2 CFR 200 § 200.313

Findings Citing § 200.313

Equipment.

Total Findings
40,693
Across all audits in database
Showing Page
733 of 814
50 findings per page
About this section
Section 200.313 states that equipment acquired with federal funds belongs to the recipient or subrecipient but comes with conditions, including using it for the project's intended purpose and obtaining approval before disposing of it. This section affects recipients like states and Indian Tribes, requiring them to manage and dispose of the equipment according to their laws or the specified federal guidelines.
View full section details →
FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
California State University
Compliance Requirement: F
Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a phy...

Criteria: An institution must conduct a physical inventory of equipment and real property at least once every two years with results reconciled with the equipment and property records (2 CFR Section 200.313(d)(2)).Condition and Context: During our testwork over equipment and real property management, we requested support from management relating to their physical inventory of equipment and real property acquired with federal funds. We noted management was unable to produce such records, as a physical inventory of federal equipment and real property had not been conducted within the required two-year period.Cause and Effect: There was a lapse in the University's internal controls surrounding monitoring the physical inventory of equipment and real property acquired with federal funds. The University did not conduct their physical inventory of equipment and real property acquired with federal funds within the required two-year period.

FY End: 2022-06-30
San Gabriel Unified School District
Compliance Requirement: FN
Finding 2022-003: Equipment (50000)Assistance Listing No. 84.425 ? Education Stabilization Fund,Elementary and Secondary School Emergency Relief (ESSER) FundU.S. Department of EducationPassed through California Department of EducationCriteria: Consistent with 2 CFR section 200.311 (real property), section 200.313 (equipment), and section 200.439 (equipment and other capital expenditures) ESF funds may be used to purchase equipment. Capital expenditures for general and special purpose equipment p...

Finding 2022-003: Equipment (50000)Assistance Listing No. 84.425 ? Education Stabilization Fund,Elementary and Secondary School Emergency Relief (ESSER) FundU.S. Department of EducationPassed through California Department of EducationCriteria: Consistent with 2 CFR section 200.311 (real property), section 200.313 (equipment), and section 200.439 (equipment and other capital expenditures) ESF funds may be used to purchase equipment. Capital expenditures for general and special purpose equipment purchases are subject to prior approval by ED or the pass-through entity.Nonfederal entities shall include in their construction contracts subject to the Wage Rate Requirements (which still may be referenced as the Davis-Bacon Act) a provision that the contractor or subcontractor comply with those requirements and the DOL regulations (29 CFR Part 5, Labor Standards Provisions Applicable to Contacts Governing Federally Financed and Assisted Construction). This includes a requirement for the contractor or subcontractor to submit to the nonfederal entity weekly, for each week in which any contract work is performed, a copy of the payroll and a statement of compliance (certified payrolls) (29 CFR sections 5.5 and 5.6; the A-102 Common Rule (section 36(i)(5)); OMB Circular A-110 (2 CFR Part 215, Appendix A, Contract Provisions); 2 CFR Part 176, Subpart C; and 2 CFR section 200.326).Condition: The District made three expenditures above the capital threshold for federal purchases but did not obtain prior approval from the California Department of Education. Furthermore, the District was unable to provide documentation that federal wage rate requirements were included in the contracts.Question Costs: $66,608Context: These were the only capital purchases made from this federal program in the year under audit.Cause: The District was unaware of the requirements to obtain prior approval from CDE and to obtain federal wage rate data.Effect: The funds spent on these purchases may be subject to review by or return to the awarding agency.Recommendation: We recommend that the District obtain prior approval from CDE and that contracts include federal wage rate requirements for all capital purchases from the Education Stabilization Fund.Views of Responsible Officials: The District will ensure it receives prior approval from CDE prior to making expenditures utilizing ESSER funds and will update its agreements to reflect the federal wage rate requirements when utilizing this funding.

FY End: 2022-06-30
Puerto Rico Metropolitan Bus Authority
Compliance Requirement: F
2 CFR section 200.313(d) Equipment Management Requirements requires that (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and co...

2 CFR section 200.313(d) Equipment Management Requirements requires that (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property. (2) A physical inventory of the property must be taken, and the results reconciled with the property records at least once every two years. During our audit procedures over the compliance requirement of equipment management we noted that the physical inventory of the property and equipment has not been reconciled with the general ledger of the accounting records. We identified certain additions in the general ledger that were not included in the inventory and noted inconsistencies in the period in which the additions were recorded in the general ledger and the acquisition date per the physical inventory report. The lack of reconciliation of the physical inventory and the general ledger may cause errors in the accounting records and/or misuse of the equipment purchased with federal funds that may result in questioned costs. This situation is caused by the lack of adequate internal control procedures for reconciling and analyzing the financial transactions related to capital assets recorded throughout the year.

FY End: 2022-06-30
Catholic Charities of Central and Northern Missouri
Compliance Requirement: F
Finding 2022-007 Assistance Listing Number: 19.510 Program Title: U.S. Refugee Admissions Program Agency: U.S. Department of State Pass-Through Entity: United States Conference of Catholic Bishops Federal Award Identification Number: SPRMCO21CA3001, SPRMCO22CA0023 and SPRMCO21CA3291 Compliance Requirements: Equipment and Real Property Criteria: In accordance with Title 2 CFR Part 200.313(d)(1), Title 2 CFR Part 200.313(d)(2), and the U.S. Department of State Cooperative Agreement, a physical inv...

Finding 2022-007 Assistance Listing Number: 19.510 Program Title: U.S. Refugee Admissions Program Agency: U.S. Department of State Pass-Through Entity: United States Conference of Catholic Bishops Federal Award Identification Number: SPRMCO21CA3001, SPRMCO22CA0023 and SPRMCO21CA3291 Compliance Requirements: Equipment and Real Property Criteria: In accordance with Title 2 CFR Part 200.313(d)(1), Title 2 CFR Part 200.313(d)(2), and the U.S. Department of State Cooperative Agreement, a physical inventory and inventory report is required to be submitted 30 days prior to the expiration of the Cooperative Agreement that lists all items and purchase price of all non-expendable tangible personal property having a useful life of more than one year and having a current per unit fair market value of $5,000 or more per unit. The report must include a description, date of purchase, serial number, and the country in which the item was used. Condition: A physical inventory of equipment and real property purchased under the federal program is not being performed. An inventory report is not being submitted to the federal agency. Effect: A physical inventory and an inventory report was not submitted to the federal agency. Context: Total equipment charged to the federal program was $70,082 for the year ended June 30, 2022. Repeat Finding: Not applicable. Recommendation: We recommend Catholic Charities review current policies and procedures surrounding equipment and real property management and establish procedures related to physical inventory and retention of data required under Uniform Guidance. Views of the Responsible Officials: Catholic Charities of Central and Northern Missouri agrees and is currently reviewing policies and procedures surrounding equipment and real property management and physical inventory and data retention as required under Uniform Guidance.

FY End: 2022-06-30
North Fork Area Transit
Compliance Requirement: F
Equipment/Real Property Management Federal Award Identification Assistance Listing Program Title: Formula Grants for Rural Areas Assistance Listing Program Number: 20.509 Federal Award ID Number and Year: Various Federal Agency: U.S. Department of Transportation Pass-Through Entity: Nebraska Department of Transportation Criteria Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (i...

Equipment/Real Property Management Federal Award Identification Assistance Listing Program Title: Formula Grants for Rural Areas Assistance Listing Program Number: 20.509 Federal Award ID Number and Year: Various Federal Agency: U.S. Department of Transportation Pass-Through Entity: Nebraska Department of Transportation Criteria Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property (2 CFR 200.313(d)(1)). A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years (2 CFR 200.313(d)(2)). Condition The Organization lacked certain required elements on its vehicle listing. The Organization failed to adequately document the performance of the required physical inventory. Repeat Finding No. Cause Procedures within the Organization were inadequate to ensure that required elements are regularly updated on its vehicle listing, and that the physical inventory count and reconciliation is documented. Effect or Potential Effect Federal interests in property are lost or inadequately tracked. Questioned Costs No. Statistical Sample No. Context Nebraska Department of Transportation provides its subrecipients with an online portal through which, among other things, a vehicle listing is kept. The auditor obtained this vehicle listing, noting that most of the elements required by 2 CFR 200.313(d)(1) were present, however, out of the seven federally-funded vehicles on the listing: - Two were missing the FAIN (VINs *8494 and *2891). - One had a total purchase price of $63,670, whereas source documentation suggested a total purchase price of $103,475 (VIN *2891). - One was missing a purchase price. Source documentation suggested a total purchase price of $36,231 (VIN *2472). - One had an acquisition date of 9/30/2019, whereas source documentation suggested an acquisition date of 2/25/2020 (VIN *2891). Management indicates that a physical inventory is performed nightly with all vehicles, however, no documentation exists to prove that this was performed during the audit period. Recommendation We recommend the Organization establish a system of internal control consisting of policies and procedures whereby the individual maintaining vehicle listings is different from the individual updating the Nebraska Department of Transportation online portal. Additionally, we recommend the Organization track all Federally-required elements along with its own internal data points (such as bus number and depreciation system number) in one consolidated listing. Further, we recommend that a policy be instituted whereby a physical inventory and related reconciliation is performed annually on June 30, with the results being documented, reviewed, and approved by appropriate personnel. Views of Responsible Officials See Corrective Action Plan, below.

FY End: 2022-06-30
White Shield School
Compliance Requirement: F
2022-006 Property Management Material Weakness CONDITION: It was noted during the audit that documentation for a detailed listing of fixed assets, a depreciation schedule and periodic inventories for fixed assets have not been maintained. CRITERIA: Federal funding agencies require maintenance of a property management system to meet statutory requirements set forth under funding contracts 2 CFR 200.313(d)(1) outline the requirements of a property management system. CAUSE: Lack of existing policie...

2022-006 Property Management Material Weakness CONDITION: It was noted during the audit that documentation for a detailed listing of fixed assets, a depreciation schedule and periodic inventories for fixed assets have not been maintained. CRITERIA: Federal funding agencies require maintenance of a property management system to meet statutory requirements set forth under funding contracts 2 CFR 200.313(d)(1) outline the requirements of a property management system. CAUSE: Lack of existing policies & procedures and staffing issues have contributed to this condition. EFFECT: Weak internal controls over fixed assets limits the School’s ability to properly report and safeguard its assets. Assets could be taken from the School, and it go undetected for a long period of time or never be detected at all. Weak controls also significantly increase the risk of financial misstatement occurring. Insufficient or excessive insurance coverage could result as well.

FY End: 2022-06-30
White Shield School
Compliance Requirement: F
2022-006 Property Management Material Weakness CONDITION: It was noted during the audit that documentation for a detailed listing of fixed assets, a depreciation schedule and periodic inventories for fixed assets have not been maintained. CRITERIA: Federal funding agencies require maintenance of a property management system to meet statutory requirements set forth under funding contracts 2 CFR 200.313(d)(1) outline the requirements of a property management system. CAUSE: Lack of existing policie...

2022-006 Property Management Material Weakness CONDITION: It was noted during the audit that documentation for a detailed listing of fixed assets, a depreciation schedule and periodic inventories for fixed assets have not been maintained. CRITERIA: Federal funding agencies require maintenance of a property management system to meet statutory requirements set forth under funding contracts 2 CFR 200.313(d)(1) outline the requirements of a property management system. CAUSE: Lack of existing policies & procedures and staffing issues have contributed to this condition. EFFECT: Weak internal controls over fixed assets limits the School’s ability to properly report and safeguard its assets. Assets could be taken from the School, and it go undetected for a long period of time or never be detected at all. Weak controls also significantly increase the risk of financial misstatement occurring. Insufficient or excessive insurance coverage could result as well.

FY End: 2022-06-30
White Shield School
Compliance Requirement: F
2022-006 Property Management Material Weakness CONDITION: It was noted during the audit that documentation for a detailed listing of fixed assets, a depreciation schedule and periodic inventories for fixed assets have not been maintained. CRITERIA: Federal funding agencies require maintenance of a property management system to meet statutory requirements set forth under funding contracts 2 CFR 200.313(d)(1) outline the requirements of a property management system. CAUSE: Lack of existing policie...

2022-006 Property Management Material Weakness CONDITION: It was noted during the audit that documentation for a detailed listing of fixed assets, a depreciation schedule and periodic inventories for fixed assets have not been maintained. CRITERIA: Federal funding agencies require maintenance of a property management system to meet statutory requirements set forth under funding contracts 2 CFR 200.313(d)(1) outline the requirements of a property management system. CAUSE: Lack of existing policies & procedures and staffing issues have contributed to this condition. EFFECT: Weak internal controls over fixed assets limits the School’s ability to properly report and safeguard its assets. Assets could be taken from the School, and it go undetected for a long period of time or never be detected at all. Weak controls also significantly increase the risk of financial misstatement occurring. Insufficient or excessive insurance coverage could result as well.

FY End: 2022-06-30
White Shield School
Compliance Requirement: F
2022-006 Property Management Material Weakness CONDITION: It was noted during the audit that documentation for a detailed listing of fixed assets, a depreciation schedule and periodic inventories for fixed assets have not been maintained. CRITERIA: Federal funding agencies require maintenance of a property management system to meet statutory requirements set forth under funding contracts 2 CFR 200.313(d)(1) outline the requirements of a property management system. CAUSE: Lack of existing policie...

2022-006 Property Management Material Weakness CONDITION: It was noted during the audit that documentation for a detailed listing of fixed assets, a depreciation schedule and periodic inventories for fixed assets have not been maintained. CRITERIA: Federal funding agencies require maintenance of a property management system to meet statutory requirements set forth under funding contracts 2 CFR 200.313(d)(1) outline the requirements of a property management system. CAUSE: Lack of existing policies & procedures and staffing issues have contributed to this condition. EFFECT: Weak internal controls over fixed assets limits the School’s ability to properly report and safeguard its assets. Assets could be taken from the School, and it go undetected for a long period of time or never be detected at all. Weak controls also significantly increase the risk of financial misstatement occurring. Insufficient or excessive insurance coverage could result as well.

FY End: 2022-06-30
White Shield School
Compliance Requirement: F
2022-006 Property Management Material Weakness CONDITION: It was noted during the audit that documentation for a detailed listing of fixed assets, a depreciation schedule and periodic inventories for fixed assets have not been maintained. CRITERIA: Federal funding agencies require maintenance of a property management system to meet statutory requirements set forth under funding contracts 2 CFR 200.313(d)(1) outline the requirements of a property management system. CAUSE: Lack of existing policie...

2022-006 Property Management Material Weakness CONDITION: It was noted during the audit that documentation for a detailed listing of fixed assets, a depreciation schedule and periodic inventories for fixed assets have not been maintained. CRITERIA: Federal funding agencies require maintenance of a property management system to meet statutory requirements set forth under funding contracts 2 CFR 200.313(d)(1) outline the requirements of a property management system. CAUSE: Lack of existing policies & procedures and staffing issues have contributed to this condition. EFFECT: Weak internal controls over fixed assets limits the School’s ability to properly report and safeguard its assets. Assets could be taken from the School, and it go undetected for a long period of time or never be detected at all. Weak controls also significantly increase the risk of financial misstatement occurring. Insufficient or excessive insurance coverage could result as well.

FY End: 2022-06-30
White Shield School
Compliance Requirement: F
2022-006 Property Management Material Weakness CONDITION: It was noted during the audit that documentation for a detailed listing of fixed assets, a depreciation schedule and periodic inventories for fixed assets have not been maintained. CRITERIA: Federal funding agencies require maintenance of a property management system to meet statutory requirements set forth under funding contracts 2 CFR 200.313(d)(1) outline the requirements of a property management system. CAUSE: Lack of existing policie...

2022-006 Property Management Material Weakness CONDITION: It was noted during the audit that documentation for a detailed listing of fixed assets, a depreciation schedule and periodic inventories for fixed assets have not been maintained. CRITERIA: Federal funding agencies require maintenance of a property management system to meet statutory requirements set forth under funding contracts 2 CFR 200.313(d)(1) outline the requirements of a property management system. CAUSE: Lack of existing policies & procedures and staffing issues have contributed to this condition. EFFECT: Weak internal controls over fixed assets limits the School’s ability to properly report and safeguard its assets. Assets could be taken from the School, and it go undetected for a long period of time or never be detected at all. Weak controls also significantly increase the risk of financial misstatement occurring. Insufficient or excessive insurance coverage could result as well.

FY End: 2022-06-30
White Shield School
Compliance Requirement: F
2022-006 Property Management Material Weakness CONDITION: It was noted during the audit that documentation for a detailed listing of fixed assets, a depreciation schedule and periodic inventories for fixed assets have not been maintained. CRITERIA: Federal funding agencies require maintenance of a property management system to meet statutory requirements set forth under funding contracts 2 CFR 200.313(d)(1) outline the requirements of a property management system. CAUSE: Lack of existing policie...

2022-006 Property Management Material Weakness CONDITION: It was noted during the audit that documentation for a detailed listing of fixed assets, a depreciation schedule and periodic inventories for fixed assets have not been maintained. CRITERIA: Federal funding agencies require maintenance of a property management system to meet statutory requirements set forth under funding contracts 2 CFR 200.313(d)(1) outline the requirements of a property management system. CAUSE: Lack of existing policies & procedures and staffing issues have contributed to this condition. EFFECT: Weak internal controls over fixed assets limits the School’s ability to properly report and safeguard its assets. Assets could be taken from the School, and it go undetected for a long period of time or never be detected at all. Weak controls also significantly increase the risk of financial misstatement occurring. Insufficient or excessive insurance coverage could result as well.

FY End: 2022-06-30
White Shield School
Compliance Requirement: F
2022-006 Property Management Material Weakness CONDITION: It was noted during the audit that documentation for a detailed listing of fixed assets, a depreciation schedule and periodic inventories for fixed assets have not been maintained. CRITERIA: Federal funding agencies require maintenance of a property management system to meet statutory requirements set forth under funding contracts 2 CFR 200.313(d)(1) outline the requirements of a property management system. CAUSE: Lack of existing policie...

2022-006 Property Management Material Weakness CONDITION: It was noted during the audit that documentation for a detailed listing of fixed assets, a depreciation schedule and periodic inventories for fixed assets have not been maintained. CRITERIA: Federal funding agencies require maintenance of a property management system to meet statutory requirements set forth under funding contracts 2 CFR 200.313(d)(1) outline the requirements of a property management system. CAUSE: Lack of existing policies & procedures and staffing issues have contributed to this condition. EFFECT: Weak internal controls over fixed assets limits the School’s ability to properly report and safeguard its assets. Assets could be taken from the School, and it go undetected for a long period of time or never be detected at all. Weak controls also significantly increase the risk of financial misstatement occurring. Insufficient or excessive insurance coverage could result as well.

FY End: 2022-06-30
White Shield School
Compliance Requirement: F
2022-006 Property Management Material Weakness CONDITION: It was noted during the audit that documentation for a detailed listing of fixed assets, a depreciation schedule and periodic inventories for fixed assets have not been maintained. CRITERIA: Federal funding agencies require maintenance of a property management system to meet statutory requirements set forth under funding contracts 2 CFR 200.313(d)(1) outline the requirements of a property management system. CAUSE: Lack of existing policie...

2022-006 Property Management Material Weakness CONDITION: It was noted during the audit that documentation for a detailed listing of fixed assets, a depreciation schedule and periodic inventories for fixed assets have not been maintained. CRITERIA: Federal funding agencies require maintenance of a property management system to meet statutory requirements set forth under funding contracts 2 CFR 200.313(d)(1) outline the requirements of a property management system. CAUSE: Lack of existing policies & procedures and staffing issues have contributed to this condition. EFFECT: Weak internal controls over fixed assets limits the School’s ability to properly report and safeguard its assets. Assets could be taken from the School, and it go undetected for a long period of time or never be detected at all. Weak controls also significantly increase the risk of financial misstatement occurring. Insufficient or excessive insurance coverage could result as well.

FY End: 2022-06-30
White Shield School
Compliance Requirement: F
2022-006 Property Management Material Weakness CONDITION: It was noted during the audit that documentation for a detailed listing of fixed assets, a depreciation schedule and periodic inventories for fixed assets have not been maintained. CRITERIA: Federal funding agencies require maintenance of a property management system to meet statutory requirements set forth under funding contracts 2 CFR 200.313(d)(1) outline the requirements of a property management system. CAUSE: Lack of existing policie...

2022-006 Property Management Material Weakness CONDITION: It was noted during the audit that documentation for a detailed listing of fixed assets, a depreciation schedule and periodic inventories for fixed assets have not been maintained. CRITERIA: Federal funding agencies require maintenance of a property management system to meet statutory requirements set forth under funding contracts 2 CFR 200.313(d)(1) outline the requirements of a property management system. CAUSE: Lack of existing policies & procedures and staffing issues have contributed to this condition. EFFECT: Weak internal controls over fixed assets limits the School’s ability to properly report and safeguard its assets. Assets could be taken from the School, and it go undetected for a long period of time or never be detected at all. Weak controls also significantly increase the risk of financial misstatement occurring. Insufficient or excessive insurance coverage could result as well.