Equipment.

Total Findings
40,639
Across all audits in database
Showing Page
551 of 813
50 findings per page
About this section
Section 200.313 states that equipment acquired with federal funds belongs to the recipient or subrecipient but comes with conditions, including using it for the project's intended purpose and obtaining approval before disposing of it. This section affects recipients like states and Indian Tribes, requiring them to manage and dispose of the equipment according to their laws or the specified federal guidelines.
View full section details →
FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

FY End: 2023-06-30
University of California
Compliance Requirement: F
2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment exp...

2023-003 – Equipment and real property management Cluster: Research and Development Sponsoring Agency: Various Award Names: All awards for 3 campuses with federal equipment expenditures in the Schedules of Expenditures of Federal Awards (“SEFA”) Award Numbers: Various Assistance Listing Titles: Various Assistance Listing Numbers: All awards for 3 campuses with equipment expenditures in the SEFA Award Year: 2022-2023 Pass-through entity: All pass-through awards for 3 campuses with equipment expenditures in the SEFA Criteria 2 CFR 200.313(d) requires that a physical inventory of equipment acquired in whole or in part under a Federal award must be taken and the results reconciled with the property records at least once every two years. Condition Through our testing of federal equipment and real property management across three campuses, we noted the following: • One campus has a control by which all custodians are responsible for the completion of their federal equipment inventory on a 2-year rolling basis, which includes timely review and approval of the Physical Inventory Certification Form. Through our testing of 12 custodians, out of a population of 120, we noted that 11 custodians did not complete the Physical Inventory Certification Form within the two-year timeframe. On average these certifications were completed 263 days late. • At a second campus, we noted a similar control in which a Department Inventorial Equipment Certification form is periodically required to be signed and submitted by each custodian. Through our testing of timeliness and approval of equipment inventories being performed by custodian, we selected 15 custodians, out of a population of 153, to ensure timely submission and approval of this form and noted the following: o Three of the sampled custodians submitted forms in early FY2022 and the next form was not due based on campus policy until FY2024; due dates for which were all beyond the two-year requirement. On average, using the scheduled due dates based on campus policy, these inventories would be 63 days late. o Eleven of the sampled custodians submitted the latest certifications during FY2022, FY2023 or FY2024, however, when compared to the date of the previous submission, the submissions were on average 274 days late when compared to the Uniform Guidance biennial requirement. • At a third campus, we selected seven custodians for equipment observation procedures and for those seven custodians also obtained their annual inventory certification form, which was completed on a timely basis. One of the certifications that is attested to on this form is that the last inventory date on the equipment for which the custodian is responsible has been inventoried within the last two years. Through review of the underlying detail for these seven custodians, we noted two custodians with equipment that had not been inventoried within the two-year timeframe. For context, one custodian had 261 out of 972 pieces of equipment that had not been inventoried within the two year-period; a second custodian had 542 out of 569 assets that had not been inventoried within the two-year period, including 473 pieces having last inventory dates during calendar years 2012-2019. Cause • In the case of the first campus, we understand that many of the custodians continue to work remotely and adhering to the required timeframe has been difficult to enforce. • In the case of the second campus, federal equipment inventory dates are assigned based on a system algorithm, which allocates due dates ratably across the custodians. This algorithm does not, however, take into account when the last inventory was completed and the biennial requirement. Additionally, we understand this campus has custodians working remotely and request extensions on their inventory requirement, however, when granting such extensions, the biennial requirement is not considered. • In the case of the third campus, the custodians indicated that they completed the inventories as certified, however, due to the volume of assets they either do not update the dates in the equipment management system or update them well after-the-fact due to a manual process. There is no central review of the underlying equipment management system detail to validate “last inventory dates” and thus no monitoring to ensure inventory dates are updated by custodians in the equipment management system. Effect Federal equipment inventories that are not completed in a timely manner, could result in assets purchased with federal funds not being appropriately safeguarded. Questioned Costs None noted. Recommendation We recommend the campuses review their federal equipment policies and procedures and implement controls to ensure federal equipment inventories are completed on a timely basis in accordance with the Uniform Guidance requirements and that underlying details in the equipment management systems get updated timely, as applicable. Management’s Views and Corrective Action Plan Management’s response is included in “Management’s Views and Corrective Action Plan” included at the end of this report after the summary schedule of status of prior audit findings.

« 1 549 550 552 553 813 »