2 CFR 200 § 200.313

Findings Citing § 200.313

Equipment.

Total Findings
40,631
Across all audits in database
Showing Page
753 of 813
50 findings per page
About this section
Section 200.313 states that equipment acquired with federal funds belongs to the recipient or subrecipient but comes with conditions, including using it for the project's intended purpose and obtaining approval before disposing of it. This section affects recipients like states and Indian Tribes, requiring them to manage and dispose of the equipment according to their laws or the specified federal guidelines.
View full section details →
FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

FY End: 2022-06-30
Dartmouth-Hitchcock Health and Subsidiaries
Compliance Requirement: F
Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records...

Cluster: Research and Development Federal Agency: Various Award Names: Various Award Numbers: Various Assistance Listing Title: Various Assistance Listing Number: Various Award Year: 2021- 2022 Pass-through entity: Various Criteria According to 2 CFR section 200.313, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, at a minimum, meet the following requirements: (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. (5) If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. Condition The Health System did not perform a physical inventory of federally purchased fixed assets at least once during the last two years. Additionally, the federal asset listing did not specify all of the details required by 2 CFR section 200.313 (d) (1) such as asset locations, tag numbers, use and condition. The full population of equipment funded with federal research and development dollars, as provided by the Health System, consisted of 9 items with a total historical cost of $105k. Cause The Health System lacks a process to ensure that policies and procedures related to identifying and managing its federally purchased fixed assets in accordance with 2 CFR section 200.313 are followed, including updating property records to include all required data elements and the performance of a physical inventory at least once every two years. Effect The Health System's accounting records for its federally purchased fixed assets could be inaccurate as the Health System has not formally verified the existence, current utilization and continued need for the equipment through this physical inventory process. Additionally, without maintaining tag numbers and records of asset locations, safeguarding of assets could be impacted. Questioned Costs None noted. Recommendation We recommend that the Health System implement a process to ensure its policies and procedures over equipment management are followed, including the performance of a physical inventory of federally purchased fixed assets at least once every two years in accordance with 2 CFR section 200.313(d)(2), and updating its property records to include all details required by 2 CFR section 200.313(d)(1). Management?s Views and Corrective Action Plan Management?s Views and Corrective Action Plan is included at the end of this report after the summary schedule of prior audit findings and status.

« 1 751 752 754 755 813 »