Section 200.508 outlines the responsibilities of the auditee, which include arranging and ensuring the proper execution of audits, preparing financial statements, addressing audit findings promptly, and granting auditors access to necessary information. This section primarily affects organizations receiving federal awards that must comply with these audit requirements.
View full section details →
FY End: 2023-06-30
Myrtle Point School District
Compliance Requirement: L
Finding 2023-002 - Schedule of Expenditures of Federal Awards (Material Weakness) CFDA Title and Number 84.425 Education Stabilization Fund Name of Federal Agency: U.S. Department of Education CFDA Title and Number 10.555 National School Lunch Program cluster Name of Federal Agency: U.S. Department of Agriculture Compliance/Internal Control over Compliance: Auditee Responsibilities Criteria: CFR Part 200.508, CFR Part 200.510, Auditee Responsibilities state that the auditee must prepare...

Finding 2023-002 - Schedule of Expenditures of Federal Awards (Material Weakness) CFDA Title and Number 84.425 Education Stabilization Fund Name of Federal Agency: U.S. Department of Education CFDA Title and Number 10.555 National School Lunch Program cluster Name of Federal Agency: U.S. Department of Agriculture Compliance/Internal Control over Compliance: Auditee Responsibilities Criteria: CFR Part 200.508, CFR Part 200.510, Auditee Responsibilities state that the auditee must prepare the Schedule of Expenditures of Federal Awards, which must list individual Federal awards by Federal Agency, including the total Federal awards expended, name of the pass-through entity, CFDA number, and total amount provided to subrecipients. The information contained in the Schedule of Expenditures of Federal Awards should be derived from and relate directly to the underlying accounting and other records used to prepare the financial statements. Condition: The Schedule of Expenditures of Federal Awards (SEFA) was presented for audit with values that were not reconciled with the general ledger. Cause: The District relied on individuals with insufficient training or support to prepare the SEFA and ensure that it was reconciled with general ledger amounts. District management did not have sufficient training or monitoring policies to recognize and correct the deficiency. Effect or Potential Effect: Expenditures of federal awards and not be detected and corrected. Because the Auditee’s SEFA was completed incorrectly, and not reconciled to the general ledger the SEFA was materially misstated, prior to auditors’ correction recommendations.   Questioned Cost: No Context: Lack of adequate controls over the Schedule of Expenditures of Federal Awards and related accounting resulted in the following: • SEFA was originally presented for auditors with incorrect information. • No reconciliation between federal expenditures reported on the GL and the SEFA was presented. Repeat of a Prior-Year Finding: No Recommendation: We recommend that the District establish policies and procedures to ensure that all Federal awards are identified and reported accurately on future SEFAs. Internal controls should be designed to prevent, detect, or correct errors in a timely manner by performing periodic reconciliations of the SEFA information to the general ledger throughout the fiscal year. The District should provide appropriate training to staff who are assigned to prepare and review the SEFA. District’s Response: The District acknowledges the deficiencies. Corrective Action Plan: The District will establish policies and procedures to ensure that all Federal awards are identified and reported accurately on future SEFAs. Planned Implementation Date: October 1, 2024 Responsible Person: Director of Business Services, Yamhill County School District No. 8

FY End: 2023-06-30
Myrtle Point School District
Compliance Requirement: L
Finding 2023-002 - Schedule of Expenditures of Federal Awards (Material Weakness) CFDA Title and Number 84.425 Education Stabilization Fund Name of Federal Agency: U.S. Department of Education CFDA Title and Number 10.555 National School Lunch Program cluster Name of Federal Agency: U.S. Department of Agriculture Compliance/Internal Control over Compliance: Auditee Responsibilities Criteria: CFR Part 200.508, CFR Part 200.510, Auditee Responsibilities state that the auditee must prepare...

Finding 2023-002 - Schedule of Expenditures of Federal Awards (Material Weakness) CFDA Title and Number 84.425 Education Stabilization Fund Name of Federal Agency: U.S. Department of Education CFDA Title and Number 10.555 National School Lunch Program cluster Name of Federal Agency: U.S. Department of Agriculture Compliance/Internal Control over Compliance: Auditee Responsibilities Criteria: CFR Part 200.508, CFR Part 200.510, Auditee Responsibilities state that the auditee must prepare the Schedule of Expenditures of Federal Awards, which must list individual Federal awards by Federal Agency, including the total Federal awards expended, name of the pass-through entity, CFDA number, and total amount provided to subrecipients. The information contained in the Schedule of Expenditures of Federal Awards should be derived from and relate directly to the underlying accounting and other records used to prepare the financial statements. Condition: The Schedule of Expenditures of Federal Awards (SEFA) was presented for audit with values that were not reconciled with the general ledger. Cause: The District relied on individuals with insufficient training or support to prepare the SEFA and ensure that it was reconciled with general ledger amounts. District management did not have sufficient training or monitoring policies to recognize and correct the deficiency. Effect or Potential Effect: Expenditures of federal awards and not be detected and corrected. Because the Auditee’s SEFA was completed incorrectly, and not reconciled to the general ledger the SEFA was materially misstated, prior to auditors’ correction recommendations.   Questioned Cost: No Context: Lack of adequate controls over the Schedule of Expenditures of Federal Awards and related accounting resulted in the following: • SEFA was originally presented for auditors with incorrect information. • No reconciliation between federal expenditures reported on the GL and the SEFA was presented. Repeat of a Prior-Year Finding: No Recommendation: We recommend that the District establish policies and procedures to ensure that all Federal awards are identified and reported accurately on future SEFAs. Internal controls should be designed to prevent, detect, or correct errors in a timely manner by performing periodic reconciliations of the SEFA information to the general ledger throughout the fiscal year. The District should provide appropriate training to staff who are assigned to prepare and review the SEFA. District’s Response: The District acknowledges the deficiencies. Corrective Action Plan: The District will establish policies and procedures to ensure that all Federal awards are identified and reported accurately on future SEFAs. Planned Implementation Date: October 1, 2024 Responsible Person: Director of Business Services, Yamhill County School District No. 8

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

FY End: 2023-06-30
City of Baltimore, Maryland
Compliance Requirement: L
Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Addit...

Material Weakness over Schedule of Expenditures of Federal Awards (SEFA) Reporting Repeat Finding: Yes, 2022-006 Condition: Finance is responsible for preparing the schedule of expenditures of Federal awards based upon grant information obtained from the financial accounting records and other information provided by each department or agency. In many instances, the detail expenditure information in the accounting software differed from the expenditures reported by various City departments. Additionally, expenditures related to sub-recipients, subcontractors, and beneficiaries are not separately tracked in the general ledger. Criteria: In accordance with 2 CFR 200.303, Internal controls: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. In accordance with 2 CFR 200.508, Auditee responsibilities: The auditee must: (b) Prepare appropriate financial statements, including the schedule of expenditures of Federal awards in accordance with §200.510 Financial statements. In accordance with 2 CFR 200.510, Financial statements: (b) Schedule of expenditures of Federal awards: the auditee must also prepare a schedule of expenditures of Federal awards for the period covered by the auditee’s financial statements which must include the total Federal awards expended as determined in accordance with §200.502 Basis for determining Federal awards expended. While not required, the auditee may choose to provide information requested by Federal awarding agencies and pass-through entities to make the schedule easier to use. For example, when a Federal program has multiple Federal award years, the auditee may list the amount of Federal awards expended for each Federal award year separately. At a minimum, the schedule must: (1) List individual Federal programs by Federal agency. For a cluster of programs, provide the cluster name, list individual Federal programs within the cluster of programs, and provide the applicable Federal agency name. For R&D, total Federal awards expended must be shown either by individual Federal award or by Federal agency and major subdivision within the Federal agency. (2) For Federal awards received as a subrecipient, the name of the pass-through entity and identifying number assigned by the pass-through entity must be included. (3) Provide total Federal awards expended for each individual Federal program and the AL number or other identifying number when the AL information is not available. For a cluster of programs, also provide the total for the cluster. (4) Include the total amount provided to subrecipients from each Federal program. (5) For loan or loan guarantee programs described in § 200.502(b), identify in the notes to the schedule the balances outstanding at the end of the audit period. This is in addition to including the total Federal awards expended for loan or loan guarantee programs in the schedule and (6) Include notes that describe that significant accounting policies used in preparing the schedule and note whether or not the non-Federal entity elected to use the 10% de minimis cost rate as covered in §200.414 Indirect (F&A) costs. Cause: The City does not maintain a centralized grant accounting function or standardized policies and procedures, including requirements to periodically submit and reconcile expenditures; instead, each department maintains its own grant information. The lack of submission of grant documents and accurate information by the various agencies and departments to Finance weakens internal controls over grant reporting and hinders the ability of Finance to accurately prepare the Schedule. Internal controls over financial reporting should be designed to prevent, detect or correct errors in a timely manner. Without adequate controls, the City cannot provide reasonable assurance that the Schedule is fairly presented. Controls have not been established by the City to ensure complete and accurate reporting for the Schedule for the 2023 fiscal year. Effect: The determination of which major programs will be audited is affected by the accuracy of the Schedule at the time of audit. Without proper internal controls over financial reporting, inaccurate reporting of the City’s financial information could occur and the City cannot provide reasonable assurance that the SEFA is fairly presented. As a result, individual program reports throughout the year could have inaccurate information. There were also significant delays in the preparation of the Schedule of Expenditures of Federal awards, which prevented the City from meeting the March 31, 2024 deadline with the Federal clearinghouse. Questioned Costs: Unknown. Recommendation: We recommend that Finance establish policies and procedures to ensure that the Federal funds are properly identified and reported accurately in the Schedule in accordance with Uniform Guidance requirements. We also recommend that individuals responsible for administering Federal assistance programs with the City receive training in grant administration. Auditee Response and Corrective Action Plan: Management agrees with the finding. Refer to the corrective action plan on current findings in Part V of this report. Auditor’s Conclusion: Finding remains as stated.

« 1 57 58 60 61 83 »