Chief Financial Officer in collaboration with the Assistant Director for Finance and the Assistant Director for Financial Compliance will set a calendar at the end of the fiscal year to ensure timely closeout of the books that will allow ample time to engage and complete the audit prior to the deadline for the FAC filing.

FY End: 2023-12-31
Oakland Livingston Human Service Agency
Compliance Requirement: P
Assistance Listing Number, Federal Agency, and Program Name: Across all major programs Federal Award Identification Number and Year: Across all major programs Pass-through Entity – Various Finding Type – Material weakness in internal control over compliance Repeat Finding – No Criteria – Per 2 CFR 200.512 (a) (1), the audit must be completed, and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must ...

Assistance Listing Number, Federal Agency, and Program Name: Across all major programs Federal Award Identification Number and Year: Across all major programs Pass-through Entity – Various Finding Type – Material weakness in internal control over compliance Repeat Finding – No Criteria – Per 2 CFR 200.512 (a) (1), the audit must be completed, and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Per 2 CFR 200.501 (b), a non-Federal entity that expends $750,000 or more during the non-Federal entity's fiscal year in Federal awards must have a single audit conducted in accordance with § 200.514. Condition – The data collection form was not submitted within the required time as required by 2 CFR 200.512 for the year ended December 31, 2023. Identification of How Questioned Costs Were Computed – N/A Questioned Costs – None Cause/Effect – The Organization’s books and records for the 2023 fiscal year were not reconciled or closed in a timely manner. The data collection form was not submitted within the required time. Data collection form was not submitted on time. Recommendation – We recommend that the Organization maintain a system of policies, procedures, and controls to ensure that the financial records closed in a timely manner in order to facilitate the timely submission of the data collection form. View of Responsible Officials and Corrective Action Plan – We agree with this finding. The Chief Financial Officer in collaboration with the Assistant Director for Finance and the Assistant Director for Financial Compliance will set a calendar at the end of the fiscal year to ensure timely closeout of the books that will allow ample time to engage and complete the audit prior to the deadline for the FAC filing.

FY End: 2023-12-31
Oakland Livingston Human Service Agency
Compliance Requirement: P
Assistance Listing Number, Federal Agency, and Program Name: Across all major programs Federal Award Identification Number and Year: Across all major programs Pass-through Entity – Various Finding Type – Material weakness in internal control over compliance Repeat Finding – No Criteria – Per 2 CFR 200.512 (a) (1), the audit must be completed, and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must ...

Assistance Listing Number, Federal Agency, and Program Name: Across all major programs Federal Award Identification Number and Year: Across all major programs Pass-through Entity – Various Finding Type – Material weakness in internal control over compliance Repeat Finding – No Criteria – Per 2 CFR 200.512 (a) (1), the audit must be completed, and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Per 2 CFR 200.501 (b), a non-Federal entity that expends $750,000 or more during the non-Federal entity's fiscal year in Federal awards must have a single audit conducted in accordance with § 200.514. Condition – The data collection form was not submitted within the required time as required by 2 CFR 200.512 for the year ended December 31, 2023. Identification of How Questioned Costs Were Computed – N/A Questioned Costs – None Cause/Effect – The Organization’s books and records for the 2023 fiscal year were not reconciled or closed in a timely manner. The data collection form was not submitted within the required time. Data collection form was not submitted on time. Recommendation – We recommend that the Organization maintain a system of policies, procedures, and controls to ensure that the financial records closed in a timely manner in order to facilitate the timely submission of the data collection form. View of Responsible Officials and Corrective Action Plan – We agree with this finding. The Chief Financial Officer in collaboration with the Assistant Director for Finance and the Assistant Director for Financial Compliance will set a calendar at the end of the fiscal year to ensure timely closeout of the books that will allow ample time to engage and complete the audit prior to the deadline for the FAC filing.

FY End: 2023-12-31
Oakland Livingston Human Service Agency
Compliance Requirement: P
Assistance Listing Number, Federal Agency, and Program Name: Across all major programs Federal Award Identification Number and Year: Across all major programs Pass-through Entity – Various Finding Type – Material weakness in internal control over compliance Repeat Finding – No Criteria – Per 2 CFR 200.512 (a) (1), the audit must be completed, and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must ...

Assistance Listing Number, Federal Agency, and Program Name: Across all major programs Federal Award Identification Number and Year: Across all major programs Pass-through Entity – Various Finding Type – Material weakness in internal control over compliance Repeat Finding – No Criteria – Per 2 CFR 200.512 (a) (1), the audit must be completed, and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Per 2 CFR 200.501 (b), a non-Federal entity that expends $750,000 or more during the non-Federal entity's fiscal year in Federal awards must have a single audit conducted in accordance with § 200.514. Condition – The data collection form was not submitted within the required time as required by 2 CFR 200.512 for the year ended December 31, 2023. Identification of How Questioned Costs Were Computed – N/A Questioned Costs – None Cause/Effect – The Organization’s books and records for the 2023 fiscal year were not reconciled or closed in a timely manner. The data collection form was not submitted within the required time. Data collection form was not submitted on time. Recommendation – We recommend that the Organization maintain a system of policies, procedures, and controls to ensure that the financial records closed in a timely manner in order to facilitate the timely submission of the data collection form. View of Responsible Officials and Corrective Action Plan – We agree with this finding. The Chief Financial Officer in collaboration with the Assistant Director for Finance and the Assistant Director for Financial Compliance will set a calendar at the end of the fiscal year to ensure timely closeout of the books that will allow ample time to engage and complete the audit prior to the deadline for the FAC filing.

FY End: 2023-12-31
Oakland Livingston Human Service Agency
Compliance Requirement: P
Assistance Listing Number, Federal Agency, and Program Name: Across all major programs Federal Award Identification Number and Year: Across all major programs Pass-through Entity – Various Finding Type – Material weakness in internal control over compliance Repeat Finding – No Criteria – Per 2 CFR 200.512 (a) (1), the audit must be completed, and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must ...

Assistance Listing Number, Federal Agency, and Program Name: Across all major programs Federal Award Identification Number and Year: Across all major programs Pass-through Entity – Various Finding Type – Material weakness in internal control over compliance Repeat Finding – No Criteria – Per 2 CFR 200.512 (a) (1), the audit must be completed, and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Per 2 CFR 200.501 (b), a non-Federal entity that expends $750,000 or more during the non-Federal entity's fiscal year in Federal awards must have a single audit conducted in accordance with § 200.514. Condition – The data collection form was not submitted within the required time as required by 2 CFR 200.512 for the year ended December 31, 2023. Identification of How Questioned Costs Were Computed – N/A Questioned Costs – None Cause/Effect – The Organization’s books and records for the 2023 fiscal year were not reconciled or closed in a timely manner. The data collection form was not submitted within the required time. Data collection form was not submitted on time. Recommendation – We recommend that the Organization maintain a system of policies, procedures, and controls to ensure that the financial records closed in a timely manner in order to facilitate the timely submission of the data collection form. View of Responsible Officials and Corrective Action Plan – We agree with this finding. The Chief Financial Officer in collaboration with the Assistant Director for Finance and the Assistant Director for Financial Compliance will set a calendar at the end of the fiscal year to ensure timely closeout of the books that will allow ample time to engage and complete the audit prior to the deadline for the FAC filing.

FY End: 2023-12-31
Oakland Livingston Human Service Agency
Compliance Requirement: P
Assistance Listing Number, Federal Agency, and Program Name: Across all major programs Federal Award Identification Number and Year: Across all major programs Pass-through Entity – Various Finding Type – Material weakness in internal control over compliance Repeat Finding – No Criteria – Per 2 CFR 200.512 (a) (1), the audit must be completed, and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must ...

Assistance Listing Number, Federal Agency, and Program Name: Across all major programs Federal Award Identification Number and Year: Across all major programs Pass-through Entity – Various Finding Type – Material weakness in internal control over compliance Repeat Finding – No Criteria – Per 2 CFR 200.512 (a) (1), the audit must be completed, and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Per 2 CFR 200.501 (b), a non-Federal entity that expends $750,000 or more during the non-Federal entity's fiscal year in Federal awards must have a single audit conducted in accordance with § 200.514. Condition – The data collection form was not submitted within the required time as required by 2 CFR 200.512 for the year ended December 31, 2023. Identification of How Questioned Costs Were Computed – N/A Questioned Costs – None Cause/Effect – The Organization’s books and records for the 2023 fiscal year were not reconciled or closed in a timely manner. The data collection form was not submitted within the required time. Data collection form was not submitted on time. Recommendation – We recommend that the Organization maintain a system of policies, procedures, and controls to ensure that the financial records closed in a timely manner in order to facilitate the timely submission of the data collection form. View of Responsible Officials and Corrective Action Plan – We agree with this finding. The Chief Financial Officer in collaboration with the Assistant Director for Finance and the Assistant Director for Financial Compliance will set a calendar at the end of the fiscal year to ensure timely closeout of the books that will allow ample time to engage and complete the audit prior to the deadline for the FAC filing.

FY End: 2023-12-31
Oakland Livingston Human Service Agency
Compliance Requirement: P
Assistance Listing Number, Federal Agency, and Program Name: Across all major programs Federal Award Identification Number and Year: Across all major programs Pass-through Entity – Various Finding Type – Material weakness in internal control over compliance Repeat Finding – No Criteria – Per 2 CFR 200.512 (a) (1), the audit must be completed, and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must ...

Assistance Listing Number, Federal Agency, and Program Name: Across all major programs Federal Award Identification Number and Year: Across all major programs Pass-through Entity – Various Finding Type – Material weakness in internal control over compliance Repeat Finding – No Criteria – Per 2 CFR 200.512 (a) (1), the audit must be completed, and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Per 2 CFR 200.501 (b), a non-Federal entity that expends $750,000 or more during the non-Federal entity's fiscal year in Federal awards must have a single audit conducted in accordance with § 200.514. Condition – The data collection form was not submitted within the required time as required by 2 CFR 200.512 for the year ended December 31, 2023. Identification of How Questioned Costs Were Computed – N/A Questioned Costs – None Cause/Effect – The Organization’s books and records for the 2023 fiscal year were not reconciled or closed in a timely manner. The data collection form was not submitted within the required time. Data collection form was not submitted on time. Recommendation – We recommend that the Organization maintain a system of policies, procedures, and controls to ensure that the financial records closed in a timely manner in order to facilitate the timely submission of the data collection form. View of Responsible Officials and Corrective Action Plan – We agree with this finding. The Chief Financial Officer in collaboration with the Assistant Director for Finance and the Assistant Director for Financial Compliance will set a calendar at the end of the fiscal year to ensure timely closeout of the books that will allow ample time to engage and complete the audit prior to the deadline for the FAC filing.

FY End: 2023-12-31
Oakland Livingston Human Service Agency
Compliance Requirement: P
Assistance Listing Number, Federal Agency, and Program Name: Across all major programs Federal Award Identification Number and Year: Across all major programs Pass-through Entity – Various Finding Type – Material weakness in internal control over compliance Repeat Finding – No Criteria – Per 2 CFR 200.512 (a) (1), the audit must be completed, and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must ...

Assistance Listing Number, Federal Agency, and Program Name: Across all major programs Federal Award Identification Number and Year: Across all major programs Pass-through Entity – Various Finding Type – Material weakness in internal control over compliance Repeat Finding – No Criteria – Per 2 CFR 200.512 (a) (1), the audit must be completed, and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Per 2 CFR 200.501 (b), a non-Federal entity that expends $750,000 or more during the non-Federal entity's fiscal year in Federal awards must have a single audit conducted in accordance with § 200.514. Condition – The data collection form was not submitted within the required time as required by 2 CFR 200.512 for the year ended December 31, 2023. Identification of How Questioned Costs Were Computed – N/A Questioned Costs – None Cause/Effect – The Organization’s books and records for the 2023 fiscal year were not reconciled or closed in a timely manner. The data collection form was not submitted within the required time. Data collection form was not submitted on time. Recommendation – We recommend that the Organization maintain a system of policies, procedures, and controls to ensure that the financial records closed in a timely manner in order to facilitate the timely submission of the data collection form. View of Responsible Officials and Corrective Action Plan – We agree with this finding. The Chief Financial Officer in collaboration with the Assistant Director for Finance and the Assistant Director for Financial Compliance will set a calendar at the end of the fiscal year to ensure timely closeout of the books that will allow ample time to engage and complete the audit prior to the deadline for the FAC filing.

FY End: 2023-12-31
Oakland Livingston Human Service Agency
Compliance Requirement: P
Assistance Listing Number, Federal Agency, and Program Name: Across all major programs Federal Award Identification Number and Year: Across all major programs Pass-through Entity – Various Finding Type – Material weakness in internal control over compliance Repeat Finding – No Criteria – Per 2 CFR 200.512 (a) (1), the audit must be completed, and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must ...

Assistance Listing Number, Federal Agency, and Program Name: Across all major programs Federal Award Identification Number and Year: Across all major programs Pass-through Entity – Various Finding Type – Material weakness in internal control over compliance Repeat Finding – No Criteria – Per 2 CFR 200.512 (a) (1), the audit must be completed, and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Per 2 CFR 200.501 (b), a non-Federal entity that expends $750,000 or more during the non-Federal entity's fiscal year in Federal awards must have a single audit conducted in accordance with § 200.514. Condition – The data collection form was not submitted within the required time as required by 2 CFR 200.512 for the year ended December 31, 2023. Identification of How Questioned Costs Were Computed – N/A Questioned Costs – None Cause/Effect – The Organization’s books and records for the 2023 fiscal year were not reconciled or closed in a timely manner. The data collection form was not submitted within the required time. Data collection form was not submitted on time. Recommendation – We recommend that the Organization maintain a system of policies, procedures, and controls to ensure that the financial records closed in a timely manner in order to facilitate the timely submission of the data collection form. View of Responsible Officials and Corrective Action Plan – We agree with this finding. The Chief Financial Officer in collaboration with the Assistant Director for Finance and the Assistant Director for Financial Compliance will set a calendar at the end of the fiscal year to ensure timely closeout of the books that will allow ample time to engage and complete the audit prior to the deadline for the FAC filing.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Bay Area Environmental Research Institute
Compliance Requirement: L
Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after re...

Identification of The Federal Program: National Aeronautics and Space Administration Research and Development Cluster Assistance Listing No. 43.001 Criteria of Specific Requirement (Including Statutory, Regulatory, or Other Citation): 2 CFR 200.512 (a)(1) requires that the audit must be completed and the data collection form described in paragraph (b) of this section and reporting package described in paragraph (c) of this section must be submitted within the earlier of 30 calendar days after receipt of the auditor's report(s), or nine months after the end of the audit period. Condition: Bay Area Environmental Research Institute’s did not submit its’ audit report and SF-SAC form for the year ended December 31, 2023 before the due date of September 30, 2024. Cause: Due to a turnover of new management and staff, the Bay Area Environmental Research Institute was not able to complete the audit process before the due date of September 30, 2024. Effect or Potential Effect: Bay Area Environmental Research Institute is not in compliance with its federal grant agreements. Questioned Costs: None. Context: The previous management and staff had abruptly left the Organization. This left the new management and staff unable to complete the audit in a timely manner. Identification as a Repeat Finding, if Applicable: This is a repeat finding. Recommendation: I recommend that Bay Area Environmental Research Institute ensure that future audit reports and filing requirements be completed in a timely manner. Views of Responsible Officials: Management agrees with the finding and will implement corrective action for the audit fiscal year ending in 2024.

FY End: 2023-12-31
Tennessee Pharmacists Research and Education Foundation
Compliance Requirement: L
Criteria: In accordance with 2 CFR Section 200.512(a), the audit must be complete, and the data collection form and the reporting package must be submitted within the earlier of 30 days after receipt of the auditor’s report(s), or nine months after the end of the audit period, adjusted for any extension permitted by the Office of Management and Budget. The Foundation failed to meet the nine-month deadline. Condition: The audit, reporting package and data collection form for the year ended Dece...

Criteria: In accordance with 2 CFR Section 200.512(a), the audit must be complete, and the data collection form and the reporting package must be submitted within the earlier of 30 days after receipt of the auditor’s report(s), or nine months after the end of the audit period, adjusted for any extension permitted by the Office of Management and Budget. The Foundation failed to meet the nine-month deadline. Condition: The audit, reporting package and data collection form for the year ended December 31, 2023, was not filed by the deadline of September 30, 2024, to the Federal Audit Clearinghouse. Cause: Turnover in key accounting personnel in December 2023 caused key accounts to not be reconciled timely and information requested for the audit difficult to find in a timely manner. Effect or potential effect: Delays in submission of audit reports, reporting packages and data collection forms raise concerns about the Foundation’s reliability in adhering to accounting and compliance requirements in a timely manner, potentially jeopardizing its ability to secure funding. Recommendation: We recommend that Foundation maintain competent accounting personnel which has the time and resources needed to ensure compliance with its reporting deadlines. Views of responsible officers: Management acknowledges this finding and will address remediation in the accompanying management’s corrective action plan in appendix A.

FY End: 2023-12-31
Phoenix Transitional Housing Plus INC
Compliance Requirement: L
NONCOMPLAINCE – REPORT SUBMISSION Program Title/Federal Grantor/ALN: Foster Care Title IV-E U.S. Department of Health and Human Services Assistance Listing Number 93.658 Criteria In accordance with CFR section 200.512 of the Uniform Guidance, the audit must be completed, and the data collection form and reporting package must be submitted to the Federal Audit Clearinghouse within the earlier of 30 calendar days after receipt of the auditor’s report(s) or nine months after the end of the audit...

NONCOMPLAINCE – REPORT SUBMISSION Program Title/Federal Grantor/ALN: Foster Care Title IV-E U.S. Department of Health and Human Services Assistance Listing Number 93.658 Criteria In accordance with CFR section 200.512 of the Uniform Guidance, the audit must be completed, and the data collection form and reporting package must be submitted to the Federal Audit Clearinghouse within the earlier of 30 calendar days after receipt of the auditor’s report(s) or nine months after the end of the audit period (whichever is earlier). The cognizant agency for audit or oversight agency for audit (in the absence of a cognizant agency for audit) may authorize an extension when the nine-month timeframe would place an undue burden on the auditee. Condition The SF-SAC Single Audit Data Collection Form was not submitted to the Federal Audit Clearinghouse by the required deadline of September 30, 2023. Questioned Costs Not Applicable Proper Perspective The Organization is not incompliance with Uniform Guidance Effect The Organization is not in compliance with federal regulations and guidelines. There is no fiscal impact. Cause The organization did not obtain the UEI number in time to file the SF-SAC Single Audit Data Collection Form within the required time frame. Recommendation We recommend the Organization make efforts to meet the annual requirements in the future or request an extension to file. Views of Responsible Officials: ___X__ Agree _____ Disagree

FY End: 2023-12-31
Phoenix Transitional Housing Plus INC
Compliance Requirement: L
NONCOMPLAINCE – REPORT SUBMISSION Program Title/Federal Grantor/ALN: Foster Care Title IV-E U.S. Department of Health and Human Services Assistance Listing Number 93.658 Criteria In accordance with CFR section 200.512 of the Uniform Guidance, the audit must be completed, and the data collection form and reporting package must be submitted to the Federal Audit Clearinghouse within the earlier of 30 calendar days after receipt of the auditor’s report(s) or nine months after the end of the audit...

NONCOMPLAINCE – REPORT SUBMISSION Program Title/Federal Grantor/ALN: Foster Care Title IV-E U.S. Department of Health and Human Services Assistance Listing Number 93.658 Criteria In accordance with CFR section 200.512 of the Uniform Guidance, the audit must be completed, and the data collection form and reporting package must be submitted to the Federal Audit Clearinghouse within the earlier of 30 calendar days after receipt of the auditor’s report(s) or nine months after the end of the audit period (whichever is earlier). The cognizant agency for audit or oversight agency for audit (in the absence of a cognizant agency for audit) may authorize an extension when the nine-month timeframe would place an undue burden on the auditee. Condition The SF-SAC Single Audit Data Collection Form was not submitted to the Federal Audit Clearinghouse by the required deadline of September 30, 2023. Questioned Costs Not Applicable Proper Perspective The Organization is not incompliance with Uniform Guidance Effect The Organization is not in compliance with federal regulations and guidelines. There is no fiscal impact. Cause The organization did not obtain the UEI number in time to file the SF-SAC Single Audit Data Collection Form within the required time frame. Recommendation We recommend the Organization make efforts to meet the annual requirements in the future or request an extension to file. Views of Responsible Officials: ___X__ Agree _____ Disagree

FY End: 2023-12-31
Phoenix Transitional Housing Plus INC
Compliance Requirement: L
NONCOMPLAINCE – REPORT SUBMISSION Program Title/Federal Grantor/ALN: Foster Care Title IV-E U.S. Department of Health and Human Services Assistance Listing Number 93.658 Criteria In accordance with CFR section 200.512 of the Uniform Guidance, the audit must be completed, and the data collection form and reporting package must be submitted to the Federal Audit Clearinghouse within the earlier of 30 calendar days after receipt of the auditor’s report(s) or nine months after the end of the audit...

NONCOMPLAINCE – REPORT SUBMISSION Program Title/Federal Grantor/ALN: Foster Care Title IV-E U.S. Department of Health and Human Services Assistance Listing Number 93.658 Criteria In accordance with CFR section 200.512 of the Uniform Guidance, the audit must be completed, and the data collection form and reporting package must be submitted to the Federal Audit Clearinghouse within the earlier of 30 calendar days after receipt of the auditor’s report(s) or nine months after the end of the audit period (whichever is earlier). The cognizant agency for audit or oversight agency for audit (in the absence of a cognizant agency for audit) may authorize an extension when the nine-month timeframe would place an undue burden on the auditee. Condition The SF-SAC Single Audit Data Collection Form was not submitted to the Federal Audit Clearinghouse by the required deadline of September 30, 2023. Questioned Costs Not Applicable Proper Perspective The Organization is not incompliance with Uniform Guidance Effect The Organization is not in compliance with federal regulations and guidelines. There is no fiscal impact. Cause The organization did not obtain the UEI number in time to file the SF-SAC Single Audit Data Collection Form within the required time frame. Recommendation We recommend the Organization make efforts to meet the annual requirements in the future or request an extension to file. Views of Responsible Officials: ___X__ Agree _____ Disagree

« 1 76 77 79 80 247 »