2 CFR 200 § 200.458

Findings Citing § 200.458

Pre-award costs.

Total Findings
220
Across all audits in database
Showing Page
1 of 5
50 findings per page
About this section
Pre-award costs are expenses incurred before a Federal award starts, necessary for efficient project performance, and can only be charged if approved by the Federal agency. These costs must align with what would be allowed after the award's start date and are typically included in the initial budget period unless stated otherwise.
View full section details →
FY End: 2023-12-31
City of Michigan City
Compliance Requirement: ABH
FINDING 2023-003 Subject: COVID-19: Coronavirus State and Local Fiscal Recovery Funds - Body Camera - Activities Allowed or Unallowed, Allowable Costs/Cost Principles, Period of Performance Federal Agency: Department of the Treasury Federal Program: COVID-19: Coronavirus State and Local Fiscal Recovery Funds Assistance Listings Number: 21.027 Federal Award Number and Year (or Other Identifying Number): 71391 Pass-Through Entity: Indiana Department of Homeland Security Compliance Requirements: Ac...

FINDING 2023-003 Subject: COVID-19: Coronavirus State and Local Fiscal Recovery Funds - Body Camera - Activities Allowed or Unallowed, Allowable Costs/Cost Principles, Period of Performance Federal Agency: Department of the Treasury Federal Program: COVID-19: Coronavirus State and Local Fiscal Recovery Funds Assistance Listings Number: 21.027 Federal Award Number and Year (or Other Identifying Number): 71391 Pass-Through Entity: Indiana Department of Homeland Security Compliance Requirements: Activities Allowed or Unallowed, Allowable Costs/ Cost Principles, Period of Performance Audit Findings: Material Weakness, Other Matters INDIANA STATE BOARD OF ACCOUNTS 17 CITY OF MICHIGAN CITY SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Condition and Context The City's Police Department applied for and was awarded a body camera grant from the Indiana Department of Homeland Security (IDHS). The City's Police Department sought reimbursement from the IDHS in October of 2023. An invoice from Utility, dated October 28, 2022, in the amount of $600,000 for body cameras was submitted for the reimbursement. The invoice was originally paid by the City with American Rescue Plan Act (ARPA) funds on April 3, 2023. The City received reimbursement of $61,740 from the IDHS on December 5, 2023, which was receipted into the City's Grant Fund along with the City's local match in the amount of $30,870. The Controller's Office did an adjustment on December 31, 2023, in the amount of $92,610, to reimburse the ARP Coronavirus LF Recovery Fund and decrease the Grant Fund, for the reimbursement of $61,740 and the local share of $30,870. However, per the grant agreement with the IDHS, "If the subrecipient incurs a financial obligation prior to approval of the State, then the subrecipient will be required to reimburse the State for the amount of funds that were not approved." As such, the expenditure was not an allowable activity or allowable cost and was outside of the period of performance due to the City incurring the expense prior to signing the grant agreement with the IDHS on March 3, 2023. The lack of internal controls and noncompliance were isolated to the purchase noted above. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: . . . (c) Be consistent with policies and procedures that apply uniformly to both federallyfinanced and other activities of the non-Federal entity. . . . (f) Not be included as a cost or used to meet cost sharing or matching requirements of any other federally-financed program in either the current or a prior period. . . ." 2 CFR 200.306(b) states: "For all Federal awards, any shared costs or matching funds and all contributions, including cash and third-party in-kind contributions, must be accepted as part of the non-Federal entity's cost sharing or matching when such contributions meet all of the following criteria: (1) Are verifiable from the non-Federal entity's records; INDIANA STATE BOARD OF ACCOUNTS 18 CITY OF MICHIGAN CITY SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (2) Are not included as contributions for any other Federal award; (3) Are necessary and reasonable for accomplishment of project or program objectives; (4) Are allowable under subpart E of this part; (5) Are not paid by the Federal Government under another Federal award, except where the Federal statute authorizing a program specifically provides that Federal funds made available for such program can be applied to matching or cost sharing requirements of other Federal programs; (6) Are provided for in the approved budget when required by the Federal awarding agency; and (7) Conform to other provisions of this part, as applicable." The Grant Agreement states in part: "Any purchases made by the Subrecipient that are not authorized by the U.S. Department of the Treasury allowability guidelines, the Subrecipient's Project or State, will not be reimbursed under this grant." "Pre-award costs, as defined in 2 CFR 200.458, may not be paid with funding from this award." 2 CFR 200.458 states: "Pre-award costs are those incurred prior to the effective date of the Federal award or subaward directly pursuant to the negotiation and in anticipation of the Federal award where such costs are necessary for efficient and timely performance of the scope of work. Such costs are allowable only to the extent that they would have been allowable if incurred after the date of the Federal award and only with the written approval of the Federal awarding agency. If charged to the award, these costs must be charged to the initial budget period of the award, unless otherwise specified by the Federal awarding agency or pass-through entity." Cause Management had not developed a system of internal controls that would have prevented or detected material noncompliance. The City did not ensure that the policies and procedures in place related to allowable or unallowable activities, allowable costs and cost principles, and period of performance were complied with at the acceptance of the grant from the IDHS. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, an invoice that was previously paid with other federal award funds was submitted for reimbursement to another agency. The original invoice was outside of the period of performance and unallowable as related to the award from the IDHS. Furthermore, noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the City. Questioned Costs We identified $61,740 in questioned costs as noted above in the Condition and Context. INDIANA STATE BOARD OF ACCOUNTS 19 CITY OF MICHIGAN CITY SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Recommendation We recommended that management of the City establish a proper system of internal controls, including strengthening its policies and procedures to ensure all costs submitted for reimbursement are not already reimbursed by another federal award and are within the period of performance. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

FY End: 2023-12-31
City of Michigan City
Compliance Requirement: ABH
FINDING 2023-003 Subject: COVID-19: Coronavirus State and Local Fiscal Recovery Funds - Body Camera - Activities Allowed or Unallowed, Allowable Costs/Cost Principles, Period of Performance Federal Agency: Department of the Treasury Federal Program: COVID-19: Coronavirus State and Local Fiscal Recovery Funds Assistance Listings Number: 21.027 Federal Award Number and Year (or Other Identifying Number): 71391 Pass-Through Entity: Indiana Department of Homeland Security Compliance Requirements: Ac...

FINDING 2023-003 Subject: COVID-19: Coronavirus State and Local Fiscal Recovery Funds - Body Camera - Activities Allowed or Unallowed, Allowable Costs/Cost Principles, Period of Performance Federal Agency: Department of the Treasury Federal Program: COVID-19: Coronavirus State and Local Fiscal Recovery Funds Assistance Listings Number: 21.027 Federal Award Number and Year (or Other Identifying Number): 71391 Pass-Through Entity: Indiana Department of Homeland Security Compliance Requirements: Activities Allowed or Unallowed, Allowable Costs/ Cost Principles, Period of Performance Audit Findings: Material Weakness, Other Matters INDIANA STATE BOARD OF ACCOUNTS 17 CITY OF MICHIGAN CITY SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Condition and Context The City's Police Department applied for and was awarded a body camera grant from the Indiana Department of Homeland Security (IDHS). The City's Police Department sought reimbursement from the IDHS in October of 2023. An invoice from Utility, dated October 28, 2022, in the amount of $600,000 for body cameras was submitted for the reimbursement. The invoice was originally paid by the City with American Rescue Plan Act (ARPA) funds on April 3, 2023. The City received reimbursement of $61,740 from the IDHS on December 5, 2023, which was receipted into the City's Grant Fund along with the City's local match in the amount of $30,870. The Controller's Office did an adjustment on December 31, 2023, in the amount of $92,610, to reimburse the ARP Coronavirus LF Recovery Fund and decrease the Grant Fund, for the reimbursement of $61,740 and the local share of $30,870. However, per the grant agreement with the IDHS, "If the subrecipient incurs a financial obligation prior to approval of the State, then the subrecipient will be required to reimburse the State for the amount of funds that were not approved." As such, the expenditure was not an allowable activity or allowable cost and was outside of the period of performance due to the City incurring the expense prior to signing the grant agreement with the IDHS on March 3, 2023. The lack of internal controls and noncompliance were isolated to the purchase noted above. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: . . . (c) Be consistent with policies and procedures that apply uniformly to both federallyfinanced and other activities of the non-Federal entity. . . . (f) Not be included as a cost or used to meet cost sharing or matching requirements of any other federally-financed program in either the current or a prior period. . . ." 2 CFR 200.306(b) states: "For all Federal awards, any shared costs or matching funds and all contributions, including cash and third-party in-kind contributions, must be accepted as part of the non-Federal entity's cost sharing or matching when such contributions meet all of the following criteria: (1) Are verifiable from the non-Federal entity's records; INDIANA STATE BOARD OF ACCOUNTS 18 CITY OF MICHIGAN CITY SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (2) Are not included as contributions for any other Federal award; (3) Are necessary and reasonable for accomplishment of project or program objectives; (4) Are allowable under subpart E of this part; (5) Are not paid by the Federal Government under another Federal award, except where the Federal statute authorizing a program specifically provides that Federal funds made available for such program can be applied to matching or cost sharing requirements of other Federal programs; (6) Are provided for in the approved budget when required by the Federal awarding agency; and (7) Conform to other provisions of this part, as applicable." The Grant Agreement states in part: "Any purchases made by the Subrecipient that are not authorized by the U.S. Department of the Treasury allowability guidelines, the Subrecipient's Project or State, will not be reimbursed under this grant." "Pre-award costs, as defined in 2 CFR 200.458, may not be paid with funding from this award." 2 CFR 200.458 states: "Pre-award costs are those incurred prior to the effective date of the Federal award or subaward directly pursuant to the negotiation and in anticipation of the Federal award where such costs are necessary for efficient and timely performance of the scope of work. Such costs are allowable only to the extent that they would have been allowable if incurred after the date of the Federal award and only with the written approval of the Federal awarding agency. If charged to the award, these costs must be charged to the initial budget period of the award, unless otherwise specified by the Federal awarding agency or pass-through entity." Cause Management had not developed a system of internal controls that would have prevented or detected material noncompliance. The City did not ensure that the policies and procedures in place related to allowable or unallowable activities, allowable costs and cost principles, and period of performance were complied with at the acceptance of the grant from the IDHS. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, an invoice that was previously paid with other federal award funds was submitted for reimbursement to another agency. The original invoice was outside of the period of performance and unallowable as related to the award from the IDHS. Furthermore, noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the City. Questioned Costs We identified $61,740 in questioned costs as noted above in the Condition and Context. INDIANA STATE BOARD OF ACCOUNTS 19 CITY OF MICHIGAN CITY SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Recommendation We recommended that management of the City establish a proper system of internal controls, including strengthening its policies and procedures to ensure all costs submitted for reimbursement are not already reimbursed by another federal award and are within the period of performance. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

FY End: 2023-06-30
Ada S. McKinley Community Services, Inc. Group Homes
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - 93.778, U.S. Department of Health and Human Services, Medicaid Cluster - Medical Assistance Program Federal Award Identification Number and Year - HCBS000020, 2023 Pass through Entity - Illinois Department of Healthcare and Family Services Finding Type - Significant deficiency and material noncompliance with laws and regulations Repeat Finding - No Criteria - 2 CFR 200.400(c) The non Federal entity, in recognition of its own unique combinat...

Assistance Listing, Federal Agency, and Program Name - 93.778, U.S. Department of Health and Human Services, Medicaid Cluster - Medical Assistance Program Federal Award Identification Number and Year - HCBS000020, 2023 Pass through Entity - Illinois Department of Healthcare and Family Services Finding Type - Significant deficiency and material noncompliance with laws and regulations Repeat Finding - No Criteria - 2 CFR 200.400(c) The non Federal entity, in recognition of its own unique combination of staff, facilities, and experience, has the primary responsibility for employing whatever form of sound organization and management techniques may be necessary in order to assure proper and efficient administration of the Federal award. 2 CFR 200.458 Pre-award costs are allowable only to the extent that they would have been allowable if incurred after the date of the Federal award and only with the written approval of the Federal awarding agency. Condition - A duplicate expense was recorded to the program and expenses were recorded to the program prior to the period of performance Questioned Costs - None Identification of How Questioned Costs Were Computed - N/A, see additional information within the context below Context - Five expenses totaling $4,050 were recorded to the grant as pre award expenses without written approval and another expense of $20,229 was recorded twice to the program. Cause and Effect - The Organization recorded journal entries during the year and the process and reviews for the journal entries did not identify expenses were incurred prior to the start of the period of performance. The duplicate expense was identified but not corrected prior finalization of the SEFA. Recommendation - We recommend the Organization increase controls over manual adjustments to record expenses charged to grants. Views of Responsible Officials and Corrective Action Plan - Management acknowledges noncompliance in the current fiscal year and has taken measures to improve internal controls over compliance. Management has instituted procedures to provide a review of journal entries to reclass expenses to grant funded programs and promptly record.

FY End: 2023-06-30
Ada S. McKinley Community Services, Inc. Group Homes
Compliance Requirement: B
Assistance Listing, Federal Agency, and Program Name - 93.778, U.S. Department of Health and Human Services, Medicaid Cluster - Medical Assistance Program Federal Award Identification Number and Year - HCBS000020, 2023 Pass through Entity - Illinois Department of Healthcare and Family Services Finding Type - Significant deficiency and material noncompliance with laws and regulations Repeat Finding - No Criteria - 2 CFR 200.400(c) The non Federal entity, in recognition of its own unique combinat...

Assistance Listing, Federal Agency, and Program Name - 93.778, U.S. Department of Health and Human Services, Medicaid Cluster - Medical Assistance Program Federal Award Identification Number and Year - HCBS000020, 2023 Pass through Entity - Illinois Department of Healthcare and Family Services Finding Type - Significant deficiency and material noncompliance with laws and regulations Repeat Finding - No Criteria - 2 CFR 200.400(c) The non Federal entity, in recognition of its own unique combination of staff, facilities, and experience, has the primary responsibility for employing whatever form of sound organization and management techniques may be necessary in order to assure proper and efficient administration of the Federal award. 2 CFR 200.458 Pre-award costs are allowable only to the extent that they would have been allowable if incurred after the date of the Federal award and only with the written approval of the Federal awarding agency. Condition - A duplicate expense was recorded to the program and expenses were recorded to the program prior to the period of performance Questioned Costs - None Identification of How Questioned Costs Were Computed - N/A, see additional information within the context below Context - Five expenses totaling $4,050 were recorded to the grant as pre award expenses without written approval and another expense of $20,229 was recorded twice to the program. Cause and Effect - The Organization recorded journal entries during the year and the process and reviews for the journal entries did not identify expenses were incurred prior to the start of the period of performance. The duplicate expense was identified but not corrected prior finalization of the SEFA. Recommendation - We recommend the Organization increase controls over manual adjustments to record expenses charged to grants. Views of Responsible Officials and Corrective Action Plan - Management acknowledges noncompliance in the current fiscal year and has taken measures to improve internal controls over compliance. Management has instituted procedures to provide a review of journal entries to reclass expenses to grant funded programs and promptly record.

FY End: 2022-12-31
Montgomery County
Compliance Requirement: H
FINDING 2022-006 Subject: COVID-19 - Public Health Emergency Response: Cooperative Agreement for Emergency Response: Public Health Crisis Response - Period of Performance Federal Agency: Department of Health and Human Services Federal Program: COVID-19 - Public Health Emergency Response: Cooperative Agreement for Emergency Response: Public Health Crisis Response Assistance Listings Number: 93.354 Federal Award Number and Year (or Other Identifying Number): 1NU90TP922179 Pass-Through Entity: Indi...

FINDING 2022-006 Subject: COVID-19 - Public Health Emergency Response: Cooperative Agreement for Emergency Response: Public Health Crisis Response - Period of Performance Federal Agency: Department of Health and Human Services Federal Program: COVID-19 - Public Health Emergency Response: Cooperative Agreement for Emergency Response: Public Health Crisis Response Assistance Listings Number: 93.354 Federal Award Number and Year (or Other Identifying Number): 1NU90TP922179 Pass-Through Entity: Indiana State Department of Health Compliance Requirement: Period of Performance Audit Findings: Material Weakness, Modified Opinion Condition and Context The County had not designed, nor implemented a system of internal controls to ensure grant funds were expended during the grant's period of performance. A grant's period of performance is the time frame during which the grant funds may be expended. The period of performance for the grant was identified in the grant agreement. The County received $220,000 in advance funding for the grant with a period of performance beginning July 1, 2022. The entirety of the grant funds were receipted into the County's Supp PH Workforce GRT 93.354 fund (grant fund); however, the County disbursed $36,150 from the grant fund prior to the start of the grant's period of performance. As the grant did not allow for expenditures prior to the beginning of the period performance and approval from the grantor for the costs was not obtained, the total $36,150 was considered questioned costs. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.1 states in part: ". . . Period of performance means the total estimated time interval between the start of an initial Federal award and the planned end date, which may include one or more funded portions, or budget periods. Identification of the period of performance in the Federal award per ? 200.211(b)(5) does not commit the awarding agency to fund the award beyond the currently approved budget period. . . ." 2 CFR 200.458 states: "Pre-award costs are those incurred prior to the effective date of the Federal award or subaward directly pursuant to the negotiation and in anticipation of the Federal award where such costs are necessary for efficient and timely performance of the scope of work. Such costs are allowable only to the extent that they would have been allowable if incurred after the date of the Federal award and only with the written approval of the Federal awarding agency. If charged to the award, these costs must be charged to the initial budget period of the award, unless otherwise specified by the Federal awarding agency or pass-through entity." Cause A proper system of internal controls was not designed by management of the County. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the County's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, expenses were paid outside of the period of performance. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the County. Questioned Costs Questioned costs of $36,150 were identified as outlined in the Condition and Context. Recommendation We recommended that management of the County establish a proper system of internal controls and develop policies and procedures to ensure all expenditures are within the period of performance or appropriate approval is obtained for pre-award costs. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

FY End: 2022-12-31
Montgomery County
Compliance Requirement: H
FINDING 2022-006 Subject: COVID-19 - Public Health Emergency Response: Cooperative Agreement for Emergency Response: Public Health Crisis Response - Period of Performance Federal Agency: Department of Health and Human Services Federal Program: COVID-19 - Public Health Emergency Response: Cooperative Agreement for Emergency Response: Public Health Crisis Response Assistance Listings Number: 93.354 Federal Award Number and Year (or Other Identifying Number): 1NU90TP922179 Pass-Through Entity: Indi...

FINDING 2022-006 Subject: COVID-19 - Public Health Emergency Response: Cooperative Agreement for Emergency Response: Public Health Crisis Response - Period of Performance Federal Agency: Department of Health and Human Services Federal Program: COVID-19 - Public Health Emergency Response: Cooperative Agreement for Emergency Response: Public Health Crisis Response Assistance Listings Number: 93.354 Federal Award Number and Year (or Other Identifying Number): 1NU90TP922179 Pass-Through Entity: Indiana State Department of Health Compliance Requirement: Period of Performance Audit Findings: Material Weakness, Modified Opinion Condition and Context The County had not designed, nor implemented a system of internal controls to ensure grant funds were expended during the grant's period of performance. A grant's period of performance is the time frame during which the grant funds may be expended. The period of performance for the grant was identified in the grant agreement. The County received $220,000 in advance funding for the grant with a period of performance beginning July 1, 2022. The entirety of the grant funds were receipted into the County's Supp PH Workforce GRT 93.354 fund (grant fund); however, the County disbursed $36,150 from the grant fund prior to the start of the grant's period of performance. As the grant did not allow for expenditures prior to the beginning of the period performance and approval from the grantor for the costs was not obtained, the total $36,150 was considered questioned costs. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.1 states in part: ". . . Period of performance means the total estimated time interval between the start of an initial Federal award and the planned end date, which may include one or more funded portions, or budget periods. Identification of the period of performance in the Federal award per ? 200.211(b)(5) does not commit the awarding agency to fund the award beyond the currently approved budget period. . . ." 2 CFR 200.458 states: "Pre-award costs are those incurred prior to the effective date of the Federal award or subaward directly pursuant to the negotiation and in anticipation of the Federal award where such costs are necessary for efficient and timely performance of the scope of work. Such costs are allowable only to the extent that they would have been allowable if incurred after the date of the Federal award and only with the written approval of the Federal awarding agency. If charged to the award, these costs must be charged to the initial budget period of the award, unless otherwise specified by the Federal awarding agency or pass-through entity." Cause A proper system of internal controls was not designed by management of the County. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the County's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, expenses were paid outside of the period of performance. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the County. Questioned Costs Questioned costs of $36,150 were identified as outlined in the Condition and Context. Recommendation We recommended that management of the County establish a proper system of internal controls and develop policies and procedures to ensure all expenditures are within the period of performance or appropriate approval is obtained for pre-award costs. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

FY End: 2022-06-30
Coconino County
Compliance Requirement: H
Assistance Listings number and name: 10.691 Good Neighbor Authority Award numbers and year: 22-GN-11030400-027 January 14, 2022 through January 12, 2027 Federal agency: U.S. Department of Agriculture (UDSA) Compliance requirements: Period of Performance Questioned costs: $42,555 Condition?Contrary to federal regulation and the County?s grant award with the U.S. Department of Agriculture (USDA), the County?s Flood Control District spent $42,555 on unallowable purchases that it requested and re...

Assistance Listings number and name: 10.691 Good Neighbor Authority Award numbers and year: 22-GN-11030400-027 January 14, 2022 through January 12, 2027 Federal agency: U.S. Department of Agriculture (UDSA) Compliance requirements: Period of Performance Questioned costs: $42,555 Condition?Contrary to federal regulation and the County?s grant award with the U.S. Department of Agriculture (USDA), the County?s Flood Control District spent $42,555 on unallowable purchases that it requested and received reimbursement for as part of the program?s $1.4 million total expenditures. Specifically, for 1 of 2 transactions tested, the District spent $42,555 on construction-planning services for repairing flood damage before the time period the costs were allowed to be incurred and did not receive preapproval from the federal agency, as required. Effect?The USDA may require the County to reimburse the $42,555 in unallowable costs with other County monies and either require the County to return the monies or spend them on other allowable costs before the grant expiration date of January 12, 2027.1 Cause?Despite the County?s grant award with USDA specifying the period of performance requirements, the County?s existing polices to review reimbursement requests did not require verifying that preapprovals were obtained from the federal agency when costs were incurred before the grant award term?s start date. Criteria?Federal regulation and the County?s grant award terms and conditions with USDA allow the Department to charge only allowable costs incurred during the performance period, or January 14, 2022 through January 12, 2027, and require any costs incurred before the start date to be preapproved by the federal agency (2 Code of Federal Regulations [CFR] ?200.458 and USDA grant award terms ?AA). Also, federal regulation requires establishing and maintaining effective internal control over federal awards that provides reasonable assurance that the federal program is being managed in compliance with all applicable laws, regulations, and award terms (2 CFR ?200.303). Recommendations?The County should: 1. Improve existing policies and procedures for federal grants by requiring the reviewer to verify that preapprovals were obtained from the federal agency when costs were incurred before the award term?s start date. 2. Request and obtain preapproval from the federal agency for all costs incurred outside the award term?s performance period. 3. Work with the U.S Department of Agriculture to resolve the $42,555 of program monies the District spent in violation of its federal award terms, which may involve returning monies to the federal agency.1 The County?s corrective action plan at the end of this report includes the views and planned corrective action of its responsible officials. We are not required to audit and have not audited these responses and planned corrective actions and therefore provide no assurances as to their accuracy. 1 Federal Uniform Guidance requires federal awarding agencies to follow up on audit findings and issue a management decision to ensure the recipient, the County, takes appropriate and timely corrective action (2 CFR ?200.513[c]). Further, it requires that federal awarding agencies? management decisions clearly state whether or not the audit finding is sustained, the reasons for the decision, and the expected auditee action to repay disallowed costs, make financial adjustments, or take other action, as directed by the federal awarding agencies (2 CFR ?200.521).

FY End: 2022-06-30
Heartland Alliance for Human Needs & Human Rights
Compliance Requirement: H
2022-005: Internal Control Over Compliance and Compliance with Period of Performance Program: U.S. Department of State AL Number: 19.016 AL Name: Iraq Assistance Program Grant Award Numbers Under the Uniform Guidance Requirements: Direct Award Number Award Period SLMAQM19GR2288 September 29, 2019 through June 30,2022 Program: U.S. Department of State AL Number: 19.518 AL Name: Overseas Refugee Assistance Program for Western Hemisphere Grant Award Numbers Under the Uniform Guidance R...

2022-005: Internal Control Over Compliance and Compliance with Period of Performance Program: U.S. Department of State AL Number: 19.016 AL Name: Iraq Assistance Program Grant Award Numbers Under the Uniform Guidance Requirements: Direct Award Number Award Period SLMAQM19GR2288 September 29, 2019 through June 30,2022 Program: U.S. Department of State AL Number: 19.518 AL Name: Overseas Refugee Assistance Program for Western Hemisphere Grant Award Numbers Under the Uniform Guidance Requirements: Direct Award Number Award Period SPRMCO20CA0209 September 20, 2020 through September 29, 2021 N/A September 20, 2021 through September 29, 2022 Criteria - CFR ?200.303, Internal Controls, Section (a) states the Organization must establish and maintain effective internal control over federal awards that provides reasonable assurance that the Organization is managing the federal awards in compliance with federal statutes, regulations, and terms and conditions of the federal award. Management is responsible for establishing and maintaining a system of internal control that should include controls over its grants? period of performance process. In accordance with CFR Section 200.403(h), cost must be incurred during the approved budget period. The federal awarding agency is authorized at its discretion to waive prior written approvals to carry forward unobligated balances to subsequent budget period pursuant to ?200.308(e)(3). In accordance with CFR Section 200.458, pre-award costs are those incurred prior to the effective date of the federal award or subaward directly pursuant to the negotiation and in anticipation of the federal award where such costs are necessary for efficient and timely performance of the scope of the work. Such costs are allowable only to the extent they would have been allowable if incurred after the date of the federal award and only with the written approval of the federal awarding agency. In accordance with CFR Section 200.344, the federal awarding agency or pass-through entity will close out the federal award when it determines that all applicable administrative actions and all required work of the federal award have been completed by the nonfederal entity. Per CFR Section 200.344(b), unless the federal awarding agency or pass-through entity authorizes an extension, a non-federal entity must liquidate all obligations incurred under the federal award not later than 120 calendar days after the end date of the period of performance. Condition ? During our testing of period of performance, we noted exceptions in the ability of management to support expenditures were incurred and charged to federal programs within the period of performance. Cause ? Policies and procedures were not appropriately adhered to in certain instances to ensure that supporting documentation was maintained to evidence that costs were incurred during the period of performance and that an appropriate level of review and approval was completed prior to charging costs to a federal program. Effect - The lack of adherence to the established internal control procedures around the period of performance of the award can lead to noncompliance with laws, regulations, and the provisions of grant agreements, which could ultimately lead to expenditures not being charged to the major programs in the correct period. Questioned Costs ? $29,459 Context: Assistance Listing Number: 19.016 During our testing of the period of performance compliance requirement for grant award periods that ended during the fiscal year, we sampled 12 expenditures, totaling $292,901, for the Iraq Assistance Program and noted one item amounting to $28,766 did not have adequate supporting documentation for the subrecipient expenditures charged to the program. Additionally, during our testing of the period of performance compliance requirement for grant costs incurred throughout the year, we sampled 40 expenditures, totaling $11,811, for the Iraq Assistance Programs and noted that four items, totaling $672, did not have proper documentation for the allocation of the expenditure. Assistance Listing Number: 19.518 During our testing of the period of performance compliance requirement for grant award periods that started and ended during the fiscal year, we sampled 81 expenditures, totaling $15,252, for the Overseas Refugee Assistance Program for Western Hemisphere and noted two items, totaling $21, did not have adequate supporting documentation for the subrecipient expenditures charged to the program. Repeat Finding - This finding is not a repeat finding. Recommendation - We recommend that the Organization ensure its policies and procedures ensure that documentation of when the expenditure was incurred and liquidated is maintained and that these policies and procedures are followed on a consistent basis. Views of Responsible Officials - Management agrees with the finding and takes responsibility to comply with the period of performance compliance requirements. Management through the local offices has already developed a policy to ensure that the period of performance is adhered to.

FY End: 2022-06-30
Heartland Alliance for Human Needs & Human Rights
Compliance Requirement: H
2022-005: Internal Control Over Compliance and Compliance with Period of Performance Program: U.S. Department of State AL Number: 19.016 AL Name: Iraq Assistance Program Grant Award Numbers Under the Uniform Guidance Requirements: Direct Award Number Award Period SLMAQM19GR2288 September 29, 2019 through June 30,2022 Program: U.S. Department of State AL Number: 19.518 AL Name: Overseas Refugee Assistance Program for Western Hemisphere Grant Award Numbers Under the Uniform Guidance R...

2022-005: Internal Control Over Compliance and Compliance with Period of Performance Program: U.S. Department of State AL Number: 19.016 AL Name: Iraq Assistance Program Grant Award Numbers Under the Uniform Guidance Requirements: Direct Award Number Award Period SLMAQM19GR2288 September 29, 2019 through June 30,2022 Program: U.S. Department of State AL Number: 19.518 AL Name: Overseas Refugee Assistance Program for Western Hemisphere Grant Award Numbers Under the Uniform Guidance Requirements: Direct Award Number Award Period SPRMCO20CA0209 September 20, 2020 through September 29, 2021 N/A September 20, 2021 through September 29, 2022 Criteria - CFR ?200.303, Internal Controls, Section (a) states the Organization must establish and maintain effective internal control over federal awards that provides reasonable assurance that the Organization is managing the federal awards in compliance with federal statutes, regulations, and terms and conditions of the federal award. Management is responsible for establishing and maintaining a system of internal control that should include controls over its grants? period of performance process. In accordance with CFR Section 200.403(h), cost must be incurred during the approved budget period. The federal awarding agency is authorized at its discretion to waive prior written approvals to carry forward unobligated balances to subsequent budget period pursuant to ?200.308(e)(3). In accordance with CFR Section 200.458, pre-award costs are those incurred prior to the effective date of the federal award or subaward directly pursuant to the negotiation and in anticipation of the federal award where such costs are necessary for efficient and timely performance of the scope of the work. Such costs are allowable only to the extent they would have been allowable if incurred after the date of the federal award and only with the written approval of the federal awarding agency. In accordance with CFR Section 200.344, the federal awarding agency or pass-through entity will close out the federal award when it determines that all applicable administrative actions and all required work of the federal award have been completed by the nonfederal entity. Per CFR Section 200.344(b), unless the federal awarding agency or pass-through entity authorizes an extension, a non-federal entity must liquidate all obligations incurred under the federal award not later than 120 calendar days after the end date of the period of performance. Condition ? During our testing of period of performance, we noted exceptions in the ability of management to support expenditures were incurred and charged to federal programs within the period of performance. Cause ? Policies and procedures were not appropriately adhered to in certain instances to ensure that supporting documentation was maintained to evidence that costs were incurred during the period of performance and that an appropriate level of review and approval was completed prior to charging costs to a federal program. Effect - The lack of adherence to the established internal control procedures around the period of performance of the award can lead to noncompliance with laws, regulations, and the provisions of grant agreements, which could ultimately lead to expenditures not being charged to the major programs in the correct period. Questioned Costs ? $29,459 Context: Assistance Listing Number: 19.016 During our testing of the period of performance compliance requirement for grant award periods that ended during the fiscal year, we sampled 12 expenditures, totaling $292,901, for the Iraq Assistance Program and noted one item amounting to $28,766 did not have adequate supporting documentation for the subrecipient expenditures charged to the program. Additionally, during our testing of the period of performance compliance requirement for grant costs incurred throughout the year, we sampled 40 expenditures, totaling $11,811, for the Iraq Assistance Programs and noted that four items, totaling $672, did not have proper documentation for the allocation of the expenditure. Assistance Listing Number: 19.518 During our testing of the period of performance compliance requirement for grant award periods that started and ended during the fiscal year, we sampled 81 expenditures, totaling $15,252, for the Overseas Refugee Assistance Program for Western Hemisphere and noted two items, totaling $21, did not have adequate supporting documentation for the subrecipient expenditures charged to the program. Repeat Finding - This finding is not a repeat finding. Recommendation - We recommend that the Organization ensure its policies and procedures ensure that documentation of when the expenditure was incurred and liquidated is maintained and that these policies and procedures are followed on a consistent basis. Views of Responsible Officials - Management agrees with the finding and takes responsibility to comply with the period of performance compliance requirements. Management through the local offices has already developed a policy to ensure that the period of performance is adhered to.

FY End: 2022-06-30
Heartland Alliance for Human Needs & Human Rights
Compliance Requirement: H
2022-006: Internal Control Over Compliance and Compliance with Period of Performance Program: U.S. Department of State AL Number: 19.518 AL Name: Overseas Refugee Assistance Program for Western Hemisphere Grant Award Numbers Under the Uniform Guidance Requirements: Direct Award Number Award Period SPRMCO20CA0209 September 20, 2020 through September 29, 2021 N/A September 20, 2021 through September 29, 2022 Criteria ? CFR ?200.303, Internal Controls, Section (a) states the Organizati...

2022-006: Internal Control Over Compliance and Compliance with Period of Performance Program: U.S. Department of State AL Number: 19.518 AL Name: Overseas Refugee Assistance Program for Western Hemisphere Grant Award Numbers Under the Uniform Guidance Requirements: Direct Award Number Award Period SPRMCO20CA0209 September 20, 2020 through September 29, 2021 N/A September 20, 2021 through September 29, 2022 Criteria ? CFR ?200.303, Internal Controls, Section (a) states the Organization must establish and maintain effective internal control over federal awards that provides reasonable assurance that the Organization is managing the federal awards in compliance with federal statutes, regulations, and terms and conditions of the federal award. Management is responsible for establishing and maintaining a system of internal control that should include controls over its grants? period of performance process. In accordance with CFR Section 200.403(h), cost must be incurred during the approved budget period. The federal awarding agency is authorized at its discretion to waive prior written approvals to carry forward unobligated balances to subsequent budget period pursuant to ?200.308(e)(3). In accordance with CFR Section 200.458, pre-award costs are those incurred prior to the effective date of the federal award or subaward directly pursuant to the negotiation and in anticipation of the federal award where such costs are necessary for efficient and timely performance of the scope of the work. Such costs are allowable only to the extent they would have been allowable if incurred after the date of the federal award and only with the written approval of the federal awarding agency. In accordance with CFR Section 200.344, the federal awarding agency or pass-through entity will close out the federal award when it determines that all applicable administrative actions and all required work of the federal award have been completed by the nonfederal entity. Per CFR Section 200.344(b), unless the federal awarding agency or pass-through entity authorizes an extension, a non-federal entity must liquidate all obligations incurred under the federal award not later than 120 calendar days after the end date of the period of performance. Condition ? During our testing of period of performance, we noted exceptions where expenditures were incurred outside of the grant?s performance period. Cause ? Policies and procedures were not appropriately adhered to in certain instances to ensure that supporting documentation was maintained to evidence that costs were incurred during the period of performance and that an appropriate level of review and approval was completed prior to charging costs to a federal program. Effect - The lack of adherence to the established internal control procedures around the period of performance of the award can lead to noncompliance with law and regulations and possible loss of funding for the related program. Questioned Costs ? $125 Context: During our testing of the allowable costs/cost principles compliance requirements, we sampled 25 nonpayroll expenditures, totaling $6,365, for the Overseas Refugee Assistance Program for Western Hemisphere and noted that four items, totaling $125, were incurred and paid outside of the grant award period. Repeat Finding - This finding is a repeat finding from prior year. This finding was reported as finding 2021-001 in the 2021 reporting package. Recommendation - We recommend management revisits and considers revising its internal procedures around detecting expenditures incurred outside of the period of performance of the awards. Views of Responsible Officials - Management agrees with the finding and takes responsibility to comply with the period of performance compliance requirements. Management is emphasizing prompt period closing to ensure that no items are recorded in the wrong period.

FY End: 2022-06-30
Heartland Alliance for Human Needs & Human Rights
Compliance Requirement: H
2022-005: Internal Control Over Compliance and Compliance with Period of Performance Program: U.S. Department of State AL Number: 19.016 AL Name: Iraq Assistance Program Grant Award Numbers Under the Uniform Guidance Requirements: Direct Award Number Award Period SLMAQM19GR2288 September 29, 2019 through June 30,2022 Program: U.S. Department of State AL Number: 19.518 AL Name: Overseas Refugee Assistance Program for Western Hemisphere Grant Award Numbers Under the Uniform Guidance R...

2022-005: Internal Control Over Compliance and Compliance with Period of Performance Program: U.S. Department of State AL Number: 19.016 AL Name: Iraq Assistance Program Grant Award Numbers Under the Uniform Guidance Requirements: Direct Award Number Award Period SLMAQM19GR2288 September 29, 2019 through June 30,2022 Program: U.S. Department of State AL Number: 19.518 AL Name: Overseas Refugee Assistance Program for Western Hemisphere Grant Award Numbers Under the Uniform Guidance Requirements: Direct Award Number Award Period SPRMCO20CA0209 September 20, 2020 through September 29, 2021 N/A September 20, 2021 through September 29, 2022 Criteria - CFR ?200.303, Internal Controls, Section (a) states the Organization must establish and maintain effective internal control over federal awards that provides reasonable assurance that the Organization is managing the federal awards in compliance with federal statutes, regulations, and terms and conditions of the federal award. Management is responsible for establishing and maintaining a system of internal control that should include controls over its grants? period of performance process. In accordance with CFR Section 200.403(h), cost must be incurred during the approved budget period. The federal awarding agency is authorized at its discretion to waive prior written approvals to carry forward unobligated balances to subsequent budget period pursuant to ?200.308(e)(3). In accordance with CFR Section 200.458, pre-award costs are those incurred prior to the effective date of the federal award or subaward directly pursuant to the negotiation and in anticipation of the federal award where such costs are necessary for efficient and timely performance of the scope of the work. Such costs are allowable only to the extent they would have been allowable if incurred after the date of the federal award and only with the written approval of the federal awarding agency. In accordance with CFR Section 200.344, the federal awarding agency or pass-through entity will close out the federal award when it determines that all applicable administrative actions and all required work of the federal award have been completed by the nonfederal entity. Per CFR Section 200.344(b), unless the federal awarding agency or pass-through entity authorizes an extension, a non-federal entity must liquidate all obligations incurred under the federal award not later than 120 calendar days after the end date of the period of performance. Condition ? During our testing of period of performance, we noted exceptions in the ability of management to support expenditures were incurred and charged to federal programs within the period of performance. Cause ? Policies and procedures were not appropriately adhered to in certain instances to ensure that supporting documentation was maintained to evidence that costs were incurred during the period of performance and that an appropriate level of review and approval was completed prior to charging costs to a federal program. Effect - The lack of adherence to the established internal control procedures around the period of performance of the award can lead to noncompliance with laws, regulations, and the provisions of grant agreements, which could ultimately lead to expenditures not being charged to the major programs in the correct period. Questioned Costs ? $29,459 Context: Assistance Listing Number: 19.016 During our testing of the period of performance compliance requirement for grant award periods that ended during the fiscal year, we sampled 12 expenditures, totaling $292,901, for the Iraq Assistance Program and noted one item amounting to $28,766 did not have adequate supporting documentation for the subrecipient expenditures charged to the program. Additionally, during our testing of the period of performance compliance requirement for grant costs incurred throughout the year, we sampled 40 expenditures, totaling $11,811, for the Iraq Assistance Programs and noted that four items, totaling $672, did not have proper documentation for the allocation of the expenditure. Assistance Listing Number: 19.518 During our testing of the period of performance compliance requirement for grant award periods that started and ended during the fiscal year, we sampled 81 expenditures, totaling $15,252, for the Overseas Refugee Assistance Program for Western Hemisphere and noted two items, totaling $21, did not have adequate supporting documentation for the subrecipient expenditures charged to the program. Repeat Finding - This finding is not a repeat finding. Recommendation - We recommend that the Organization ensure its policies and procedures ensure that documentation of when the expenditure was incurred and liquidated is maintained and that these policies and procedures are followed on a consistent basis. Views of Responsible Officials - Management agrees with the finding and takes responsibility to comply with the period of performance compliance requirements. Management through the local offices has already developed a policy to ensure that the period of performance is adhered to.

FY End: 2022-06-30
Heartland Alliance for Human Needs & Human Rights
Compliance Requirement: H
2022-006: Internal Control Over Compliance and Compliance with Period of Performance Program: U.S. Department of State AL Number: 19.518 AL Name: Overseas Refugee Assistance Program for Western Hemisphere Grant Award Numbers Under the Uniform Guidance Requirements: Direct Award Number Award Period SPRMCO20CA0209 September 20, 2020 through September 29, 2021 N/A September 20, 2021 through September 29, 2022 Criteria ? CFR ?200.303, Internal Controls, Section (a) states the Organizati...

2022-006: Internal Control Over Compliance and Compliance with Period of Performance Program: U.S. Department of State AL Number: 19.518 AL Name: Overseas Refugee Assistance Program for Western Hemisphere Grant Award Numbers Under the Uniform Guidance Requirements: Direct Award Number Award Period SPRMCO20CA0209 September 20, 2020 through September 29, 2021 N/A September 20, 2021 through September 29, 2022 Criteria ? CFR ?200.303, Internal Controls, Section (a) states the Organization must establish and maintain effective internal control over federal awards that provides reasonable assurance that the Organization is managing the federal awards in compliance with federal statutes, regulations, and terms and conditions of the federal award. Management is responsible for establishing and maintaining a system of internal control that should include controls over its grants? period of performance process. In accordance with CFR Section 200.403(h), cost must be incurred during the approved budget period. The federal awarding agency is authorized at its discretion to waive prior written approvals to carry forward unobligated balances to subsequent budget period pursuant to ?200.308(e)(3). In accordance with CFR Section 200.458, pre-award costs are those incurred prior to the effective date of the federal award or subaward directly pursuant to the negotiation and in anticipation of the federal award where such costs are necessary for efficient and timely performance of the scope of the work. Such costs are allowable only to the extent they would have been allowable if incurred after the date of the federal award and only with the written approval of the federal awarding agency. In accordance with CFR Section 200.344, the federal awarding agency or pass-through entity will close out the federal award when it determines that all applicable administrative actions and all required work of the federal award have been completed by the nonfederal entity. Per CFR Section 200.344(b), unless the federal awarding agency or pass-through entity authorizes an extension, a non-federal entity must liquidate all obligations incurred under the federal award not later than 120 calendar days after the end date of the period of performance. Condition ? During our testing of period of performance, we noted exceptions where expenditures were incurred outside of the grant?s performance period. Cause ? Policies and procedures were not appropriately adhered to in certain instances to ensure that supporting documentation was maintained to evidence that costs were incurred during the period of performance and that an appropriate level of review and approval was completed prior to charging costs to a federal program. Effect - The lack of adherence to the established internal control procedures around the period of performance of the award can lead to noncompliance with law and regulations and possible loss of funding for the related program. Questioned Costs ? $125 Context: During our testing of the allowable costs/cost principles compliance requirements, we sampled 25 nonpayroll expenditures, totaling $6,365, for the Overseas Refugee Assistance Program for Western Hemisphere and noted that four items, totaling $125, were incurred and paid outside of the grant award period. Repeat Finding - This finding is a repeat finding from prior year. This finding was reported as finding 2021-001 in the 2021 reporting package. Recommendation - We recommend management revisits and considers revising its internal procedures around detecting expenditures incurred outside of the period of performance of the awards. Views of Responsible Officials - Management agrees with the finding and takes responsibility to comply with the period of performance compliance requirements. Management is emphasizing prompt period closing to ensure that no items are recorded in the wrong period.

FY End: 2022-06-30
Heartland Alliance for Human Needs & Human Rights
Compliance Requirement: H
2022-005: Internal Control Over Compliance and Compliance with Period of Performance Program: U.S. Department of State AL Number: 19.016 AL Name: Iraq Assistance Program Grant Award Numbers Under the Uniform Guidance Requirements: Direct Award Number Award Period SLMAQM19GR2288 September 29, 2019 through June 30,2022 Program: U.S. Department of State AL Number: 19.518 AL Name: Overseas Refugee Assistance Program for Western Hemisphere Grant Award Numbers Under the Uniform Guidance R...

2022-005: Internal Control Over Compliance and Compliance with Period of Performance Program: U.S. Department of State AL Number: 19.016 AL Name: Iraq Assistance Program Grant Award Numbers Under the Uniform Guidance Requirements: Direct Award Number Award Period SLMAQM19GR2288 September 29, 2019 through June 30,2022 Program: U.S. Department of State AL Number: 19.518 AL Name: Overseas Refugee Assistance Program for Western Hemisphere Grant Award Numbers Under the Uniform Guidance Requirements: Direct Award Number Award Period SPRMCO20CA0209 September 20, 2020 through September 29, 2021 N/A September 20, 2021 through September 29, 2022 Criteria - CFR ?200.303, Internal Controls, Section (a) states the Organization must establish and maintain effective internal control over federal awards that provides reasonable assurance that the Organization is managing the federal awards in compliance with federal statutes, regulations, and terms and conditions of the federal award. Management is responsible for establishing and maintaining a system of internal control that should include controls over its grants? period of performance process. In accordance with CFR Section 200.403(h), cost must be incurred during the approved budget period. The federal awarding agency is authorized at its discretion to waive prior written approvals to carry forward unobligated balances to subsequent budget period pursuant to ?200.308(e)(3). In accordance with CFR Section 200.458, pre-award costs are those incurred prior to the effective date of the federal award or subaward directly pursuant to the negotiation and in anticipation of the federal award where such costs are necessary for efficient and timely performance of the scope of the work. Such costs are allowable only to the extent they would have been allowable if incurred after the date of the federal award and only with the written approval of the federal awarding agency. In accordance with CFR Section 200.344, the federal awarding agency or pass-through entity will close out the federal award when it determines that all applicable administrative actions and all required work of the federal award have been completed by the nonfederal entity. Per CFR Section 200.344(b), unless the federal awarding agency or pass-through entity authorizes an extension, a non-federal entity must liquidate all obligations incurred under the federal award not later than 120 calendar days after the end date of the period of performance. Condition ? During our testing of period of performance, we noted exceptions in the ability of management to support expenditures were incurred and charged to federal programs within the period of performance. Cause ? Policies and procedures were not appropriately adhered to in certain instances to ensure that supporting documentation was maintained to evidence that costs were incurred during the period of performance and that an appropriate level of review and approval was completed prior to charging costs to a federal program. Effect - The lack of adherence to the established internal control procedures around the period of performance of the award can lead to noncompliance with laws, regulations, and the provisions of grant agreements, which could ultimately lead to expenditures not being charged to the major programs in the correct period. Questioned Costs ? $29,459 Context: Assistance Listing Number: 19.016 During our testing of the period of performance compliance requirement for grant award periods that ended during the fiscal year, we sampled 12 expenditures, totaling $292,901, for the Iraq Assistance Program and noted one item amounting to $28,766 did not have adequate supporting documentation for the subrecipient expenditures charged to the program. Additionally, during our testing of the period of performance compliance requirement for grant costs incurred throughout the year, we sampled 40 expenditures, totaling $11,811, for the Iraq Assistance Programs and noted that four items, totaling $672, did not have proper documentation for the allocation of the expenditure. Assistance Listing Number: 19.518 During our testing of the period of performance compliance requirement for grant award periods that started and ended during the fiscal year, we sampled 81 expenditures, totaling $15,252, for the Overseas Refugee Assistance Program for Western Hemisphere and noted two items, totaling $21, did not have adequate supporting documentation for the subrecipient expenditures charged to the program. Repeat Finding - This finding is not a repeat finding. Recommendation - We recommend that the Organization ensure its policies and procedures ensure that documentation of when the expenditure was incurred and liquidated is maintained and that these policies and procedures are followed on a consistent basis. Views of Responsible Officials - Management agrees with the finding and takes responsibility to comply with the period of performance compliance requirements. Management through the local offices has already developed a policy to ensure that the period of performance is adhered to.

FY End: 2022-06-30
Heartland Alliance for Human Needs & Human Rights
Compliance Requirement: H
2022-006: Internal Control Over Compliance and Compliance with Period of Performance Program: U.S. Department of State AL Number: 19.518 AL Name: Overseas Refugee Assistance Program for Western Hemisphere Grant Award Numbers Under the Uniform Guidance Requirements: Direct Award Number Award Period SPRMCO20CA0209 September 20, 2020 through September 29, 2021 N/A September 20, 2021 through September 29, 2022 Criteria ? CFR ?200.303, Internal Controls, Section (a) states the Organizati...

2022-006: Internal Control Over Compliance and Compliance with Period of Performance Program: U.S. Department of State AL Number: 19.518 AL Name: Overseas Refugee Assistance Program for Western Hemisphere Grant Award Numbers Under the Uniform Guidance Requirements: Direct Award Number Award Period SPRMCO20CA0209 September 20, 2020 through September 29, 2021 N/A September 20, 2021 through September 29, 2022 Criteria ? CFR ?200.303, Internal Controls, Section (a) states the Organization must establish and maintain effective internal control over federal awards that provides reasonable assurance that the Organization is managing the federal awards in compliance with federal statutes, regulations, and terms and conditions of the federal award. Management is responsible for establishing and maintaining a system of internal control that should include controls over its grants? period of performance process. In accordance with CFR Section 200.403(h), cost must be incurred during the approved budget period. The federal awarding agency is authorized at its discretion to waive prior written approvals to carry forward unobligated balances to subsequent budget period pursuant to ?200.308(e)(3). In accordance with CFR Section 200.458, pre-award costs are those incurred prior to the effective date of the federal award or subaward directly pursuant to the negotiation and in anticipation of the federal award where such costs are necessary for efficient and timely performance of the scope of the work. Such costs are allowable only to the extent they would have been allowable if incurred after the date of the federal award and only with the written approval of the federal awarding agency. In accordance with CFR Section 200.344, the federal awarding agency or pass-through entity will close out the federal award when it determines that all applicable administrative actions and all required work of the federal award have been completed by the nonfederal entity. Per CFR Section 200.344(b), unless the federal awarding agency or pass-through entity authorizes an extension, a non-federal entity must liquidate all obligations incurred under the federal award not later than 120 calendar days after the end date of the period of performance. Condition ? During our testing of period of performance, we noted exceptions where expenditures were incurred outside of the grant?s performance period. Cause ? Policies and procedures were not appropriately adhered to in certain instances to ensure that supporting documentation was maintained to evidence that costs were incurred during the period of performance and that an appropriate level of review and approval was completed prior to charging costs to a federal program. Effect - The lack of adherence to the established internal control procedures around the period of performance of the award can lead to noncompliance with law and regulations and possible loss of funding for the related program. Questioned Costs ? $125 Context: During our testing of the allowable costs/cost principles compliance requirements, we sampled 25 nonpayroll expenditures, totaling $6,365, for the Overseas Refugee Assistance Program for Western Hemisphere and noted that four items, totaling $125, were incurred and paid outside of the grant award period. Repeat Finding - This finding is a repeat finding from prior year. This finding was reported as finding 2021-001 in the 2021 reporting package. Recommendation - We recommend management revisits and considers revising its internal procedures around detecting expenditures incurred outside of the period of performance of the awards. Views of Responsible Officials - Management agrees with the finding and takes responsibility to comply with the period of performance compliance requirements. Management is emphasizing prompt period closing to ensure that no items are recorded in the wrong period.

FY End: 2022-06-30
Maxwell C. King Center for the Performing Arts, Inc.
Compliance Requirement: H
SD 2022-001: PERIOD OF PERFORMANCE Assistance Listing No. 59.075 Shuttered Venue Operators Grant Program 2022 Funding U.S. Small Business Administration Criteria: The Uniform Guidance specifies that a non-Federal entity may charge to the Federal award only allowable costs incurred during the period of performance. Guidance is found under Standards for Financial and Program Management (200.309). Recipients of the supplemental award can spend all award funds (both initial and supplemental phase ...

SD 2022-001: PERIOD OF PERFORMANCE Assistance Listing No. 59.075 Shuttered Venue Operators Grant Program 2022 Funding U.S. Small Business Administration Criteria: The Uniform Guidance specifies that a non-Federal entity may charge to the Federal award only allowable costs incurred during the period of performance. Guidance is found under Standards for Financial and Program Management (200.309). Recipients of the supplemental award can spend all award funds (both initial and supplemental phase awards) received over an 18-month period after the initial phase award issuance date for eligible and allowable costs incurred between March 1, 2020 and June 30, 2022. Pre-award costs can be charged if they are authorized by the federal awarding agency or pass-through entity (200.458). Additionally, under 2 CFR 200.303, non-Federal entities must establish and maintain effective internal controls to provide reasonable assurance of compliance with the Uniform Guidance. Condition: Grant funds were disbursed for marketing expenses incurred prior to the start of the funding period without approval of the granting agency. Marketing expenses incurred prior to March 1, 2020 were applied to the grant as they related to producing a theatrical or live performing arts productions that were scheduled to occur during March and April of 2020 but cancelled due to the impacts of COVID-19. Cause: The control did not operate effectively as the reviewer did not have a sufficient understanding of the grant requirements. Perspective: There was initially $9,344 of expenses applied to the grant. Effect: Shuttered venue operators grant funding was applied to expenses incurred outside the period of availability. Prior to the report being filed the Center utilized other expenses that were within the period of availability. Questioned Costs: $0 Recommendation: Only allowable costs incurred during the period of performance should be charged to the federal award. Supporting documentation should be reviewed in conjunction with the grant agreement and other applicable compliance requirements including statutes and uniform reporting requirements for restrictions, limitations, and conditions pertaining to the grant to minimize the amount of disallowed costs. Management Response: Management concurs with the suggestion. Grant personnel has been reminded to review supporting documentation in conjunction with the grant agreement and other applicable compliance requirements including statutes and uniform reporting requirements for restrictions, limitations, and conditions pertaining to the grant to minimize the amount of disallowed costs.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

FY End: 2022-06-30
State of Colorado
Compliance Requirement: HI
Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual proj...

Finding 2022-061 Internal Controls and Compliance Over Research and Development Cluster Period of Performance and Procurement The federal government sponsors Research and Development (R&D) activities under a variety of types of awards, most commonly grants, cooperative agreements, and contracts, to achieve objectives agreed upon between the federal awarding agency and the non-federal grantee entity. The types of R&D conducted under these awards vary greatly. The objective of an individual project is explained in the federal award. R&D activities at the Colorado School of Mines are subject to federal period of performance and procurement requirements. Period of performance is the time in which the School may incur new obligations to carry out the work authorized by the federal award. Procurement is the process that the School follows to purchase goods and services. The School has established a process to review expenditures charged to federal awards during the federal award?s period of performance period to ensure that any costs incurred outside of the allowable timeframe are reversed out and not charged to the federal award. Per the Colorado School of Mines policies and procedures, the School pre-audits travel, equipment, personal disbursements, and participant support expenses prior to recording the transaction to ensure allowability of the expense. The School also post-audits salary, fringe benefits, tuition, and credit card expenses to ensure allowability. The School?s procurement process includes a policy that establishes levels of approval for purchase orders (PO) based on the dollar amount of the PO. Based on the dollar amount of the PO, the School will also attach the vendor contract to the PO. The School?s Controller?s Office sends the contracts with the attached PO to the assigned individual for signature and approval. During Fiscal Year 2022, the School expended approximately $65 million in federal R&D grant funds. What was the purpose of our audit work and what work was performed? The purpose of our audit work was to determine whether the School had adequate internal controls in place over, and complied with, the Procurement and Period of Performance requirements within the R&D Cluster during Fiscal Year 2022. Period of Performance. We reviewed a random sample of 40 costs that were incurred prior to or within the first month of the grant start date to determine whether the School only charged the allowable cost to a federal award during the period of performance. Procurement. We reviewed a random sample of 16 procurement transactions that were over the micro-purchase threshold of $10,000 to determine whether School staff complied with the School?s internal procurement policy. All transactions over the micro-purchase threshold are subject to the procurement policy approval thresholds. We also compared the original PO issued against the School?s procurement policy to determine if the appropriate approval was obtained. How were the results of the audit work measured? We measured the results of our audit work against the following requirements: ? Federal regulations [2 CFR 200.303(a)] states that a non-federal entity should establish and maintain effective internal control over Federal awards that provide reasonable assurance that non-federal entities are managing Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. These internal controls should be in compliance with guidance in ?Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the ?Internal Control Integrated Framework,? issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). As a part of maintaining internal controls, the School should maintain evidence of such controls occurring to show that the School Mines has internal controls in place as required by the Uniform Guidance and that it is evaluating and monitoring its compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. ? Federal regulations [2 CFR 200.77 and 2 CFR 200.458] state that a non-Federal entity may only charge allowable costs to a federal award during the period of performance. According to the grant agreement, pre-award costs may be charged up to 90 days prior to the start date. Therefore, the pre-award cost period for the School?s R&D grant for Federal Fiscal Year 2022 began on October 19, 2021. ? Federal regulation [2 CFR 200.318] states that the School must document procurement procedures. The Schools procurement policy provides approval limits for purchase orders. According to this policy, certain individuals can approve POs up to $500,000, and others can approve POs up to $5 million. What problems did the audit work identify? During our Fiscal Year 2022 audit, we identified exceptions with period of performance and procurement requirements for the R&D grant. Specifically, we identified the following issues: Period of Performance. We found that the School incurred expenses prior to the period of performance start date related to 2 of the 40 disbursements (5 percent) tested. Specifically, School spent $2,593 between October 1, 2021 and October 16, 2021, or 3 to 18 days before the allowable period. Procurement. We found that the School did not obtain the appropriate approval for 1 of the 16 (6 percent) transactions tested. Specifically, the individual who signed the PO for $706,660 only had authority to sign PO?s up to a threshold of $ $500,000, which was $206,660 less than the amount of the PO. Why did these problems occur? The School did not have adequate internal controls over period of performance and procurement requirements for its R&D grant during Fiscal Year 2022. Specifically: Period of Performance. The School?s reviewer misunderstood the period of performance requirements related to the transaction and related federal award. Specifically, according to the School, the reviewer confused the period of performance start date of October 19, 2021 with the payroll period of October 1, 2021 through October 15, 2021, which was prior to the period of performance start date and resulted in the expenditures erroneously being charged to the grant. Procurement. We found that there was inconsistency with the Schools internal process and its published procurement policy regarding the approval process for POs. Specifically, the verbally approved internal process allowed the individual we noted as an exception to approve POs up to $2.5 million; however, this had not been updated in the published procurement policy. Why do these problems matter? By charging expenditures to federal awards outside of the period of performance, the School is not complying with the requirements of the federal awards. In addition, by not obtaining documented evidence of approval from the appropriate individuals, the School is not complying with its internal procurement procedures. This could result in procuring a service or product for an unreasonable amount and there is an increased risk of fictitious or fraudulent POs if the charge does not align with the Schools mission. See Schedule of Findings and Questioned Costs for chart/table Recommendation 2022-061 The Colorado School of Mines should strengthen its internal controls over and ensure it complies with period of performance and procurement requirements for its Research and Development (R&D) grants by: A. Instituting an appropriate review of expenditures to ensure they are within the period of performance for the federal award, and ensuring that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Updating its published procurement policy to ensure it contains the current approval process and thresholds. Response Colorado School of Mines A. Agree Implementation Date: July 1, 2022 Colorado School of Mines will ensure appropriate reviews of expenditures occur to ensure they are within the period of performance for the federal award, and ensure that staff have an appropriate understanding of the related period of performance requirements or obtain clarification from the federal grantor, as appropriate. B. Agree Implementation Date: June 30, 2023 Mines did not update published Procurement Policies specific to approval limits by position to accurately reflect the delegated approval authority. Mines will update the published policies to accurately reflect delegated approval limits and review the procurement approval process.

2 3 5 »