2 CFR 200 § 200.313

Findings Citing § 200.313

Equipment.

Total Findings
40,600
Across all audits in database
Showing Page
805 of 812
50 findings per page
About this section
Section 200.313 states that equipment acquired with federal funds belongs to the recipient or subrecipient but comes with conditions, including using it for the project's intended purpose and obtaining approval before disposing of it. This section affects recipients like states and Indian Tribes, requiring them to manage and dispose of the equipment according to their laws or the specified federal guidelines.
View full section details →
FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

FY End: 2022-06-30
University of Delaware
Compliance Requirement: F
Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the pr...

Finding 2022-002: EquipmentFederal ProgramResearch and Development Cluster (R&D) (AL No.: Various)Federal AgenciesAgencies included within the R&D clusterFederal Award YearJuly 1, 2021 through June 30, 2022Criteria or RequirementNon-federal entities other than states must follow 2 CFR sections 200.313(c) through (e) which require that:1. Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property (2 CFR section 200.313(d)(1)).2. A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR section 200.313(d)(2)).4. A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated (2 CFR section 200.313(d)(3)). 5. Adequate maintenance procedures must be developed to keep the property in good condition (2 CFR section 200.313(d)(4))Per 2 CFR Section 200.303, the non-Federal entity must establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award.Condition Found, Including PerspectiveThe University did not complete its physical inventory counts for 10 departments out of the 15 sampled University departments. The University has a total of 70 departments monitoring federal equipment. In addition, for one item in our sample of 40 physical inspections, we noted the property was not appropriately tagged for identification.Possible Cause and EffectThe control that equipment purchased on federal grants is counted, and reconciled to property records, within a two-year period was not operating effectively. Further, the control regarding tagging and identifying equipment to the University?s property records was not operating effectively.Questioned CostsNone identified.Statistical ValidityThe sample was not intended to be, and was not, a statistically valid sample.Repeat Finding in the Prior YearNo.RecommendationWe recommend the University enhance its internal control over compliance around establishing property records of newly acquired federally funded equipment in accordance with applicable Federal regulations, and completing the necessary physical inventories and reconciliations.Views of Responsible OfficialsThe University agrees with the finding and will strengthen processes including unit and senior leadership accountability around the tagging and surveying of federally funded equipment. The University will implement management and escalation procedures with executive leadership to ensure that accountability for all completed surveys resides with the senior leader. The entire process is being evaluated and controls will be enhanced where needed and training will be expanded to include the importance of timely compliance.

« 1 803 804 806 807 812 »